KGS1054211 Addendum #1.pdf

PDF 108 KB Posted

Attached to
Irrigation Pond & Water Farming System, Kinston, NC (REBID)
Solicitation number
63-KGS1054211
Issued by
Lincoln County, North Carolina

About this file

This is Addendum #1 for NC State University RFP #63-KGS1054211 for an Irrigation Pond & Water Farming System project in Kinston, NC. The addendum establishes an additional questions period through December 18, 2024 at 5:00 pm, with questions to be submitted via email to kgshelto@ncsu.edu. A follow-up addendum will be issued by December 11, 2024, containing answers to site visit questions, design updates, and information about a second site visit opportunity. The proposal due date has been extended to January 3, 2024 at 2:00 pm.

The attached site visit sign-in sheet shows six companies attended: Trico Grading Inc, Lanier Construction Co. Inc, Charles W Hughes Construction LLC, HGS LLC (RES), Lanier Construction, and Ernie Everett Site Prep. The addendum must be signed, dated and returned with proposal responses, as failure to include it will result in disqualification from award consideration.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM #1

TO: POTENTIAL RESPONDING SUPPLIERS

FROM: Kristen Shelton, CPPB Procurement Specialist

DATE: December 9, 2024

SUBJECT: NC State University RFP #63-KGS1054211 Irrigation Pond & Water Farming System, Kinston, NC (REBID)

This addendum is issued as a result of questions raised on the above referenced request for proposal. This addendum is part of the bid process and must be returned with your proposal response. Failure to include this addendum with your response will cause your proposal to not be considered for award.

1. Additional Questions Period: Questions must be submitted in writing via email to kgshelto@ncsu.edu with Subject Line: RFP #63-KGS1054211 - Questions, no later than 5:00 pm on Wednesday, December 18, 2024. Additional information will be provided in the next addendum that will be issued on or before Wednesday, 12/11/2024, with the answers to questions during the site visit, design updates and information for a second opportunity to visit the site.

2. Due Date Extension: Friday, January 3, 2024 by 2:00 pm

3. Attached is the site-visit sign in sheet.

Please sign, date and return this addendum with your proposal response. Failure to return this addendum will cause your response to not be considered for award.

Company Name:

Acknowledge by Signature:

Acknowledge by Full Name (printed):

Date:

#63-KGS1054211_Addendum #1, page 1 | 2 mailto:kgshelto@ncsu.edu mailto:kgshelto@ncsu.edu

Company Name Representative #1 Full Name Representative #1 Email Address Representative #2 Full Name Representative #2 Email Address Initials

Trico Grading inc Will chamblee Wchamblee@tricograding.com Wc

Lanier Construction Co., Inc. BJ Lanier bj@lanierconstruction.com BBL

Charles W Hughes Construction, LLC Jason Hurley jason@hughesnc.com JH

HGS, LLC (RES) Andrew Simansky Asimansky@res.us AVS

Lanier Construction Garrius Jones Garrius@lanierconstruction.com GJ

Ernie Everett Site Prep Etnest lane Everett Ernieeverett@suddelinkmail.com EE

Company Name:
Acknowledge by Signature:
Acknowledge by Full Name printed:
Date:

File details come from the government source that posted it. Updated .