Keller ROHS Casework Bid_Part5.pdf

PDF 819 KB Posted

Attached to
Keller Elem and Royal Oak High School Casework Replacement
Solicitation number
RFP ROY 210000000569 1
Issued by
Macomb County, Michigan

About this file

This document is a bid specification for casework installation at Keller Elementary School. The project involves the installation of custom casework units in two first-floor classroom spaces (rooms 159 and 160) and a trainer's room. The casework specifications include multiple drawer units (D1133 models in various dimensions), base units (B2052 and B2522 models), wall-mounted units (W2062 models), and a table unit (T2102 measuring 48"X84"X30"D). The scope of work also requires the removal and replacement of plumbing for multiple sink locations, specifically complete removal of existing plumbing for four sinks in room 159, removal and preparation for new sink installations at two locations in room 159 and one location in room 160. The sinks and faucets specified are to match those used at Keller Elementary School, with plastic laminate countertops. Additionally, the work includes reconnecting a condensate drain into a sink in one of the rooms and removing and prepping four additional sink locations for new installations.

The document contains floor plan diagrams and detailed casework layout specifications with measurements and unit quantities clearly marked for each room. Cost information, payment terms, and contract duration are not specified in this excerpt. The document indicates areas requiring demolition work and provides clear notation of existing sink locations to be removed and new sink installation points, with plumbing work to be completed back to the walls.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

lecol Cloud lecol Text Box room 159 and 160 lecol Cloud lecol Text Box Lower level trainers room lecol Arrow lecol Arrow lecol Text Box

AC.1

Snapshot lecol Text Box A0.1A lecol Snapshot lecol Text Box lecol Text Box

First Floor Classrooms

Trainer's Room

Rectangle lecol Text Box

(3) D1133 42"X34"X30"D

(1) D1133 48"X34"X30"D

(3) W2062 42"X30"X14"D

(1) W2062 42"X30"X14"D lecol Arrow lecol Arrow lecol Text Box

(6) B2052 48"X30"X24"D

(1) Blind corner unit 48"X30"X24"D lecol Arrow lecol Arrow lecol Text Box

(4) D1133 48"X34"X30"D

(1) B2522 48"X34"X30"D

(1) T2102 48"X84"X30"D lecol Arrow lecol Arrow lecol Arrow lecol Text Box

(3) B2522 48"X34"X24"D

(7) D1133 48"X34"X24"D

(9)W2062 48"X30"X14"D lecol Arrow lecol Arrow

Arrow lecol Line lecol Line lecol Line lecol Line lecol Line lecol Text Box Indicates extent of demo lecol Line lecol Line lecol Line lecol Text Box Indicates location of old sink. Remove plumbing back to walls lecol Text Box Other 4 sink locations to be removed and prepped for new sink in same locations lecol Text Box

AD.1

lecol Snapshot lecol Text Box lecol Text Box lecol Line lecol Text Box P1 lecol Snapshot lecol Text Box lecol Text Box

Rectangle lecol Rectangle lecol Text Box Scope of work - Remove existing plumbing for 4 sinks in room 159 completely and remove and prep for new sink 2 locations in room 159 and 1 location in room 160. Use same sink and faucet as Keller Elementary School. Countertops will be plastic laminate lecol Text Box No sink this room lecol

Re-connect condensate drain into sink - this room

File details come from the government source that posted it. Updated .