K_43046815801-PLANS-01-ROADWAY.pdf
PDF 6 MB Posted
- Solicitation number
- 24-25. 060
- Issued by
- Escambia County, Florida
About this file
This is a roadway and bridge construction plans document prepared by Sigma Consulting Group, Inc. for Escambia County Engineering Department in Florida, detailing the design specifications for the O.C. Phillips Road Over Brushy Creek Bridge Replacement project (Financial Project ID 430468-1-58-01). The project involves approximately 0.5 miles of roadway construction encompassing bridge replacement, roadway approaches, temporary traffic control phases, and stormwater management across northeast Escambia County. The construction plans include general notes, typical sections, plan/profile sheets, cross-sections, stormwater pollution prevention plan (SWPPP) specifications, signing and pavement marking details, and temporary traffic control (TTC) plans for two phased construction approaches. The roadway design features 12-foot travel lanes with 5-foot shoulders, a design speed of 35 mph, and includes clearing and grubbing, graded aggregate base installation, asphalt pavement, bridge pile construction, and riprap ditch armoring totaling approximately 6 acres of soil disturbance. Utility coordination is required with Escambia River Electric Cooperative, Walnut Hill Waterworks, AT&T Florida, and Frontier Communications, with all utilities to be notified 48 hours prior to construction. The plans comply with Florida Department of Transportation (FDOT) FY 2024-2025 standard specifications and the Florida Greenbook design criteria manual.
The construction plans establish comprehensive environmental and operational requirements including permanent stabilization through sodding and turf placement per specification section 570, temporary stabilization with artificial coverings and sediment barriers, and sediment and erosion control practices implemented before upstream areas are stabilized. Stormwater discharge occurs through existing roadside ditches to Brushy Creek via one identified outfall with a runoff coefficient of 0.51 for both pre- and post-construction conditions. The contractor must obtain all necessary permits and comply with federal, state, and local regulations including FDOT environmental resource permits, state 404 program individual permits, and NPDES construction generic permits. The contractor assumes full responsibility for locating and protecting existing utilities, survey monumentation, and archaeological resources, with specific notification procedures outlined for AT&T (611 from landline or 877-737-2478 from mobile), Sunshine State One-Call, and the Escambia County Engineer. The project requires maintenance of at least one 10-foot open lane at all times with no overnight excavations, one-lane traffic restoration daily, and compliance with FDOT Index 102-600 maintenance of traffic standards.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT LOCATION
CERTIFICATE OF AUTHORIZATION NO. 26889
VENDOR NO. 591294824004
CONTRACT NO. C-9F68
(850) 332 - 7912
PENSACOLA FL 32503
3298 SUMMIT BLVD, STE 32
P.E. NO. 57353
JASON L. LASHLEY, P.E.
T H
E
O F
F I
C I
A L
R
C O
D
T
I
S
E E
T
E C
T R
O N
C
G I
T A
L
Y
G N
N
A L
U
D
L E
G
A
C
BRIDGE REPLACEMENT
STRUCTURE PLANS
ROADWAY PLANS
COMPONENTS:
DISTRICT FIVE
DISTRICT FOUR
DISTRICT THREE
DISTRICT TWO
DISTRICT ONE
CONSULTING
GROUP, INC.
SIGMA
CERTIFICATE OF AUTHORIZATION #26889
PHONE: (850) 332-7912
PENSACOLA, FLORIDA 32503
3298 SUMMIT BOULEVARD, SUITE 32
ESCAMBIA COUNTY
ENGINEERING DEPARTMENT
CONTRACT PLANS
ROADWAY PLANS
1:36:46 PM Z:\Projects Directory\180904 - Occie Phillips Bridge Replacement\01800 (CAD Drawings)\DWG\OC Phillips to Eric S\KEYSHEET01.dgnFAvera 2/27/2024
FINANCIAL PROJECT ID 430468-1-58-01
ESCAMBIA COUNTY
(FEDERAL FUNDS)
NO.
SHEET
YEAR
FISCAL
CONTRACT NO.
CONSTRUCTION
EXPRESSWAY
T U
R N P
IK
E
PENSACOLA FORT WALTON
BEACH
PANAMA
CITY
CHIPLEY
TALLAHASSEE
JACKSONVILLE
ST AUGUSTINE
GAINESVILLE
OCALA DAYTONA BEACH
DELAND
NEW PORT RICHEY
TAMPA
LAKELAND
MELBOURNE -
COCOA
ORLANDO
BARTOWST PETERSBURG
SARASOTA -
BRADENTON
FT PIERCE
FT MYERS
WEST PALM
BEACH
FT LAUDERDALE
MIAMI
NAPLES
KEY WEST
CITY
LAKE
F
LO
R
ID
A 'S
BEACH LINE
PROJECT MANAGER
ENGINEER OF RECORD:
ROADWAY PLANS
TEMPORARY (TCP) PHASE II-CROSS-SECTIONS23-25
TEMPORARY (TCP) PHASE I-CROSS-SECTIONS20-22
TEMPORARY (TCP) PHASE I-PLAN/PROFILE17-19
TEMPORARY (TCP) TYPICAL SECTIONS16
SIGNING & PAVEMENT MARKING & DRIVEWAY TYPICAL SECTIONS15
STORMWATER POLLUTION PREVENTION PLAN13-14
CROSS-SECTIONS10-12
ROADWAY PLAN-PROFILE6-9
GENERAL NOTES5
TYPICAL SECTIONS3-4
SUMMARY OF PAY ITEMS2
KEY SHEET 1
DESCRIPTIONSHEET NO.
OCCIE (O.C.) PHILLIPS ROAD OVER BRUSHY CREEK
GOVERNING STANDARDS AND SPECIFICATIONS:
NOTE: THE SCALE OF THESE PLANS MAY HAVE CHANGED DUE TO PRODUCTION
HTTP://WWW.FDOT.GOV/PROGRAMMANAGEMENT/IMPLEMENTED/SPECBOOKS
FOR ROAD AND BRIDGE CONSTRUCTION AT THE FOLLOWING WEBSITE:
FLORIDA DEPARTMENT OF TRANSPORTATION, JULY 2024 STANDARD SPECIFICATIONS
COMPONENT
STANDARD PLANS FOR BRIDGE CONSTRUCTION ARE INCLUDED IN THE STRUCTURES PLANS
FOLLOWING WEBSITE: HTTP://WWW.FDOT.GOV/DESIGN/STANDARDPLANS
STANDARD PLANS FOR RAOD CONSTRUCTION AND ASSOCIATED IRS ARE AVAILABLE AT THE
BRIDGE CONSTRUCTION AND APPLICABLE INTERM REVISIONS (IRS).
FLORIDA DEPARTMENT OF TRANSPORTATION, FY 2024-2025 STANDARD PLANS FOR ROAD AND
ALL ROADWAY CONSTRUCTION SHALL COMPLY WITH:
STEVEN BARRY (CHAIRMAN)
ROBERT BENDER (VICE CHAIRMAN)
LUMON MAY
MIKE KOHLER
JEFF BERGOSH
COMMISSIONERS
JOHN ROSENAU
jlashley FDOT Seal with Sig
CERTIFICATE OF AUTHORIZATION 26889
PENSACOLA FL 32503
3298 SUMMIT BLVD, STE 32
SIGMA CONSULTING GROUP INC.
P.E. LICENSE NUMBER 57353
JASON L. LASHLEY, P.E.
PHILLIPS
O.C.
ESCAMBIA 430468-1-58-01 2
SUMMARY OF PAY ITEMS
2/27/2024FAvera Z:\Projects Directory\180904 - Occie Phillips Bridge Replacement\01800 (CAD Drawings)\DWG\OC Phillips to Eric S\QUANRD01.DGN1:37:24 PM
ROAD NO. FINANCIAL PROJECT IDCOUNTY
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTION
NO.
SHEETESCAMBIA COUNTY
ENGINEERING DEPARTMENT
TYPE B STABILIZATION
5'
0.06
SHOULDER PAVEMENT DETAIL
0.02
DESIGN CRITERIA
MANUAL OF MINIMUM STANDARDS (FL GREENBOOK)
SEE CROSS SECTIONS
DEPTH AND WIDTH VARY
Natural Ground
LIMITS OF CONSTRUCTION
STANDARD CLEARING AND GRUBBING
LIMITS OF CONSTRUCTION
3'
TYP.
1:3 T Y P
.5
0.06 0.02
10' 12' 12' 10'
0.02
LBR 40
TYPE B STABILIZATION
12"
0.06
Natural Ground
� CONST. *
STA. 22+31.13 TO 26+00.00
STA. 14+22.21 TO 21+15.96
O.C. PHILLIPS ROAD
TYPICAL SECTION
PAVT.
SHLDR.
5'
PAVT.
SHLDR.
5'
GRADE POINT
PROFILE
8"
DESIGN SPEED = 35 MPH
2/27/2024 1:37:30 PM
T
F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
C
PROJECT CONTROLS
5 - RESTRICTIVE w/440 ft. Connection Spacing
4 - NON-RESTRICTIVE w/2640 ft. Signal Spacing
7 - BOTH MEDIAN TYPES
6 - NON-RESTRICTIVE w/1320 ft. Signal Spacing
2 - RESTRICTIVE w/Service Roads
1 - FREEWAY
3 - RESTRICTIVE w/660 ft. Connection Spacing
NEW CONSTRUCTION / RECONSTRUCTION
ACCESS CLASSIFICATION
CRITERIA
STATE HIGHWAY SYSTEM
( ) NATIONAL HIGHWAY SYSTEM
(X)
HIGHWAY SYSTEM
STRATEGIC INTERMODAL SYSTEM
(X)
(X)
NO.
SHEET
(X) LOCAL
FUNCTIONAL CLASSIFICATION
CONTEXT CLASSIFICATION
C1 : NATURAL
C2 : RURAL
C2T : RURAL TOWN
C6 : URBAN CORE
C5 : URBAN CENTER
C4 : URBAN GENERAL
C3R : SUBURBAN RES.
C3C : SUBURBAN COMM.
OFF-STATE HIGHWAY SYSTEM
RRR (ARTERIALS & COLLECTORS)
RESURFACING (LA FACILITIES)
INTERSTATE
FREEWAY/EXPWY.
PRINCIPAL ARTERIAL
MINOR ARTERIAL
MAJOR COLLECTOR
MINOR COLLECTOR
(X) N/A : OFF-STATE HIGHWAY FACILITY
RELATED TO TYPICAL SECTION:
POTENTIAL EXCEPTIONS AND VARIATIONS
FINANCIAL PROJECT ID
1:3 1:3
SOD SOD
NEW CONSTRUCTION
TYPE 12.5 SP STRUCTURAL COURSE (2")
8" GRADED AGGREGATE BASE
SHOULDER PAVEMENT
TYPE 12.5 SP STRUCTURAL COURSE (2")
8" GRADED AGGREGATE BASE
8" GAB
10'
5' SOD
R/W LINE
PROPOSED
R/W LINE
PROPOSED
1:
3'
TYP.
SEE CROSS SECTIONS
DEPTH AND WIDTH VARY
PROPOSED R/W VARIES (98' MIN.)
8" GAB
430468-1-58-01
DESIGN CRITERIA
MANUAL OF MINIMUM STANDARDS (FL GREENBOOK)
Natural Ground
LIMITS OF CONSTRUCTION
STANDARD CLEARING AND GRUBBING
0.02 0.02
Natural Ground
� CONST. *
STA. 26+00.00 TO 27+00.00
STA. 13+22.21 TO 14+22.21
O.C. PHILLIPS ROAD
TYPICAL SECTION
GRADE POINT
PROFILE
EXISTING
10'-12' 10'-12' varies varies
2/27/2024 1:37:31 PM
T
F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
C
PROJECT CONTROLS
5 - RESTRICTIVE w/440 ft. Connection Spacing
4 - NON-RESTRICTIVE w/2640 ft. Signal Spacing
7 - BOTH MEDIAN TYPES
6 - NON-RESTRICTIVE w/1320 ft. Signal Spacing
2 - RESTRICTIVE w/Service Roads
1 - FREEWAY
3 - RESTRICTIVE w/660 ft. Connection Spacing
NEW CONSTRUCTION / RECONSTRUCTION
ACCESS CLASSIFICATION
CRITERIA
STATE HIGHWAY SYSTEM
( ) NATIONAL HIGHWAY SYSTEM
(X)
HIGHWAY SYSTEM
STRATEGIC INTERMODAL SYSTEM
(X)
(X)
NO.
SHEET
(X) LOCAL
FUNCTIONAL CLASSIFICATION
CONTEXT CLASSIFICATION
C1 : NATURAL
C2 : RURAL
C2T : RURAL TOWN
C6 : URBAN CORE
C5 : URBAN CENTER
C4 : URBAN GENERAL
C3R : SUBURBAN RES.
C3C : SUBURBAN COMM.
OFF-STATE HIGHWAY SYSTEM
RRR (ARTERIALS & COLLECTORS)
RESURFACING (LA FACILITIES)
INTERSTATE
FREEWAY/EXPWY.
PRINCIPAL ARTERIAL
MINOR ARTERIAL
MAJOR COLLECTOR
MINOR COLLECTOR
(X) N/A : OFF-STATE HIGHWAY FACILITY
RELATED TO TYPICAL SECTION:
POTENTIAL EXCEPTIONS AND VARIATIONS
FINANCIAL PROJECT ID
APPARENT R/W VARIES
6" ABC BASE
6"
DESIGN SPEED = 35 MPH
NEW CONSTRUCTION
ABC BASE (6")
varies
SOD
varies
SOD
(LBR 40)
12" TYPE B STABILIZATION
12"
3298 SUMMIT BLVD, STE 32
SIGMA CONSULTING GROUP INC.
P.E. LICENSE NUMBER 57353
JASON L. LASHLEY, P.E.
PHILLIPS
O.C.
GENERAL NOTES:
UTILITY NOTES:
SHALL BE TO THE SATISFACTION OF UTILITY OWNERS.
6. UTILITIES TO REMAIN AND BE PROTECTED DURING CONSTRUCTION. NECESSARY REPAIRS SHALL BE CONSIDERED INCIDENTAL TO OTHER PAY ITEMS AND
5. CONTRACTOR IS TO USE CAUTION WHEN WORKING IN OR AROUND AREAS OF OVERHEAD TRANSMISSION LINES AND UNDERGROUND UTILITIES.
CELL PHONE.
4. ALL CABLE DAMAGE MUST BE REPORTED TO THE ATT FLORIDA REPAIR SERVICE DEPARTMENT AT 611 FROM A LAND LINE OR 877-737-2478 IF USING A
3. AT&T FLORIDA WILL COMPLETE ALL WORK DURING THE HOURS OF 7:30 AM - 4:30 PM, MONDAY THRU FRIDAY. NO NIGHT OR WEEKEND WORK.
PENSACOLA, FL. 32505 PH:(850) 595-3404
3363 WEST PARK PLACE
MR. JOHNNY COX
TRAFFIC DEPARTMENT - ESCAMBIA COUNTY PUBLIC WORKS
ATMORE, AL 36502 ; PH: (850) 327-4122
ORLANDO, FL. 32809 PH: (800) 432-4770201 S. PENSACOLA, AVENUE
7200 LAKE ELLENOR DRIVE, SUITE 200MR. ROBERT SPICER
SUNSHINE STATE ONE-CALLTELEPHONE - FRONTIER COMMUNICATIONS
JAY, FL. 32565 PH: (850) 675-7409WALNUT HILL, FL. 32568 PH: (850) 327-4530
3425 HWY 45026 ARHUR BROWN ROAD
MR. WESLEY SCOTTMR. LORENCE WHITMIRE
ELECTRIC - ESCAMBIA RIVER ELECTRIC COOPERATIVE WATER - WALNUT HILL WATERWORKS
THEIR UTILITIES. KNOWN UTILITIES OWNERS INCLUDE:
2. UTILITY OWNERS SHALL BE NOTIFIED AT LEAST 48 HOURS PRIOR TO ANY CONSTRUCTION SO THAT THE UTILITY OWNER CAN SPOT VERIFY AND/OR EXPOSE
MIGHT OCCUR BY HIS FAILURE TO EXACTLY LOCATE AND PRESERVE ALL UTILITIES.
EXISTING UTILITIES BEFORE COMMENCING WORK IN EACH AREA. THE CONTRACTOR AGREES TO BE COMPLETELY RESPONSIBLE FOR ALL DAMAGES WHICH
1. THE LOCATION SHOWN FOR EXISTING UNDERGROUND UTILITIES IS APPROXIMATE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL
PROPER AUTHORITIES NOTIFIED IN ACCORDANCE WITH F.S. 872.05.
25. IN THE EVENT THAT UNMARKED HUMAN REMAINS ARE ENCOUNTERED DURING PERMITTED ACTIVITIES, ALL WORK MUST STOP IMMEDIATELY AND THE
OF HISTORICAL RESOURCES.
OFFICER FOR FURTHER GUIDANCE. PROJECT ACTIVITIES SHOULD NOT RESUME WITHOUT VERBAL AND/OR WRITTEN AUTHORIZATION FROM THE DIVISION
STATE HISTORIC PRESERVATION OFFICER (SHPO) AND THE DSH/FEMA REGION IV ENVIRONMENTAL OFFICER AND FDEM STATE ENVIRONMENTAL LIAISON
THE APPLICANT/RECIPIENT, OR OTHER DESIGNEE, SHOULD CONTACT THE FLORIDA DEPARTMENT OF STATE, DIVISION OF HISTORICAL RESOURCES, THE
AT ANY TIME, THE PROJECT SHOULD CEASE ALL ACTIVITIES INVOLVING SUBSURFACE DISTURBANCE IN THE IMMEDIATE VICINITY OF SUCH DISCOVERIES.
PHYSICAL REMAINS THAT COULD BE ASSOCIATED WITH NATIVE AMERICAN CULTURES, OR EARLY COLONIAL OR AMERICAN SETTLEMENT ARE ENCOUNTERED
24. IF ARCHAEOLOGICAL MATERIAL/PREHISTORIC ARTIFACTS SUCH AS POTTERY OR CERAMICS, STONE TOOLS OR METAL IMPLEMENTS, OR ANY OTHER
THEREFORE, ALL PIPES LENGTHS ASSOCIATED WITH MITERED END SECTIONS SHALL BE PAID FOR IN THE UNIT COST OF THE MITERED END SECTION.
23. PIPE LENGTHS SHOWN IN THE PLANS DO NOT INCLUDE THE LENGTH OF PIPE THAT MUST BE INSTALLED WITH THE MITERED END SECTION.
FOR PAVING, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE COUNTY ENGINEER OR DESIGNEE PRIOR TO ANY EXCAVATION.
IS ENCOUNTERED IN THE AREAS PROPOSED CONDITION, AND ANY OTHER MATERIAL THAT IS CONSIDERED BY THE COUNTY ENGINEER TO BE UNSUITABLE
22. WHERE UNSUITABLE MATERIAL, AS DEFINED AS ANY MATERIAL SUCH AS MUCK, WOOD, ROCK, PEAT, GARBAGE, NON-COMPACTABLE SOILS IN DRY
INSTALLATION OF ANY SIGNING AND PAVEMENT MARKINGS.
PLACED IN ACCORDANCE WITH THE LATEST FDOT DESIGN STANDARDS. THE CONTRACTOR SHALL CONTACT THE COUNTY TRAFFIC DEPARTMENT PRIOR TO
21. THE CONTRACTOR SHALL, AT A MINIMUM, MATCH EXISTING SIGNING AND PAVEMENT MARKINGS. ALL SIGNING AND PAVEMENT MARKINGS SHALL BE
20. MAINTENANCE OF TRAFFIC AS PER FDOT INDEX 102-600.
19. ALL COMPACTED FILL SHALL BE PLACED IN 4" LIFTS FOR HAND POWERED TAMPERS AND 8" LIFTS FOR HEAVY EQUIPMENT OPERATED TAMPERS.
18. ALL TREES WITHIN LIMITS OF CONSTRUCTION SHALL BE REMOVED UNLESS OTHERWISE NOTED IN PLANS.
BASE.
17. GRADED AGGREGATE BASE SHALL BE REQUIRED WHERE THE SEASONAL HIGH GROUND WATER ENCROACHES WITHIN TWO (2) FEET OF THE BOTTOM OF
RESTORATION SHALL BE CONSIDERED INCIDENTAL TO OTHER PAY ITEMS.
16. VEGETATION ON R/W AND EASEMENTS SHALL BE RESTORED TO ORIGINAL CONDITION UNLESS OTHERWISE NOTED ON THE PLAN SHEETS. COST OF SAID
CHIPLEY FL, 32428 ; PH (850) 638-0970 PENSACOLA, FLORIDA 32505 PH (850) 595-3427
1130 HWY 90 3363 WEST PARK PLACE
SOUTHEASTERN SURVEYING AND MAPPING CORPORATION ESCAMBIA COUNTY SURVEYOR
THOMAS K. MEAD, PSM MR. JOE BARRETT, PLS
15. IN THE EVENT THAT SURVEY MONUMENTATION OR REFERENCE POINTS ARE MISSING OR HAVE BEEN DESTROYED, PLEASE CONTACT:
CONSTRUCTION SHALL BE ACQUIRED BY THE CONTRACTOR WITH NO ADDITIONAL COMPENSATION OR ASSISTANCE FROM THE COUNTY.
14. ONLY ACCESS TO THE ROAD R/W AS SHOWN IS GUARANTEED BY THE COUNTY, PRIVATE R/W REQUIRED BY THE CONTRACTOR TO FACILITATE
13. CONTRACTOR SHALL COMPLY WITH ALL LOCAL, STATE, AND FEDERAL REQUIREMENTS.
RESTORE ROAD TO TWO LANES OF TRAFFIC AT THE END OF EACH WORK DAY.
12. THE CONTRACTOR SHALL MAINTAIN AT LEAST ONE 10' OPEN LANE AT ALL TIMES. NO OPEN EXCAVATION SHALL REMAIN OVER NIGHT. CONTRACTOR SHALL
DAMAGED BEYOND USE BY THE CONTRACTOR SHALL BE REPLACED BY THE CONTRACTOR AT HIS EXPENSE.
LIMITS BY THE CONTRACTOR AS DIRECTED BY THE COUNTY ENGINEER OR DESIGNEE. ANY EXISTING SIGNS THAT ARE TO BE RELOCATED AND ARE
VEHICLES. ALL OTHER EXISTING SIGNS THAT CONFLICT WITH CONSTRUCTION OPERATIONS SHALL BE TAKEN DOWN AND STOCKPILED WITHIN THE R/W
11. EXISTING STREET AND ROAD NAME SIGNS ON THE PROJECT SHALL BE KEPT VISIBLE AT ALL TIMES FOR THE FACILITATION OF ACCESS BY EMERGENCY
10 EXISTING STREETS AND DRIVES SHALL BE MAINTAINED TO LOCAL TRAFFIC AND PROPERTY OWNERS.
DESIGNEE.
9. THE CONTRACTOR SHALL MATCH EXISTING CONDITIONS AT THE BEGINNING AND END OF CONSTRUCTION AS DIRECTED BY THE COUNTY ENGINEER OR
8. EXISTING DRAINAGE FEATURES WITHIN CONSTRUCTION LIMITS SHALL REMAIN UNLESS OTHERWISE NOTED.
APPROVAL.
LICENSED PROFESSIONAL SURVEYOR AND MAPPER USING GUIDELINES AS ESTABLISHED BY NATIONAL GEODETIC SURVEY FOR BLUE BOOKING AND
THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACEMENT OF THE MONUMENTS AND HAVE THE MONUMENTS POSITION DETERMINED BY A FLORIDA
BE PROTECTED. IF A HARN/GPS NETWORK MONUMENTS OR BUREAU OF SURVEY AND MAPPING GPS NETWORK MONUMENTS ARE DISTURBED OR DESTROYED
COUNTY HARN/GPS NETWORK MONUMENTS OR BUREAU OF SURVEY AND MAPPING GPS NETWORK MONUMENTS WITHIN THE LIMITS OF CONSTRUCTION SHALL
DESTROYED AND HAS NOT BEEN PROPERLY REFERENCED, THE CONTRACTOR SHALL NOTIFY THE ENGINEER OR DESIGNEE IMMEDIATELY. ANY ESCAMBIA
ALL PUBLIC OR PRIVATE CORNER MONUMENTATION SHALL BE PROTECTED. IF A PUBLIC OR PRIVATE CORNER MONUMENTATION IS IN DANGER OF BEING
7. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO PRESERVE OR RELOCATE ALL BENCHMARKS (VERTICAL CONTROL) AS NEEDED DURING CONSTRUCTION.
6. THE CONTRACTOR IS CAUTIONED TO VISIT THE SITE AND FAMILIARIZE HIMSELF WITH THE PROJECT PRIOR TO BIDDING AND/OR CONSTRUCTION.
REQUIRED PERMITS.
5. ANY NECESSARY PERMITS WILL BE THE RESPONSIBILITY OF THE CONTRACTOR. ESCAMBIA COUNTY OR ITS DESIGNEE WILL ASSIST CONTRACTOR WITH
ASSOCIATED DISTURBED AREAS ARE STABILIZED AS TO REDUCE SEDIMENT RUNOFF, UNLESS OTHERWISE DIRECTED BY THE ENGINEER OR DESIGNEE.
CONTROL INSPECTOR'S MANUAL, 2018 EDITION, OR AS INDICATED ON THE PLANS. ALL EROSION CONTROL MEASURES SHALL REMAIN IN PLACE UNTIL
DURING CONSTRUCTION BY PROVIDING SILT FENCE AND/OR STAKED HAY BALES AS REQUIRED BY THE FLORIDA STORMWATER EROSION AND SEDIMENT
4. THE CONTRACTOR SHALL TAKE STEPS NECESSARY TO PREVENT EROSION AND ANY OFF SITE SEDIMENT TRANSPORT RESULTING FROM INCREASED RUNOFF
3. ALL ROADS DAMAGED BY CONSTRUCTION OPERATIONS ARE TO BE PATCHED OR RECONSTRUCTED AS DIRECTED BY THE COUNTY ENGINEER OR DESIGNEE.
COMPLIED WITH IN EVERY DETAIL.
2. ALL CONDITIONS AND STIPULATIONS OF THE CONSTRUCTION PERMITS AND THE APPROVALS ISSUED BY THE ESCAMBIA COUNTY ENGINEER SHALL BE
1. THE CONTRACTORS SHALL NOTIFY THE COUNTY DESIGN ENGINEER OR DESIGNEE 48 HOURS PRIOR TO CONSTRUCTION.
Z:\Projects Directory\180904 - Occie Phillips Bridge Replacement\01800 (CAD Drawings)\DWG\OC Phillips to Eric S\GENNOTES.dgnFAvera 2/27/2024 1:37:31 PM Default
5 430468-1-58-01 ESCAMBIA
ROAD NO. FINANCIAL PROJECT IDCOUNTY
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTION
NO.
GENERAL NOTES
10 40
Feet
0 0
26.99
10 ¬
°2
'4
(R
T
P O
T
S
T A
.9
P C
S
T A
.9
P T
S
T A
.2
P I
S
T A
.1
PI STA. = 12+76.17
T = 151.21
L = 297.25
R = 658.24
PC STA. = 11+24.96
PT STA. = 14+22.21
CURVE DATA CENTERLINE1
97.97 310.
(-) 2.200%
.8
.4
.1
.8
.5
.3
.2
.2
E
L
.1
(-) 2.200%
ESCAMBIA 430468-1-58-01
PLAN & PROFILE SHEET
CERTIFICATE OF AUTHORIZATION 26889
PENSACOLA FL 32503
3298 SUMMIT BLVD, STE 32
SIGMA CONSULTING GROUP INC.
P.E. LICENSE NUMBER 57353
JASON L. LASHLEY, P.E.
120 120
STATION 11+24.96
BEGIN PROJECT
10+00 11+00 12+00 13+00 14+00 15+00
EXISTING WETLANDS
EXISTING WETLANDS
EXISTING EDGE OF DIRT ROAD
EXISTING EDGE OF DIRT ROAD
¡ CONSTRUCTION
EXISTING GROUND @ ¡ CONSTRUCTION
PHILLIPS
O.C.
F O
R
C
O N
T I N
U A
T I O
N
S
E E
S
H E
E T
M A
T C
H L I N
E
S
T A
T I O
N
.0
VERTICAL SCALE = 1" - 20'
APPARENT R.O.W.
(TO BE RELOCATED BY E.R.E.C.)
EXISTING OVERHEAD ELECTRIC
APPARENT R.O.W.
EXISTING TREELINE
EXISTING TREELINE
(MATCH EXISTING)
STATION 13+22.21 ¡ CONSTRUCTION
BEGIN CONSTRUCTION
STATION 13+22.21
A.B.C. BASE
BEGIN CONSTRUCTION/
END A.B.C. BASE
BEGIN ASPHALT
ASPHALT
A.B.C. BASE
LEGEND:
PROPOSED R.O.W.
PROPOSED R.O.W.
2/27/2024FAvera Z:\Projects Directory\180904 - Occie Phillips Bridge Replacement\01800 (CAD Drawings)\DWG\OC Phillips to Eric S\PLANSSP01.dgn1:37:33 PM
REVISIONS
DATE DESCRIPTION
NO.
SHEET
ESCAMBIA COUNTY
PROFILE GRADE
WIDTH TO PROPOSED TRAVEL LANE WIDTH
TRANSITION FROM EXISTING TRAVEL LANE
STA 13+22.21 TO STA 14+22.21
STA 14+22.21
BEGIN DITCH
STA 14+22.21
BEGIN DITCH
+22.21
31.20' (LT)
+22.21
35.30' (RT)
+22.21
49.00' (LT)
+22.21
49.00' (RT)
+96.08
49.00' (RT)
EL. 99.00
PROFILES STA 14+22.21
BEGIN LT/RT DITCH
(-) 0.70%
DITCH GRADES
PROPOSED LT/RT
FRONTIER)
(TO BE RELOCATED BY
EXISTING TELEPHONE
(TO BE RELOCATED BY EREC)
EXISTING WATERLINE
Feet
.3
.1
.9
.3
.1
.9
.7
.5
.3
.1
.9
.7
.5
.1
.0
.9
.7
.5
P I
.7
E L
.9
(-) 2.200% (+) 1.000%
K = 98
(+) 1.000% (+) 0.300%
.2
.0
.0
.9
.9
.0
.0
.7
.5
P I
.0
E L
.0
.7
E
L
.4
.2
.3
304.34' V.C.
1,534.22
P C
S
T A
.1
18 19 20
P T
S
T A
.1
P I
S
T A
.7
PT STA. = 20+60.14
PC STA. = 17+33.15
R = 4,050.00
L = 326.99
T = 163.58
PI STA. = 18+96.73
CURVE DATA CENTERLINE2
310.93
ESCAMBIA 430468-1-58-01
PLAN & PROFILE SHEET
CERTIFICATE OF AUTHORIZATION 26889
PENSACOLA FL 32503
3298 SUMMIT BLVD, STE 32
SIGMA CONSULTING GROUP INC.
P.E. LICENSE NUMBER 57353
JASON L. LASHLEY, P.E.
21+0020+0019+0018+0017+0016+00
EXISTING WETLANDS
EXISTING WETLANDS
EDGE OF BRUSHY CREEK
STATION 20+94.68
BEGIN APPROACH SLAB
STATION 21+15.96
BEGIN BRIDGE
¡ CONSTRUCTION
EXISTING GROUND @ ¡ CONSTRUCTION
PROFILE GRADE
PHILLIPS
O.C.
EXISTING EDGE OF DIRT ROAD
F O
R
C
O N
T I N
U A
T I O
N
S
E E
S
H E
E T
M A
T C
H L I N
E
S
T A
T I O
N
.0
F O
R
C
O N
T I N
U A
T I O
N
S
E E
S
H E
E T
M A
T C
H L I N
E
S
T A
T I O
N
.0
VERTICAL SCALE = 1" - 20'
S T
A T I
O N
B E
G
B
I
D G
E
APPARENT R.O.W.
EXISTING TREELINE
EXISTING TREELINE
APPARENT R.O.W.
(TO BE RELOCATED BY E.R.E.C.)
EXISTING OVERHEAD ELECTRIC
R=25'
DRIVEWAY (95 SY)
CONSTRUCT ASPHALT
PROPOSED T.C.E.
PROPOSED R.O.W.
PROPOSED R.O.W.
2/27/2024FAvera Z:\Projects Directory\180904 - Occie Phillips Bridge Replacement\01800 (CAD Drawings)\DWG\OC Phillips to Eric S\PLANSSP02.dgn1:37:35 PM
REVISIONS
DATE DESCRIPTION
TEMPORARY L.O.C.
MAINLINE L.O.C.
MAINLINE L.O.C.
INV EL: 95.30
CONSTRUCT M.E.S. (4:1)
+80.00
66.00' (RT)
+93.02
20.93' (RT)
+38.02
20.89' (LT)
+83.20
52.00' (LT)
+83.70
17.06' (LT)
CONCRETE FLUME
CONSTRUCT 29' LONG BY 4' WIDE
INV EL: 94.97
M.E.S. (4:1)
CONSTRUCT
CONSTRUCT 45 LF OF 24" PIPE
+98.98
19.25' (RT)
RIP RAP
ASPHALT
LEGEND:
54.00' (LT)
+00.00
49.00' (LT)
+00.00
+00.00
49.00' (RT)
+00.00
54.00' (RT)
54.00' (LT)
+33.00
74.00' (LT)
+33.00
+30.00
66.00' (RT)
+30.00
54.00' (RT)
DITCH GRADES
PROPOSED LT/RT
(-) 0.70%
EL. 95.0
EL. 98.0
(-) 0.70% (-) 0.70%
DITCH GRADES
PROPOSED LT
DITCH GRADES
PROPOSED RT
BY FRONTIER)
(TO BE RELOCATED
EXISTING TELEPHONE
BY EREC)
(TO BE RELOCATED
EXISTING WATERLINE
B-1
B-3
GRADELINE
PROPOSED GUARDRAIL
GRADELINE
PROPOSED GUARDRAIL
63.59' (LT)
+08.24 (I.E. 95.0)
(19.00 RT)
TL-2 PARALLEL TERMINAL
BEGIN GR. STA. 20+01.35
(19.00 LT)
TL-2 PARALLEL TERMINAL
BEGIN GR. STA. 19+72.12
(17.00 LT)
TL-2 APPRH. TRANS.
END GR. STA. 20+88.48
(17.00 RT)
TL-2 APPRH. TRANS.
END GR. STA. 21+00.85
CONCRETE FLUME
CONSTRUCT 33' LONG BY 4' WIDE
Feet
.5
.4
.4
.3
.3
.2
.1
.1
.4
(+) 0.300% (-) 0.400%
P I
.6
E L
.7
(-) 0.400% (+) 4.362
300' V.C.
K = 63
.6
E
L
.3
.3
.3
.4
.5
.7
.0
.3
.7
.2
.7
.3
.9
.7
.4
.6
E
L
.3
P I
.0
E L
.5
.3
22 23 24 25 26
1,534.22
ESCAMBIA 430468-1-58-01
PLAN & PROFILE SHEET
CERTIFICATE OF AUTHORIZATION 26889
PENSACOLA FL 32503
3298 SUMMIT BLVD, STE 32
SIGMA CONSULTING GROUP INC.
P.E. LICENSE NUMBER 57353
JASON L. LASHLEY, P.E.
STATION 22+31.13
END BRIDGE
26+0025+0024+0023+0022+00
EDGE OF BRUSHY CREEK
EDGE OF BRUSHY CREEK
EXISTING WETLANDS
EXISTING WETLANDS
EXISTING GROUND @ ¡ CONSTRUCTION
PROFILE GRADE
EXISTING EDGE OF DIRT ROAD
F O
R
C
O N
T I N
U A
T I O
N
S
E E
S
H E
E T
M A
T C
H L I N
E
S
T A
T I O
N
.0
PHILLIPS
O.C.
VERTICAL SCALE = 1" - 20'
S T
A T I
O N
E
I
D G
E
EXISTING TREELINE
APPARENT R.O.W.
EXISTING TREELINE
APPARENT R.O.W.
(TO BE RELOCATED BY E.R.E.C.)
EXISTING OVERHEAD ELECTRIC
STATION 22+52.42
END APPROACH SLAB
PROPOSED R.O.W.
PROPOSED R.O.W.
PROPOSED T.C.E.
2/27/2024FAvera Z:\Projects Directory\180904 - Occie Phillips Bridge Replacement\01800 (CAD Drawings)\DWG\OC Phillips to Eric S\PLANSSP03.dgn1:37:36 PM
REVISIONS
DATE DESCRIPTION
F O
R
C
O N
T I N
U A
T I O
N
S
E E
S
H E
E T
M A
T C
H L I N
E
S
T A
T I O
N
.0
¡ CONSTRUCTION
STATION 26+00.00
BEGIN A.B.C. BASE
END ASPHALT/
MAINLINE L.O.C.
MAINLINE L.O.C.
+53.04
21.60' (LT)
+79.05
20.89' (RT)+59.43
19.25 (RT)
+45.41
19.25 (LT)
TEMPORARY L.O.C.
+00.00
31.60' (LT)
STA 26+00.00
END ARMORED DITCH
+00.00
32.40' (RT)
STA 26+00.00
END ARMORED DITCH
+93.50
41.78' (LT)
+12.80
52.00 (RT)
STA 22+12.80
BEGIN ARMORED DITCH
+60.40
56.40 (RT)
+31.60
50.00 (LT)
STA 21+93.50
DITCH
BEGIN ARMORED
STA 21+31.60
END DITCH
OF RIP RAP
CONSTRUCT 388 SY
RIP RAP
DITCH ARMORING
A.B.C. BASE
ASPHALT
LEGEND:
74.00' (LT)
+94.00
54.00' (LT)
+94.00
+30.00
66.00' (RT)
+30.00
54.00' (RT)
+00.00
49.00' (RT)
+00.00
54.00' (RT)
54.00' (LT)
+00.00
49.00' (LT)
+00.00
+03.90
40.00' (RT)
+00.00
49.00' (RT)
49.00' (LT)
+00.00
CONSTRUCT 406 SY OF RIP RAP
STATION 21+37.73 EL = 96.91
END LT DITCH PROFILE
STATION 21+41.62 EL = 94.09
END RT DITCH PROFILE
EL = 94.58
BEGIN LT/RT DITCH PROFILE
(+) 3.50%
PROPOSED LT/RT DITCH GRADE
EL = 108.50
DITCH PROFILE
END LT/RT
B-2
B-4
(TO BE RELOCATED BY FRONTIER)
EXISTING TELEPHONE
(TO BE RELOCATED BY EREC)
EXISTING WATERLINE
GRADELINE
GUARDRAIL
PROPOSED
GRADELINE
PROPOSED GUARDRAIL
STA 21+96.00-STA 26+00.00
BE ARMORED FROM
PROPOSED DITCH TO
STA 22+12.80-STA 26+00.00
BE ARMORED FROM
PROPOSED DITCH TO
(17.00' LT)
TL-2 APPRH. TRANS.
BEGIN GR. STA. 22+46.22
(17.00' RT)
TL-2 APPRH. TRANS.
BEGIN GR. STA. 22+58.60
(19.00' LT)
TL-2 PARALLEL TERMINAL
END GR. STA. 23+42.08
(19.00' RT)
TL-2 PARALLEL TERMINAL
END GR. STA. 23+67.33
Feet
27 28 29 30 31 32
ESCAMBIA 430468-1-58-01
PLAN & PROFILE SHEET
CERTIFICATE OF AUTHORIZATION 26889
PENSACOLA FL 32503
3298 SUMMIT BLVD, STE 32
SIGMA CONSULTING GROUP INC.
P.E. LICENSE NUMBER 57353
JASON L. LASHLEY, P.E.
120 120
32+0031+0030+0029+0028+0027+00
EXISTING GROUND LINE @ ¡ CONST
F O
R
C
O N
T I N
U A
T I O
N
S
E E
S
H E
E T
M A
T C
H L I N
E
S
T A
T I O
N
.0
PHILLIPS
O.C.
VERTICAL SCALE = 1" - 20'
EXISTING EDGE OF DIRT ROAD
¡ CONSTRUCTION
EXISTING TREELINE
APPARENT R.O.W.
(TO BE PROTECTED)
EXISTING TELEPHONE
(TO BE PROTECTED)
EXISTING TELEPHONE PEDESTAL
(TO BE PROTECTED)
EXISTING WATERLINE
EXISTING TREELINE
APPARENT R.O.W.
(TO BE RELOCATED BY E.R.E.C.)
EXISTING OVERHEAD ELECTRIC
(+) 7.
508%
2/27/2024FAvera Z:\Projects Directory\180904 - Occie Phillips Bridge Replacement\01800 (CAD Drawings)\DWG\OC Phillips to Eric S\PLANSSP04.dgn1:37:37 PM
REVISIONS
DATE DESCRIPTION
LANE WIDTH
LANE WIDTH TO EXISTING TRAVEL
TRANSITION FROM PROPOSED TRAVEL
STA. 26+00.00 TO STA. 27+00.00
A.B.C. BASE
LEGEND:
STATION 27+00.00
A.B.C. BASE
CONSTRUCTION/
END PROJECT/
R/W
PROP
R/W
PROP
R/W
PROP
R/W
PROP
R/W
PROP
R/W
PROP
R/W
APP.
R/W
APP.
R/W
APP.
R/W
APP.
R/W
APP.
R/W
APP.
R/W
APP.
R/W
APP.
T.C.E.
T.C.E.R/W
PROP
R/W
APP.
R/W
PROP
R/W
APP.
CERTIFICATE OF AUTHORIZATION 26889
PENSACOLA FL 32503
3298 SUMMIT BLVD, STE 32
SIGMA CONSULTING GROUP INC.
P.E. LICENSE NUMBER 57353
JASON L. LASHLEY, P.E.
PHILLIPS
O.C.
ESCAMBIA 430468-1-58-01
CROSS SECTION SHEET
¡ CONST
¡ CONST¡ CONST
¡ CONST
98 98
105 105
PROP ¡ EL = 104.79'
PROP ¡ EL = 104.19'
PROP ¡ EL = 102.84'
PROP ¡ EL = 102.00'
PROP ¡ EL = 102.20'
40 32 24 16 8 0 8 16 24 32 40 40 32 24 16 8 0 8 16 24 32 40
= 1"=20'VERTICAL
HORIZONTAL = 1"=40'
SCALE:
EXIST ¡ EL = 104.19'
EXIST ¡ EL = 104.79'
EXIST ¡ EL = 99.70'
EXIST ¡ EL = 100.74'
EXIST ¡ EL = 102.42'
72645648 80
STA. 14+00.00
STA. 14+22.21
STA. 15+00.00
STA. 16+00.00
STA. 17+00.00
2/27/2024FAvera Z:\Projects Directory\180904 - Occie Phillips Bridge Replacement\01800 (CAD Drawings)\DWG\OC Phillips to Eric S\RDXSSH01.dgn1:37:38 PM
REVISIONS
DATE DESCRIPTION
8072645648
40 32 24 16 8 0 8 16 24 32 40 8072645648 40 32 24 16 8 0 8 16 24 32 40 72645648 80
ENGINEERING DEPARTMENT
ESCAMBIA COUNTY
88 9656 48
48564856
106 106
R/W
PROP
R/W
PROP
R/W
PROP
R/W
PROP
R/W
PROP
R/W
PROP
R/W
PROP
R/W
APP.
R/W
APP.
R/W
APP.
R/W
APP.
R/W
APP.
R/W
APP.
R/W
APP. R/W
APP.
T.C.E.
T.C.E.
T.C.E.
T.C.E.
R/W
APP.
R/W
APP.
R/W
PROP
R/W
PROP
T.C.E.
R/W
PROP
R/W
APP. R/W
PROP
R/W
APP. T.C.E.
STA. 20+00
STA. 19+00
STA. 18+00
CERTIFICATE OF AUTHORIZATION 26889
PENSACOLA FL 32503
3298 SUMMIT BLVD, STE 32
SIGMA CONSULTING GROUP INC.
P.E. LICENSE NUMBER 57353
JASON L. LASHLEY, P.E.
PHILLIPS
O.C.
ESCAMBIA 430468-1-58-01 11
¡ CONST
¡ CONST¡ CONST
¡ CONST
PROP ¡ EL: 103.17'
PROP ¡ EL: 104.17'
PROP ¡ EL: 105.17' PROP ¡ EL: 106.51'
40 32 24 16 8 0 8 16 24 32 4040 32 24 16 8 0 8 16 24 32 40
= 1"=20'VERTICAL
HORIZONTAL = 1"=40'
SCALE:
EXIST ¡ EL = 99.06'
EXIST ¡ EL = 98.67'
EXIST ¡ EL = 99.08'
EXIST ¡ EL = 100.79'
96 96
CROSS SECTION SHEET
STA. 21+00
2/27/2024FAvera Z:\Projects Directory\180904 - Occie Phillips Bridge Replacement\01800 (CAD Drawings)\DWG\OC Phillips to Eric S\RDXSSH02.dgn1:37:38 PM
REVISIONS
DATE DESCRIPTION
8072645648 9688 8072645648 968840
40 32 24 16 8 0 8 16 24 32 40 8072645648 9688
40 32 24 16 8 0 8 16 24 32 40 8072645648 968840
48564856
EXIST ¡ EL = 99.90'
PROP ¡ EL: 106.06'
647280
80 6472 647280
647280
STA. 20+80
PROP ¡ EL: 105.97'
EXIST ¡ EL = 99.93'
INV. ELV. = 94.97
PROPOSED 24" SIDEDRAIN
CONCRETE FLUME
CONSTRUCT
FLUME
CONSTRUCT CONCRETE
STA. 22+52.41
R/W
PROP
R/W
PROP
R/W
PROP
R/W
PROP
R/W
PROPR/W
APP.
R/W
APP.
R/W
APP.
R/W
APP.
R/W
APP.
R/W
APP.
R/W
APP.
R/W
APP.
T.C.E.
T.C.E.
STA. 26+00
STA. 25+00
STA. 24+00
STA. 27+00
CERTIFICATE OF AUTHORIZATION 26889
PENSACOLA FL 32503
3298 SUMMIT BLVD, STE 32
SIGMA CONSULTING GROUP INC.
P.E. LICENSE NUMBER 57353
JASON L. LASHLEY, P.E.
PHILLIPS
O.C.
ESCAMBIA 430468-1-58-01
CROSS SECTION SHEET
0 40
¡ CONST
¡ CONST¡ CONST
¡ CONST
PROP ¡ EL: 106.76'
PROP ¡ EL: 108.75'
PROP ¡ EL: 112.32'
PROP ¡ EL: 119.26'
40 824 1632 8 16 24 32 40 32 24 16 8 0 8 16 24 32 40
= 1"=20'VERTICAL
HORIZONTAL = 1"=40'
SCALE:
EXIST ¡ EL = 104.32'
EXIST ¡ EL = 107.75'
EXIST ¡ EL = 112.32'
EXIST ¡ EL = 119.26'
6448 56 72 80 6448 56 72 80
2/27/2024FAvera Z:\Projects Directory\180904 - Occie Phillips Bridge Replacement\01800 (CAD Drawings)\DWG\OC Phillips to Eric S\RDXSSH03.dgn1:37:39 PM
REVISIONS
DATE DESCRIPTION
0 40816 8 16 24 32 6448 5640 2432 72 80 40 32 24 16 8 0 8 16 24 32 40 6448 56 72 80
96884856
4856 9688 4856 9688
4856 9688
3298 SUMMIT BLVD, STE 32
SIGMA CONSULTING GROUP INC.
P.E. LICENSE NUMBER 57353
JASON L. LASHLEY, P.E.
PHILLIPS
O.C.
Z:\Projects Directory\180904 - Occie Phillips Bridge Replacement\01800 (CAD Drawings)\DWG\OC Phillips to Eric S\SWPPPRD01.dgnFAvera 2/27/2024 1:37:39 PM Default
13 ESCAMBIA
ROAD NO. FINANCIAL PROJECT IDCOUNTY
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTION
NO.
SHEETESCAMBIA COUNTY
SWPPP NOTES
ROADSIDE DITCHES AND DISCHARGE TO BRUSHY CREEK AS SHOWN IN THE PLANS.
DISCHARGE POINTS TO SURFACE WATERS: PROJECT AREA DISCHARGE TO THE EXISTING
POINT IS THE BRIDGE CROSSING OVER BRUSHY CREEK.
OTHER THAN THE ROAD SIDE DITCHES AND ADJACENT WETLAND AREAS. PRIMARY DRAINAGE
SURFACE WATERS: NO DEFINED SURFACE WATERS ARE LOCATED WITHIN THE PROJECT LIMITS
SHOWN IN THE SAME LOCATIONS AS MENTIONED ABOVE.
AREAS TO BE STABILIZED: TEMPORARY AND PERMANENT STABILIZATION PRACTICES AREA
ARE SHOWN ON THE TYPICAL SECTION AND STANDARD DETAIL SHEETS.
THE PERMANENT CONTROL FOR THIS PROJECT. LIMITS OF SODDING AND TURF PLACEMENT
LOCATION OF PERMANENT CONTROLS: SODDING AND PLACING TURF ON DISTURBED AREAS IN
NOT INDICATED FOR WORK ON THE ROADWAY PLAN SHEETS WILL NOT BE DISTURBED.
AREAS THAT ARE NOT TO BE DISTURBED: ALL AREAS WITHIN THE PROJECT RIGHT OF WAY
CONSTRUCTED ABOVE OR BELOW THE GROUND WILL BE DISTURBED.
PLAN/PROFILE SHEETS. ANY AREA WHERE PERMANENT FEATURES ARE SHOWN TO BE
AREAS OF SOIL DISTURBANCE: THE AREAS TO BE DISTURBED ARE SHOWN ON THE
SHEETS AND THE PLAN/PROFILE SHEETS.
APPROXIMATE SLOPES: THE SLOPES OF THE SITE CAN BE SEEN IN THE CROSS SECTION
ROADWAY DITCHES AND IS CONVEYED TO THE OUTFALL LISTED ABOVE.
DRAINAGE PATTERNS: RUNOFF FROM THE ROADWAY SURFACES DISCHARGES DIRECTLY TO THE
REFERENCED ARE IDENTIFIED ON THE KEY SHEET OF THESE CONSTRUCTION PLANS.
REQUIRED INFORMATION IS DESCRIBED BELOW. THE SHEET NUMBERS FOR THE PLAN SHEETS
THE CONSTRUCTION PLANS ARE BEING USED AS THE SITE MAPS. THE LOCATION OF THE
1.E SITE MAP
OUTFALL NO.1 DESCRIPTION: ROADSIDE DITCHES DISCHARGE TO BRUSHY CREEK
THERE IS ONE OUTFALL WITHIN THE PROJECT LIMITS.
OUTFALL INFORMATION:
AFTER: 0.51
DURING: 0.51
BEFORE: 0.51
RUNOFF COEFFICIENTS:
1.D RUNOFF DATA
TOTAL AREA TO BE DISTURBED: 6.00 ACRES
TOTAL SITE AREA: 9.00 ACRES
1.C AREA ESTIMATES
4. BRIDGE PILE CONSTRUCTION
3. EARTHWORK ASSOCIATED WITH FILL SECTIONS FOR FINAL ROADWAY
EARTHWORK ASSOCIATED WITH FILL SECTIONS FOR TEMPORARY DETOUR2.
CLEARING AND GRUBBING1.
MAJOR SOIL DISTURBING ACTIVITIES ARE:
UPSTREAM AREAS ARE STABILIZED.
WORK FOR THE CONSTRUCTION PHASE. REMOVE PERIMETER CONTROLS ONLY AFTER ALL
GRUBBING NECESSARY FOR INSTALLATION OF CONTROLS, BUT BEFORE BEGINNING OTHER
FOR EACH CONSTRUCTION PHASE, INSTALL PERIMETER CONTROLS AFTER CLEARING AND
CONTROLLING EROSION AND TRAPPING SEDIMENT AND IS APPROVED BY THE ENGINEER.
UNLESS THE CONTRACTOR PROPOSES A DIFFERENT SEQUENCE THAT IS EQUAL OR BETTER AT
CONTRACTOR SHALL FOLLOW THE SEQUENCE OF MAJOR ACTIVITIES DESCRIBED BELOW,
DETAILED SEQUENCE OF CONSTRUCTION FOR ALL CONSTRUCTION ACTIVITIES. THE
IN THE SEDIMENT AND EROSION CONTROL PLAN, THE CONTRACTOR SHALL PROVIDE A
1.B SEQUENCE OF MAJOR SOIL DISTURBING ACTIVITIES
PROJECT EXTENDS APPROXIMATELY 0.5 MILES.
IS CLEARING AND GRUBBING, ROADSIDE DITCH CONSTRUCTION AND EROSION CONTROL. THE
ROADWAY AND DRAINAGE DESIGN CRITERIA. ALSO INCLUDED IN CONSTRUCTION ACTIVITES
APPROXIMALTEY 1700 LF OF ROADWAY APPROACHES TO COMPLY WITH THE MOST CURRENT
OVER BRUSHY CREEK. THIS INVOLVES CONSTRUCTING A NEW BRIDGE OVER BRUSHY CREEK,
THE PROJECT CONSISTS OF THE REMOVAL AND REPLACEMENT OF THE OC PHILLIPS BRIDGE
1.A NATURE OF CONSTRUCTION ACTIVITY:
SITE DESCRIPTION1.0
2.C.1 WASTE DISPOSAL:
2.C OTHER CONTROLS:
IT TO BRUSHY CREEK.
EXISTING ROADSIDE DITCHES COLLECT THE RUNOFF FROM THE PROJECT SITE AND DIRECT
2.B STORMWATER MANAGEMENT:
*SOD AND TURF IN ACCORDANCE WITH SPECIFICATION SECTION 570.
PERMANENT:
ACCORDANCE WITH SPECIFICATION SECTION 104.
*SEDIMENT BARRIERS, INLET PROTECTION, AND OTHER APPLICABLE PROVISIONS IN
TEMPORARY:
APPROVED BY THE ENGINEER:
STRUCTURAL PRACTICES SHALL INCLUDE AT LEAST THE FOLLOWING, UNLESS OTHERWISE
SHALL BE IN PLACE BEFORE DISTURBING SOIL UPSTREAM OF THE CONTROL. THE
THE DISCHARGE OF POLLUTANTS FROM EXPOSED AREAS OF THE SITE. SEDIMENT CONTROLS
PROPOSED STRUCTURAL PRACTICES TO CONTROL OR TRAP SEDIMENT AND OTHERWISE PREVENT
IN THE SEDIMENT AND EROSION CONTROL PLAN, THE CONTRACTOR SHALL DESCRIBE THE
2.A.2 STRUCTURAL PRACTICES:
INDEX 570-010.
*SOD IN ACCORDANCE WITH SPECIFICATION SECTION 570 AND
*ASPHALT OR CONCRETE SURFACE.
PERMANENT:
*TURF AND SOD IN ACCORDANCE WITH SPECIFICATION SECTION 570.
*ARTIFICAL COVERINGS IN ACCORDANCE WITH SPECIFICATION SECTION 104.
TEMPORARY:
ENGINEER.
SHALL INCLUDE AT LEAST THE FOLLOWING, UNLESS OTHERWISE APPROVED BY THE
ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED. THE STABILIZATION PRACTICES
IN NO CASE MORE THAN 7 DAYS, IN PORTIONS OF THE SITE WHERE CONSTRUCTION
CONTRACTOR SHALL INITIATE ALL STABILIZATION MEASURES AS SOON AS PRACTICAL, BUT
DESCRIBE THE STABILIZATION PRACTICES PROPOSED TO CONTROL EROSION. THE
IN THE SEDIMENT AND EROSION CONTROL PLAN, THE PROPOSED CONTRACTOR SHALL
2.A.1 STABILIZATION PRACTICES:
UPSTREAM AREAS ARE STABILIZED.
WORK FOR THE CONSTRUCTION PHASE. REMOVE PERIMETER CONTROLS ONLY AFTER ALL
FOR EACH CONSTRUCTION PHASE, INSTALL PERIMETER CONTROLS BEFORE BEGINNING OTHER
ACTIVITIES, AND THE NEED FOR BETTER PRACTICES.
MODIFY THE PLAN TO ADAPT TO SEASONAL VARIATION, CHANGES IN CONSTRUCTION
SUBJECT TO APPROVAL BY THE ENGINEER. AS WORK PROGRESSES, THE CONTRACTOR SHALL
FOLLOWING GUIDELINES OR MODIFY THEM IN THE SEDIMENT AND EROSION CONTROL PLAN,
OUTLINED IN THESE CONTSTRUCTION PLANS, THE CONTRACTOR MAY CHOOSE TO ACCEPT THE
CONSTRUCTION PLANS. WHERE FOLLOWING THE TEMPORARY TRAFFIC CONTROL PLAN
GUIDELINES ARE BASED ON THE TEMPORARY TRAFFIC CONTROL PLAN OUTLINED IN THE
PROPOSED TEMPORARY TRAFFIC CONTROL (TTC) PLAN. THE FOLLOWING RECOMMENDED
PROPOSED STABILIZATION AND STRUCTURAL PRACTICES BASED ON THE CONTRACTOR’S
IN THE SEDIMENT AND EROSION CONTROL PLAN, THE CONTRACTOR SHALL DESCRIBE THE
2.A EROSION AND SEDIMENT CONTROLS
CONTROLS2.0
REPORT".
#19-233 ENTITLED, "OCCIE PHILLIPS ROAD BRIDGE REPLACEMENT BRIDGE DESIGN
SAND FROM 0'TO 5' BLS. FOR ADDITIONAL GEOTECHNICAL INFORMATION SEE LMJ FILE
SOIL RANGED FROM RED/ORANGE MEDIUM DENSE, SILTY SAND TO DARK GRAY LOOSE SILTY
FOUR (4) BORINGS (B1-B4) WERE TAKEN WITHIN THE EXISTING ROADWAY FOOTPRINT. THE
1.G SOIL INFORMATION
RECEIVING WATER.
ADJACENT WETLAND AREAS ARE DESIGNATED ON THE PLAN SHEETS. BRUSHY CREEK IS THE
1.F RECEIVING WATERS
DISCHARGE POINTS TO OUTFALL: SEE PLANS
3298 SUMMIT BLVD, STE 32
SIGMA CONSULTING GROUP INC.
P.E. LICENSE NUMBER 57353
JASON L. LASHLEY, P.E.
PHILLIPS
O.C.
Z:\Projects Directory\180904 - Occie Phillips Bridge Replacement\01800 (CAD Drawings)\DWG\OC Phillips to Eric S\SWPPPRD02.dgnFAvera 2/27/2024 1:37:40 PM Default
14 ESCAMBIA
ROAD NO. FINANCIAL PROJECT IDCOUNTY
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTION
NO.
SHEETESCAMBIA COUNTY
SWPPP NOTES
DEREK FOX AT (850) 595-2413 OR (850) 384-3760.
CONTAMINATED SOIL OR GROUNDWATER, CONTACT THE ESCAMBIA COUNTY LAP COORDINATOR
POLLUTION OF THESE NON-STORMWATER DISCHARGES. IF THE CONTRACTOR ENCOUNTERS
ACTIVITIES). THE CONTRACTOR SHALL DESCRIBE THE PROPOSED MEASURES TO PREVENT
ANTICIPATED NON-STORMWATER DISCHARGES (EXCEPT FLOWS FROM FIRE FIGHTING
IN THE SECTION 104 EROSION CONTROL PLAN, THE CONTRACTOR SHALL IDENTIFY ALL
5.0 NON-STORMWATER DISCHARGES:
APPROVED BY THE ENGINEER.
DISCHARGING POLLUTANTS, THE CONTRACTOR SHALL PROVIDE ADDITIONAL MEASURES, AS
PRACTICES ARE NOT SUFFICENT TO MINIMIZE EROSION, RETAIN SEDIMENT, AND PREVENT
IF INSPECTIONS INDICATE THAT THE INSTALLED STABILIZATION AND STRUCTURAL
INDICATE ITEMS ARE NOT IN GOOD WORKING ORDER.
THE CONTRACTOR SHALL INITIATE REPAIRS WITHIN 24 HOURS OF INSPECTIONS THAT
*LOCATIONS WHERE VEHICLES ENTER OR EXIT THE SITE.
*STORMWATER MANAGEMENT SYSTEMS.
*STRUCTURAL CONTROLS.
*AREAS USED FOR STORAGE OF MATERIALS THAT ARE EXPOSED TO PRECIPIATION.
*DISTURBED AREAS OF THE SITE
*POINTS OF DISCHARGE TO MUNICIPAL SEPARATE STORM DRAIN SYSTEMS.
*POINTS OF DISCHARGE TO WATERS OF THE UNITED STATES.
STORMWATER PREVENTION PLAN.
CONTROLS INSTALLED IN THE FIELD TO VERIFY THAT THEY AGREE WITH THE LATEST
A RAIN EVENT OF 0.5 INCHES OR GREATER). THE CONTRACTOR SHALL INSPECT THE
BE INSPECTED DURING NORMAL INSPECTIONS (EVERY 7 DAYS) AND WITHIN 24 HOURS AFTER
RECORD THE DAILY RAINFALL. SITES THAT HAVE BEEN PERMANENTLY STABILIZED, SHALL
GREATER. TO COMPLY, THE CONTRACTOR SHALL INSTALL AND MAINTAIN RAIN GAUGES AND
CALENDAR DAYS AND WITHIN 24 HOURS OF THE END OF A STORM THAT IS 0.50 INCHES OR
QUALIFIED PERSONNEL SHALL INSPECT THE FOLLOWING ITEMS AT LEAST ONCE EVERY SEVEN
4.0 INSPECTIONS:
430468-1-58-01
WHEN WATER PONDS IN UNACCEPTABLE AMOUNTS OR AREAS.
*SEDIMENT BARRIERS: REMOVE SEDIMENT AS PER MANUFACTURER’S RECOMMENDATIONS OR
ANTICIPATE REPLACING SILT FENCE ON 12 MONTH INTERVALS.
*SILT FENCE, IF UTILIZED: MAINTAIN PER SECTION 104. THE CONTRACTOR SHOULD
THE MAINTENANCE PLAN SHALL AT A MINIMUM, COMPLY WITH THE FOLLOWING:
FOR MAINTAINING ALL EROSION AND SEDIMENT CONTROLS THROUGHOUT CONSTRUCTION.
IN THE SEDIMENT AND EROSION CONTROL PLAN, THE CONTRACTOR SHALL PROVIDE A PLAN
3.0 MAINTENANCE:
F.A.C.
STATE 404 PROGRAM INDIVIDUAL PERMIT PER FDEP STATE 404 PROGRAM Chapter 62-331, NOTICE OF INTENT WILL ALSO NEED TO BE SUBMITTED (62-621.300 (4)(B).
CONSTRUCTION GENERIC PERMIT FOR NPDES PER 62-621.300 (4)(A). A REQUIRED
AN EASEMENT OVER STATE-OWNED SUBMERGED LANDS.
MANAGEMENT PERMIT PER 62-330.301 (A), (B), (C), (E) FAC AND AN APPLICATION FOR
FDEP ENVIRONMENTAL RESOURCE PERMIT PER 62-330.060(1) FAC INCLUDING STORMWATER
2.D.4 FEDERAL, STATE, AND LOCAL PLANS AND PERMITS:
THESE SUBSTANCES.
ADDRESSING THE GENERATION, APPLICATION, MIGRATION, STORAGE, AND DISPOSAL OF
OF TOXIC SUBSTANCES THAT ARE LIKELY TO BE USED ON THE JOB AND PROVIDE A PLAN
IN THE SEDIMENT AND EROSION CONTROL PLAN, THE CONTRACTOR SHALL PROVIDE A LIST
2.C.5 TOXIC SUBSTANCES:
SHALL COMPLY WITH APPLICABLE SUBSECTIONS OF SECTION 570 OF THE SPECIFICATIONS.
PROCEDURES FOR APPLYING FERTILIZERS AND PESTICIDES. THE PROPOSED PROCEDURES
IN THE SEDIMENT AND EROSION CONTROL PLAN, THE CONTRACTOR SHALL DESCRIBE THE
2.C.4 FERTILIZERS AND PESTICIDES:
WASTE DISPOSAL, AND SANITARY SEWER OR SEPTIC SYSTEMS.
PROPOSED PROCEDURES TO COMPLY WITH APPLICABLE STATE AND LOCAL REGULATIONS FOR
IN THE SECTION 104 EROSION CONTROL PLAN, THE CONTRACTOR SHALL DESCRIBE THE
SEPTIC TANK REGULATIONS:
2.C.3 STATE AND LOCAL REGULATIONS FOR WASTE DISPOSAL, SANITARY SEWER, OR
AND MILLING OPERATIONS.
*USING ROADWAY SWEEPERS DURING DUST GENERATING ACTIVITIES SUCH AS EXCAVATION
*STABILIZING CONSTRUCTION ENTRANCES ACCORDING TO SPECIFICATION SECTION 104.
*REMOVING EXCESS DIRT FROM ROADS DAILY.
*COVERING LOADED HAUL TRUCKS WITH TARPAULINS.
UNLESS OTHERWISE APPROVED BY THE ENGINEER.
GENERATING DUST. THE PROPOSED METHODS SHALL INCLUDE AT LEAST THE FOLLOWING,
PROPOSED METHODS FOR MINIMIZING OFFSITE VEHICLE TRACKING OF SEDIMENTS AND
IN THE SEDIMENT AND EROSION CONTROL PLAN, THE CONTRACTOR SHALL DESCRIBE THE
2.C.2 OFF-SITE VEHICLE TRACKING & DUST CONTROL:
OFF THE PROJECT SITE BUT NOT IN SURFACE WATERS, OR WETLANDS.
*DISPOSING OF SOLID MATERIALS INCLUDING BUILDING AND CONSTRUCTION MATERIALS
EPA’S STANDARD PRACTICES AS DETAILED BY THE MANUFACTURER.
*DISPOSING OF ALL FERTILIZER OR OTHER CHEMICAL CONTAINERS ACCORDING TO THE
CONSTRUCTION ACTIVITIES.
*PROVIDING LITTER CONTROL AND COLLECTION WITHIN THE PROJECT DURING
ENGINEER:
SHALL INCLUDE AT LEAST THE FOLLOWING, UNLESS OTHERWISE APPROVED BY THE
BUILDING MATERIALS, TO WATERS OF THE UNITED STATES. THE PROPOSED METHODS
PROPOSED METHODS TO PREVENT THE DISCHARGE OF SOLID MATERIALS, INCLUDING
IN THE SEDIMENT AND EROSION CONTROL PLAN, THE CONTRACTOR SHALL DESCRIBE THE
R/W
APP. R/W
PROP
R/W
APP. T.C.E.
34%
10%
ESCAMBIA 430468-1-58-01
CERTIFICATE OF AUTHORIZATION 26889
PENSACOLA FL 32503
3298 SUMMIT BLVD, STE 32
SIGMA CONSULTING GROUP INC.
P.E. LICENSE NUMBER 57353
JASON L. LASHLEY, P.E.
PHILLIPS
O.C.
2/27/2024FAvera Z:\Projects Directory\180904 - Occie Phillips Bridge Replacement\01800 (CAD Drawings)\DWG\OC Phillips to Eric S\S&PM SHEET.dgn1:37:41 PM
REVISIONS
DATE DESCRIPTION
24.00'
12.00' 12.00'5.00' 5.00'
34.00'
24.00'
12.00' 12.00'5.00' 5.00'
34.00'
TYPICAL SECTIONS
MARKING & DRIVEWAY
SIGNING & PAVEMENT
GRADE
PROPOSED MAINLINE DRIVEWAY
DRIVEWAY GRADE
TEMPORARY DETOUR
INV. ELV. = 95.40
UNDER TEMPORARY DRIVEWAY
TEMPORARY 24" SIDEDRAIN
INV. ELV. = 95.14
UNDER PROPOSED DRIVEWAY
PROPOSED 24" SIDEDRAIN
LANE
EDGE OF TRAVEL
LANE
EDGE OF TRAVEL
LANE
EDGE OF TRAVEL
6" SOLID WHITE THERMOPLASTIC
STA. 48+16.87 - STA. 51+82.01
STA. 40+00.00 - STA. 47+01.87
SIGNING & PAVEMENT MARKING SECTION
O.C. PHILLIPS ROAD DETOUR TYPICAL
6" DOUBLE SOLID YELLOW THERMOPLASTIC
6" SOLID WHITE THERMOPLASTIC
6" SOLID WHITE PAINT
6" DOUBLE SOLID YELLOW PAINT
6" SOLID WHITE PAINT
DRIVEWAY SECTION
STATION 19+80.00
SIGNING & PAVEMENT MARKING NOTES
EDGE OF ROADWAY SHOULDER
SHOULDER
EDGE OF ROADWAY
SHOULDER
EDGE OF ROADWAY
SHOULDER
EDGE OF BRIDGE
SHOULDER
EDGE OF BRIDGE
1'-4" 1'-4"
36'-8"
STA. 14+22.21 - STA. 26+00.00
SIGNING & PAVEMENT MARKING SECTION
O.C. PHILLIPS ROAD & BRIDGE TYPICAL
NO 706-001
PER FDOT INDEX
ON ROADWAY & DETOUR
2. RPMs TO BE PLACED
LIMIT OF 20 M.P.H.
HAVE A POSTED SPEED
1. TEMPORARY DETOUR SHALL
3298 SUMMIT BLVD, STE 32
SIGMA CONSULTING GROUP INC.
P.E. LICENSE NUMBER 57353
JASON L. LASHLEY, P.E.
PHILLIPS
O.C.
Natural Ground
1:3
EXISTING DIRT ROAD
OCCIE PHILLIPS ROAD
0.020.02 0.06
LIMITS OF CONSTRUCTION
LIMITS OF CONSTRUCTION
12' 12'
TEMPORARY DETOUR
:2
GRADE POINT
DETOUR
0.06
DETOUR �
20±
SOD
VARIES
1:3
12' 12'
TEMPORARY DETOUR
GRADE POINT
DETOUR
DETOUR �
SOD
VARIES
0.06 0.020.02
0.061 :2
LIMITS OF CONSTRUCTION
R/W VARIES (124' MIN.)
LIMITS OF CONSTRUCTION
PROPOSED �
12' 12'
PERMANENT LANES
PAVT.
SHLDR.
5'
1:2
0.06 0.020.02
0.06
10'
1:
PHASE I TRAFFIC CONTROL PLAN NOTES:
EXISTING ROADWAY
ROADWAY AND TEMPORARY BRIDGE WHILE MAINTAINING TRAFFIC ON THE
PHASE I TRAFFIC CONTROL CONSISTS OF CONTRUCTING THE DIVERSION
TYPICAL SECTION NOTES:
PHASE II TRAFFIC CONTROL PLAN NOTES:
TYPICAL SECTION NOTES:
INSTALL EROSION CONTROL BLANKET ON SLOPES EQUAL TO OR STEEPER THAN 1:2
Z:\Projects Directory\180904 - Occie Phillips Bridge Replacement\01800 (CAD Drawings)\DWG\OC Phillips to Eric S\TYPSRD03 - DETOUR.dgnFAvera 2/27/2024 1:37:41 PM Default
ESCAMBIA
ROAD NO. FINANCIAL PROJECT IDCOUNTY
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTION
NO.
STA. 48+22.45 TO STA. 51+82.01
STA. 40+00.00 TO STA. 46+93.29
OCCIE PHILLIPS ROAD
TYPICAL SECTION : PHASE I
TEMPORARY TRAFFIC CONTROL DIVERSION
STA. 48+22.45 TO STA. 51+82.01
STA. 40+00.00 TO STA. 46+93.29
OCCIE PHILLIPS ROAD
TYPICAL SECTION NO. 1 PHASE II
TEMPORARY TRAFFIC CONTROL DIVERSION
APPARENT R/W LINE TCE LINEAPPARENT R/W LINE
APPARENT R/W VARIES TCE VARIES
INSTALL EROSION CONTROL BLANKET ON SLOPES EQUAL TO OR STEEPER THAN 1:2
* PAVEMENT ONLY REQUIRED IN AREAS WHERE BARRIER WALL IS REQUIRED (SEE TABLE)
PROPOSED R/W LINE
TCE LINE
TEMPORARY ROADWAY AND BRIDGE.
ROADWAY AND BRIDGE WHILE MAINTAINING TRAFFIC ON THE
PHASE II TRAFFIC CONTROL CONSISTS OF CONTRUCTING THE FINAL
SHLDR.
*5'
PAVT.
SHLDR.
5'
SHLDR.
5'
SHLDR.
*5'
SHLDR.
5'
TYPICAL SECTION
TEMPORARY TCP PHASE I & II
DITCH (3:1)
REMOVE DETOUR & REGRADE
COMPLETE PERMANENT LANES,
1:3
TYPE 12.5 SP STRUCTURAL COURSE (2")
12" TYPE "B" STABILIZATION LBR 40
8" AGGREGATE BASE
12" TYPE "B" STABILIZATION LBR 40
8" AGGREGATE BASE
TYPE 12.5 SP STRUCTURAL COURSE (2")
PHASE II BARRIER WALL TABLE
PHASE I BARRIER WALL TABLE
LT 50+43.77 48+64.37 DETOUR
LT 46+54.37 41+43.91 DETOUR
LT/RTSTA STA TOALIGNMENT
RT 24+66.29 22+14.75 MAINLINE
RT 21+14.88 15+63.91 MAINLINE
LT/RTSTA STA TOALIGNMENT
P I
S
T A
.7
P C
S
T A
.2
P T
S
T A
.1
P I
S
T A
.1
P C
S
T A
.0
P I
S
T A
.5
P C
S
T A
.0
P T
S
T A
.5
P C
S
T A
.2
P T
S
T A
.1
P C
S
T A
.0
PI STA. = 40+48.70
T = 48.70
L = 96.55
R = 300.00
PC STA. = 40+00.00
PT STA. = 40+96.55
PI STA. = 42+12.11
T = 48.85 L = 96.86 R = 300.00
PC STA. = 41+63.25
PT STA. = 42+60.11
DETOUR CURVE #1 DETOUR CURVE #2
66.70
48.89
N 10 40
Feet
.1
.4
.8
.3
.8
.3
.9
.5
.2
.9
.7
.5
.3
.2
.1
.1
.1
.2
.3
.4
.6
.9
.1
.5
.8
P I
.1
E L
.1
(-) 3.275% (+) 2.000%
K = 92
.0
E
L
.1
486.29' V.C.
ESCAMBIA 430468-1-58-01
CERTIFICATE OF AUTHORIZATION 26889
PENSACOLA FL 32503
3298 SUMMIT BLVD, STE 32
SIGMA CONSULTING GROUP INC.
P.E. LICENSE NUMBER 57353
JASON L. LASHLEY, P.E.
F O
R
C
O N
T I N
U A
T I O
N
S
E E
S
H E
E T
M A
T C
H L I N
E
S
T A
T I O
N
.0
44+0043+0042+0041+0040+00
EXISTING WETLANDS
PHILLIPS
O.C.
VERTICAL SCALE = 1" - 20'
EXISTING GROUND @ DETOUR ¡ CONSTRUCTION
PHASE I
TRAFFIC CONTROL PLAN
EXISTING TREELINE
APPARENT R.O.W.
DETOUR PROFILE GRADE
DIRT ROAD
EXISTING EDGE OF
(TO BE RELOCATED BY E.R.E.C.)
EXISTING OVERHEAD ELECTRIC
PROPOSED R.O.W.
PROPOSED R.O.W.
2/27/2024FAvera Z:\Projects Directory\180904 - Occie Phillips Bridge Replacement\01800 (CAD Drawings)\DWG\OC Phillips to Eric S\TCPLRD01.dgn1:37:43 PM
REVISIONS
DATE DESCRIPTION
DETOUR ¡
STATION 40+00.00 =
BEGIN DETOUR
STATION 14+26.75, 0.00 OFFSET
C.L. CONSTRUCTION
EREC)
(TO BE RELOCATED BY
EXISTING WATERLINE
FRONTIER)
(TO BE RELOCATED BY
EXISTING TELEPHONE
20 21 22 23 24
45 46
P T
S
T A
.9
47 48 49 P C
S
T A
.3
P T
S
T A
.6
P I
S
T A
.1
P T
S
T A
.9
P C
S
T A
.3
P T
S
T A
.6
PI STA. = 44+72.58
T = 163.58 L = 326.99 R = 4,050.00
PC STA. = 43+09.00
PT STA. = 46+35.99
PI STA. = 49+84.13
T = 55.75
L = 110.23
R = 300.00
PC STA. = 49+28.38
PT STA. = 50+38.62
DETOUR CURVE #3 DETOUR CURVE #4
292.39
N 10 40
Feet
.6
.2
.8
.4
.0
.0
.0
.0
.0
.0
.0
.8
.2
.5
.7
.9
.0
.9
.8
.6
.5
.3
P I
.2
E L
.0
(+) 2.000% (-) 0.000%
100' V.C.
K = 50
P I
.3
E L
.0
(-) 0.000% (-) 0.700%
.2
E
L
.0
.2
E
L
.0
.2
E
L
.0
.2
P I
.5
(-) 0.700%
.5
E
L
.3
.2
.3
.6
.9
.4
.9
ESCAMBIA 430468-1-58-01
CERTIFICATE OF AUTHORIZATION 26889
PENSACOLA FL 32503
3298 SUMMIT BLVD, STE 32
SIGMA CONSULTING GROUP INC.
P.E. LICENSE NUMBER 57353
JASON L. LASHLEY, P.E.
F O
R
C
O N
T I N
U A
T I O
N
S
E E
S
H E
E T
M A
T C
H L I N
E
S
T A
T I O
N
.0
49+0048+0047+0046+0045+00
EXISTING WETLANDS
PHILLIPS
O.C.
VERTICAL SCALE = 1" - 20'
F O
R
C
O N
T I N
U A
T I O
N
S
E E
S
H E
E T
M A
T C
H L I N
E
S
T A
T I O
N
.0
EXISTING GROUND @ ¡ OF DETOUR CONSTRUCTION
50+00
PHASE I
TRAFFIC CONTROL PLAN
S T
A T I
O N
S T
A
M P
O R
A
I
D G
E
STA. 47+04.37
BEGIN TEMPORARY BRIDGE
STA. 48+14.37
END TEMPORARY BRIDGE
DETOUR PROFILE GRADE
EXISTING BRIDGE
EXISTING TREELINE
APPARENT R.O.W.
TEMPORARY DRIVEWAY
CONSTRUCT 65 SY OF
E
M P
O R
A
I
D G
E
(TO BE RELOCATED NY E.R.E.C.)
EXISTING OVERHEAD ELECTRIC
DETOUR ¡
PROPOSED R.O.W.
PROPOSED R.O.W.PROPOSED T.C.E.
2/27/2024FAvera Z:\Projects Directory\180904 - Occie Phillips Bridge Replacement\01800 (CAD Drawings)\DWG\OC Phillips to Eric S\TCPLRD02.dgn1:37:44 PM
REVISIONS
DATE DESCRIPTION
EXISTING WETLANDS
OF DIRT ROAD
EXISTING EDGE
INV EL: 95.87
CONSTRUCT M.E.S. (4:1)
INV EL: 95.80
CONSTRUCT M.E.S. (4:1)
CONSTRUCT 24" SIDEDRAIN (45 LF)
INV EL: 96.32
SLOT EL: 97.82
TOP EL: 98.32
CONSTRUCT TYPE "C" DBI
INV EL: 96.10
CONSTRUCT M.E.S. (4:1)
(48 LF @ 0.3%)
CONSTRUCT 18" PIPE
B-1
B-3
B-2
B-4
BY FRONTIER)
(TO BE RELOCATED
EXISTING TELEPHONE
BY EREC)
(TO BE RELOCATED
EXISTING WATERLINE
(14.00 LT/RT)
TL-2 PARALLEL TERMINAL
BEGIN GR. STA. 46+54.37
(12.81 LT/RT)
TL-2 APPRH. TRANS
BEGIN GR. STA. 48+14.37
(14.00 LT/RT)
TL-2 PARALLEL TERMINAL
END GR. STA. 48+64.37
(12.81 LT/RT)
TL-2 APPRH. TRANS
END GR. STA. 47+04.37
25 26 27 28 29 30
P C
S
T A
.8
51 P T
S
T A
.0
P I
S
T A
.5
P C
S
T A
.8
P T
S
T A
.0
CURVE DATA DETOURDEC35
PI STA. = 51+28.55
T = 55.75 L = 110.23 R = 300.00
PC STA. = 50+72.81
PT STA. = 51+83.04
.19
N 10 40
Feet
P I
.5
E L
.3
(-) 0.700% (+) 7.2 21%
K = 35
.0
E
L
.3
.6
.4
.3
.4
.5
.8
.1
276.5' V.C.
ESCAMBIA 430468-1-58-01
CERTIFICATE OF AUTHORIZATION 26889
PENSACOLA FL 32503
3298 SUMMIT BLVD, STE 32
SIGMA CONSULTING GROUP INC.
P.E. LICENSE NUMBER 57353
JASON L. LASHLEY, P.E.
51+00
EXISTING WETLANDS
EXISTING TELEPHONE
PHILLIPS
O.C.
VERTICAL SCALE = 1" - 20'
F O
R
C
O N
T I N
U A
T I O
N
S
E E
S
H E
E T
M A
T C
H L I N
E
S
T A
T I O
N
.0
EXISTING GROUND @ DETOUR ¡ CONSTRUCTION
PHASE I
TRAFFIC CONTROL PLANS
DETOUR ¡
DETOUR PROFILE GRADE
(TO BE PROTECTED)
EXISTING WATERLINE
(TO BE RELOCATED BY E.R.E.C.)
EXISTING OVERHEAD ELECTRIC
(TO BE PROTECTED)
TELEPHONE PEDESTAL
APPARENT R.O.W.
EXISTING TREELINE
(TO BE RELOCATED BY E.R.E.C.)
EXISTING POWERPOLE
(TO BE RELOCATED BY E.R.E.C.)
EXISTING POWERPOLE
PROPOSED R.O.W.
PROPOSED R.O.W.
2/27/2024FAvera Z:\Projects Directory\180904 - Occie Phillips Bridge Replacement\01800 (CAD Drawings)\DWG\OC Phillips to Eric S\TCPLRD03.dgn1:37:45 PM
REVISIONS
DATE DESCRIPTION
EXISTING WETLANDS
ESCAMBIA COUNTY
STATION 26+01.02, 0.00 OFFSET
C.L. CONSTRUCTION
STATION 51+83.04 =
END DETOUR
R/W
PROP
R/W
PROP
R/W
PROP
R/W
PROP
R/W
PROP
R/W
APP.
R/W
APP.
R/W
APP.
R/W
APP.
R/W
APP.
R/W
APP.
R/W
APP.
R/W
APP.
T.C.E.
T.C.E.R/W
PROP
R/W
APP.
R/W
PROP
R/W
APP.
CERTIFICATE OF AUTHORIZATION 26889
PENSACOLA FL 32503
3298 SUMMIT BLVD, STE 32
SIGMA CONSULTING GROUP INC.
P.E. LICENSE NUMBER 57353
JASON L. LASHLEY, P.E.
PHILLIPS
O.C.
ESCAMBIA 430468-1-58-01
¡ CONST
¡ CONST¡ CONST
¡ CONST
98 98
105 105
DETOUR ¡ EL = 99.96'
DETOUR ¡ EL = 99.18'
40 32 24 16 8 0 8 16 24 32 40 40 32 24 16 8 0 8 16 24 32 40
= 1"=20'VERTICAL
HORIZONTAL = 1"=40'
SCALE:
EXIST ¡ EL = 104.10'
EXIST ¡ EL = 104.79'
EXIST ¡ EL = 99.70'
EXIST ¡ EL = 100.74'
EXIST ¡ EL = 102.42'
72645648 80
DIVERSION CROSS SECTIONS
TEMPORARY TCP PHASE I
DETOUR STA. 40+74.01
STA. 15+00.00
DETOUR STA. 41+79.06
STA. 16+00.00
DETOUR STA. 42+80.05
STA. 17+00.00
STA. 14+00.00
DETOUR ¡ EL = 102.08'
2/27/2024FAvera Z:\Projects Directory\180904 - Occie Phillips Bridge Replacement\01800 (CAD Drawings)\DWG\OC Phillips to Eric S\RDXSSH01 - PHASE I.dgn1:37:46 PM
REVISIONS
DATE DESCRIPTION
968856 4856 48 96888072645648
40 32 24 16 8 0 8 16 24 32 40 72645648 80 968856 4840 32 24 16 8 0 8 16 24 32 4056 48 96888072645648
DETOUR ¡ EL = 104.10'
DETOUR STA. 40+00.00
STA. 14+23.75
DITCH EL = 100.50'
DITCH EL = 98.70'
DITCH EL = 97.70'
DITCH EL = 96.70'
R/W
PROP
R/W
PROP
R/W
PROP
R/W
PROP
R/W
PROP
R/W
PROP
R/W
PROP
R/W
APP.
R/W
APP.
R/W
APP.
R/W
APP.
R/W
APP.
R/W
APP.
R/W
APP. R/W
APP.
T.C.E.
T.C.E.
T.C.E.
T.C.E.
R/W
PROP
R/W
APP. R/W
PROP
R/W
APP. T.C.E.
CERTIFICATE OF AUTHORIZATION 26889
PENSACOLA FL 32503
3298 SUMMIT BLVD, STE 32
SIGMA CONSULTING GROUP INC.
P.E. LICENSE NUMBER 57353
JASON L. LASHLEY, P.E.
PHILLIPS
O.C.
ESCAMBIA 430468-1-58-01
¡ CONST
¡ CONST¡ CONST
¡ CONST
40 32 24 16 8 0 8 16 24 32 4040 32 24 16 8 0 8 16 24 32 40
= 1"=20'VERTICAL
HORIZONTAL = 1"=40'
SCALE:
EXIST ¡ EL = 99.06'
EXIST ¡ EL = 98.67'
EXIST ¡ EL = 99.08'
EXIST ¡ EL = 100.79'
96 96
DIVERSION CROSS SECTIONS
TEMPORARY TCP PHASE I
DETOUR STA. 45+76.60
STA. 20+00.00
DETOUR STA. 44+77.90
STA. 19+00.00
DETOUR STA. 43+79.19
STA. 18+00.00
DETOUR STA. 46+75.83
STA. 21+00.00
DETOUR STA. 48+28.24
STA. 22+52.41
DETOUR ¡ EL: 102.67'
DETOUR ¡ EL: 100.80'
DETOUR ¡ EL: 99.49'
DETOUR ¡ EL: 103.97'
DETOUR ¡ EL: 103.88'
2/27/2024FAvera Z:\Projects Directory\180904 - Occie Phillips Bridge Replacement\01800 (CAD Drawings)\DWG\OC Phillips to Eric S\RDXSSH02 - PHASE I.dgn1:37:46 PM
REVISIONS
DATE DESCRIPTION
40 32 24 16 8 0 8 16 24 32 4056 48 96888072645648
40 32 24 16 8 0 8 16 24 32 4056 48 96888072645648 40 32 24 16 8 0 8 16 24 32 4056 48 96888072645648
40 32 24 16 8 0 8 16 24 32 4056 48 96888072645648
ENGINEERING DEPARTMENT
ESCAMBIA COUNTY
EXIST ¡ EL = 99.90'
647280
647280 647280
647280
INV. ELV. = 95.80
TEMPORARY SIDEDRAIN
34%
DITCH EL = 96.40'
DITCH EL = 96.10' DITCH EL = 95.10'
DITCH EL = 94.50'
R/W
PROP
R/W
PROP
R/W
PROP
R/W
PROP
R/W
PROPR/W
APP.
R/W
APP.
R/W
APP.
R/W
APP.
R/W
APP.
R/W
APP.
T.C.E.
T.C.E.
CERTIFICATE OF AUTHORIZATION 26889
PENSACOLA FL 32503
3298 SUMMIT BLVD, STE 32
SIGMA CONSULTING GROUP INC.
P.E. LICENSE NUMBER 57353
JASON L. LASHLEY, P.E.
PHILLIPS
O.C.
ESCAMBIA 430468-1-58-01
0 40
¡ CONST
¡ CONST
PROP ¡ EL: 103.51'
PROP ¡ EL: 106.45'
PROP ¡ EL: 112.32'
40 824 1632 8 16 24 32
= 1"=20'VERTICAL
HORIZONTAL = 1"=40'
SCALE:
EXIST ¡ EL = 104.32'
EXIST ¡ EL = 107.75'
EXIST ¡ EL = 112.32'
6448 56 72 80
DETOUR STA. 51+83.06
STA. 26+00.00
DETOUR STA. 50+81.11
STA. 25+00.00
DETOUR STA. 49+76.02
STA. 24+00.00
2/27/2024FAvera Z:\Projects Directory\180904 - Occie Phillips Bridge Replacement\01800 (CAD Drawings)\DWG\OC Phillips to Eric S\RDXSSH03 - PHASE I.dgn1:37:47 PM
REVISIONS
DATE DESCRIPTION
4856 9688
0 4040 824 1632 8 16 24 32 6448 56 72 804856 9688
ENGINEERING DEPARTMENT
ESCAMBIA COUNTY
DIVERSION CROSS SECTIONS
TEMPORARY TCP PHASE I
DITCH EL = 99.50'
DITCH EL = 105.20'
DITCH EL = 108.00'
R/W
PROP
R/W
PROP
R/W
PROP
R/W
PROP
R/W
PROP
R/W
APP.
R/W
APP.
R/W
APP.
R/W
APP.
R/W
APP.
R/W
APP.
R/W
APP.
R/W
APP.
T.C.E.
T.C.E.R/W
PROP
R/W
APP.
R/W
PROP
R/W
APP.
CERTIFICATE OF AUTHORIZATION 26889
PENSACOLA FL 32503
3298 SUMMIT BLVD, STE 32
SIGMA CONSULTING GROUP INC.
P.E. LICENSE NUMBER 57353
JASON L. LASHLEY, P.E.
PHILLIPS
O.C.
ESCAMBIA 430468-1-58-01
¡ CONST
¡ CONST¡ CONST
¡ CONST
98 98
105 105
PROP ¡ EL = 104.79'
PROP ¡ EL = 104.19'
PROP ¡ EL = 102.84'
PROP ¡ EL = 102.00'
PROP ¡ EL = 102.20'
40 32 24 16 8 0 8 16 24 32 40 40 32 24 16 8 0 8 16 24 32 40
= 1"=20'VERTICAL
HORIZONTAL = 1"=40'
SCALE:
EXIST ¡ EL = 104.19'
EXIST ¡ EL = 104.79'
EXIST ¡ EL = 99.70'
EXIST ¡ EL = 100.74'
EXIST ¡ EL = 102.42'
72645648 80
DIVERSION CROSS SECTIONS
TEMPORARY TCP PHASE II
STA. 14+00.00
DETOUR STA. 40+74.01
STA. 15+00.00
DETOUR STA. 41+79.06
STA. 16+00.00
DETOUR STA. 42+80.05
STA. 17+00.00
DETOUR ¡ EL = 102.08'
DETOUR ¡ EL = 99.96'
DETOUR ¡ EL = 99.18'
807264564840
2/27/2024FAvera Z:\Projects Directory\180904 - Occie Phillips Bridge Replacement\01800 (CAD Drawings)\DWG\OC Phillips to Eric S\RDXSSH01 - PHASE II.dgn1:37:47 PM
REVISIONS
DATE DESCRIPTION
40 32 24 16 8 0 8 16 24 32 40 72645648 8040 32 24 16 8 0 8 16 24 32 40 807264564840
88 9656 4856 48 88 96
56 48 88 96 56 48 88 96
ENGINEERING DEPARTMENT
ESCAMBIA COUNTY
DETOUR STA. 40+00.00
STA. 14+26.75
DITCH EL = 96.70'
DITCH EL = 97.70'
DITCH EL = 98.70'
DITCH EL = 100.50'
DITCH EL = 99.40'
DITCH EL = 98.90'
R/W
PROP
R/W
PROP
R/W
PROP
R/W
PROP
R/W
PROP
R/W
PROP
R/W
PROP
R/W
APP.
R/W
APP.
R/W
APP.
R/W
APP.
R/W
APP.
R/W
APP.
R/W
APP. R/W
APP.
T.C.E.
T.C.E.
T.C.E.
T.C.E.
R/W
APP.
R/W
APP.
R/W
PROP
R/W
PROP
T.C.E.
R/W
PROP
R/…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .