About this file

This solicitation seeks proposals for a telephone room remediation project at various Army installations in Japan. The Performance Work Statement provides prospective bidders with information and expectations for the technical refresh and upgrade of telecommunications rooms and network infrastructure at Camp Zama Hardy Barracks, Sagama Depot, Sagamihara Housing, Yokohama North Dock. The purpose of the project is to provide several buildings with a modernized Outside Plant, Inside Plant, and infrastructure to meet current Department of Defense, Unified Capabilities Requirements and support customers of the NEC. The period of performance is from September 20, 2022 through June 30, 2023. Any questions must be submitted by September 10, 2022. The solicitation was issued by the Department of the Army Materiel Command Army Contracting Command.

View the file

Other files for this federal contract opportunity

Other files attached to TR REMEDIATION, newest first.
File Type Posted
Questions.pdf PDF
Performance work statement for Remediation 3-4-22 (1).docx DOCX document
Japan First 27_-.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

12345678

D

C

B

D

C

B

1234567

A

FOUO (FOR OFFICIAL USE ONLY)

APPROVED BY: SCALE:

B

SIZE FSCM NO

SHEET

54233

DRAWN BY: NDF

CAMP ZAMA (ZAMJP)

05/06/2020

DWG. NO.

FLOORPLANS AND RACK ELEVATIONS

ZA

M

JP

_1

_N

-1

_F lo or _P la n_ a nd

_R ac k_ E le v at io n_

0.

vs dx

/6 /2

2:

P

M

TR Floor Plan

A

PAK

DAT E:

ZONEREV DAT EREVIS IO N DESCRIPTIO N APPROVED

20191204EAS SURVEY

21'-7"

7"

ZAMJP BUILDING 101

FLOOR PLAN

ROOM N107

TELECOMMUNCIATIONS AREA

4 STRAND

FIBER SC

24 PORT COPP

WALL

MOUNTED

CABINET

BACKBOARD

RJ-45 PORTS

AND CONDUIT

RJ-45 PORTS

AND CONDUIT

RJ-45 PORTS

AND CONDUIT

RJ-45 PORTS

AND CONDUIT

Category Work Operation Descriptor UM Qty

ISP Remove 1 Backboard REMOVE LARGE ITEM EA 1

Fiber Remove FOPP REMOVE-REINSTALL-FOPP EA 1

ISP Remove fiber cables REMOVE_CABLE-SMALL FT 100

Fiber Remove 24 port COPP REMOVE-REINSTALL-FOPP EA 1

ISP Remove copper cables REMOVE_CABLE-SMALL FT 50

Remove conduits Remove/Relocate Equip EA 6

Remove copper RJ-45 wall ports Remove/Relocate Equip EA 6

C

B

D

C

B

1234567

A

FOUO (FOR OFFICIAL USE ONLY)

APPROVED BY: SCALE:

B

SIZE FSCM NO

SHEET

54233

DRAWN BY: NDF

CAMP ZAMA (ZAMJP)

05/06/2020

DWG. NO.

FLOORPLANS AND RACK ELEVATIONS

ZA

M

JP

_1

_N

-1

_F lo or _P la n_ a nd

_R ac k_ E le v at io n_

0.

vs dx

/6 /2

2:

P

M

Rack Elevat ion

A

PAK

DAT E:

ZONEREV DAT EREVIS IO N DESCRIPTIO N APPROVED

20191204EAS SURVEY

1/16 : 1

ZAMJP BUILDING 101

ROOM N107

EQUIPMENT DETAIL

RR01.01 (NOT LABELED)

FOPP-12SM-SC

COPP 241

4 RU

FOPP-12SM-SC

COPP 241

4 RU

PROPOSED

RR01.01 (NOT LABELED)

FOPP-12SM-SC

COPP 241

4 RU

PROPOSEDEXISTING

RR01.01 (NOT LABELED)

FOPP-12SM-SC

COPP 241

4 RU

FOPP-12SM-SC

COPP 241

4 RU

EXISTING

RR01.01 (NOT LABELED)

FOPP-12SM-SC

COPP 241

4 RU

RR01.01 (NOT LABELED)

FOPP-12SM-SC

COPP 241

4 RU

PROPOSEDEXISTING

RR01.01 (NOT LABELED)

FOPP-12SM-SC

COPP 241

4 RU

C

B

D

C

B

1234567

A

FOUO (FOR OFFICIAL USE ONLY)

APPROVED BY: SCALE:

B

SIZE FSCM NO

SHEET

54233

DRAWN BY: JSS

CAMP ZAMA (ZAMJP)

02/24/2020

DWG. NO.

FLOORPLANS AND RACK ELEVATIONS

ZA

M

JP

_1

_N

4_

Fl oo r_ Pl an _a nd _R ac k_

El ev at io n_

.v sd x

2/

/2

:5

AM

Floor Plan Template

A

ETA

DATE:

ZONEREV DATEREVISION DESCRIPTION APPROVED

20191206EAS SURVEY

RR01.01

N114

ZAMJP BUILDING 101

FLOOR PLAN

ROOM N114

TELECOMMUNCIATIONS AREA

BACKBOARD

SBB

DUPLEX 5-15R

DUPLEX 5-15R

SIMPLEX L6-30R

FRONT

CABLE LADDER

AC POWER SUB-PANEL

PANEL 1L-2N-1

Category Work Operation Descriptor UM Qty Enclosures Install new lockable cabinet CABINET-ZONE4-45U EA 1 Enclosures deinstall current cabinet REMOVE-CABINET EA 1 Enclosures move equipment Remove/Relocate Equip EA 1 Power Install 1 208v 30 amp circuit AC-240V-2PH-30AMP EA 1 Power Install 1 L6-20P PDU PDU-L620P-C13R EA 1 Power Install 1 L6-30P PDU PDU-L630P-C13/19 EA 1 Ground Install RBB RBB-19IN EA 1 Ground Install 25' of #6 Ground Wire GND-CABLE-#6-AWG FT 25 Network Order 8 C14-C15 power cords CAB-C15-C14-10FT EA 8 Power Install new sub panel to feed TR/Cabinet _AC-SUB-PANEL-240V/100A EA 25 UPS Install 5KVA in RR01.01 UPS-5KVA-CONTROLLER EA 1 UPS Install Battery UPS-5KVA-BATTERY-BP192V12RT3UTAAEA 4 Ground Install SBB SBB EA 1 Ground Install 500' of 750AWG grounding wire Power Cable Grounding 6 AWG, 600V, GreenFT 500 Fiber Install new tie cable from N114 to N105 FOC-SM-OS1-24 (RISER) FT 100 Fiber install 2 FOPPS FOPP-24-LC EA 2

Install 2 48 port COPPS COPP-48-CAT6 N/A 2 Install 1 48 port COPP COPP-48-CAT6 N/A 1

Enclosures Install 3 2RU Horizontal CMP's CMP-2RU EA 3 Install 2 4inch sleeve kits in wall FIRE-BARRIER-SLEEVE-KIT-4IN EA 2

ISP 23 conduits/holes need to be Labeled FIRESTOP-LABEL EA 23 ISP 21 Conduits/ holes need to be fire stopped and sealed FIRE-BARRIER-PUTTY-6IN EA 21 ISP Re-Cable Remove/Relocate Equip EA 120

ISP HVAC HVAC-SPLIT EA 1

C

B

D

C

B

1234567

A

FOUO (FOR OFFICIAL USE ONLY)

APPROVED BY: SCALE:

B

SIZE FSCM NO

SHEET

54233

DRAWN BY: JSS

CAMP ZAMA (ZAMJP)

02/24/2020

DWG. NO.

FLOORPLANS AND RACK ELEVATIONS

ZA

M

JP

_1

_N

4_

Fl oo r_ Pl an _a nd _R ac k_

El ev at io n_

.v sd x

2/

/2

:5

AM

Rack Template

A

ETA

DATE:

ZONEREV DATEREVISION DESCRIPTION APPROVED

20191206EAS SURVEY

1/16 : 1

ZAMJP BUILDING 101

ROOM N114

EQUIPMENT DETAIL

6' CABINET

EXISTING

(NO LABEL)

6 FEET

UNUSABLE

FOPP-24-SC

EAS101 C3850-48F

EAS101 C3850-48F

COPP-96

EAS101 C3850-48F

EAS101 C3850-48F

CMP

COPP-24

7' CABINET

PROPOSED

RR01.01

7 FEET

FOPP-24-SC

EAS101 C3850-48F

EAS101 C3850-48F

EAS101 C3850-48F

PDU (L620P-C13R)

RBB (REAR)

EAS101 C3850-48F

CMP

CMP

TRIPPLITE BATTERY

TRIPPLITE BATTERY

TRIPPLITE BATTERY

TRIPPLITE BATTERY

TRIPPLITE 5.0KVA

PDU (L630P-C13R/C19R)

COPP-48

COPP-48

COPP-48

CMP

CMP

CMP

PDU (515P-515R)(REAR)

FOPP-24-LC

C

B

D

C

B

1234567

A

FOUO (FOR OFFICIAL USE ONLY)

APPROVED BY: SCALE:

B

SIZE FSCM NO

SHEET

54233

DRAWN BY: JSS

CAMP ZAMA (ZAMJP)

02/24/2020

DWG. NO.

FLOORPLANS AND RACK ELEVATIONS

ZA

M

JP

_1

_N

4_

Fl oo r_ Pl an _a nd _R ac k_

El ev at io n_

.v sd x

2/

/2

:5

AM

Network Diagram

A

ETA

DATE:

ZONEREV DATEREVISION DESCRIPTION APPROVED

20191206EAS SURVEY

BLD547 RM103

WHA547MTC

WHEHI-547-103-1

WHEHI-547-130-1

BLD1020 RM130

WHEHI-547-3a-1

BLD1020 RM3A

10/12 SM Vacant

BLD547 RM103

ADS547

WHEHI-547-103-1

WHEHI-547-130-1

BLD1020 RM130

WHEHI-547-3a-1

BLD1020 RM3A

Wall FOPPRack FOPP 6 Strands

102 104

ACS102-2

FO

PP

FOPP

ACS102-1

FO

PP

FOPP

FOPP FOPP

FOPP

102 104

ACS102-2

FO

PP

FOPP

ACS102-1

FO

PP

Wall FOPP

FOPP

FOPP

FOPP

FOPP

10/12 SM Vacant

C2 Building

C

B

D

C

B

1234567

A

FOUO (FOR OFFICIAL USE ONLY)

APPROVED BY: SCALE:

B

SIZE FSCM NO

SHEET

54233

DRAWN BY: JSS

CAMP ZAMA (ZAMJP)

02/24/2020

DWG. NO.

FLOORPLANS AND RACK ELEVATIONS

ZA

M

JP

_1

_N

4_

Fl oo r_ Pl an _a nd _R ac k_

El ev at io n_

.v sd x

2/

/2

:5

AM

UPS

A

ETA

DATE:

ZONEREV DATEREVISION DESCRIPTION APPROVED

20191206EAS SURVEY

UPS

5-15R

20A 1/16 : 1

SITECODE BUILDING ##

ROOM TR1

EQUIPMENT DETAIL

5-15R 5-15R 5-15R

5-15R 5-15R 5-15R 5-15R

20A

20A

30A

20A

C15 C14 C14 C19

C14 C14 C19 C19

EAS220-1

EAS220-2

EAS220-3

C15

C15

C15

C15

C15

C19

L6-30

L6-30

20A 20A

30A

C14 C14 C19

C14 C14 C19 C19

C19

L6-30

Tripp Lite SU1500RTXLCDTAA 13 minutes

Tripp Lite BP48V60RT3UTAA Additional 126 minutes

5-15P

120V 15A

5-15R

5-15R

5-15R

5-15R

5-15R

5-15R

5-15R5-15R

-1

R

-1

R

3.50 x 17.50 x 18.50 in

5.25 x 17.50 x 25 in

C-15 C-15

1.5a

C-15

1.5a

C-15

1.5a

1.5a

ADS

2x WSC3850-24XS-SPS1 PS2

PS1 PS2

Both 3850s together pull 2.3amps max. 2N = 2.3/2 = 1.15

L6-

PD

U

5-20R

Tripp Lite BP48V60RT3UTAA Additional 126 minutes

Tripp Lite BP48V60RT3UTAA Additional 126 minutes

C

B

D

C

B

1234567

A

FOUO (FOR OFFICIAL USE ONLY)

APPROVED BY: SCALE:

B

SIZE FSCM NO

SHEET

54233

DRAWN BY: JSS

CAMP ZAMA (ZAMJP)

02/24/2020

DWG. NO.

FLOORPLANS AND RACK ELEVATIONS

ZA

M

JP

_1

_N

-1

_F lo or _P la n_ an d_

Ra ck

_E le va tio n_

.v sd x

2/

/2

:2

AM

Floor Plan Template

A

ETA

DATE:

ZONEREV DATEREVISION DESCRIPTION APPROVED

20191210EAS SURVEY

8' -1

0"

21'-9"

N117

ZAMJP BUILDING 101

FLOOR PLAN

ROOM N117

TELECOMMUNCIATIONS AREA

REMOVE 2

STRAND FIBER

SCREMOVE

BACKBOARD

REMOVE 2 CAT

6 CABLES

Category Work Operation Descriptor UM Qty ISP Remove 1 backboard 30"x30" REMOVE LARGE ITEM EA 1

Remove fiber cables REMOVE_CABLE-SMALL FT 100 Remove copper cables REMOVE_CABLE-SMALL FT 50

C

B

D

C

B

1234567

A

FOUO (FOR OFFICIAL USE ONLY)

APPROVED BY: SCALE:

B

SIZE FSCM NO

SHEET

54233

DRAWN BY: JSS

CAMP ZAMA (ZAMJP)

02/24/2020

DWG. NO.

FLOORPLANS AND RACK ELEVATIONS

ZA

M

JP

_1

_N

-1

_F lo or _P la n_ an d_

Ra ck

_E le va tio n_

.v sd x

2/

/2

:2

AM

Rack Template

A

ETA

DATE:

ZONEREV DATEREVISION DESCRIPTION APPROVED

20191210EAS SURVEY

1/16 : 1

ZAMJP BUILDING 101

ROOM E116

EQUIPMENT DETAIL

C

B

D

C

B

1234567

A

FOUO (FOR OFFICIAL USE ONLY)

APPROVED BY: SCALE:

B

SIZE FSCM NO

SHEET

54233

DRAWN BY: JSS

CAMP ZAMA (ZAMJP)

02/24/2020

DWG. NO.

FLOORPLANS AND RACK ELEVATIONS

ZA

M

JP

_1

_N

-2

_F lo or _P la n_ an d_

Ra ck

_E le va tio n_

.v sd x

2/

/2

:2

AM

Floor Plan Template

A

PAK

DATE:

ZONEREV DATEREVISION DESCRIPTION APPROVED

20191204EAS SURVEY

5'-4"

ZAMJP BUILDING 101

FLOOR PLAN

ROOM N220

TELECOMMUNCIATIONS AREA

SIMPLEX L5-20R

BACKBOARD

FRONT

SBB

DUPLEX 5-20R

DUPLEX 5-20R

DUPLEX 5-20R

A/C PANELBOARD

UNLABELED POWER PANEL

BACKBOARD

DUPLEX 5-20R

SIMPLEX L6-30R

Category Work Operation Descriptor UM Qty ISP Install suspended Lighting LIGHT-CEILING-LED EA 1

Install 2 Backboards BACKBOARD EA 2 Ground Install RBB RBB-19IN EA 1

Install 25' of #6 Ground Wire to SBB Power Cable Grounding 6 AWG, 600V, GreenFT 30 Re-terminate exsisitng grounding lugs RETERMINATE GROUND LUG EA 1

Power Install 1 208v 30 amp circuits AC-240V-3PH-30AMP EA 2 Install 2 L5-20P PDU's PDU-L520P-520R EA 2

Ground Install RBB RBB-19IN EA 1 Install 25' of #6 Ground Wire to SBB Power Cable Grounding 6 AWG, 600V, GreenFT 30 Re-terminate exsisitng grounding lugs RETERMINATE GROUND LUG EA 1

Network Install additional switch for 25% growth GFE - ACS-3850 EA 1

GFE - ACS-3850 EA 1

Ground Install RBB RBB-19IN EA 1 Install 25' of #6 Ground Wire to SBB Power Cable Grounding 6 AWG, 600V, GreenFT 1 Re-terminate exsisitng grounding lugs RETERMINATE GROUND LUG EA 1

UPS Install 5KVA controller UPS-5KVA-CONTROLLER EA 1 2-post rack kit needed UPS-2POSTRMKITHD EA 1

ISP Relocate equipment for UPS Remove/Relocate Equip EA 1 UPS Install 5KVA 8 hour battery UPS-5KVA-BATTERY-BP192V12RT3UTAAEA 1 Ground Install SBB SBB EA 1

Install 500' of 750AWG grounding wire Power Cable Grounding 6 AWG, 600V, GreenFT 1 Copper Install new CAT6 COPP-48 COPP-48-CAT6 EA 1

Re-run existing drops with new CAT6 cable to new COPP-48 CAT6-DROP-REPLACE EA 48 Network Install and label new CAT6 jumpers to replace existing PATCH CAT6 1M EA 48 Copper Install new CAT6 COPP-48 COPP-48-CAT6 EA 1

Re-run existing drops with new CAT6 cable to new COPP-48 CAT6-DROP-REPLACE EA 48 Network Install and label new CAT6 jumpers to replace existing PATCH CAT6 1M EA 48 Copper Install new CAT6 COPP-48 COPP-48-CAT6 EA 1

Re-run existing drops with new CAT6 cable to new COPP-48 CAT6-DROP-REPLACE EA 48 Network Install and label new CAT6 jumpers to replace existing PATCH CAT6 1M EA 48 Copper Install new CAT6 COPP-48 COPP-48-CAT6 EA 1

Re-run existing drops with new CAT6 cable to new COPP-48 CAT6-DROP-REPLACE EA 48 Network Install and label new CAT6 jumpers to replace existing PATCH CAT6 1M EA 48 Copper Install new CAT6 COPP-48 COPP-48-CAT6 EA 1

Re-run existing drops with new CAT6 cable to new COPP-48 CAT6-DROP-REPLACE EA 48 Network Install and label new CAT6 jumpers to replace existing PATCH CAT6 1M EA 48 Copper Install new CAT6 COPP-48 COPP-48-CAT6 EA 1

Re-run existing drops with new CAT6 cable to new COPP-48 CAT6-DROP-REPLACE EA 48 Network Install and label new CAT6 jumpers to replace existing PATCH CAT6 1M EA 48 ISP Remove COPP Remove/Relocate Equip EA 1 Copper Install new CAT6 COPP-48 CAT6-DROP-REPLACE EA 24 Network Re-run existing drops with new CAT6 cable to new COPP-48 PATCH CAT6 1M EA 24 Copper Install and label new CAT6 jumpers to replace existing COPP-48-CAT6 EA 1

Install new CAT6 COPP-48 CAT6-DROP-REPLACE EA 48 Network Re-run existing drops with new CAT6 cable to new COPP-48 PATCH CAT6 1M EA 48 Copper Install and label new CAT6 jumpers to replace existing COPP-48-CAT6 EA 1 ISP Remove COPP Remove/Relocate Equip EA 1

Remove/Relocate Equip EA 1 Remove/Relocate Equip EA 1 Remove/Relocate Equip EA 1 Remove/Relocate Equip EA 1 Remove/Relocate Equip EA 1

Enclosures Install 15 2RU Horizontal CMP's CMP-2RU EA 15 ISP Install 3 4inch sleeve kits and conduit in wall FIRE-BARRIER-SLEEVE-KIT-4IN EA 3

Install 3 4inch sleeve kits and conduit in floor FIRE-BARRIER-SLEEVE-KIT-4IN EA 1 Re-cable (Create a discriptor) 63 total Remove/Relocate Equip EA 70

C

B

D

C

B

1234567

A

FOUO (FOR OFFICIAL USE ONLY)

APPROVED BY: SCALE:

B

SIZE FSCM NO

SHEET

54233

DRAWN BY: JSS

CAMP ZAMA (ZAMJP)

02/24/2020

DWG. NO.

FLOORPLANS AND RACK ELEVATIONS

ZA

M

JP

_1

_N

-2

_F lo or _P la n_ an d_

Ra ck

_E le va tio n_

.v sd x

2/

/2

:2

AM

Rack Template

A

PAK

DATE:

ZONEREV DATEREVISION DESCRIPTION APPROVED

20191204EAS SURVEY

1/16 : 1

ZAMJP BUILDING 101

ROOM N220

EQUIPMENT DETAIL

7' RACK

PROPOSED

RR01.01

7' RACK

PROPOSED

RR01.02

7 FEET

7' RACK

PROPOSED

RR01.03

CMP

EAS101 C3850-48F

EAS101 C3850-48F

EAS101 C3850-48F

CMP

EAS101 C3850-48F

EAS101 C3850-48F

PDU (L620P-C13R)

RBB (REAR)

EAS101 C3850-48F

CMP

CMP

TRIPPLITE BATTERY

TRIPPLITE BATTERY

TRIPPLITE BATTERY

TRIPPLITE BATTERY

TRIPPLITE 5.0KVA

PDU (L630P-C13R/C19R)

EAS101 C3850-48F

CMP

CMP

7' CABINET

EXISTING

RR01.01 (RR.1.1)

7 FEET

7' CABINET

EXISTING

RR01.01 (RR.1.1)

7 FEET

7' CABINET

EXISTING

RR01.01 (RR.1.1)

7 FEET

CMP

CMP

COPP-48

COPP-24

COPP-48

CMP

CMP

COPP-48

COPP-48

CMP

CMP

COPP-48

COPP-48

CMP

COPP-48

COPP-48

CMP

COPP-48

COPP-48

CMP

COPP-48

COPP-48

COPP-24

COPP-24

FOPP-24-SC

CMP

EASxxx C3850-48F

EASxxx C3850-48F

EASxxx C3850-48F

EASxxx C3850-48F

EASxxx C3850-48F

CMP

EASxxx C3850-48F

PDU

FOPP-24-SC

CMP

FOPP-24-SC

CMP

FOPP-24-SC

CMP

FOPP-24-SC

CMP

FOPP-24-SC

CMP

7 FEET

FOPP-24-SC

CMP

FOPP-24-SC

CMP

FOPP-24-SC

CMP

FOPP-24-SC

CMP

FOPP-24-SC

CMP

FOPP-24-SC

CMP

RBB (REAR)

CMP

7 FEET

CMP

COPP-48

COPP-48

CMP

CMP

COPP-48

COPP-48

CMP

CMP

COPP-48

COPP-48

COPP-48

COPP-48

CMP

CMP

COPP-24

RR01.01

RBB (REAR)

CMP

C

B

D

C

B

1234567

A

FOUO (FOR OFFICIAL USE ONLY)

APPROVED BY: SCALE:

B

SIZE FSCM NO

SHEET

54233

DRAWN BY: JSS

CAMP ZAMA (ZAMJP)

01/08/2020

DWG. NO.

FLOORPLANS AND RACK ELEVATIONS

1-

ZA

M

JP

_1

_S

0_ Fl oo r_

Pl an

_a nd

_R ac k_ El ev at io n_

.v sd x

1/ 8/

2:

P

M

Floor Plan Template

A

PAK

DATE:

ZONEREV DATEREVISION DESCRIPTION APPROVED

20191205EAS SURVEY

8'-3"

'-3

S220

ZAMJP BUILDING 101

FLOOR PLAN

ROOM S220

TELECOMMUNCIATIONS AREA

SIMPLEX L5-20R

BACKBOARD

SBB

DUPLEX 5-20R

DUPLEX 5-20R

BACKBOARD

DUPLEX 5-20R

SIMPLEX L6-30R

FRONT

A/C PANELBOARD

UNLABELED POWER PANEL

Category Work Operation Descriptor UM Qty ISP Install suspended Lighting x 2 LIGHT-CEILING-LED EA 2 ISP Install 2 Backboards per Floor plan BACKBOARD EA 2 Ground Install RBB RBB-19IN EA 1 Ground Install 25' of #6 Ground Wire GND-CABLE-#6-AWG FT 25 Ground Ground new RBB to SBB GND-RACK EA 1 Power Install 1 208v 30 amp circuit AC-240V-2PH-30AMP EA 1 Power Install 1 L6-20P PDU PDU-L620P-C13R EA 1 Power Install 1 L6-30P PDU PDU-L630P-C13/19 EA 1 Ground Install RBB RBB-19IN EA 1 Ground Install 25' of #6 Ground Wire GND-CABLE-#6-AWG FT 25 Ground Re-terminate exsisitng grounding lugs RETERMINATE GROUND LUG EA 1 Network Install additional switch for 25% growth EAS-48PORT EA 1 Network Order 10 C14-C15 power cords CAB-C15-C14-10FT EA 10 Ground Install RBB RBB-19IN EA 1 Ground Install 25' of #6 Ground Wire GND-CABLE-#6-AWG FT 25 Ground Re-terminate exsisitng grounding lugs RETERMINATE GROUND LUG EA 1 UPS Install 5KVA in RR01.03 UPS-5KVA-2HR EA 1 UPS 2-post rack kit needed UPS-2POSTRMKITHD EA 1 Ground Install SBB SBB EA 1 Ground Install 20' #6 GND-WIRE GND-CABLE-#6-AWG FT 20 Enclosures install 500' of 750kcmil 750-GND-Cable-750-kcmil FT 500 Enclosures Install 3 2RU Horizontal CMP's CMP-2RU EA 3 ISP Install 1 VCMP in RR01.03 VCMP-45RU EA 1 ISP Install 2 4inch sleeve kits in wall FIRE-BARRIER-SLEEVE-KIT-4IN EA 2 ISP Install 2 4inch sleeve kits in floor FIRE-BARRIER-SLEEVE-KIT-4IN EA 2 ISP 11 conduits/holes need to be Fire stopped, Sealed, and Labeled FIRE-BARRIER-PUTTY-6IN EA 11 ISP 8 holes need to be labeled FIRESTOP-LABEL FT 8 ISP Re-Cable 190 total(Create new descriptor for this work) Remove/Relocate Equip EA 200

C

B

D

C

B

1234567

A

FOUO (FOR OFFICIAL USE ONLY)

APPROVED BY: SCALE:

B

SIZE FSCM NO

SHEET

54233

DRAWN BY: JSS

CAMP ZAMA (ZAMJP)

01/08/2020

DWG. NO.

FLOORPLANS AND RACK ELEVATIONS

1-

ZA

M

JP

_1

_S

0_ Fl oo r_

Pl an

_a nd

_R ac k_ El ev at io n_

.v sd x

1/ 8/

2:

P

M

Rack Template

A

PAK

DATE:

ZONEREV DATEREVISION DESCRIPTION APPROVED

20191205EAS SURVEY

1/16 : 1

ZAMJP BUILDING 101

ROOM S220

EQUIPMENT DETAIL

7' RACK

EXISTING

RR01.03 (NO LABEL)

7 FEET

7' RACK

EXISTING

RR01.02 (NO LABEL)

7 FEET

7' RACK

EXISTING

RR01.01 (NO LABEL)

7 FEET

CMP

COPP-48

CMP

COPP-48

CMP

COPP-48

CMP

COPP-48

CMP

COPP-48

CMP

COPP-48

CMP

COPP-48

COPP-24

CMP

COPP-48

CMP

EAS101 C3850-48F

EAS101 C3850-48F

EAS101 C3850-48F

EAS101 C3850-48F

PDU (L520P-520R)

RBB (REAR)CABLE LADDER

CMP

CMP

RBB (REAR)

FOPP-24-SC

7' RACK

PROPOSED

RR01.03 (NO LABEL)

7 FEET

7' RACK

PROPOSED

RR01.02 (NO LABEL)

7 FEET

7' RACK

PROPOSED

RR01.01 (NO LABEL)

7 FEET

CMP

COPP-48

CMP

COPP-48

CMP

COPP-48

CMP

COPP-48

CMP

COPP-48

CMP

COPP-48

CMP

COPP-48

COPP-24

CMP

COPP-48

CMP

EAS101 C3850-48F

EAS101 C3850-48F

EAS101 C3850-48F

EAS101 C3850-48F

PDU (520P-515R)

RBB (REAR)CABLE LADDER

CMP

CMP

RBB (REAR)

FOPP-24-SC

CMP

CMP

TRIPPLITE BATTERY

TRIPPLITE BATTERY

TRIPPLITE BATTERY

TRIPPLITE BATTERY

TRIPPLITE 5.0KVA

PDU (L620P-C13R)

PDU (L630P-C13R/C19R)

C

B

D

C

B

1234567

A

FOUO (FOR OFFICIAL USE ONLY)

APPROVED BY: SCALE:

B

SIZE FSCM NO

SHEET

54233

DRAWN BY: NF

CAMP ZAMA (ZAMJP)

02/24/2020

DWG. NO.

FLOORPLANS AND RACK ELEVATIONS

ZA

M

JP

_1

_W

-2

_F lo or _P la n_ an d_

Ra ck

_E le va tio n_

.v sd x

2/

/2

:3

AM

Floor Plan Template

A

PAK

DATE:

ZONEREV DATEREVISION DESCRIPTION APPROVED

20191206EAS SURVEY

ROOM W217

TELECOMMUNCIATIONS AREA

5' -2

20'-2"

W

(3) SIMPLEX L5-30R

BACKBOARD

SBBDUPLEX 5-20R

DUPLEX 5-20R

DUPLEX 5-20R

A/C PANELBOARD

UNLABELED POWER PANEL

BACKBOARD

DUPLEX 5-20R

SIMPLEX L6-30R

DUPLEX 5-20R

ZAMJP BUILDING 101

FLOOR PLAN

Category Work Operation Descriptor UM Qty ISP Install 2 Backboards BACKBOARD EA 1 Ground Install RBB RBB-19IN EA 1

Install 25' of #6 Ground Wire to SBB Power Cable Grounding 6 AWG, 600V, GreenFT 50 Re-terminate exsisitng grounding lugs RETERMINATE GROUND LUG EA 1

Power Install 1 208v 30 amp circuits AC-240V-3PH-30AMP EA 1 Install 2 L5-20P PDU's (10 5-20R) PDU-L520P-520R EA 2

Ground Install RBB RBB-19IN EA 1 Install 25' of #6 Ground Wire to SBB Power Cable Grounding 6 AWG, 600V, GreenFT 50 Re-terminate exsisitng grounding lugs RETERMINATE GROUND LUG EA 1

Network Install additional switch for 25% growth GFE - ACS-3850 EA 1 Ground Install RBB RBB-19IN EA 1

Install 25' of #6 Ground Wire to SBB Power Cable Grounding 6 AWG, 600V, GreenFT 50 Re-terminate exsisitng grounding lugs RETERMINATE GROUND LUG EA 1

UPS Install 5KVA UPS-5KVA-CONTROLLER EA 1 2-post rack kit needed 2POSTRMKITHD EA 1

ISP Relocate equipment for UPS Remove/Relocate Equip EA 1 UPS Install 5KVA 8 hour battery UPS-5KVA-BATTERY-BP192V12RT3UTAAEA 4 Ground Install SBB SBB EA 1

Install 500' of 750AWG grounding wire Power Cable Grounding 6 AWG, 600V, GreenFT 50 Copper Install new CAT6 COPP-48 COPP-48-CAT6 EA 1

Re-run existing drops with new CAT6 cable to new COPP-48 CAT6-DROP-REPLACE EA 1 Network Install and label new CAT6 jumpers to replace existing PATCH CAT6 1M EA 48 ISP Remove COPP REMOVE LARGE ITEM EA 1 Copper Install new CAT6 COPP-48 COPP-48-CAT6 EA 1

Re-run existing drops with new CAT6 cable to new COPP-48 CAT6-DROP-REPLACE EA 48 Network Install and label new CAT6 jumpers to replace existing PATCH CAT6 1M EA 48 ISP Remove COPP REMOVE LARGE ITEM EA 1 Copper Install new CAT6 COPP-48 COPP-48-CAT6 EA 1

Re-run existing drops with new CAT6 cable to new COPP-48 CAT6-DROP-REPLACE EA 48 Network Install and label new CAT6 jumpers to replace existing PATCH CAT6 1M EA 48 ISP Remove COPP REMOVE LARGE ITEM EA 1 Copper Install new CAT6 COPP-48 COPP-48-CAT6 EA 1

Re-run existing drops with new CAT6 cable to new COPP-48 CAT6-DROP-REPLACE EA 48 Network Install and label new CAT6 jumpers to replace existing PATCH CAT6 1M EA 48 ISP Remove COPP REMOVE LARGE ITEM EA 1

REMOVE LARGE ITEM EA 1

Copper Install new CAT6 COPP-48 COPP-48-CAT6 EA 1

Re-run existing drops with new CAT6 cable to new COPP-48 CAT6-DROP-REPLACE EA 48 Network Install and label new CAT6 jumpers to replace existing PATCH CAT6 1M EA 48 ISP Remove COPP REMOVE LARGE ITEM EA 1 Copper Install new CAT6 COPP-48 COPP-48-CAT6 EA 1

Re-run existing drops with new CAT6 cable to new COPP-48 CAT6-DROP-REPLACE EA 48 Network Install and label new CAT6 jumpers to replace existing PATCH CAT6 1M EA 48 ISP Remove COPP REMOVE LARGE ITEM EA 1 Enclosures Install 9 2RU Horizontal CMP's CMP-2RU EA 9 ISP Install 3 4inch sleeve kits and conduit in wall FIRE-BARRIER-SLEEVE-KIT-4IN EA 3

Install 3 4inch sleeve kits and conduit in floor FIRE-BARRIER-SLEEVE-KIT-4IN EA 3 Re-cable (Create a discriptor) Remove/Relocate Equip EA 1

C

B

D

C

B

1234567

A

FOUO (FOR OFFICIAL USE ONLY)

APPROVED BY: SCALE:

B

SIZE FSCM NO

SHEET

54233

DRAWN BY: NF

CAMP ZAMA (ZAMJP)

02/24/2020

DWG. NO.

FLOORPLANS AND RACK ELEVATIONS

ZA

M

JP

_1

_W

-2

_F lo or _P la n_ an d_

Ra ck

_E le va tio n_

.v sd x

2/

/2

:3

AM

Rack Template

A

PAK

DATE:

ZONEREV DATEREVISION DESCRIPTION APPROVED

20191206EAS SURVEY

1/16 : 1

ZAMJP BUILDING 101

ROOM E216

EQUIPMENT DETAIL

7' RACK

PROPOSED

7' RACK

PROPOSED

RR01.02 (NO LABEL)

7 FEET

7' RACK

PROPOSED

RR01.03 (NO LABEL)

7 FEET

CMP

EAS101 C3850-48F

EAS101 C3850-48F

CMP

PDU (L620P-C13R)

RBB (REAR)

RBB (REAR)

EAS101 C3850-48F

TRIPPLITE BATTERY

TRIPPLITE BATTERY

TRIPPLITE BATTERY

TRIPPLITE BATTERY

TRIPPLITE 5.0KVA

PDU (L630P-C13R/C19R)

7' RACK

EXISTING

RR01.01 (NO LABEL)

7 FEET

7' RACK

EXISTING

RR01.02 (NO LABEL)

7 FEET

7' RACK

EXISTING

RR01.03 (NO LABEL)

7 FEET

CMP

COPP-48

CMP

COPP-48

CMP

CMP

COPP-48

CMP

COPP-48

CMP

COPP-48

CMP

COPP-48

CMP

CMP

FOPP-24-SC

CMP

CMP

EAS101 C3850-48F

EAS101 C3850-48F

EAS101 C3850-48F

CMP

RBB (REAR)RBB (REAR) RBB (REAR)

FOPP-24-SC

CMP

CMP

COPP-48

COPP-48

COPP-24

CMP

COPP-24

COPP-24

COPP-24

COPP-24

RR01.01 (NO LABEL)

7 FEET

CMP

COPP-48

CMP

COPP-48

COPP-48

CMP

COPP-48

CMP

COPP-48

CMP

COPP-48

CMP

Shelf Shelf

CMP

EAS101 C3850-48F

C

B

D

C

B

1234567

A

FOUO (FOR OFFICIAL USE ONLY)

APPROVED BY: SCALE:

B

SIZE FSCM NO

SHEET

54233

DRAWN BY: JSS

CAMP ZAMA (ZAMJP)

02/24/2020

DWG. NO.

FLOORPLANS AND RACK ELEVATIONS

ZA

M

JP

_1

_W

-2

_F lo or _P la n_ an d_

Ra ck

_E le va tio n_

.v sd x

2/

/2

:3

AM

Floor Plan Template

A

PAK

DATE:

ZONEREV DATEREVISION DESCRIPTION APPROVED

20191206EAS SURVEY

ZAMJP BUILDING 101

FLOOR PLAN

ROOM W-234

TELECOMMUNCIATIONS AREA

RR01.01

BACKBOARD

SBB

DUPLEX 5-15R

DUPLEX 5-20R

FR

O

N T

AC POWER SUB-PANEL TO2L-4W

WALL COPP

CABLE LADDER

DUPLEX 5-15R

BACKBOARD

Category Work Operation Descriptor UM Qty Security Install new door that swings out FE-DOOR EA 1 ISP Install new lighting LIGHT-CEILING-LED EA 1 ISP Install 2 Backboards BACKBOARD EA 2 ISP Remove rack REMOVE-LARGE-ITEM EA 1 Power Install 1 208v 30 amp circuits AC-240V-3PH-30AMP EA 1 Power Install 2 L5-20P PDU's (10 5-20R) PDU-L520P-520R EA 2 Ground Install RBB RBB-19IN EA 1 Ground Install 25' of #6 Ground Wire to SBB Power Cable Grounding 6 AWG, 600V, GreenFT 20 Ground Re-terminate exsisitng grounding lugs RETERMINATE GROUND LUG EA 1 UPS Install 2.2KVA UPS-2.2KVA-CONTROLLER EA 1 UPS 2-post rack kit needed 2POSTRMKITHD EA 1 ISP Relocate equipment for UPS REMOVE-UPS EA 1 UPS Install 2.2KVA batterys UPS-1.5/2.2kVA-BATTERY EA 1 Copper Install 3 COPP-48 in RR01.01 COPP-48-CAT6 EA 3 Enclosures Install 4 2RU Horizontal CMP's CMP-2RU EA 4 ISP Install 2 VCMP VCMP-45RU EA 2 ISP Install cable ladder from patch panel mounted to wall to RR01.01 K1010-CA-LADDER EA 1 Network Re-cable (Create a discriptor) PATCH CAT6 1M EA 48

C

B

D

C

B

1234567

A

FOUO (FOR OFFICIAL USE ONLY)

APPROVED BY: SCALE:

B

SIZE FSCM NO

SHEET

54233

DRAWN BY: JSS

CAMP ZAMA (ZAMJP)

02/24/2020

DWG. NO.

FLOORPLANS AND RACK ELEVATIONS

ZA

M

JP

_1

_W

-2

_F lo or _P la n_ an d_

Ra ck

_E le va tio n_

.v sd x

2/

/2

:3

AM

Rack Template

A

PAK

DATE:

ZONEREV DATEREVISION DESCRIPTION APPROVED

20191206EAS SURVEY

1/16 : 1

ZAMJP BUILDING 101

ROOM W-234

EQUIPMENT DETAIL

7' RACK

EXISTING

RR01.01 (NO LABEL)

7 FEET

FOPP-24-SC

EAS101 C3850-48F

EATON 9.0KVA

CMP

TRIPPLITE BATTERY

TRIPPLITE BATTERY

TRIPPLITE BATTERY

TRIPPLITE BATTERY

TRIPPLITE 2.2KVA

PDU (520P-520R)

7' RACK

PROPOSED

RR01.01 (NO LABEL)

7 FEET

FOPP-24-SC

EAS101 C3850-48F

PDU (520P-520R)

COPP-48

COPP-48

CMP

COPP-48

CMP

RBB (REAR)

C

B

D

C

B

1234567

A

FOUO (FOR OFFICIAL USE ONLY)

APPROVED BY: SCALE:

B

SIZE FSCM NO

SHEET

54233

DRAWN BY: NF

CAMP ZAMA (ZAMJP)

02/24/2020

DWG. NO.

FLOORPLANS AND RACK ELEVATIONS

ZA

M

JP

_1

_F

-1

_F lo or _P la n_ an d_

Ra ck

_E le va tio n_

.v sd x

2/

/2

:4

AM

Floor Plan Template

A

PAK

DATE:

ZONEREV DATEREVISION DESCRIPTION APPROVED

20191212EAS SURVEY

21'-3"

'-1

F111

ZAMJP BUILDING 102

FLOOR PLAN

ROOM F111

TELECOMMUNCIATIONS AREA

DUPLEX 5-20R

BACKBOARD

SBBDUPLEX 5-20R

UNLABELED

POWER PANEL

BACKBOARD

FRONT

FRONT

DUPLEX 5-20R

CABLE LADDER

CABLE LADDER

A/C PANELBOARD

Category Work Operation Descriptor UM Qty ISP Install 2 Backboards BACKBOARD EA 2

Remove existing cabinet REMOVE/RELOCATE EQUIP EA 1 Enclosures Install 7' rack RACK-4POST-45U EA 1 Power Install new 20A circuit with L520R receptacle AC-REPLACE-L520 EA 1

Install 1 new PDU with L5-20P in new rack PDU-L520P-520R EA 1 Ground Install RBB RBB-19IN EA 1

Install #6 Ground wire Power Cable Grounding 6 AWG, 600V, GreenFT 100 Install PBB in TR PBB EA 1 Bond new rack to PBB GND-RACK EA 1 Bond PBB to Power Panel GND-CABLE-#6-AWG FT 50

Fiber Install new FOPP 24 to M112 FOPP-24-SC EA 1 ISP Label existing fiber jumpers LABEL-EXISTING EA 1 Network Install and label new CAT6 jumpers PATCH CAT6 1M EA 7 Copper Install new CAT6 COPP-48 COPP-48-CAT6 EA 1

Re-run existing drops with new CAT6 cable to new COPP-48 CAT6-DROP-REPLACE EA 1 Network Install and label new CAT6 jumpers PATCH CAT6 1M EA 1 Copper Install new CAT6 COPP-48 COPP-48-CAT6 EA 1

Re-run existing drops with new CAT6 cable to new COPP-48 CAT6-DROP-REPLACE EA 1 Network Install and label new CAT6 jumpers PATCH CAT6 1M EA 6 Copper Install new CAT6 COPP-48 COPP-48-CAT6 EA 1

Re-run existing drops with new CAT6 cable to new COPP-48 CAT6-DROP-REPLACE EA 1 Enclosures Install 5 2RU horizontal CMP's CMP-2RU EA 5 ISP Install VCMP in new rack VCMP-45RU EA 2

Install 2 new cable ladders to rack CABLE-LADDER-12IN FT 20

C

B

D

C

B

1234567

A

FOUO (FOR OFFICIAL USE ONLY)

APPROVED BY: SCALE:

B

SIZE FSCM NO

SHEET

54233

DRAWN BY: NF

CAMP ZAMA (ZAMJP)

02/24/2020

DWG. NO.

FLOORPLANS AND RACK ELEVATIONS

ZA

M

JP

_1

_F

-1

_F lo or _P la n_ an d_

Ra ck

_E le va tio n_

.v sd x

2/

/2

:4

AM

Rack Template

A

PAK

DATE:

ZONEREV DATEREVISION DESCRIPTION APPROVED

20191212EAS SURVEY

1/16 : 1

ZAMJP BUILDING 102

ROOM F111

EQUIPMENT DETAIL

6 FEET

PDU (REAR)

6' RACK

EXISTING

REAR

RR01.01 (NO LABEL)

6' RACK

EXISTING

FRONT

RR01.01 (NO LABEL)

6 FEET

COPP-48

CMP

COPP-48

CMP

COPP-48

CMP

Panel

EAS102 C3850-48F

FOPP-12-SC

ASR 1001-X

C3850-48F

C2921

7' RACK

PROPOSED

RR01.03 (NO LABEL)

7 FEET

CMP

COPP-48

CMP

COPP-48

CMP

RBB (REAR)

FOPP-24-SC

CMP

COPP-48

EAS102 C3850-48F

ASR 1001-X

C3850-48F

C2921

PDU (L520P-520R)

C

B

D

C

B

1234567

A

FOUO (FOR OFFICIAL USE ONLY)

APPROVED BY: SCALE:

B

SIZE FSCM NO

SHEET

54233

DRAWN BY: JSS

CAMP ZAMA (ZAMJP)

02/24/2020

DWG. NO.

FLOORPLANS AND RACK ELEVATIONS

ZA

M

JP

_1

_F

6_

Fl oo r_ Pl an _a nd _R ac k_

El ev at io n_

.v sd x

2/

/2

:5

AM

TR Floor Plan

A

PAK

DATE:

ZONEREV DATEREVISION DESCRIPTION APPROVED

20191211EAS SURVEY

10'-0"

8' -6

F206

ZAMJP BUILDING 102

FLOOR PLAN

ROOM F206

TELECOMMUNCIATIONS AREA

SIMPLEX L530R

PANEL L1/PANEL L2

BACKBOARD

SBB

Category Work Operation Descriptor UM Qty ISP Install 1 backboard for wall mount cabinet BACKBOARD EA 1 ISP Install 1 additional backboard for SBB BACKBOARD EA 1 ISP Install wall rack to wall Remove/Relocate Equip EA 1 Power Install 1PDU With L5-30A PDU-L530P-520R EA 1 Ground Install RBB RBB-19IN EA 1 Ground Install SBB SBB EA 1 Enclosures Install 50' of 350kcmil wire 750-GND-Cable-750-kcmil FT 50 Ground Ground to power panel GND-ITEM EA 1 Fiber Install 1 12 strand SC FOPPS in M112 and in F206 FOPP-24-LC EA 2 Enclosures Install 1 1RU Horizontal CMP CMP-1RU EA 1

C

B

D

C

B

1234567

A

FOUO (FOR OFFICIAL USE ONLY)

APPROVED BY: SCALE:

B

SIZE FSCM NO

SHEET

54233

DRAWN BY: JSS

CAMP ZAMA (ZAMJP)

02/24/2020

DWG. NO.

FLOORPLANS AND RACK ELEVATIONS

ZA

M

JP

_1

_F

6_

Fl oo r_ Pl an _a nd _R ac k_

El ev at io n_

.v sd x

2/

/2

:5

AM

Rack Template

A

PAK

DATE:

ZONEREV DATEREVISION DESCRIPTION APPROVED

20191211EAS SURVEY

1/16 : 1

ZAMJP BUILDING 102

ROOM F206

EQUIPMENT DETAIL

3' CABINET

EXISTING

RR00.01 (NO LABEL)

3 FEET

EAS102 C3850-48F

PDU (520P-520R)

3' CABINET

PROPOSED

RR00.01 (NO LABEL)

3 FEET

EAS102 C3850-48F

PDU (L530P-520R)

CMP

FOPP-12-LC

C

B

D

C

B

1234567

A

FOUO (FOR OFFICIAL USE ONLY)

APPROVED BY: SCALE:

B

SIZE FSCM NO

SHEET

54233

DRAWN BY: JSS

CAMP ZAMA (ZAMJP)

01/08/2020

DWG. NO.

FLOORPLANS AND RACK ELEVATIONS

1-

ZA

M

JP

_1

_M

2_ Fl oo r_

Pl an

_a nd

_R ac k_ El ev at io n_

.v sd x

1/ 8/

:2

PM

TR Floor Plan

A

PAK

DATE:

ZONEREV DATEREVISION DESCRIPTION APPROVED

20191211EAS SURVEY

21'-10"

'-1 1"

M112

ZAMJP BUILDING 102

FLOOR PLAN

ROOM M112

TELECOMMUNCIATIONS AREA

FRO

N

T

PBB

UNLABELED POWER PANEL 1

MDF

PANEL 1

4X DUPEX 5-20R

2X SIMPLEX 5-20R

2X DUPLEX 5-15R

2X QUAD 5-15R

NTT FIBER SPLICE TRAY

AMP ILON BACKBOARD

TEMPERATURE

MONITORING

SYSTEM

BACKBOARD

UNLABELED POWER PANEL 2

2X DUPEX 5-15R

Category Work Operation Descriptor UM Qty ISP relocate rack BACKBOARD EA 1 Power install 1 208v 60 amp circuit AC-208V-1PH-60AMP EA 1 Ground Install RBB RBB-19IN EA 0 ISP Label RBB LABEL-EXISTING EA 28 ISP Label grounds LABEL-EXISTING EA 28 Ground reterminate ground Lugs RETERMINATE GROUND LUG EA 1 ISP relocate rack Remove/Relocate Equip EA 1 Power install 1 208v 60 amp circuit AC-208V-1PH-60AMP EA 1 Ground Install RBB RBB-19IN EA 1 ISP Label RBB LABEL-EXISTING EA 1 ISP Label grounds LABEL-EXISTING EA 1 Ground reterminate ground Lugs RETERMINATE GROUND LUG EA 1 ISP relocate rack Remove/Relocate Equip EA 1 ISP Label Ground bar LABEL-EXISTING EA 1 ISP Label grounds LABEL-EXISTING EA 1 Enclosures replace rack with Black Box RM162A RACK-45RU-4POST-SYSTEM EA 1 ISP remove old rack Remove/Relocate Equip EA 1 ISP relocate equipment Remove/Relocate Equip EA 1 ISP Label Ground bar LABEL-EXISTING EA 1 ISP Label Grounds LABEL-EXISTING EA 1 ISP relocate rack Remove/Relocate Equip EA 1 Power install 2 L6-20P-C13r PDU-L620P-C13R EA 2 ISP Label RBB LABEL-EXISTING EA 1 ISP Label grounds LABEL-EXISTING EA 1 Network install additional 3850 for growth EAS-48PORT EA 1 Enclosures replace rack with Black Box RM162A RACK-45RU-4POST-SYSTEM EA 1 ISP remove old rack REMOVE-CABINET EA 1 ISP relocate equipment Remove/Relocate Equip EA 1 Copper Re-run 120 drops to RR01.06 CAT6-DROP-REPLACE EA 120 Ground Install RBB RBB-19IN EA 1 ISP Label RBB LABEL-EXISTING EA 1 ISP Label grounds LABEL-EXISTING EA 1 Ground reterminate ground Lugs RETERMINATE GROUND LUG EA 1 Power Install 100amp 208-120v panel AC-Sub-Panel-240V/100A EA 1 Fiber FOC-SM-OS1-12 (RISER) FOC-SM-OS1-12 (RISER) FT 350 Fiber FOPP-24-LC FOPP-24-LC EA 1 Enclosures Add 3 horizontal CMPs CMP-2RU EA 3 ISP Needs 3 4" fire sleeve for wall FIRE-BARRIER-SLEEVE-KIT-4IN EA 3 ISP Needs 2 4" fire sleeve for floor FIRE-BARRIER-SLEEVE-KIT-4IN EA 2 ISP 9 holes to be labled FIRESTOP-LABEL EA 9 ISP 4 holes to be fire stopped FIRE-BARRIER-PUTTY-6IN EA 4

C

B

D

C

B

1234567

A

FOUO (FOR OFFICIAL USE ONLY)

APPROVED BY: SCALE:

B

SIZE FSCM NO

SHEET

54233

DRAWN BY: JSS

CAMP ZAMA (ZAMJP)

01/08/2020

DWG. NO.

FLOORPLANS AND RACK ELEVATIONS

1-

ZA

M

JP

_1

_M

2_ Fl oo r_

Pl an

_a nd

_R ac k_ El ev at io n_

.v sd x

1/ 8/

:2

PM

Rack Template

A

PAK

DATE:

ZONEREV DATEREVISION DESCRIPTION APPROVED

20191211EAS SURVEY

1/16 : 1

ZAMJP BUILDING 102

ROOM M112

EQUIPMENT DETAIL

7' RACK

EXISTING

(RR01.04)

7 FEET

7' RACK

EXISTING

(RR01.05)

7 FEET

7' RACK

EXISTING

(RACK #6)

7 FEET

CMP

COPP-48

COPP-48

PDU (L620P-L620R)

EAS102 C3850-48F

EAS102 C3850-48F

RBB (REAR)

COPP-96

COPP-24

CMP

CABLE LADDER

CMP

EAS102 C3850-48F

CMP

7' RACK

EXISTING

RR01.01 (NO LABEL)

7 FEET

7' RACK

EXISTING

RR01.02 (NO LABEL)

7 FEET

7' RACK

EXISTING

(RR01.03)

7 FEET

APC BATTERY

RBB (REAR)RBB (REAR)

FOPP-96-SC

CORNING CABLE

SYSTEMS

CMP

FOPP-132-SC

CORNING CABLE

SYSTEMS

FOPP-24-SC

TRIPPLITE BATTERY

CMP

CMP

EAS102 C3850-48F

EAS102 C3850-48F

CMP

ACS102 C7706

CMP

APC BATTERY

PANASONIC

SENSOR

APC 9KVA

CMP

CMP

FOPP-24-SC

FOPP-24-SC

FOPP-24-SC

FOPP-24-SC

FOPP-24-SC

FOPP-24-SC

FOPP-24-SC

FOPP-24-SC

TRIPPLITE BATTERY

TRIPPLITE BATTERY

TRIPPLITE BATTERY

COPP-48

COPP-24

CMP

COPP-48

COPP-48

CMP

CMP

CMP

COPP-24

CMP

COPP-48

CMP

FOPP-144-SC

TRIPPLITE 5.0KVA

COPP-24

C

B

D

C

B

1234567

A

FOUO (FOR OFFICIAL USE ONLY)

APPROVED BY: SCALE:

B

SIZE FSCM NO

SHEET

54233

DRAWN BY: NF

CAMP ZAMA (ZAMJP)

01/08/2020

DWG. NO.

FLOORPLANS AND RACK ELEVATIONS

1-

ZA

M

JP

_1

_M -1

_F lo or

_P la n_ an d_ Ra ck _E le va tio n_

.v sd x

1/ 8/

:3

PM

Floor Plan Template

A

PAK

DATE:

ZONEREV DATEREVISION DESCRIPTION APPROVED

20191211EAS SURVEY

8'-9"

8' -5

M119

ZAMJP BUILDING 102

FLOOR PLAN

ROOM M119

TELECOMMUNCIATIONS AREA

ADD SECURITY

BARS ON

WINDOW

BACKBOARD

SUB-POWER PANEL

BACKBOARD

LIGHT SWITCH

Category Work Operation Descriptor UM Qty Security Install new door FE-DOOR EA 1 ISP Instal lgiht kit LIGHT-CEILING-LED EA 1 ISP Install 2 Backboards BACKBOARD EA 2

Install security bars on windows. 8' x 60". Needs Descriptor N/A 0 ISP Move equipment Remove/Relocate Equip EA 1 Power Install 2 power outlets for PDUs AC-120V-2PH-20AMP EA 2 Power Install 2 L5-20P PDU's (10 5-20R) PDU-L520P-520R EA 2 Ground Install RBB RBB-19IN EA 1 Ground Install 25' of #6 Ground Wire to SBB Power Cable Grounding 6 AWG, 600V, GreenFT 10 Ground Re-terminate exsisitng grounding lugs RETERMINATE GROUND LUG EA 1 Network Install Cisco 3850 for 25% growth. GFE - ACS-3850 EA 1 Ground Install RBB RBB-19IN EA 1 Ground Install 25' of #6 Ground Wire to SBB Power Cable Grounding 6 AWG, 600V, GreenFT 10 Ground Re-terminate exsisitng grounding lugs RETERMINATE GROUND LUG EA 1 Power Install sub-panel AC-Sub-Panel-240V/100A EA 0 Ground Install SBB SBB EA 0 Ground Install grounding wire Power Cable Grounding 6 AWG, 600V, GreenFT 20 Enclosures Install 7 2RU Horizontal CMP's CMP-2RU EA 7 ISP Install 3 4inch sleeve kits and conduit in wall FIRE-BARRIER-SLEEVE-KIT-4IN EA 3 ISP Re-cable (Create a discriptor) Remove/Relocate Equip EA 192

C

B

D

C

B

1234567

A

FOUO (FOR OFFICIAL USE ONLY)

APPROVED BY: SCALE:

B

SIZE FSCM NO

SHEET

54233

DRAWN BY: NF

CAMP ZAMA (ZAMJP)

01/08/2020

DWG. NO.

FLOORPLANS AND RACK ELEVATIONS

1-

ZA

M

JP

_1

_M -1

_F lo or

_P la n_ an d_ Ra ck _E le va tio n_

.v sd x

1/ 8/

:3

PM

Rack Template

A

PAK

DATE:

ZONEREV DATEREVISION DESCRIPTION APPROVED

20191211EAS SURVEY

1/16 : 1

ZAMJP BUILDING 102

ROOM M119

EQUIPMENT DETAIL

7' CABINET

EXISTING

RR01.01 (RACK1)

7 FEET

CMP

COPP-48

COPP-24

COPP-48

CMP

CMP

COPP-24

FOPP-24-SC

CMP

FOP 8-SC

EAS101 C3850-48F

EAS101 C3850-48F

EAS101 C3850-48F

PDU

PDU

7' CABINET

EXISTING

RR01.02 (Rack2

7 FEET

CMP

CMP

COPP-96

COPP-48

SHELF

7' RACK

PROPOSED

RR01.01

7 FEET

CMP

COPP-48

COPP-24

COPP-48

CMP

CMP

COPP-24

FOPP-24-SC

CMP

FOP 8-SC

EAS101 C3850-48F

EAS101 C3850-48F

EAS101 C3850-48F

PDU

PDU

CMP

CMP

CMP

EAS101 C3850-48F

CMP

7' RACK

PROPOSED

RR01.02

7 FEET

CMP

CMP

COPP-96

COPP-48

SHELF

C

B

D

C

B

1234567

A

FOUO (FOR OFFICIAL USE ONLY)

APPROVED BY: SCALE:

B

SIZE FSCM NO

SHEET

54233

DRAWN BY: NF

CAMP ZAMA (ZAMJP)

02/24/2020

DWG. NO.

FLOORPLANS AND RACK ELEVATIONS

ZA

M

JP

_1

_M

6_

Fl oo r_ Pl an _a nd _R ac k_

El ev at io n_

.v sd x

2/

/2

:0

PM

Floor Plan Template

A

PAK

DATE:

ZONEREV DATEREVISION DESCRIPTION APPROVED

20191211EAS SURVEY

10'-8"

'-1

0"

M126

ZAMJP BUILDING 102

FLOOR PLAN

ROOM M126

TELECOMMUNCIATIONS AREA

BACKBOARD

SUB-POWER PANEL

BACKBOARD

Category Work Operation Descriptor UM Qty Security Install new outward door FE-DOOR EA 1 ISP Install 2 Backboards BACKBOARD EA 2 Power Install 1 208v 30 amp circuits AC-120V-2PH-20AMP EA 2

Install 2 L5-20P PDU's (10 5-20R) PDU-L520P-520R EA 2 Ground Install RBB RBB-19IN EA 1

Install 25' of #6 Ground Wire to SBB Power Cable Grounding 6 AWG, 600V, GreenFT 25 Re-terminate exsisitng grounding lugs RETERMINATE GROUND LUG EA 1

Network Install Cisco 3850 for 25% growth. EAS-48PORT EA 1 Ground Install RBB RBB-19IN EA 1

Install 25' of #6 Ground Wire to SBB Power Cable Grounding 6 AWG, 600V, GreenFT 25 Re-terminate exsisitng grounding lugs RETERMINATE GROUND LUG EA 1

Power Install sub-panel AC-Sub-Panel-240V/100A EA 1 AC-Sub-Panel-240V/100A EA 1

Ground Install SBB SBB EA 1 Install 500' of 750AWG grounding wire Power Cable Grounding 6 AWG, 600V, GreenFT 25

Enclosures Label cables Relabel Racks EA 2 ISP Recable Remove/Relocate Equip EA 2 Enclosures Install 5 2RU Horizontal CMP's CMP-2RU EA 5 ISP Install 4 4inch sleeve kits and conduit in wall FIRE-BARRIER-SLEEVE-KIT-4IN EA 4

4 conduits need to be Fire stopped, Sealed, and Labeled FIRE-STOP EA 4

C

B

D

C

B

1234567

A

FOUO (FOR OFFICIAL USE ONLY)

APPROVED BY: SCALE:

B

SIZE FSCM NO

SHEET

54233

DRAWN BY: NF

CAMP ZAMA (ZAMJP)

02/24/2020

DWG. NO.

FLOORPLANS AND RACK ELEVATIONS

ZA

M

JP

_1

_M

6_

Fl oo r_ Pl an _a nd _R ac k_

El ev at io n_

.v sd x

2/

/2

:0

PM

Rack Template

A

PAK

DATE:

ZONEREV DATEREVISION DESCRIPTION APPROVED

20191211EAS SURVEY

1/16 : 1

ZAMJP BUILDING 102

ROOM M119

EQUIPMENT DETAIL

7' CABINET

EXISTING

RR01.01 (RACK1)

7 FEET

CMP

COPP-48

COPP-48

CMP

CMP

COPP-24

FOPP-24-SC

CMP

EAS101 C3850-48F

EAS101 C3850-48F

EAS101 C3850-48F

EAS101 C3850-48F

COPP-48

GB

7' CABINET

EXISTING

RR01.02 (Rack2

7 FEET

CMP

COPP-96

COP-24

CMP

COP-24

COPP-96

COP-24

CMP

COP-24

COP-24

GB

7' RACK

PROPOSED

RR01.01

7 FEET

CMP

COPP-48

COPP-24

COPP-48

CMP

CMP

COPP-24

FOPP-24-SC

CMP

FOP 8-SC

EAS101 C3850-48F

EAS101 C3850-48F

EAS101 C3850-48F

PDU

PDU

CMP

CMP

CMP

EAS101 C3850-48F

CMP

7' RACK

PROPOSED

RR01.02

7 FEET

CMP

CMP

COPP-96

COPP-48

SHELF

C

B

D

C

B

1234567

A

FOUO (FOR OFFICIAL USE ONLY)

APPROVED BY: SCALE:

B

SIZE FSCM NO

SHEET

54233

DRAWN BY: JSS

CAMP ZAMA (ZAMJP)

02/24/2020

DWG. NO.

FLOORPLANS AND RACK ELEVATIONS

ZA

M

JP

_1

_M

0_

Fl oo r_ Pl an _a nd _R ac k_

El ev at io n_

.v sd x

2/

/2

:2

PM

TR Floor Plan

A

PAK

DATE:

ZONEREV DATEREVISION DESCRIPTION APPROVED

20191211EAS SURVEY

21'-0"

5' -7

"M200

ZAMJP BUILDING 102

FLOOR PLAN

ROOM M200

TELECOMMUNCIATIONS AREA

4X SIMPLEX 6-20RPOWER PANEL BOARD

BACKBOARD

DUPLEX 5-15R

LIGHTING PANEL BOARD DUPLEX 5-15R

SBB

BACKBOARD

SHELF SHELF

POE/PNL

H

VAC

Category Work Operation Descriptor UM Qty ISP Install 2 backboards BACKBOARD EA 2 Power install 2 110v 20 amp circuit AC-120V-1PH-20AMP EA 2 Power Install 2 PDU-L520P-520R PDU-L520P-520R EA 2 Ground Install RBB RBB-19IN EA 1 ISP Label RBB LABEL-EXISTING EA 1 ISP Label grounds LABEL-EXISTING EA 1 Ground reterminate ground Lugs RETERMINATE GROUND LUG EA 1 Network Instal new cisco 3850 for growth EAS-48PORT EA 1 Ground Install RBB RBB-19IN EA 1 ISP Label RBB LABEL-EXISTING EA 1 ISP Label grounds LABEL-EXISTING EA 1 Ground Install SBB SBB EA 1 Ground 15' of #6-GND-CBL GND-CABLE-#6-AWG FT 15 Enclosures Install 4 1 ru CMP's CMP-1RU EA 4 ISP Needs 2 4" fire sleeve for ceiling/Wall FIRE-BARRIER-SLEEVE-KIT-4IN EA 2 ISP 10 holes to be labled FIRESTOP-LABEL EA 10 ISP 8 holes to be fire stopped FIRE-BARRIER-PUTTY-6IN EA 8

C

B

D

C

B

1234567

A

FOUO (FOR OFFICIAL USE ONLY)

APPROVED BY: SCALE:

B

SIZE FSCM NO

SHEET

54233

DRAWN BY: JSS

CAMP ZAMA (ZAMJP)

02/24/2020

DWG. NO.

FLOORPLANS AND RACK ELEVATIONS

ZA

M

JP

_1

_M

0_

Fl oo r_ Pl an _a nd _R ac k_

El ev at io n_

.v sd x

2/

/2

:2

PM

Rack Template

A

PAK

DATE:

ZONEREV DATEREVISION DESCRIPTION APPROVED

20191211EAS SURVEY

1/16 : 1

ZAMJP BUILDING 102

ROOM M200

EQUIPMENT DETAIL

EAS102 C3850-48F

7' RACK

EXISTING

RR01.01 (RACK 1)

7 FEET

EAS102 C3850-48F

EAS102 C3850-48F

EAS102 C3850-48F

FOPP-24-SC

CMP

CMP

PDU (520P-515R)

RBB

7' RACK

EXISTING

RR01.02 (RACK 2)

7 FEET

RBB

CMP

COPP-48

COPP-48

CMP

COPP-48

COPP-48

CMP

COPP-48

CMP

COPP-48

COPP-48

CMP

COPP-48

COPP-48

CMP

CABLE LADDER

EAS102 C3850-48F

7' RACK

PROPOSED

RR01.01 (RACK 1)

7 FEET

EAS102 C3850-48F

EAS102 C3850-48F

EAS102 C3850-48F

FOPP-24-SC

CMP

CMP

PDU (L520P-520R)

RBB

EAS102 C3850-48F

CMP

CMP

CMP

CMP

PDU (L520P-520R)

7' RACK

PROPOSED

RR01.02 (RACK 2)

7 FEET

RBB

CMP

COPP-48

COPP-48

CMP

COPP-48

COPP-48

CMP

COPP-48

CMP

COPP-48

COPP-48

CMP

COPP-48

COPP-48

CABLE LADDER

C

B

D

C

B

1234567

A

FOUO (FOR OFFICIAL USE ONLY)

APPROVED BY: SCALE:

B

SIZE FSCM NO

SHEET

54233

DRAWN BY: JSS

CAMP ZAMA (ZAMJP)

04/15/2020

DWG. NO.

FLOORPLANS AND RACK ELEVATIONS

ZA

M

JP

_1

_1

_F lo or

_P la n_ a nd _R ac k_

E le v at io n_

9.

vs dx

/1

5/

:1

AM

TR Floor Plan

A

PAK

DAT E:

ZONEREV DAT EREVIS IO N DESCRIPTIO N APPROVED

20200309EAS SURVEY

RR01.07

ZAMJP BUILDING 121

FLOOR PLAN

ROOM 110

TELECOMMUNCIATIONS AREA

46'8"

26'9"

RRO1.06

BACKBOARD

SIMPLEX L6-30R

BACKBOARD

Category Work Operation Descriptor UM Qty ISP (x2) Install backboard BACKBOARD EA 2

Enclosures (x1) Instal fan kit. FAN-KIT-CUSTOM EA 1

Ground (X1) INSTALL RBB IN RR01.06 RBB-19IN EA 1

Preparation (x1) Relocate equipment Remove/Relocate Equip EA 1

Preparation (x1) Relocate equipment Remove/Relocate Equip EA 1

Preparation (x1) Relocate equipment Remove/Relocate Equip EA 1

Preparation (x1) Relocate equipment Remove/Relocate Equip EA 1

Preparation (x1) Relocate equipment Remove/Relocate Equip EA 1

Enclosures (X1) Install new CABINET-ZONE4-45U CABINET-ZONE4-45U EA 1

UPS (X1) Install UPS-5KVA UPS-5KVA-CONTROLLER EA 1

UPS (X4) INSTALL BATTERIES FOR 5KVA UPS IN RR01.07. UPS-5KVA-BATTERY-BP192V12RT3UTAAEA 4

Power (X1) AC-220V-2PH-30AMP AC-240V-2PH-30AMP EA 1

Power (X2)PDU-L620P-L620R PDU-L620P-L620R EA 2

Preparation (x1) Remove / relocate FOPP-24 Remove/Relocate Equip EA 1

Fiber (x1) Install FOPP-24 FOPP-12SM (R&M) EA 1

Preparation (x1) Remove / relocate FOPP-24 REMOVE/RELOCATE EQUIP EA 1

Preparation (x1) Remove / relocate RELOCATE-EQUIPMENT EA 1

Network (X13) BLUE 5M CAT6 PATCH CABLES PATCH-RJ45-5M EA 13

Preparation (x1) Remove / relocate RELOCATE-EQUIPMENT EA 1

Network (X14) BLUE 5M CAT6 PATCH CABLES PATCH-RJ45-5M EA 14

Preparation (x1) Remove / relocate RELOCATE-EQUIPMENT EA 1

Network (X20) BLUE 5M CAT6 PATCH CABLES PATCH-RJ45-5M EA 20

Preparation (x1) Remove / relocate RELOCATE-EQUIPMENT EA 1

Network (X20) BLUE 5M CAT6 PATCH CABLES PATCH-RJ45-5M EA 20

Preparation (x1) Remove / relocate RELOCATE-EQUIPMENT EA 1

Network (X14) BLUE 5M CAT6 PATCH CABLES PATCH-RJ45-5M EA 14

Preparation (x1) Remove / relocate RELOCATE-EQUIPMENT EA 1

Network (X39) BLUE 5M CAT6 PATCH CABLES PATCH-RJ45-5M EA 39

Preparation (x1) Remove / relocate RELOCATE-EQUIPMENT EA 1

Network (X21) BLUE 5M CAT6 PATCH CABLES PATCH-RJ45-5M EA 21

Preparation (x1) Remove / relocate RELOCATE-EQUIPMENT EA 1

Network (X14) BLUE 5M CAT6 PATCH CABLES PATCH-RJ45-5M EA 14

Preparation (x1) Remove / relocate RELOCATE-EQUIPMENT EA 1

RELOCATE-EQUIPMENT EA 1

Network (X3) BLUE 5M CAT6 PATCH CABLES PATCH-RJ45-5M EA 3

Preparation (x1) Remove / relocate RELOCATE-EQUIPMENT EA 1

Network (X9) BLUE 5M CAT6 PATCH CABLES PATCH-RJ45-5M EA 9

Cable (x 3) Install 3 CMP-2RU into RR01.07 CMP-2RU EA 3

(x12) Install 12 CMP-1RU into RR01.06 CMP-1RU EA 12

(x1) Install 1 CMP-2ru into RR01.06 CMP-2RU EA 1

ISP (x1) Install Firestop to three holes in celling FIRE-BARRIER-PUTTY-6IN EA 1

POWER PANEL

C

B

D

C

B

1234567

A

FOUO (FOR OFFICIAL USE ONLY)

APPROVED BY: SCALE:

B

SIZE FSCM NO

SHEET

54233

DRAWN BY: JSS

CAMP ZAMA (ZAMJP)

04/15/2020

DWG. NO.

FLOORPLANS AND RACK ELEVATIONS

ZA

M

JP

_1

_1

_F lo or

_P la n_ a nd _R ac k_

E le v at io n_

9.

vs dx

/1

5/

:1

AM

Rack Elevat ion

A

PAK

DAT E:

ZONEREV DAT EREVIS IO N DESCRIPTIO N APPROVED

20200309EAS SURVEY

ZAMJP BUILDING 121

ROOM 110

EQUIPMENT DETAIL 1:16

RR01.06

7 FEET

7' CABINET

EXISTING

FOPP-24-SC

COPP-24

COPP-24

CMP

COPP-24

COPP-24

COPP-24

COPP-48

COPP-24

COPP-24

CMP

COPP-24

COPP-24

CMP

JBCE FIBER

CMP

JBCE COPPER

CMP

FOPP-24-SC

COPP-24

EAS121-C3850-48F

EAS121-C3850-48F

EAS121-C3850-48F

CMP

7' CABINET

PROPSOED

7 FEET

FOPP-24-LC

COPP-24

COPP-24

COPP-24

COPP-24

COPP-24

COPP-48

COPP-24

COPP-24

CMP

COPP-24

COPP-24

CMP

TJBCE121 C3850-24XS

CMP

TJBCE121 C3850-48F

CMP

FOPP-24-SC

COPP-24

RR01.06

RBB (REAR)

CMP

CMP

CMP

CMP

CMP

CMP

CMP

CMP

CMP

CMP

EAS121-C3850-48F

CMP

EAS121-C3850-48F

CMP

TRIPPLITE BATTERY

TRIPPLITE 5.0kVA

7' CABINET

PROPSOED

PDU (L620P-L620R)

PDU (L620P-L620R)

TRIPPLITE BATTERY

TRIPPLITE BATTERY

TRIPPLITE BATTERY

RBB (REAR)

EAS121-C3850-48F

7 FEET

RR01.07

45 45

7 FEET

RR01.07

45 45

C

B

D

C

B

1234567

A

FOUO (FOR OFFICIAL USE ONLY)

APPROVED BY: SCALE:

B

SIZE FSCM NO

SHEET

54233

DRAWN BY: NDF

SCHOFIELD BARRACKS (SCHHI)

04/20/2020

DWG. NO.

FLOORPLANS AND RACK ELEVATIONS

ZA

M

JP

_1

_R m

2_ Cl as sr oo m

D ra w in gs .v sd x

4/

/2

7:

A M

Floor Plan Template

A

ETA

DATE:

ZONEREV DATEREVISION DESCRIPTION APPROVED

20191112EAS SURVEY

ZAMJP BUILDING 125

FLOOR PLAN

ROOM 102

TELECOMMUNCIATIONS AREA

23'1"

17'4"

NEW 19RU CABINET

FOPP-24

COPP-48

2 X 2RU CMP

RBB

PDU

L5-20R

FRO

N

T

FRO

N

T

SBB

BACKBOARD 4' X 8'

TR

PP

Category Work Operation Descriptor UM Qty ISP (x1) Install backboard BACKBOARD EA 1

(x1) Install rack RU labels RU-LABELS EA 1 Enclosures (x1) Install wall cabinet 19RU system WALLCAB-19U-SYSTEM EA 1 Preparation (x1) Remove cabinet Remove/Relocate Equip EA 2 Power (X1) Install PDU (L5-20P TO 5-20R) PDU-520P-520R EA 1

(x1) Install power circuit to cabinet AC-120V-1PH-20AMP-L520 EA 1 Ground (x1) Install RBB RBB-19IN EA 1

(x1) Install SBB SBB EA 1 ISP (x1) Install grounding cables Ground Wire Support PKG 1 Fiber (x1) 24 port FOPP tie FOPP-24-SC EA 1 Copper (x1) Install COPP-48 COPP-48-CAT6 EA 1

(x24) Label jumpers COPP-PORT-LABEL EA 24 Network (x24) Install catch cables PATCH CAT6 1M EA 1

Cable (X2) CMP-2RU CMP-2RU EA 2 ISP (x3) Install Firestop to three holes in celling FIRE-STOP EA 3

(x3) Install Firestop labels FIRESTOP-LABEL EA 3

C

B

D

C

B

1234567

A

FOUO (FOR OFFICIAL USE ONLY)

APPROVED BY: SCALE:

B

SIZE FSCM NO

SHEET

54233

DRAWN BY: NDF

SCHOFIELD BARRACKS (SCHHI)

04/20/2020

DWG. NO.

FLOORPLANS AND RACK ELEVATIONS

ZA

M

JP

_1

_R m

2_ Cl as sr oo m

D ra w in gs .v sd x

4/

/2

7:

A M

Rack Template

A

ETA

DATE:

ZONEREV DATEREVISION DESCRIPTION APPROVED

20191112EAS SURVEY

ZAMJP BUILDING 125

ROOM 102

EQUIPMENT DETAIL

1:16

24RU CABINET

EXISTING

NO LABEL

EAS125-102-C3850-48F

19RU CABINET

PROPOSED

W01.01

19FOPP-24-SC

CMP

PDU L5-20

COPP-48

CMP

EAS125-102-C3850-48F

C

B

D

C

B

1234567

A

FOUO (FOR OFFICIAL USE ONLY)

APPROVED BY: SCALE:

B

SIZE FSCM NO

SHEET

54233

DRAWN BY: NDF

SCHOFIELD BARRACKS (SCHHI)

04/20/2020

DWG. NO.

FLOORPLANS AND RACK ELEVATIONS

ZA

M

JP

_1

_R m

4_ Cl as sr oo m

D ra w in gs (1

).v sd x

4/

/2

8:

A

M

Floor Plan Template

A

ETA

DATE:

ZONEREV DATEREVISION DESCRIPTION APPROVED

20191112EAS SURVEY

ZAMJP BUILDING 125

FLOOR PLAN

ROOM 104

TELECOMMUNCIATIONS AREA

57'9"

31'11"

NEW 19RU CABINET

FOPP-24

COPP-48

2 X 2RU CMP

RBB

PDU

L5-20R

FRO

N

T

FRONT

SBB

BACKBOARD 4' X 8'

PP TR

POWER PANEL L-6 (3P/4W) 120V/

208V

Category Work Operation Descriptor UM Qty ISP (x1) Install backboard BACKBOARD EA 1

(x1) Install rack RU labels RU-LABELS EA 1 Enclosures (x1) Install wall cabinet 19RU system WALLCAB-19U-SYSTEM EA 1 Power (X1) Install PDU (L5-20P TO 5-20R) PDU-520P-520R EA 2

(x1) Install power circuit to cabinet AC-120V-1PH-20AMP-L520 EA 1 Ground (x1) Install RBB RBB-19IN EA 1 Network (x1) Install Cisco 3850 48 POE+ EAS-48PORT EA 1 Ground (x1) Install SBB SBB EA 1 ISP (x1) Install grounding cables Ground Wire Support PKG 1 Fiber (x1) 24 port FOPP tie to storage room FOPP-24-SC EA 1 Copper (x1) Install COPP-48 COPP-48-CAT6 EA 1

(x24) Label jumpers COPP-PORT-LABEL EA 24 Network (x24) Install catch cables PATCH CAT6 1M EA 1 Copper (x24) Install CAT-6 drops CAT6-DROP-REPLACE EA 24 Cable (X2) CMP-2RU CMP-2RU EA 2 ISP (x3) Install Firestop to three holes in celling FIRE-STOP EA 3

C

B

D

C

B

1234567

A

FOUO (FOR OFFICIAL USE ONLY)

APPROVED BY: SCALE:

B

SIZE FSCM NO

SHEET

54233

DRAWN BY: NDF

SCHOFIELD BARRACKS (SCHHI)

04/20/2020

DWG. NO.

FLOORPLANS AND RACK ELEVATIONS

ZA

M

JP

_1

_R m

4_ Cl as sr oo m

D ra w in gs (1

).v sd x

4/

/2

8:

A

M

Rack Template

A

ETA

DATE:

ZONEREV DATEREVISION DESCRIPTION APPROVED

20191112EAS SURVEY

ZAMJP BUILDING 125

ROOM 102

EQUIPMENT DETAIL

1:16

24RU CABINET

EXISTING

NO LABEL

EAS125-102-C3850-48F

19RU CABINET

PROPOSED

W01.01

19FOPP-24-SC

CMP

PDU L5-20

COPP-48

CMP

EAS125-102-C3850-48F

C

B

D

C

B

1234567

A

FOUO (FOR OFFICIAL USE ONLY)

APPROVED BY: SCALE:

B

SIZE FSCM NO

SHEET

54233

DRAWN BY: JSS

CAMP ZAMA (ZAMJP)

02/24/2020

DWG. NO.

FLOORPLANS AND RACK ELEVATIONS

ZA

M

JP

_1

_1

_F lo or

_P la n_ an d_ Ra ck _E le va tio n_

.v sd x

2/

/2

:4

PM

TR Floor Plan

A

PAK

DATE:

ZONEREV DATEREVISION DESCRIPTION APPROVED

20191212EAS SURVEY

18'-9"

ZAMJP BUILDING 125

FLOOR PLAN

ROOM 129

TELECOMMUNCIATIONS AREA

BACKBOARD

DUPLEX 5-15RDUPLEX 5-15R

'-9

RR01.01

DUPLEX 5-15R

SIMPLEX 5-15R

AC SUB PANEL

SIMPLEX L5-20R

SIMPLEX L5-20R

Category Work Operation Descriptor UM Qty Enclosures Install new 45 RU lockable cabinet CABINET-45U EA 1 ISP Remove rack REMOVE-CABINET EA 1 ISP Move equipment (switch, FOPPS,COPPS Remove/Relocate Equip EA 1 Power Install 2 circuits for PDUs AC-120V-1PH-20AMP EA 2 Power Install 2 L5-20P 5-20R PDU PDU-L520P-520R EA 1 Ground 10' of #6-GND-WR GND-CABLE-#6-AWG FT 10 Network Install new 3850 for growth EAS-48PORT EA 1 ISP Remove rack REMOVE-CABINET EA 1 ISP remove equipment Remove/Relocate Equip EA 1 Power Install 208v/120v 60 amp sub panel in room 129 AC-Sub-Panel-240V/100A EA 1 Ground Install SBB SBB EA 1 Ground Install 25' of #6-GND-Wire grounding wire GND-CABLE-#6-AWG FT 25

Install new cat6 48 port COPP COPP-48-CAT6 EA 1 Copper Reterminate 48 User ports with Cat 6 CAT6-DROP-REPLACE EA 48

Install new cat6 48 port COPP COPP-48-CAT6 EA 1 Copper Reterminate 48 User ports with Cat 6 CAT6-DROP-REPLACE EA 48 Copper Install new cat6 24 port COPP COPP-24-CAT6 EA 1 Copper Reterminate 24 User ports with Cat 6 CAT6-DROP-REPLACE EA 24 Copper Install new cat6 24 port COPP COPP-24-CAT6 EA 1 Copper Reterminate 24 User ports with Cat 6 CAT6-DROP-REPLACE EA 24 Copper Install new cat6 24 port COPP COPP-24-CAT6 EA 1 Copper Reterminate 24 User ports with Cat 6 CAT6-DROP-REPLACE EA 24 Enclosures Install 2 1RU Horizontal CMP CMP-1RU EA 2 Enclosures Install 4 2 RU CMP CMP-2RU EA 4

C

B

D

C

B

1234567

A

FOUO (FOR OFFICIAL USE ONLY)

APPROVED BY: SCALE:

B

SIZE FSCM NO

SHEET

54233

DRAWN BY: JSS

CAMP ZAMA (ZAMJP)

02/24/2020

DWG. NO.

FLOORPLANS AND RACK ELEVATIONS

ZA

M

JP

_1

_1

_F lo or

_P la n_ an d_ Ra ck _E le va tio n_

.v sd x

2/

/2

:4

PM

Rack Template

A

PAK

DATE:

ZONEREV DATEREVISION DESCRIPTION APPROVED

20191212EAS SURVEY

1/16 : 1

ZAMJP BUILDING 125

ROOM 129

EQUIPMENT DETAIL

PDU (L520P-520R)

EAS102 C3850-48F

COPP-48

POWER INJECTOR

COPP-48

COPP-48

7' CABINET

PROPOSED

RR01.01

7 FEET

FOPP-48-SC

CMP

CMP

CMP

CMP

EAS102 C3850-48F

CMP

CMP

6' CABINET

EXISTING

NO LABEL

6 FEET

FILER

FILER

KVM

TRIPPLITE UPS

7' RACK

EXISTING

NO LABEL

7 FEET

PDU (520P-515R)

EAS102 C3850-48F

COPP-48

FOUNDRY FASTIRON 800

POWER INJECTOR

COPP-48

COPP-24

FOPP-48-SC

COPP-24

COPP-24

COPP-24

C

B

D

C

B

1234567

A

FOUO (FOR OFFICIAL USE ONLY)

APPROVED BY: SCALE:

B

SIZE FSCM NO

SHEET

54233

DRAWN BY: JSS

CAMP ZAMA (ZAMJP)

04/15/2020

DWG. NO.

FLOORPLANS AND RACK ELEVATIONS

ZA

M

JP

_1

_2

_F lo or

_P la n_ an d_ Ra ck _E le va tio n_

.v sd x

4/

/2

9:

A

M

TR Floor Plan

A

PAK

DATE:

ZONEREV DATEREVISION DESCRIPTION APPROVED

20200318EAS SURVEY

ROOM 201

TELECOMMUNICATION AREA

ZAMJP BUILDING 138

FLOOR PLAN

POWER PANEL L-2

PBB

BACKBOARD

RR00.01

(NOT

LABELED)

MONITOR

DESK

DESK

DESK

CABINET

CABINET

CABINET CABINET CABINET

CABINET

TABLE

DESK

CABINET

DESKSIMPLEX L5-20R

DUPLEX 5-15R

BACKBOARD

4'-7"

CABINET CABINET CABINET CABINET DESK

Category Work Operation Descriptor UM Qty ISP (x1) ADD BACKBOARDS. BACKBOARD EA 1

(x1) LABEL EXISTING CABINET LABEL-EXISTING EA 1 Power (x1) ADD PDU L520P TO 520R PDU-L520P-520R EA 1 Preparation (x1) REMOVE EXISTING RBB REMOVE/RELOCATE EQUIP EA 1 Ground (x1) ADD RBB RBB-19IN EA 1

(10') GND-AWG-#6-CABLE FROM PROPOSED RBB TO PROPOSED PBB. GND-CABLE-#6-AWG FT 10

ISP (x1) RELABEL EXISTING EAS SWITCH LABEL-EXISTING EA 1 Preparation (x1) RELOCATE SWITCH RELOCATE-EQUIPMENT EA 1 Power (x1) ADD 120V 20A CKT WITH L5-20R IN RR00.01. AC-120V-1PH-20AMP-L520 EA 1 Ground (x1) ADD PBB. PBB EA 1

(x1) RETERMINATE EXISTING CONDUCTOR TO PROPOSED PBB. GND-ITEM EA 1 ISP (x1)RELABEL OSP CABLE. LABEL-EXISTING EA 1 Preparation (x1) REMOVE FOPP REMOVE/RELOCATE EQUIP EA 1 Fiber (x1) ADD LC R&M FOPP FOPP-24SM (R&M) EA 1 ISP (x1) LABEL EXISTING FIBER JUMPER. LABEL-EXISTING EA 1

(x1) LABEL EXISTING COPP LABEL-EXISTING EA 1 Copper (x11) LABEL EXISTING CAT6 PATCH CABLES. COPP-PORT-LABEL EA 11 Cable Management

(x2) ADD 1-RU CMPs CMP-1RU EA 2

C

B

D

C

B

1234567

A

FOUO (FOR OFFICIAL USE ONLY)

APPROVED BY: SCALE:

B

SIZE FSCM NO

SHEET

54233

DRAWN BY: JSS

CAMP ZAMA (ZAMJP)

04/15/2020

DWG. NO.

FLOORPLANS AND RACK ELEVATIONS

ZA

M

JP

_1

_2

_F lo or

_P la n_ an d_ Ra ck _E le va tio n_

.v sd x

4/

/2

9:

A

M

Rack Elevation

A

PAK

DATE:

ZONEREV DATEREVISION DESCRIPTION APPROVED

20200318EAS SURVEY

1/16 : 1

ZAMJP BUILDING 138

ROOM 201

EQUIPMENT DETAIL

RBB

FOPP-24-SC

EAS138 C3850-48F

1'6" WALL CABINET

EXISTING

RR00.01 (NOT LABELED)

1.5 FEET

COPP-24

EAS138 C3850-48F

1'6" WALL CABINET

PROPOSED

RR00.01 (NOT LABELED)

1.5 FEET

COPP-24

PDU (L520P-520R)

FOPP-24-LC

CMP

RBB

C

B

D

C

B

1234567

A

FOUO (FOR OFFICIAL USE ONLY)

APPROVED BY: SCALE:

B

SIZE FSCM NO

SHEET

54233

DRAWN BY: NDF

SCHOFIELD BARRACKS (SCHHI)

04/16/2020

DWG. NO.

FLOORPLANS AND RACK ELEVATIONS

ZA

M

JP

_2

_P as s

O ff ic e

D ra w in gs .v sd x

4/

/2

2:

P M

Floor Plan Template

A

ETA

DATE:

ZONEREV DATEREVISION DESCRIPTION APPROVED

20191112EAS SURVEY

ZAMJP BUILDING 235

FLOOR PLAN

ROOM Pass Office

TELECOMMUNCIATIONS AREA

38'2"

24'10"

NEW 24RU CABINET

COPP-48

2 X 2RU CMP

RBB

PDU

L5-20R

FRO

N

T

FRONT

SBB

PP

TR

POWER PANEL NL-A (1P/2W) 120V/208V

BACKBOARD 4' X 8'

POWER PANEL NL (3P/4W) 120V/208V

Category…