This solicitation seeks proposals for a telephone room remediation project at various Army installations in Japan. The Performance Work Statement provides prospective bidders with information and expectations for the technical refresh and upgrade of telecommunications rooms and network infrastructure at Camp Zama Hardy Barracks, Sagama Depot, Sagamihara Housing, Yokohama North Dock. The purpose of the project is to provide several buildings with a modernized Outside Plant, Inside Plant, and infrastructure to meet current Department of Defense, Unified Capabilities Requirements and support customers of the NEC. The period of performance is from September 20, 2022 through June 30, 2023. Any questions must be submitted by September 10, 2022. The solicitation was issued by the Department of the Army Materiel Command Army Contracting Command.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions.pdf | ||
| Performance work statement for Remediation 3-4-22 (1).docx | DOCX document | |
| Japan First 27_-.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
12345678
D
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: NDF
CAMP ZAMA (ZAMJP)
05/06/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
ZA
M
JP
_1
_N
-1
_F lo or _P la n_ a nd
_R ac k_ E le v at io n_
0.
vs dx
/6 /2
2:
P
M
TR Floor Plan
A
PAK
DAT E:
ZONEREV DAT EREVIS IO N DESCRIPTIO N APPROVED
20191204EAS SURVEY
21'-7"
7"
ZAMJP BUILDING 101
FLOOR PLAN
ROOM N107
TELECOMMUNCIATIONS AREA
4 STRAND
FIBER SC
24 PORT COPP
WALL
MOUNTED
CABINET
BACKBOARD
RJ-45 PORTS
AND CONDUIT
RJ-45 PORTS
AND CONDUIT
RJ-45 PORTS
AND CONDUIT
RJ-45 PORTS
AND CONDUIT
Category Work Operation Descriptor UM Qty
ISP Remove 1 Backboard REMOVE LARGE ITEM EA 1
Fiber Remove FOPP REMOVE-REINSTALL-FOPP EA 1
ISP Remove fiber cables REMOVE_CABLE-SMALL FT 100
Fiber Remove 24 port COPP REMOVE-REINSTALL-FOPP EA 1
ISP Remove copper cables REMOVE_CABLE-SMALL FT 50
Remove conduits Remove/Relocate Equip EA 6
Remove copper RJ-45 wall ports Remove/Relocate Equip EA 6
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: NDF
CAMP ZAMA (ZAMJP)
05/06/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
ZA
M
JP
_1
_N
-1
_F lo or _P la n_ a nd
_R ac k_ E le v at io n_
0.
vs dx
/6 /2
2:
P
M
Rack Elevat ion
A
PAK
DAT E:
ZONEREV DAT EREVIS IO N DESCRIPTIO N APPROVED
20191204EAS SURVEY
1/16 : 1
ZAMJP BUILDING 101
ROOM N107
EQUIPMENT DETAIL
RR01.01 (NOT LABELED)
FOPP-12SM-SC
COPP 241
4 RU
FOPP-12SM-SC
COPP 241
4 RU
PROPOSED
RR01.01 (NOT LABELED)
FOPP-12SM-SC
COPP 241
4 RU
PROPOSEDEXISTING
RR01.01 (NOT LABELED)
FOPP-12SM-SC
COPP 241
4 RU
FOPP-12SM-SC
COPP 241
4 RU
EXISTING
RR01.01 (NOT LABELED)
FOPP-12SM-SC
COPP 241
4 RU
RR01.01 (NOT LABELED)
FOPP-12SM-SC
COPP 241
4 RU
PROPOSEDEXISTING
RR01.01 (NOT LABELED)
FOPP-12SM-SC
COPP 241
4 RU
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: JSS
CAMP ZAMA (ZAMJP)
02/24/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
ZA
M
JP
_1
_N
4_
Fl oo r_ Pl an _a nd _R ac k_
El ev at io n_
.v sd x
2/
/2
:5
AM
Floor Plan Template
A
ETA
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20191206EAS SURVEY
RR01.01
N114
ZAMJP BUILDING 101
FLOOR PLAN
ROOM N114
TELECOMMUNCIATIONS AREA
BACKBOARD
SBB
DUPLEX 5-15R
DUPLEX 5-15R
SIMPLEX L6-30R
FRONT
CABLE LADDER
AC POWER SUB-PANEL
PANEL 1L-2N-1
Category Work Operation Descriptor UM Qty Enclosures Install new lockable cabinet CABINET-ZONE4-45U EA 1 Enclosures deinstall current cabinet REMOVE-CABINET EA 1 Enclosures move equipment Remove/Relocate Equip EA 1 Power Install 1 208v 30 amp circuit AC-240V-2PH-30AMP EA 1 Power Install 1 L6-20P PDU PDU-L620P-C13R EA 1 Power Install 1 L6-30P PDU PDU-L630P-C13/19 EA 1 Ground Install RBB RBB-19IN EA 1 Ground Install 25' of #6 Ground Wire GND-CABLE-#6-AWG FT 25 Network Order 8 C14-C15 power cords CAB-C15-C14-10FT EA 8 Power Install new sub panel to feed TR/Cabinet _AC-SUB-PANEL-240V/100A EA 25 UPS Install 5KVA in RR01.01 UPS-5KVA-CONTROLLER EA 1 UPS Install Battery UPS-5KVA-BATTERY-BP192V12RT3UTAAEA 4 Ground Install SBB SBB EA 1 Ground Install 500' of 750AWG grounding wire Power Cable Grounding 6 AWG, 600V, GreenFT 500 Fiber Install new tie cable from N114 to N105 FOC-SM-OS1-24 (RISER) FT 100 Fiber install 2 FOPPS FOPP-24-LC EA 2
Install 2 48 port COPPS COPP-48-CAT6 N/A 2 Install 1 48 port COPP COPP-48-CAT6 N/A 1
Enclosures Install 3 2RU Horizontal CMP's CMP-2RU EA 3 Install 2 4inch sleeve kits in wall FIRE-BARRIER-SLEEVE-KIT-4IN EA 2
ISP 23 conduits/holes need to be Labeled FIRESTOP-LABEL EA 23 ISP 21 Conduits/ holes need to be fire stopped and sealed FIRE-BARRIER-PUTTY-6IN EA 21 ISP Re-Cable Remove/Relocate Equip EA 120
ISP HVAC HVAC-SPLIT EA 1
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: JSS
CAMP ZAMA (ZAMJP)
02/24/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
ZA
M
JP
_1
_N
4_
Fl oo r_ Pl an _a nd _R ac k_
El ev at io n_
.v sd x
2/
/2
:5
AM
Rack Template
A
ETA
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20191206EAS SURVEY
1/16 : 1
ZAMJP BUILDING 101
ROOM N114
EQUIPMENT DETAIL
6' CABINET
EXISTING
(NO LABEL)
6 FEET
UNUSABLE
FOPP-24-SC
EAS101 C3850-48F
EAS101 C3850-48F
COPP-96
EAS101 C3850-48F
EAS101 C3850-48F
CMP
COPP-24
7' CABINET
PROPOSED
RR01.01
7 FEET
FOPP-24-SC
EAS101 C3850-48F
EAS101 C3850-48F
EAS101 C3850-48F
PDU (L620P-C13R)
RBB (REAR)
EAS101 C3850-48F
CMP
CMP
TRIPPLITE BATTERY
TRIPPLITE BATTERY
TRIPPLITE BATTERY
TRIPPLITE BATTERY
TRIPPLITE 5.0KVA
PDU (L630P-C13R/C19R)
COPP-48
COPP-48
COPP-48
CMP
CMP
CMP
PDU (515P-515R)(REAR)
FOPP-24-LC
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: JSS
CAMP ZAMA (ZAMJP)
02/24/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
ZA
M
JP
_1
_N
4_
Fl oo r_ Pl an _a nd _R ac k_
El ev at io n_
.v sd x
2/
/2
:5
AM
Network Diagram
A
ETA
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20191206EAS SURVEY
BLD547 RM103
WHA547MTC
WHEHI-547-103-1
WHEHI-547-130-1
BLD1020 RM130
WHEHI-547-3a-1
BLD1020 RM3A
10/12 SM Vacant
BLD547 RM103
ADS547
WHEHI-547-103-1
WHEHI-547-130-1
BLD1020 RM130
WHEHI-547-3a-1
BLD1020 RM3A
Wall FOPPRack FOPP 6 Strands
102 104
ACS102-2
FO
PP
FOPP
ACS102-1
FO
PP
FOPP
FOPP FOPP
FOPP
102 104
ACS102-2
FO
PP
FOPP
ACS102-1
FO
PP
Wall FOPP
FOPP
FOPP
FOPP
FOPP
10/12 SM Vacant
C2 Building
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: JSS
CAMP ZAMA (ZAMJP)
02/24/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
ZA
M
JP
_1
_N
4_
Fl oo r_ Pl an _a nd _R ac k_
El ev at io n_
.v sd x
2/
/2
:5
AM
UPS
A
ETA
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20191206EAS SURVEY
UPS
5-15R
20A 1/16 : 1
SITECODE BUILDING ##
ROOM TR1
EQUIPMENT DETAIL
5-15R 5-15R 5-15R
5-15R 5-15R 5-15R 5-15R
20A
20A
30A
20A
C15 C14 C14 C19
C14 C14 C19 C19
EAS220-1
EAS220-2
EAS220-3
C15
C15
C15
C15
C15
C19
L6-30
L6-30
20A 20A
30A
C14 C14 C19
C14 C14 C19 C19
C19
L6-30
Tripp Lite SU1500RTXLCDTAA 13 minutes
Tripp Lite BP48V60RT3UTAA Additional 126 minutes
5-15P
120V 15A
5-15R
5-15R
5-15R
5-15R
5-15R
5-15R
5-15R5-15R
-1
R
-1
R
3.50 x 17.50 x 18.50 in
5.25 x 17.50 x 25 in
C-15 C-15
1.5a
C-15
1.5a
C-15
1.5a
1.5a
ADS
2x WSC3850-24XS-SPS1 PS2
PS1 PS2
Both 3850s together pull 2.3amps max. 2N = 2.3/2 = 1.15
L6-
PD
U
5-20R
Tripp Lite BP48V60RT3UTAA Additional 126 minutes
Tripp Lite BP48V60RT3UTAA Additional 126 minutes
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: JSS
CAMP ZAMA (ZAMJP)
02/24/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
ZA
M
JP
_1
_N
-1
_F lo or _P la n_ an d_
Ra ck
_E le va tio n_
.v sd x
2/
/2
:2
AM
Floor Plan Template
A
ETA
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20191210EAS SURVEY
8' -1
0"
21'-9"
N117
ZAMJP BUILDING 101
FLOOR PLAN
ROOM N117
TELECOMMUNCIATIONS AREA
REMOVE 2
STRAND FIBER
SCREMOVE
BACKBOARD
REMOVE 2 CAT
6 CABLES
Category Work Operation Descriptor UM Qty ISP Remove 1 backboard 30"x30" REMOVE LARGE ITEM EA 1
Remove fiber cables REMOVE_CABLE-SMALL FT 100 Remove copper cables REMOVE_CABLE-SMALL FT 50
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: JSS
CAMP ZAMA (ZAMJP)
02/24/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
ZA
M
JP
_1
_N
-1
_F lo or _P la n_ an d_
Ra ck
_E le va tio n_
.v sd x
2/
/2
:2
AM
Rack Template
A
ETA
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20191210EAS SURVEY
1/16 : 1
ZAMJP BUILDING 101
ROOM E116
EQUIPMENT DETAIL
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: JSS
CAMP ZAMA (ZAMJP)
02/24/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
ZA
M
JP
_1
_N
-2
_F lo or _P la n_ an d_
Ra ck
_E le va tio n_
.v sd x
2/
/2
:2
AM
Floor Plan Template
A
PAK
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20191204EAS SURVEY
5'-4"
ZAMJP BUILDING 101
FLOOR PLAN
ROOM N220
TELECOMMUNCIATIONS AREA
SIMPLEX L5-20R
BACKBOARD
FRONT
SBB
DUPLEX 5-20R
DUPLEX 5-20R
DUPLEX 5-20R
A/C PANELBOARD
UNLABELED POWER PANEL
BACKBOARD
DUPLEX 5-20R
SIMPLEX L6-30R
Category Work Operation Descriptor UM Qty ISP Install suspended Lighting LIGHT-CEILING-LED EA 1
Install 2 Backboards BACKBOARD EA 2 Ground Install RBB RBB-19IN EA 1
Install 25' of #6 Ground Wire to SBB Power Cable Grounding 6 AWG, 600V, GreenFT 30 Re-terminate exsisitng grounding lugs RETERMINATE GROUND LUG EA 1
Power Install 1 208v 30 amp circuits AC-240V-3PH-30AMP EA 2 Install 2 L5-20P PDU's PDU-L520P-520R EA 2
Ground Install RBB RBB-19IN EA 1 Install 25' of #6 Ground Wire to SBB Power Cable Grounding 6 AWG, 600V, GreenFT 30 Re-terminate exsisitng grounding lugs RETERMINATE GROUND LUG EA 1
Network Install additional switch for 25% growth GFE - ACS-3850 EA 1
GFE - ACS-3850 EA 1
Ground Install RBB RBB-19IN EA 1 Install 25' of #6 Ground Wire to SBB Power Cable Grounding 6 AWG, 600V, GreenFT 1 Re-terminate exsisitng grounding lugs RETERMINATE GROUND LUG EA 1
UPS Install 5KVA controller UPS-5KVA-CONTROLLER EA 1 2-post rack kit needed UPS-2POSTRMKITHD EA 1
ISP Relocate equipment for UPS Remove/Relocate Equip EA 1 UPS Install 5KVA 8 hour battery UPS-5KVA-BATTERY-BP192V12RT3UTAAEA 1 Ground Install SBB SBB EA 1
Install 500' of 750AWG grounding wire Power Cable Grounding 6 AWG, 600V, GreenFT 1 Copper Install new CAT6 COPP-48 COPP-48-CAT6 EA 1
Re-run existing drops with new CAT6 cable to new COPP-48 CAT6-DROP-REPLACE EA 48 Network Install and label new CAT6 jumpers to replace existing PATCH CAT6 1M EA 48 Copper Install new CAT6 COPP-48 COPP-48-CAT6 EA 1
Re-run existing drops with new CAT6 cable to new COPP-48 CAT6-DROP-REPLACE EA 48 Network Install and label new CAT6 jumpers to replace existing PATCH CAT6 1M EA 48 Copper Install new CAT6 COPP-48 COPP-48-CAT6 EA 1
Re-run existing drops with new CAT6 cable to new COPP-48 CAT6-DROP-REPLACE EA 48 Network Install and label new CAT6 jumpers to replace existing PATCH CAT6 1M EA 48 Copper Install new CAT6 COPP-48 COPP-48-CAT6 EA 1
Re-run existing drops with new CAT6 cable to new COPP-48 CAT6-DROP-REPLACE EA 48 Network Install and label new CAT6 jumpers to replace existing PATCH CAT6 1M EA 48 Copper Install new CAT6 COPP-48 COPP-48-CAT6 EA 1
Re-run existing drops with new CAT6 cable to new COPP-48 CAT6-DROP-REPLACE EA 48 Network Install and label new CAT6 jumpers to replace existing PATCH CAT6 1M EA 48 Copper Install new CAT6 COPP-48 COPP-48-CAT6 EA 1
Re-run existing drops with new CAT6 cable to new COPP-48 CAT6-DROP-REPLACE EA 48 Network Install and label new CAT6 jumpers to replace existing PATCH CAT6 1M EA 48 ISP Remove COPP Remove/Relocate Equip EA 1 Copper Install new CAT6 COPP-48 CAT6-DROP-REPLACE EA 24 Network Re-run existing drops with new CAT6 cable to new COPP-48 PATCH CAT6 1M EA 24 Copper Install and label new CAT6 jumpers to replace existing COPP-48-CAT6 EA 1
Install new CAT6 COPP-48 CAT6-DROP-REPLACE EA 48 Network Re-run existing drops with new CAT6 cable to new COPP-48 PATCH CAT6 1M EA 48 Copper Install and label new CAT6 jumpers to replace existing COPP-48-CAT6 EA 1 ISP Remove COPP Remove/Relocate Equip EA 1
Remove/Relocate Equip EA 1 Remove/Relocate Equip EA 1 Remove/Relocate Equip EA 1 Remove/Relocate Equip EA 1 Remove/Relocate Equip EA 1
Enclosures Install 15 2RU Horizontal CMP's CMP-2RU EA 15 ISP Install 3 4inch sleeve kits and conduit in wall FIRE-BARRIER-SLEEVE-KIT-4IN EA 3
Install 3 4inch sleeve kits and conduit in floor FIRE-BARRIER-SLEEVE-KIT-4IN EA 1 Re-cable (Create a discriptor) 63 total Remove/Relocate Equip EA 70
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: JSS
CAMP ZAMA (ZAMJP)
02/24/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
ZA
M
JP
_1
_N
-2
_F lo or _P la n_ an d_
Ra ck
_E le va tio n_
.v sd x
2/
/2
:2
AM
Rack Template
A
PAK
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20191204EAS SURVEY
1/16 : 1
ZAMJP BUILDING 101
ROOM N220
EQUIPMENT DETAIL
7' RACK
PROPOSED
RR01.01
7' RACK
PROPOSED
RR01.02
7 FEET
7' RACK
PROPOSED
RR01.03
CMP
EAS101 C3850-48F
EAS101 C3850-48F
EAS101 C3850-48F
CMP
EAS101 C3850-48F
EAS101 C3850-48F
PDU (L620P-C13R)
RBB (REAR)
EAS101 C3850-48F
CMP
CMP
TRIPPLITE BATTERY
TRIPPLITE BATTERY
TRIPPLITE BATTERY
TRIPPLITE BATTERY
TRIPPLITE 5.0KVA
PDU (L630P-C13R/C19R)
EAS101 C3850-48F
CMP
CMP
7' CABINET
EXISTING
RR01.01 (RR.1.1)
7 FEET
7' CABINET
EXISTING
RR01.01 (RR.1.1)
7 FEET
7' CABINET
EXISTING
RR01.01 (RR.1.1)
7 FEET
CMP
CMP
COPP-48
COPP-24
COPP-48
CMP
CMP
COPP-48
COPP-48
CMP
CMP
COPP-48
COPP-48
CMP
COPP-48
COPP-48
CMP
COPP-48
COPP-48
CMP
COPP-48
COPP-48
COPP-24
COPP-24
FOPP-24-SC
CMP
EASxxx C3850-48F
EASxxx C3850-48F
EASxxx C3850-48F
EASxxx C3850-48F
EASxxx C3850-48F
CMP
EASxxx C3850-48F
PDU
FOPP-24-SC
CMP
FOPP-24-SC
CMP
FOPP-24-SC
CMP
FOPP-24-SC
CMP
FOPP-24-SC
CMP
7 FEET
FOPP-24-SC
CMP
FOPP-24-SC
CMP
FOPP-24-SC
CMP
FOPP-24-SC
CMP
FOPP-24-SC
CMP
FOPP-24-SC
CMP
RBB (REAR)
CMP
7 FEET
CMP
COPP-48
COPP-48
CMP
CMP
COPP-48
COPP-48
CMP
CMP
COPP-48
COPP-48
COPP-48
COPP-48
CMP
CMP
COPP-24
RR01.01
RBB (REAR)
CMP
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: JSS
CAMP ZAMA (ZAMJP)
01/08/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
1-
ZA
M
JP
_1
_S
0_ Fl oo r_
Pl an
_a nd
_R ac k_ El ev at io n_
.v sd x
1/ 8/
2:
P
M
Floor Plan Template
A
PAK
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20191205EAS SURVEY
8'-3"
'-3
S220
ZAMJP BUILDING 101
FLOOR PLAN
ROOM S220
TELECOMMUNCIATIONS AREA
SIMPLEX L5-20R
BACKBOARD
SBB
DUPLEX 5-20R
DUPLEX 5-20R
BACKBOARD
DUPLEX 5-20R
SIMPLEX L6-30R
FRONT
A/C PANELBOARD
UNLABELED POWER PANEL
Category Work Operation Descriptor UM Qty ISP Install suspended Lighting x 2 LIGHT-CEILING-LED EA 2 ISP Install 2 Backboards per Floor plan BACKBOARD EA 2 Ground Install RBB RBB-19IN EA 1 Ground Install 25' of #6 Ground Wire GND-CABLE-#6-AWG FT 25 Ground Ground new RBB to SBB GND-RACK EA 1 Power Install 1 208v 30 amp circuit AC-240V-2PH-30AMP EA 1 Power Install 1 L6-20P PDU PDU-L620P-C13R EA 1 Power Install 1 L6-30P PDU PDU-L630P-C13/19 EA 1 Ground Install RBB RBB-19IN EA 1 Ground Install 25' of #6 Ground Wire GND-CABLE-#6-AWG FT 25 Ground Re-terminate exsisitng grounding lugs RETERMINATE GROUND LUG EA 1 Network Install additional switch for 25% growth EAS-48PORT EA 1 Network Order 10 C14-C15 power cords CAB-C15-C14-10FT EA 10 Ground Install RBB RBB-19IN EA 1 Ground Install 25' of #6 Ground Wire GND-CABLE-#6-AWG FT 25 Ground Re-terminate exsisitng grounding lugs RETERMINATE GROUND LUG EA 1 UPS Install 5KVA in RR01.03 UPS-5KVA-2HR EA 1 UPS 2-post rack kit needed UPS-2POSTRMKITHD EA 1 Ground Install SBB SBB EA 1 Ground Install 20' #6 GND-WIRE GND-CABLE-#6-AWG FT 20 Enclosures install 500' of 750kcmil 750-GND-Cable-750-kcmil FT 500 Enclosures Install 3 2RU Horizontal CMP's CMP-2RU EA 3 ISP Install 1 VCMP in RR01.03 VCMP-45RU EA 1 ISP Install 2 4inch sleeve kits in wall FIRE-BARRIER-SLEEVE-KIT-4IN EA 2 ISP Install 2 4inch sleeve kits in floor FIRE-BARRIER-SLEEVE-KIT-4IN EA 2 ISP 11 conduits/holes need to be Fire stopped, Sealed, and Labeled FIRE-BARRIER-PUTTY-6IN EA 11 ISP 8 holes need to be labeled FIRESTOP-LABEL FT 8 ISP Re-Cable 190 total(Create new descriptor for this work) Remove/Relocate Equip EA 200
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: JSS
CAMP ZAMA (ZAMJP)
01/08/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
1-
ZA
M
JP
_1
_S
0_ Fl oo r_
Pl an
_a nd
_R ac k_ El ev at io n_
.v sd x
1/ 8/
2:
P
M
Rack Template
A
PAK
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20191205EAS SURVEY
1/16 : 1
ZAMJP BUILDING 101
ROOM S220
EQUIPMENT DETAIL
7' RACK
EXISTING
RR01.03 (NO LABEL)
7 FEET
7' RACK
EXISTING
RR01.02 (NO LABEL)
7 FEET
7' RACK
EXISTING
RR01.01 (NO LABEL)
7 FEET
CMP
COPP-48
CMP
COPP-48
CMP
COPP-48
CMP
COPP-48
CMP
COPP-48
CMP
COPP-48
CMP
COPP-48
COPP-24
CMP
COPP-48
CMP
EAS101 C3850-48F
EAS101 C3850-48F
EAS101 C3850-48F
EAS101 C3850-48F
PDU (L520P-520R)
RBB (REAR)CABLE LADDER
CMP
CMP
RBB (REAR)
FOPP-24-SC
7' RACK
PROPOSED
RR01.03 (NO LABEL)
7 FEET
7' RACK
PROPOSED
RR01.02 (NO LABEL)
7 FEET
7' RACK
PROPOSED
RR01.01 (NO LABEL)
7 FEET
CMP
COPP-48
CMP
COPP-48
CMP
COPP-48
CMP
COPP-48
CMP
COPP-48
CMP
COPP-48
CMP
COPP-48
COPP-24
CMP
COPP-48
CMP
EAS101 C3850-48F
EAS101 C3850-48F
EAS101 C3850-48F
EAS101 C3850-48F
PDU (520P-515R)
RBB (REAR)CABLE LADDER
CMP
CMP
RBB (REAR)
FOPP-24-SC
CMP
CMP
TRIPPLITE BATTERY
TRIPPLITE BATTERY
TRIPPLITE BATTERY
TRIPPLITE BATTERY
TRIPPLITE 5.0KVA
PDU (L620P-C13R)
PDU (L630P-C13R/C19R)
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: NF
CAMP ZAMA (ZAMJP)
02/24/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
ZA
M
JP
_1
_W
-2
_F lo or _P la n_ an d_
Ra ck
_E le va tio n_
.v sd x
2/
/2
:3
AM
Floor Plan Template
A
PAK
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20191206EAS SURVEY
ROOM W217
TELECOMMUNCIATIONS AREA
5' -2
20'-2"
W
(3) SIMPLEX L5-30R
BACKBOARD
SBBDUPLEX 5-20R
DUPLEX 5-20R
DUPLEX 5-20R
A/C PANELBOARD
UNLABELED POWER PANEL
BACKBOARD
DUPLEX 5-20R
SIMPLEX L6-30R
DUPLEX 5-20R
ZAMJP BUILDING 101
FLOOR PLAN
Category Work Operation Descriptor UM Qty ISP Install 2 Backboards BACKBOARD EA 1 Ground Install RBB RBB-19IN EA 1
Install 25' of #6 Ground Wire to SBB Power Cable Grounding 6 AWG, 600V, GreenFT 50 Re-terminate exsisitng grounding lugs RETERMINATE GROUND LUG EA 1
Power Install 1 208v 30 amp circuits AC-240V-3PH-30AMP EA 1 Install 2 L5-20P PDU's (10 5-20R) PDU-L520P-520R EA 2
Ground Install RBB RBB-19IN EA 1 Install 25' of #6 Ground Wire to SBB Power Cable Grounding 6 AWG, 600V, GreenFT 50 Re-terminate exsisitng grounding lugs RETERMINATE GROUND LUG EA 1
Network Install additional switch for 25% growth GFE - ACS-3850 EA 1 Ground Install RBB RBB-19IN EA 1
Install 25' of #6 Ground Wire to SBB Power Cable Grounding 6 AWG, 600V, GreenFT 50 Re-terminate exsisitng grounding lugs RETERMINATE GROUND LUG EA 1
UPS Install 5KVA UPS-5KVA-CONTROLLER EA 1 2-post rack kit needed 2POSTRMKITHD EA 1
ISP Relocate equipment for UPS Remove/Relocate Equip EA 1 UPS Install 5KVA 8 hour battery UPS-5KVA-BATTERY-BP192V12RT3UTAAEA 4 Ground Install SBB SBB EA 1
Install 500' of 750AWG grounding wire Power Cable Grounding 6 AWG, 600V, GreenFT 50 Copper Install new CAT6 COPP-48 COPP-48-CAT6 EA 1
Re-run existing drops with new CAT6 cable to new COPP-48 CAT6-DROP-REPLACE EA 1 Network Install and label new CAT6 jumpers to replace existing PATCH CAT6 1M EA 48 ISP Remove COPP REMOVE LARGE ITEM EA 1 Copper Install new CAT6 COPP-48 COPP-48-CAT6 EA 1
Re-run existing drops with new CAT6 cable to new COPP-48 CAT6-DROP-REPLACE EA 48 Network Install and label new CAT6 jumpers to replace existing PATCH CAT6 1M EA 48 ISP Remove COPP REMOVE LARGE ITEM EA 1 Copper Install new CAT6 COPP-48 COPP-48-CAT6 EA 1
Re-run existing drops with new CAT6 cable to new COPP-48 CAT6-DROP-REPLACE EA 48 Network Install and label new CAT6 jumpers to replace existing PATCH CAT6 1M EA 48 ISP Remove COPP REMOVE LARGE ITEM EA 1 Copper Install new CAT6 COPP-48 COPP-48-CAT6 EA 1
Re-run existing drops with new CAT6 cable to new COPP-48 CAT6-DROP-REPLACE EA 48 Network Install and label new CAT6 jumpers to replace existing PATCH CAT6 1M EA 48 ISP Remove COPP REMOVE LARGE ITEM EA 1
REMOVE LARGE ITEM EA 1
Copper Install new CAT6 COPP-48 COPP-48-CAT6 EA 1
Re-run existing drops with new CAT6 cable to new COPP-48 CAT6-DROP-REPLACE EA 48 Network Install and label new CAT6 jumpers to replace existing PATCH CAT6 1M EA 48 ISP Remove COPP REMOVE LARGE ITEM EA 1 Copper Install new CAT6 COPP-48 COPP-48-CAT6 EA 1
Re-run existing drops with new CAT6 cable to new COPP-48 CAT6-DROP-REPLACE EA 48 Network Install and label new CAT6 jumpers to replace existing PATCH CAT6 1M EA 48 ISP Remove COPP REMOVE LARGE ITEM EA 1 Enclosures Install 9 2RU Horizontal CMP's CMP-2RU EA 9 ISP Install 3 4inch sleeve kits and conduit in wall FIRE-BARRIER-SLEEVE-KIT-4IN EA 3
Install 3 4inch sleeve kits and conduit in floor FIRE-BARRIER-SLEEVE-KIT-4IN EA 3 Re-cable (Create a discriptor) Remove/Relocate Equip EA 1
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: NF
CAMP ZAMA (ZAMJP)
02/24/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
ZA
M
JP
_1
_W
-2
_F lo or _P la n_ an d_
Ra ck
_E le va tio n_
.v sd x
2/
/2
:3
AM
Rack Template
A
PAK
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20191206EAS SURVEY
1/16 : 1
ZAMJP BUILDING 101
ROOM E216
EQUIPMENT DETAIL
7' RACK
PROPOSED
7' RACK
PROPOSED
RR01.02 (NO LABEL)
7 FEET
7' RACK
PROPOSED
RR01.03 (NO LABEL)
7 FEET
CMP
EAS101 C3850-48F
EAS101 C3850-48F
CMP
PDU (L620P-C13R)
RBB (REAR)
RBB (REAR)
EAS101 C3850-48F
TRIPPLITE BATTERY
TRIPPLITE BATTERY
TRIPPLITE BATTERY
TRIPPLITE BATTERY
TRIPPLITE 5.0KVA
PDU (L630P-C13R/C19R)
7' RACK
EXISTING
RR01.01 (NO LABEL)
7 FEET
7' RACK
EXISTING
RR01.02 (NO LABEL)
7 FEET
7' RACK
EXISTING
RR01.03 (NO LABEL)
7 FEET
CMP
COPP-48
CMP
COPP-48
CMP
CMP
COPP-48
CMP
COPP-48
CMP
COPP-48
CMP
COPP-48
CMP
CMP
FOPP-24-SC
CMP
CMP
EAS101 C3850-48F
EAS101 C3850-48F
EAS101 C3850-48F
CMP
RBB (REAR)RBB (REAR) RBB (REAR)
FOPP-24-SC
CMP
CMP
COPP-48
COPP-48
COPP-24
CMP
COPP-24
COPP-24
COPP-24
COPP-24
RR01.01 (NO LABEL)
7 FEET
CMP
COPP-48
CMP
COPP-48
COPP-48
CMP
COPP-48
CMP
COPP-48
CMP
COPP-48
CMP
Shelf Shelf
CMP
EAS101 C3850-48F
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: JSS
CAMP ZAMA (ZAMJP)
02/24/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
ZA
M
JP
_1
_W
-2
_F lo or _P la n_ an d_
Ra ck
_E le va tio n_
.v sd x
2/
/2
:3
AM
Floor Plan Template
A
PAK
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20191206EAS SURVEY
ZAMJP BUILDING 101
FLOOR PLAN
ROOM W-234
TELECOMMUNCIATIONS AREA
RR01.01
BACKBOARD
SBB
DUPLEX 5-15R
DUPLEX 5-20R
FR
O
N T
AC POWER SUB-PANEL TO2L-4W
WALL COPP
CABLE LADDER
DUPLEX 5-15R
BACKBOARD
Category Work Operation Descriptor UM Qty Security Install new door that swings out FE-DOOR EA 1 ISP Install new lighting LIGHT-CEILING-LED EA 1 ISP Install 2 Backboards BACKBOARD EA 2 ISP Remove rack REMOVE-LARGE-ITEM EA 1 Power Install 1 208v 30 amp circuits AC-240V-3PH-30AMP EA 1 Power Install 2 L5-20P PDU's (10 5-20R) PDU-L520P-520R EA 2 Ground Install RBB RBB-19IN EA 1 Ground Install 25' of #6 Ground Wire to SBB Power Cable Grounding 6 AWG, 600V, GreenFT 20 Ground Re-terminate exsisitng grounding lugs RETERMINATE GROUND LUG EA 1 UPS Install 2.2KVA UPS-2.2KVA-CONTROLLER EA 1 UPS 2-post rack kit needed 2POSTRMKITHD EA 1 ISP Relocate equipment for UPS REMOVE-UPS EA 1 UPS Install 2.2KVA batterys UPS-1.5/2.2kVA-BATTERY EA 1 Copper Install 3 COPP-48 in RR01.01 COPP-48-CAT6 EA 3 Enclosures Install 4 2RU Horizontal CMP's CMP-2RU EA 4 ISP Install 2 VCMP VCMP-45RU EA 2 ISP Install cable ladder from patch panel mounted to wall to RR01.01 K1010-CA-LADDER EA 1 Network Re-cable (Create a discriptor) PATCH CAT6 1M EA 48
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: JSS
CAMP ZAMA (ZAMJP)
02/24/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
ZA
M
JP
_1
_W
-2
_F lo or _P la n_ an d_
Ra ck
_E le va tio n_
.v sd x
2/
/2
:3
AM
Rack Template
A
PAK
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20191206EAS SURVEY
1/16 : 1
ZAMJP BUILDING 101
ROOM W-234
EQUIPMENT DETAIL
7' RACK
EXISTING
RR01.01 (NO LABEL)
7 FEET
FOPP-24-SC
EAS101 C3850-48F
EATON 9.0KVA
CMP
TRIPPLITE BATTERY
TRIPPLITE BATTERY
TRIPPLITE BATTERY
TRIPPLITE BATTERY
TRIPPLITE 2.2KVA
PDU (520P-520R)
7' RACK
PROPOSED
RR01.01 (NO LABEL)
7 FEET
FOPP-24-SC
EAS101 C3850-48F
PDU (520P-520R)
COPP-48
COPP-48
CMP
COPP-48
CMP
RBB (REAR)
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: NF
CAMP ZAMA (ZAMJP)
02/24/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
ZA
M
JP
_1
_F
-1
_F lo or _P la n_ an d_
Ra ck
_E le va tio n_
.v sd x
2/
/2
:4
AM
Floor Plan Template
A
PAK
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20191212EAS SURVEY
21'-3"
'-1
F111
ZAMJP BUILDING 102
FLOOR PLAN
ROOM F111
TELECOMMUNCIATIONS AREA
DUPLEX 5-20R
BACKBOARD
SBBDUPLEX 5-20R
UNLABELED
POWER PANEL
BACKBOARD
FRONT
FRONT
DUPLEX 5-20R
CABLE LADDER
CABLE LADDER
A/C PANELBOARD
Category Work Operation Descriptor UM Qty ISP Install 2 Backboards BACKBOARD EA 2
Remove existing cabinet REMOVE/RELOCATE EQUIP EA 1 Enclosures Install 7' rack RACK-4POST-45U EA 1 Power Install new 20A circuit with L520R receptacle AC-REPLACE-L520 EA 1
Install 1 new PDU with L5-20P in new rack PDU-L520P-520R EA 1 Ground Install RBB RBB-19IN EA 1
Install #6 Ground wire Power Cable Grounding 6 AWG, 600V, GreenFT 100 Install PBB in TR PBB EA 1 Bond new rack to PBB GND-RACK EA 1 Bond PBB to Power Panel GND-CABLE-#6-AWG FT 50
Fiber Install new FOPP 24 to M112 FOPP-24-SC EA 1 ISP Label existing fiber jumpers LABEL-EXISTING EA 1 Network Install and label new CAT6 jumpers PATCH CAT6 1M EA 7 Copper Install new CAT6 COPP-48 COPP-48-CAT6 EA 1
Re-run existing drops with new CAT6 cable to new COPP-48 CAT6-DROP-REPLACE EA 1 Network Install and label new CAT6 jumpers PATCH CAT6 1M EA 1 Copper Install new CAT6 COPP-48 COPP-48-CAT6 EA 1
Re-run existing drops with new CAT6 cable to new COPP-48 CAT6-DROP-REPLACE EA 1 Network Install and label new CAT6 jumpers PATCH CAT6 1M EA 6 Copper Install new CAT6 COPP-48 COPP-48-CAT6 EA 1
Re-run existing drops with new CAT6 cable to new COPP-48 CAT6-DROP-REPLACE EA 1 Enclosures Install 5 2RU horizontal CMP's CMP-2RU EA 5 ISP Install VCMP in new rack VCMP-45RU EA 2
Install 2 new cable ladders to rack CABLE-LADDER-12IN FT 20
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: NF
CAMP ZAMA (ZAMJP)
02/24/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
ZA
M
JP
_1
_F
-1
_F lo or _P la n_ an d_
Ra ck
_E le va tio n_
.v sd x
2/
/2
:4
AM
Rack Template
A
PAK
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20191212EAS SURVEY
1/16 : 1
ZAMJP BUILDING 102
ROOM F111
EQUIPMENT DETAIL
6 FEET
PDU (REAR)
6' RACK
EXISTING
REAR
RR01.01 (NO LABEL)
6' RACK
EXISTING
FRONT
RR01.01 (NO LABEL)
6 FEET
COPP-48
CMP
COPP-48
CMP
COPP-48
CMP
Panel
EAS102 C3850-48F
FOPP-12-SC
ASR 1001-X
C3850-48F
C2921
7' RACK
PROPOSED
RR01.03 (NO LABEL)
7 FEET
CMP
COPP-48
CMP
COPP-48
CMP
RBB (REAR)
FOPP-24-SC
CMP
COPP-48
EAS102 C3850-48F
ASR 1001-X
C3850-48F
C2921
PDU (L520P-520R)
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: JSS
CAMP ZAMA (ZAMJP)
02/24/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
ZA
M
JP
_1
_F
6_
Fl oo r_ Pl an _a nd _R ac k_
El ev at io n_
.v sd x
2/
/2
:5
AM
TR Floor Plan
A
PAK
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20191211EAS SURVEY
10'-0"
8' -6
F206
ZAMJP BUILDING 102
FLOOR PLAN
ROOM F206
TELECOMMUNCIATIONS AREA
SIMPLEX L530R
PANEL L1/PANEL L2
BACKBOARD
SBB
Category Work Operation Descriptor UM Qty ISP Install 1 backboard for wall mount cabinet BACKBOARD EA 1 ISP Install 1 additional backboard for SBB BACKBOARD EA 1 ISP Install wall rack to wall Remove/Relocate Equip EA 1 Power Install 1PDU With L5-30A PDU-L530P-520R EA 1 Ground Install RBB RBB-19IN EA 1 Ground Install SBB SBB EA 1 Enclosures Install 50' of 350kcmil wire 750-GND-Cable-750-kcmil FT 50 Ground Ground to power panel GND-ITEM EA 1 Fiber Install 1 12 strand SC FOPPS in M112 and in F206 FOPP-24-LC EA 2 Enclosures Install 1 1RU Horizontal CMP CMP-1RU EA 1
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: JSS
CAMP ZAMA (ZAMJP)
02/24/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
ZA
M
JP
_1
_F
6_
Fl oo r_ Pl an _a nd _R ac k_
El ev at io n_
.v sd x
2/
/2
:5
AM
Rack Template
A
PAK
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20191211EAS SURVEY
1/16 : 1
ZAMJP BUILDING 102
ROOM F206
EQUIPMENT DETAIL
3' CABINET
EXISTING
RR00.01 (NO LABEL)
3 FEET
EAS102 C3850-48F
PDU (520P-520R)
3' CABINET
PROPOSED
RR00.01 (NO LABEL)
3 FEET
EAS102 C3850-48F
PDU (L530P-520R)
CMP
FOPP-12-LC
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: JSS
CAMP ZAMA (ZAMJP)
01/08/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
1-
ZA
M
JP
_1
_M
2_ Fl oo r_
Pl an
_a nd
_R ac k_ El ev at io n_
.v sd x
1/ 8/
:2
PM
TR Floor Plan
A
PAK
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20191211EAS SURVEY
21'-10"
'-1 1"
M112
ZAMJP BUILDING 102
FLOOR PLAN
ROOM M112
TELECOMMUNCIATIONS AREA
FRO
N
T
PBB
UNLABELED POWER PANEL 1
MDF
PANEL 1
4X DUPEX 5-20R
2X SIMPLEX 5-20R
2X DUPLEX 5-15R
2X QUAD 5-15R
NTT FIBER SPLICE TRAY
AMP ILON BACKBOARD
TEMPERATURE
MONITORING
SYSTEM
BACKBOARD
UNLABELED POWER PANEL 2
2X DUPEX 5-15R
Category Work Operation Descriptor UM Qty ISP relocate rack BACKBOARD EA 1 Power install 1 208v 60 amp circuit AC-208V-1PH-60AMP EA 1 Ground Install RBB RBB-19IN EA 0 ISP Label RBB LABEL-EXISTING EA 28 ISP Label grounds LABEL-EXISTING EA 28 Ground reterminate ground Lugs RETERMINATE GROUND LUG EA 1 ISP relocate rack Remove/Relocate Equip EA 1 Power install 1 208v 60 amp circuit AC-208V-1PH-60AMP EA 1 Ground Install RBB RBB-19IN EA 1 ISP Label RBB LABEL-EXISTING EA 1 ISP Label grounds LABEL-EXISTING EA 1 Ground reterminate ground Lugs RETERMINATE GROUND LUG EA 1 ISP relocate rack Remove/Relocate Equip EA 1 ISP Label Ground bar LABEL-EXISTING EA 1 ISP Label grounds LABEL-EXISTING EA 1 Enclosures replace rack with Black Box RM162A RACK-45RU-4POST-SYSTEM EA 1 ISP remove old rack Remove/Relocate Equip EA 1 ISP relocate equipment Remove/Relocate Equip EA 1 ISP Label Ground bar LABEL-EXISTING EA 1 ISP Label Grounds LABEL-EXISTING EA 1 ISP relocate rack Remove/Relocate Equip EA 1 Power install 2 L6-20P-C13r PDU-L620P-C13R EA 2 ISP Label RBB LABEL-EXISTING EA 1 ISP Label grounds LABEL-EXISTING EA 1 Network install additional 3850 for growth EAS-48PORT EA 1 Enclosures replace rack with Black Box RM162A RACK-45RU-4POST-SYSTEM EA 1 ISP remove old rack REMOVE-CABINET EA 1 ISP relocate equipment Remove/Relocate Equip EA 1 Copper Re-run 120 drops to RR01.06 CAT6-DROP-REPLACE EA 120 Ground Install RBB RBB-19IN EA 1 ISP Label RBB LABEL-EXISTING EA 1 ISP Label grounds LABEL-EXISTING EA 1 Ground reterminate ground Lugs RETERMINATE GROUND LUG EA 1 Power Install 100amp 208-120v panel AC-Sub-Panel-240V/100A EA 1 Fiber FOC-SM-OS1-12 (RISER) FOC-SM-OS1-12 (RISER) FT 350 Fiber FOPP-24-LC FOPP-24-LC EA 1 Enclosures Add 3 horizontal CMPs CMP-2RU EA 3 ISP Needs 3 4" fire sleeve for wall FIRE-BARRIER-SLEEVE-KIT-4IN EA 3 ISP Needs 2 4" fire sleeve for floor FIRE-BARRIER-SLEEVE-KIT-4IN EA 2 ISP 9 holes to be labled FIRESTOP-LABEL EA 9 ISP 4 holes to be fire stopped FIRE-BARRIER-PUTTY-6IN EA 4
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: JSS
CAMP ZAMA (ZAMJP)
01/08/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
1-
ZA
M
JP
_1
_M
2_ Fl oo r_
Pl an
_a nd
_R ac k_ El ev at io n_
.v sd x
1/ 8/
:2
PM
Rack Template
A
PAK
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20191211EAS SURVEY
1/16 : 1
ZAMJP BUILDING 102
ROOM M112
EQUIPMENT DETAIL
7' RACK
EXISTING
(RR01.04)
7 FEET
7' RACK
EXISTING
(RR01.05)
7 FEET
7' RACK
EXISTING
(RACK #6)
7 FEET
CMP
COPP-48
COPP-48
PDU (L620P-L620R)
EAS102 C3850-48F
EAS102 C3850-48F
RBB (REAR)
COPP-96
COPP-24
CMP
CABLE LADDER
CMP
EAS102 C3850-48F
CMP
7' RACK
EXISTING
RR01.01 (NO LABEL)
7 FEET
7' RACK
EXISTING
RR01.02 (NO LABEL)
7 FEET
7' RACK
EXISTING
(RR01.03)
7 FEET
APC BATTERY
RBB (REAR)RBB (REAR)
FOPP-96-SC
CORNING CABLE
SYSTEMS
CMP
FOPP-132-SC
CORNING CABLE
SYSTEMS
FOPP-24-SC
TRIPPLITE BATTERY
CMP
CMP
EAS102 C3850-48F
EAS102 C3850-48F
CMP
ACS102 C7706
CMP
APC BATTERY
PANASONIC
SENSOR
APC 9KVA
CMP
CMP
FOPP-24-SC
FOPP-24-SC
FOPP-24-SC
FOPP-24-SC
FOPP-24-SC
FOPP-24-SC
FOPP-24-SC
FOPP-24-SC
TRIPPLITE BATTERY
TRIPPLITE BATTERY
TRIPPLITE BATTERY
COPP-48
COPP-24
CMP
COPP-48
COPP-48
CMP
CMP
CMP
COPP-24
CMP
COPP-48
CMP
FOPP-144-SC
TRIPPLITE 5.0KVA
COPP-24
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: NF
CAMP ZAMA (ZAMJP)
01/08/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
1-
ZA
M
JP
_1
_M -1
_F lo or
_P la n_ an d_ Ra ck _E le va tio n_
.v sd x
1/ 8/
:3
PM
Floor Plan Template
A
PAK
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20191211EAS SURVEY
8'-9"
8' -5
M119
ZAMJP BUILDING 102
FLOOR PLAN
ROOM M119
TELECOMMUNCIATIONS AREA
ADD SECURITY
BARS ON
WINDOW
BACKBOARD
SUB-POWER PANEL
BACKBOARD
LIGHT SWITCH
Category Work Operation Descriptor UM Qty Security Install new door FE-DOOR EA 1 ISP Instal lgiht kit LIGHT-CEILING-LED EA 1 ISP Install 2 Backboards BACKBOARD EA 2
Install security bars on windows. 8' x 60". Needs Descriptor N/A 0 ISP Move equipment Remove/Relocate Equip EA 1 Power Install 2 power outlets for PDUs AC-120V-2PH-20AMP EA 2 Power Install 2 L5-20P PDU's (10 5-20R) PDU-L520P-520R EA 2 Ground Install RBB RBB-19IN EA 1 Ground Install 25' of #6 Ground Wire to SBB Power Cable Grounding 6 AWG, 600V, GreenFT 10 Ground Re-terminate exsisitng grounding lugs RETERMINATE GROUND LUG EA 1 Network Install Cisco 3850 for 25% growth. GFE - ACS-3850 EA 1 Ground Install RBB RBB-19IN EA 1 Ground Install 25' of #6 Ground Wire to SBB Power Cable Grounding 6 AWG, 600V, GreenFT 10 Ground Re-terminate exsisitng grounding lugs RETERMINATE GROUND LUG EA 1 Power Install sub-panel AC-Sub-Panel-240V/100A EA 0 Ground Install SBB SBB EA 0 Ground Install grounding wire Power Cable Grounding 6 AWG, 600V, GreenFT 20 Enclosures Install 7 2RU Horizontal CMP's CMP-2RU EA 7 ISP Install 3 4inch sleeve kits and conduit in wall FIRE-BARRIER-SLEEVE-KIT-4IN EA 3 ISP Re-cable (Create a discriptor) Remove/Relocate Equip EA 192
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: NF
CAMP ZAMA (ZAMJP)
01/08/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
1-
ZA
M
JP
_1
_M -1
_F lo or
_P la n_ an d_ Ra ck _E le va tio n_
.v sd x
1/ 8/
:3
PM
Rack Template
A
PAK
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20191211EAS SURVEY
1/16 : 1
ZAMJP BUILDING 102
ROOM M119
EQUIPMENT DETAIL
7' CABINET
EXISTING
RR01.01 (RACK1)
7 FEET
CMP
COPP-48
COPP-24
COPP-48
CMP
CMP
COPP-24
FOPP-24-SC
CMP
FOP 8-SC
EAS101 C3850-48F
EAS101 C3850-48F
EAS101 C3850-48F
PDU
PDU
7' CABINET
EXISTING
RR01.02 (Rack2
7 FEET
CMP
CMP
COPP-96
COPP-48
SHELF
7' RACK
PROPOSED
RR01.01
7 FEET
CMP
COPP-48
COPP-24
COPP-48
CMP
CMP
COPP-24
FOPP-24-SC
CMP
FOP 8-SC
EAS101 C3850-48F
EAS101 C3850-48F
EAS101 C3850-48F
PDU
PDU
CMP
CMP
CMP
EAS101 C3850-48F
CMP
7' RACK
PROPOSED
RR01.02
7 FEET
CMP
CMP
COPP-96
COPP-48
SHELF
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: NF
CAMP ZAMA (ZAMJP)
02/24/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
ZA
M
JP
_1
_M
6_
Fl oo r_ Pl an _a nd _R ac k_
El ev at io n_
.v sd x
2/
/2
:0
PM
Floor Plan Template
A
PAK
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20191211EAS SURVEY
10'-8"
'-1
0"
M126
ZAMJP BUILDING 102
FLOOR PLAN
ROOM M126
TELECOMMUNCIATIONS AREA
BACKBOARD
SUB-POWER PANEL
BACKBOARD
Category Work Operation Descriptor UM Qty Security Install new outward door FE-DOOR EA 1 ISP Install 2 Backboards BACKBOARD EA 2 Power Install 1 208v 30 amp circuits AC-120V-2PH-20AMP EA 2
Install 2 L5-20P PDU's (10 5-20R) PDU-L520P-520R EA 2 Ground Install RBB RBB-19IN EA 1
Install 25' of #6 Ground Wire to SBB Power Cable Grounding 6 AWG, 600V, GreenFT 25 Re-terminate exsisitng grounding lugs RETERMINATE GROUND LUG EA 1
Network Install Cisco 3850 for 25% growth. EAS-48PORT EA 1 Ground Install RBB RBB-19IN EA 1
Install 25' of #6 Ground Wire to SBB Power Cable Grounding 6 AWG, 600V, GreenFT 25 Re-terminate exsisitng grounding lugs RETERMINATE GROUND LUG EA 1
Power Install sub-panel AC-Sub-Panel-240V/100A EA 1 AC-Sub-Panel-240V/100A EA 1
Ground Install SBB SBB EA 1 Install 500' of 750AWG grounding wire Power Cable Grounding 6 AWG, 600V, GreenFT 25
Enclosures Label cables Relabel Racks EA 2 ISP Recable Remove/Relocate Equip EA 2 Enclosures Install 5 2RU Horizontal CMP's CMP-2RU EA 5 ISP Install 4 4inch sleeve kits and conduit in wall FIRE-BARRIER-SLEEVE-KIT-4IN EA 4
4 conduits need to be Fire stopped, Sealed, and Labeled FIRE-STOP EA 4
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: NF
CAMP ZAMA (ZAMJP)
02/24/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
ZA
M
JP
_1
_M
6_
Fl oo r_ Pl an _a nd _R ac k_
El ev at io n_
.v sd x
2/
/2
:0
PM
Rack Template
A
PAK
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20191211EAS SURVEY
1/16 : 1
ZAMJP BUILDING 102
ROOM M119
EQUIPMENT DETAIL
7' CABINET
EXISTING
RR01.01 (RACK1)
7 FEET
CMP
COPP-48
COPP-48
CMP
CMP
COPP-24
FOPP-24-SC
CMP
EAS101 C3850-48F
EAS101 C3850-48F
EAS101 C3850-48F
EAS101 C3850-48F
COPP-48
GB
7' CABINET
EXISTING
RR01.02 (Rack2
7 FEET
CMP
COPP-96
COP-24
CMP
COP-24
COPP-96
COP-24
CMP
COP-24
COP-24
GB
7' RACK
PROPOSED
RR01.01
7 FEET
CMP
COPP-48
COPP-24
COPP-48
CMP
CMP
COPP-24
FOPP-24-SC
CMP
FOP 8-SC
EAS101 C3850-48F
EAS101 C3850-48F
EAS101 C3850-48F
PDU
PDU
CMP
CMP
CMP
EAS101 C3850-48F
CMP
7' RACK
PROPOSED
RR01.02
7 FEET
CMP
CMP
COPP-96
COPP-48
SHELF
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: JSS
CAMP ZAMA (ZAMJP)
02/24/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
ZA
M
JP
_1
_M
0_
Fl oo r_ Pl an _a nd _R ac k_
El ev at io n_
.v sd x
2/
/2
:2
PM
TR Floor Plan
A
PAK
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20191211EAS SURVEY
21'-0"
5' -7
"M200
ZAMJP BUILDING 102
FLOOR PLAN
ROOM M200
TELECOMMUNCIATIONS AREA
4X SIMPLEX 6-20RPOWER PANEL BOARD
BACKBOARD
DUPLEX 5-15R
LIGHTING PANEL BOARD DUPLEX 5-15R
SBB
BACKBOARD
SHELF SHELF
POE/PNL
H
VAC
Category Work Operation Descriptor UM Qty ISP Install 2 backboards BACKBOARD EA 2 Power install 2 110v 20 amp circuit AC-120V-1PH-20AMP EA 2 Power Install 2 PDU-L520P-520R PDU-L520P-520R EA 2 Ground Install RBB RBB-19IN EA 1 ISP Label RBB LABEL-EXISTING EA 1 ISP Label grounds LABEL-EXISTING EA 1 Ground reterminate ground Lugs RETERMINATE GROUND LUG EA 1 Network Instal new cisco 3850 for growth EAS-48PORT EA 1 Ground Install RBB RBB-19IN EA 1 ISP Label RBB LABEL-EXISTING EA 1 ISP Label grounds LABEL-EXISTING EA 1 Ground Install SBB SBB EA 1 Ground 15' of #6-GND-CBL GND-CABLE-#6-AWG FT 15 Enclosures Install 4 1 ru CMP's CMP-1RU EA 4 ISP Needs 2 4" fire sleeve for ceiling/Wall FIRE-BARRIER-SLEEVE-KIT-4IN EA 2 ISP 10 holes to be labled FIRESTOP-LABEL EA 10 ISP 8 holes to be fire stopped FIRE-BARRIER-PUTTY-6IN EA 8
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: JSS
CAMP ZAMA (ZAMJP)
02/24/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
ZA
M
JP
_1
_M
0_
Fl oo r_ Pl an _a nd _R ac k_
El ev at io n_
.v sd x
2/
/2
:2
PM
Rack Template
A
PAK
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20191211EAS SURVEY
1/16 : 1
ZAMJP BUILDING 102
ROOM M200
EQUIPMENT DETAIL
EAS102 C3850-48F
7' RACK
EXISTING
RR01.01 (RACK 1)
7 FEET
EAS102 C3850-48F
EAS102 C3850-48F
EAS102 C3850-48F
FOPP-24-SC
CMP
CMP
PDU (520P-515R)
RBB
7' RACK
EXISTING
RR01.02 (RACK 2)
7 FEET
RBB
CMP
COPP-48
COPP-48
CMP
COPP-48
COPP-48
CMP
COPP-48
CMP
COPP-48
COPP-48
CMP
COPP-48
COPP-48
CMP
CABLE LADDER
EAS102 C3850-48F
7' RACK
PROPOSED
RR01.01 (RACK 1)
7 FEET
EAS102 C3850-48F
EAS102 C3850-48F
EAS102 C3850-48F
FOPP-24-SC
CMP
CMP
PDU (L520P-520R)
RBB
EAS102 C3850-48F
CMP
CMP
CMP
CMP
PDU (L520P-520R)
7' RACK
PROPOSED
RR01.02 (RACK 2)
7 FEET
RBB
CMP
COPP-48
COPP-48
CMP
COPP-48
COPP-48
CMP
COPP-48
CMP
COPP-48
COPP-48
CMP
COPP-48
COPP-48
CABLE LADDER
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: JSS
CAMP ZAMA (ZAMJP)
04/15/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
ZA
M
JP
_1
_1
_F lo or
_P la n_ a nd _R ac k_
E le v at io n_
9.
vs dx
/1
5/
:1
AM
TR Floor Plan
A
PAK
DAT E:
ZONEREV DAT EREVIS IO N DESCRIPTIO N APPROVED
20200309EAS SURVEY
RR01.07
ZAMJP BUILDING 121
FLOOR PLAN
ROOM 110
TELECOMMUNCIATIONS AREA
46'8"
26'9"
RRO1.06
BACKBOARD
SIMPLEX L6-30R
BACKBOARD
Category Work Operation Descriptor UM Qty ISP (x2) Install backboard BACKBOARD EA 2
Enclosures (x1) Instal fan kit. FAN-KIT-CUSTOM EA 1
Ground (X1) INSTALL RBB IN RR01.06 RBB-19IN EA 1
Preparation (x1) Relocate equipment Remove/Relocate Equip EA 1
Preparation (x1) Relocate equipment Remove/Relocate Equip EA 1
Preparation (x1) Relocate equipment Remove/Relocate Equip EA 1
Preparation (x1) Relocate equipment Remove/Relocate Equip EA 1
Preparation (x1) Relocate equipment Remove/Relocate Equip EA 1
Enclosures (X1) Install new CABINET-ZONE4-45U CABINET-ZONE4-45U EA 1
UPS (X1) Install UPS-5KVA UPS-5KVA-CONTROLLER EA 1
UPS (X4) INSTALL BATTERIES FOR 5KVA UPS IN RR01.07. UPS-5KVA-BATTERY-BP192V12RT3UTAAEA 4
Power (X1) AC-220V-2PH-30AMP AC-240V-2PH-30AMP EA 1
Power (X2)PDU-L620P-L620R PDU-L620P-L620R EA 2
Preparation (x1) Remove / relocate FOPP-24 Remove/Relocate Equip EA 1
Fiber (x1) Install FOPP-24 FOPP-12SM (R&M) EA 1
Preparation (x1) Remove / relocate FOPP-24 REMOVE/RELOCATE EQUIP EA 1
Preparation (x1) Remove / relocate RELOCATE-EQUIPMENT EA 1
Network (X13) BLUE 5M CAT6 PATCH CABLES PATCH-RJ45-5M EA 13
Preparation (x1) Remove / relocate RELOCATE-EQUIPMENT EA 1
Network (X14) BLUE 5M CAT6 PATCH CABLES PATCH-RJ45-5M EA 14
Preparation (x1) Remove / relocate RELOCATE-EQUIPMENT EA 1
Network (X20) BLUE 5M CAT6 PATCH CABLES PATCH-RJ45-5M EA 20
Preparation (x1) Remove / relocate RELOCATE-EQUIPMENT EA 1
Network (X20) BLUE 5M CAT6 PATCH CABLES PATCH-RJ45-5M EA 20
Preparation (x1) Remove / relocate RELOCATE-EQUIPMENT EA 1
Network (X14) BLUE 5M CAT6 PATCH CABLES PATCH-RJ45-5M EA 14
Preparation (x1) Remove / relocate RELOCATE-EQUIPMENT EA 1
Network (X39) BLUE 5M CAT6 PATCH CABLES PATCH-RJ45-5M EA 39
Preparation (x1) Remove / relocate RELOCATE-EQUIPMENT EA 1
Network (X21) BLUE 5M CAT6 PATCH CABLES PATCH-RJ45-5M EA 21
Preparation (x1) Remove / relocate RELOCATE-EQUIPMENT EA 1
Network (X14) BLUE 5M CAT6 PATCH CABLES PATCH-RJ45-5M EA 14
Preparation (x1) Remove / relocate RELOCATE-EQUIPMENT EA 1
RELOCATE-EQUIPMENT EA 1
Network (X3) BLUE 5M CAT6 PATCH CABLES PATCH-RJ45-5M EA 3
Preparation (x1) Remove / relocate RELOCATE-EQUIPMENT EA 1
Network (X9) BLUE 5M CAT6 PATCH CABLES PATCH-RJ45-5M EA 9
Cable (x 3) Install 3 CMP-2RU into RR01.07 CMP-2RU EA 3
(x12) Install 12 CMP-1RU into RR01.06 CMP-1RU EA 12
(x1) Install 1 CMP-2ru into RR01.06 CMP-2RU EA 1
ISP (x1) Install Firestop to three holes in celling FIRE-BARRIER-PUTTY-6IN EA 1
POWER PANEL
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: JSS
CAMP ZAMA (ZAMJP)
04/15/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
ZA
M
JP
_1
_1
_F lo or
_P la n_ a nd _R ac k_
E le v at io n_
9.
vs dx
/1
5/
:1
AM
Rack Elevat ion
A
PAK
DAT E:
ZONEREV DAT EREVIS IO N DESCRIPTIO N APPROVED
20200309EAS SURVEY
ZAMJP BUILDING 121
ROOM 110
EQUIPMENT DETAIL 1:16
RR01.06
7 FEET
7' CABINET
EXISTING
FOPP-24-SC
COPP-24
COPP-24
CMP
COPP-24
COPP-24
COPP-24
COPP-48
COPP-24
COPP-24
CMP
COPP-24
COPP-24
CMP
JBCE FIBER
CMP
JBCE COPPER
CMP
FOPP-24-SC
COPP-24
EAS121-C3850-48F
EAS121-C3850-48F
EAS121-C3850-48F
CMP
7' CABINET
PROPSOED
7 FEET
FOPP-24-LC
COPP-24
COPP-24
COPP-24
COPP-24
COPP-24
COPP-48
COPP-24
COPP-24
CMP
COPP-24
COPP-24
CMP
TJBCE121 C3850-24XS
CMP
TJBCE121 C3850-48F
CMP
FOPP-24-SC
COPP-24
RR01.06
RBB (REAR)
CMP
CMP
CMP
CMP
CMP
CMP
CMP
CMP
CMP
CMP
EAS121-C3850-48F
CMP
EAS121-C3850-48F
CMP
TRIPPLITE BATTERY
TRIPPLITE 5.0kVA
7' CABINET
PROPSOED
PDU (L620P-L620R)
PDU (L620P-L620R)
TRIPPLITE BATTERY
TRIPPLITE BATTERY
TRIPPLITE BATTERY
RBB (REAR)
EAS121-C3850-48F
7 FEET
RR01.07
45 45
7 FEET
RR01.07
45 45
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: NDF
SCHOFIELD BARRACKS (SCHHI)
04/20/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
ZA
M
JP
_1
_R m
2_ Cl as sr oo m
D ra w in gs .v sd x
4/
/2
7:
A M
Floor Plan Template
A
ETA
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20191112EAS SURVEY
ZAMJP BUILDING 125
FLOOR PLAN
ROOM 102
TELECOMMUNCIATIONS AREA
23'1"
17'4"
NEW 19RU CABINET
FOPP-24
COPP-48
2 X 2RU CMP
RBB
PDU
L5-20R
FRO
N
T
FRO
N
T
SBB
BACKBOARD 4' X 8'
TR
PP
Category Work Operation Descriptor UM Qty ISP (x1) Install backboard BACKBOARD EA 1
(x1) Install rack RU labels RU-LABELS EA 1 Enclosures (x1) Install wall cabinet 19RU system WALLCAB-19U-SYSTEM EA 1 Preparation (x1) Remove cabinet Remove/Relocate Equip EA 2 Power (X1) Install PDU (L5-20P TO 5-20R) PDU-520P-520R EA 1
(x1) Install power circuit to cabinet AC-120V-1PH-20AMP-L520 EA 1 Ground (x1) Install RBB RBB-19IN EA 1
(x1) Install SBB SBB EA 1 ISP (x1) Install grounding cables Ground Wire Support PKG 1 Fiber (x1) 24 port FOPP tie FOPP-24-SC EA 1 Copper (x1) Install COPP-48 COPP-48-CAT6 EA 1
(x24) Label jumpers COPP-PORT-LABEL EA 24 Network (x24) Install catch cables PATCH CAT6 1M EA 1
Cable (X2) CMP-2RU CMP-2RU EA 2 ISP (x3) Install Firestop to three holes in celling FIRE-STOP EA 3
(x3) Install Firestop labels FIRESTOP-LABEL EA 3
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: NDF
SCHOFIELD BARRACKS (SCHHI)
04/20/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
ZA
M
JP
_1
_R m
2_ Cl as sr oo m
D ra w in gs .v sd x
4/
/2
7:
A M
Rack Template
A
ETA
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20191112EAS SURVEY
ZAMJP BUILDING 125
ROOM 102
EQUIPMENT DETAIL
1:16
24RU CABINET
EXISTING
NO LABEL
EAS125-102-C3850-48F
19RU CABINET
PROPOSED
W01.01
19FOPP-24-SC
CMP
PDU L5-20
COPP-48
CMP
EAS125-102-C3850-48F
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: NDF
SCHOFIELD BARRACKS (SCHHI)
04/20/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
ZA
M
JP
_1
_R m
4_ Cl as sr oo m
D ra w in gs (1
).v sd x
4/
/2
8:
A
M
Floor Plan Template
A
ETA
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20191112EAS SURVEY
ZAMJP BUILDING 125
FLOOR PLAN
ROOM 104
TELECOMMUNCIATIONS AREA
57'9"
31'11"
NEW 19RU CABINET
FOPP-24
COPP-48
2 X 2RU CMP
RBB
PDU
L5-20R
FRO
N
T
FRONT
SBB
BACKBOARD 4' X 8'
PP TR
POWER PANEL L-6 (3P/4W) 120V/
208V
Category Work Operation Descriptor UM Qty ISP (x1) Install backboard BACKBOARD EA 1
(x1) Install rack RU labels RU-LABELS EA 1 Enclosures (x1) Install wall cabinet 19RU system WALLCAB-19U-SYSTEM EA 1 Power (X1) Install PDU (L5-20P TO 5-20R) PDU-520P-520R EA 2
(x1) Install power circuit to cabinet AC-120V-1PH-20AMP-L520 EA 1 Ground (x1) Install RBB RBB-19IN EA 1 Network (x1) Install Cisco 3850 48 POE+ EAS-48PORT EA 1 Ground (x1) Install SBB SBB EA 1 ISP (x1) Install grounding cables Ground Wire Support PKG 1 Fiber (x1) 24 port FOPP tie to storage room FOPP-24-SC EA 1 Copper (x1) Install COPP-48 COPP-48-CAT6 EA 1
(x24) Label jumpers COPP-PORT-LABEL EA 24 Network (x24) Install catch cables PATCH CAT6 1M EA 1 Copper (x24) Install CAT-6 drops CAT6-DROP-REPLACE EA 24 Cable (X2) CMP-2RU CMP-2RU EA 2 ISP (x3) Install Firestop to three holes in celling FIRE-STOP EA 3
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: NDF
SCHOFIELD BARRACKS (SCHHI)
04/20/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
ZA
M
JP
_1
_R m
4_ Cl as sr oo m
D ra w in gs (1
).v sd x
4/
/2
8:
A
M
Rack Template
A
ETA
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20191112EAS SURVEY
ZAMJP BUILDING 125
ROOM 102
EQUIPMENT DETAIL
1:16
24RU CABINET
EXISTING
NO LABEL
EAS125-102-C3850-48F
19RU CABINET
PROPOSED
W01.01
19FOPP-24-SC
CMP
PDU L5-20
COPP-48
CMP
EAS125-102-C3850-48F
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: JSS
CAMP ZAMA (ZAMJP)
02/24/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
ZA
M
JP
_1
_1
_F lo or
_P la n_ an d_ Ra ck _E le va tio n_
.v sd x
2/
/2
:4
PM
TR Floor Plan
A
PAK
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20191212EAS SURVEY
18'-9"
ZAMJP BUILDING 125
FLOOR PLAN
ROOM 129
TELECOMMUNCIATIONS AREA
BACKBOARD
DUPLEX 5-15RDUPLEX 5-15R
'-9
RR01.01
DUPLEX 5-15R
SIMPLEX 5-15R
AC SUB PANEL
SIMPLEX L5-20R
SIMPLEX L5-20R
Category Work Operation Descriptor UM Qty Enclosures Install new 45 RU lockable cabinet CABINET-45U EA 1 ISP Remove rack REMOVE-CABINET EA 1 ISP Move equipment (switch, FOPPS,COPPS Remove/Relocate Equip EA 1 Power Install 2 circuits for PDUs AC-120V-1PH-20AMP EA 2 Power Install 2 L5-20P 5-20R PDU PDU-L520P-520R EA 1 Ground 10' of #6-GND-WR GND-CABLE-#6-AWG FT 10 Network Install new 3850 for growth EAS-48PORT EA 1 ISP Remove rack REMOVE-CABINET EA 1 ISP remove equipment Remove/Relocate Equip EA 1 Power Install 208v/120v 60 amp sub panel in room 129 AC-Sub-Panel-240V/100A EA 1 Ground Install SBB SBB EA 1 Ground Install 25' of #6-GND-Wire grounding wire GND-CABLE-#6-AWG FT 25
Install new cat6 48 port COPP COPP-48-CAT6 EA 1 Copper Reterminate 48 User ports with Cat 6 CAT6-DROP-REPLACE EA 48
Install new cat6 48 port COPP COPP-48-CAT6 EA 1 Copper Reterminate 48 User ports with Cat 6 CAT6-DROP-REPLACE EA 48 Copper Install new cat6 24 port COPP COPP-24-CAT6 EA 1 Copper Reterminate 24 User ports with Cat 6 CAT6-DROP-REPLACE EA 24 Copper Install new cat6 24 port COPP COPP-24-CAT6 EA 1 Copper Reterminate 24 User ports with Cat 6 CAT6-DROP-REPLACE EA 24 Copper Install new cat6 24 port COPP COPP-24-CAT6 EA 1 Copper Reterminate 24 User ports with Cat 6 CAT6-DROP-REPLACE EA 24 Enclosures Install 2 1RU Horizontal CMP CMP-1RU EA 2 Enclosures Install 4 2 RU CMP CMP-2RU EA 4
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: JSS
CAMP ZAMA (ZAMJP)
02/24/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
ZA
M
JP
_1
_1
_F lo or
_P la n_ an d_ Ra ck _E le va tio n_
.v sd x
2/
/2
:4
PM
Rack Template
A
PAK
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20191212EAS SURVEY
1/16 : 1
ZAMJP BUILDING 125
ROOM 129
EQUIPMENT DETAIL
PDU (L520P-520R)
EAS102 C3850-48F
COPP-48
POWER INJECTOR
COPP-48
COPP-48
7' CABINET
PROPOSED
RR01.01
7 FEET
FOPP-48-SC
CMP
CMP
CMP
CMP
EAS102 C3850-48F
CMP
CMP
6' CABINET
EXISTING
NO LABEL
6 FEET
FILER
FILER
KVM
TRIPPLITE UPS
7' RACK
EXISTING
NO LABEL
7 FEET
PDU (520P-515R)
EAS102 C3850-48F
COPP-48
FOUNDRY FASTIRON 800
POWER INJECTOR
COPP-48
COPP-24
FOPP-48-SC
COPP-24
COPP-24
COPP-24
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: JSS
CAMP ZAMA (ZAMJP)
04/15/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
ZA
M
JP
_1
_2
_F lo or
_P la n_ an d_ Ra ck _E le va tio n_
.v sd x
4/
/2
9:
A
M
TR Floor Plan
A
PAK
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20200318EAS SURVEY
ROOM 201
TELECOMMUNICATION AREA
ZAMJP BUILDING 138
FLOOR PLAN
POWER PANEL L-2
PBB
BACKBOARD
RR00.01
(NOT
LABELED)
MONITOR
DESK
DESK
DESK
CABINET
CABINET
CABINET CABINET CABINET
CABINET
TABLE
DESK
CABINET
DESKSIMPLEX L5-20R
DUPLEX 5-15R
BACKBOARD
4'-7"
CABINET CABINET CABINET CABINET DESK
Category Work Operation Descriptor UM Qty ISP (x1) ADD BACKBOARDS. BACKBOARD EA 1
(x1) LABEL EXISTING CABINET LABEL-EXISTING EA 1 Power (x1) ADD PDU L520P TO 520R PDU-L520P-520R EA 1 Preparation (x1) REMOVE EXISTING RBB REMOVE/RELOCATE EQUIP EA 1 Ground (x1) ADD RBB RBB-19IN EA 1
(10') GND-AWG-#6-CABLE FROM PROPOSED RBB TO PROPOSED PBB. GND-CABLE-#6-AWG FT 10
ISP (x1) RELABEL EXISTING EAS SWITCH LABEL-EXISTING EA 1 Preparation (x1) RELOCATE SWITCH RELOCATE-EQUIPMENT EA 1 Power (x1) ADD 120V 20A CKT WITH L5-20R IN RR00.01. AC-120V-1PH-20AMP-L520 EA 1 Ground (x1) ADD PBB. PBB EA 1
(x1) RETERMINATE EXISTING CONDUCTOR TO PROPOSED PBB. GND-ITEM EA 1 ISP (x1)RELABEL OSP CABLE. LABEL-EXISTING EA 1 Preparation (x1) REMOVE FOPP REMOVE/RELOCATE EQUIP EA 1 Fiber (x1) ADD LC R&M FOPP FOPP-24SM (R&M) EA 1 ISP (x1) LABEL EXISTING FIBER JUMPER. LABEL-EXISTING EA 1
(x1) LABEL EXISTING COPP LABEL-EXISTING EA 1 Copper (x11) LABEL EXISTING CAT6 PATCH CABLES. COPP-PORT-LABEL EA 11 Cable Management
(x2) ADD 1-RU CMPs CMP-1RU EA 2
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: JSS
CAMP ZAMA (ZAMJP)
04/15/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
ZA
M
JP
_1
_2
_F lo or
_P la n_ an d_ Ra ck _E le va tio n_
.v sd x
4/
/2
9:
A
M
Rack Elevation
A
PAK
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20200318EAS SURVEY
1/16 : 1
ZAMJP BUILDING 138
ROOM 201
EQUIPMENT DETAIL
RBB
FOPP-24-SC
EAS138 C3850-48F
1'6" WALL CABINET
EXISTING
RR00.01 (NOT LABELED)
1.5 FEET
COPP-24
EAS138 C3850-48F
1'6" WALL CABINET
PROPOSED
RR00.01 (NOT LABELED)
1.5 FEET
COPP-24
PDU (L520P-520R)
FOPP-24-LC
CMP
RBB
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: NDF
SCHOFIELD BARRACKS (SCHHI)
04/16/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
ZA
M
JP
_2
_P as s
O ff ic e
D ra w in gs .v sd x
4/
/2
2:
P M
Floor Plan Template
A
ETA
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20191112EAS SURVEY
ZAMJP BUILDING 235
FLOOR PLAN
ROOM Pass Office
TELECOMMUNCIATIONS AREA
38'2"
24'10"
NEW 24RU CABINET
COPP-48
2 X 2RU CMP
RBB
PDU
L5-20R
FRO
N
T
FRONT
SBB
PP
TR
POWER PANEL NL-A (1P/2W) 120V/208V
BACKBOARD 4' X 8'
POWER PANEL NL (3P/4W) 120V/208V
Category…