This solicitation requests proposals for a telephone room remediation project at various Army installations in Japan. The Performance Work Statement provides prospective bidders with information and expectations for the technical refresh and upgrade of telecommunications rooms and network infrastructure at Camp Zama Hardy Barracks, Sagama Depot, Sagamihara Housing, Yokohama North Dock. The purpose of the project is to provide several buildings with a modernized Outside Plant, Inside Plant, and infrastructure to meet current Department of Defense, Unified Capabilities Requirements and support customers of the NEC. The period of performance is from September 20, 2022 through June 30, 2023. Any questions must be submitted by September 10, 2022. The solicitation was issued by the Department of the Army Materiel Command Army Contracting Command.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions.pdf | ||
| Japan Second 27_-.pdf | ||
| Performance work statement for Remediation 3-4-22 (1).docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
12345678
D
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: JSS
HARDY BARRACKS (HDBJP)
02/25/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
H D
BJ
P_
1_
2_ Fl oo r_
Pl an
_a nd
_R ac k_ El ev at io n_
.v sd x
2/
/2
4:
P
M
TR Floor Plan
A
PAK
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20200113EAS SURVEY
16'-9"
HDBJP BUILDING 1
FLOOR PLAN
ROOM 122
TELECOMMUNCIATIONS AREA
13'-1"
PBB
CABINET
SIMPLEX L5-30R
DUPLEX 5-15R
DUPLEX 5-20R
SUB PANEL LP-2
CABINET
CABINET
CABINET
CABIN
ET
CABINET
RR01.01 (RR01.05)
RR01.02 (FPI 06)
RR01.03 (NOT
LABELED)
RR02.01
(FPI 08)
BACKBOARD
MAIN POWER PANEL
Category Work Operation Descriptor UM Qty ISP Suspended lighting (x4) LIGHT-CEILING-LED EA 0
4'x8' Backboard (x2) BACKBOARD EA 2 Label Existing Cabinet (x4) LABEL-EXISTING EA 4
Enclosures New Fan Kit, Rack Series NTO (42RU) FAN-PANEL-3U EA 1 Power (x2) L5-30P to 5-20R PDU PDU-L530P-520R EA 2 ISP Label Existing RBB LABEL-EXISTING EA 1
Label Existing GND Connection LABEL-EXISTING EA 1 Label Existing EAS LABEL-EXISTING EA 1 Label Existing Fiber Jumper (x2) LABEL-EXISTING EA 2 Label Existing Copper Jumper (x24) LABEL-EXISTING EA 24
Preparation Relocate Existing EAS switch RELOCATE-EQUIPMENT EA 1 ISP Label Existing UPS System LABEL-EXISTING EA 1 Ground New PBB PBB EA 1
#6 GND from PBB to Existing P-T1 (100') GND-CABLE-#6-AWG FT 100 #6 GND from New PBB to RBB (20') GND-CABLE-#6-AWG FT 20
ISP Label Existing FOPP LABEL-EXISTING EA 1 Preparation (X4) Relocate FOPPS RELOCATE-EQUIPMENT EA 4 ISP Label Existing FOPP LABEL-EXISTING EA 1
LABEL-EXISTING EA 1
LABEL-EXISTING EA 1
LABEL-EXISTING EA 1
Preparation Remove Existing COPPs (x2) Remove/Relocate Equip EA 2 Copper (x2) New 48p CAT6 COPP COPP-48-CAT6 EA 2
Replace 48 CAT5 Drops with CAT6 CAT6-WAO-DUPLEX EA 48 Preparation (x2) Remove CMP Remove/Relocate Equip EA 2
(x2) Relocate CMP RELOCATE-EQUIPMENT EA 2 (x1) Remove Duct/ Panduit Remove/Relocate Equip EA 1
0 (x2) 4" Horizontal Duct exiting TR 1EMT4 FT 5' ISP (x29') New 1' Cable Ladder K1010-CA-LADDER EA 3
(x10) Duct Seal DUCT-SEAL-1 EA 10 (x10) Fire Stop FIRE-BARRIER-PUTTY-6IN EA 10 (x10) Fire Label FIRESTOP-LABEL EA 10
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: JSS
HARDY BARRACKS (HDBJP)
02/25/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
H D
BJ
P_
1_
2_ Fl oo r_
Pl an
_a nd
_R ac k_ El ev at io n_
.v sd x
2/
/2
4:
P
M
Rack Elevation
A
PAK
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20200113EAS SURVEY
1/16 : 1
HDBJP BUILDING 1
ROOM 122
EQUIPMENT DETAIL
RBB
6.5' CABINET
EXISTING
RR01.01 (RR.1.1)
6.5 FEET
COPP-24
CMP
COPP-24
FOPP-24-SC
FOPP-24-SC
CMP
FOPP-24-SC
FOPP-24-SC
CMP
FOPP-24-SC
CMP
EAS1 C3850-48F
CMP
C3850-48F
ACS1 C3850-24XS
CMP
ACS1 C3850-24XS
CMP
FOPP-24-SC
CMP
T-JBCE C3850-24XS
CMP
T-JBCE C3850-48F
CMP
T-JBCE C3850-24XS
CMP
T-JBCE C3850-48F
CMP
RBB
6.5' CABINET
PROPOSED
RR01.01 (RR.1.1)
6.5 FEET
FOPP-24-SC
FOPP-24-SC
FOPP-24-SC
FOPP-24-SC
FOPP-24-SC
CMP
EAS1 C3850-48F
CMP
C3850-24XS
ACS1 C3850-24XS
CMP
ACS1 C3850-24XS
CMP
FOPP-72-SC
CMP
T-JBCE C3850-24XS
CMP
T-JBCE C3850-48F
CMP
T-JBCE C3850-24XS
CMP
T-JBCE C3850-48F
CMP
CMP
COPP-48
CMP
COPP-48
PDU (L530P-520R)
PDU (L530P-520R)
CMP
Fan Kit - Tripplite
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: JSS
HARDY BARRACKS (HDBJP)
02/20/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
H D
BJ
P_
1_
8_ Fl oo r_
Pl an
_a nd
_R ac k_ El ev at io n_
.v sd x
2/
/2
:3
AM
TR Floor Plan
A
PAK
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20200113EAS SURVEY
11'-11"
HDBJP BUILDING 1
FLOOR PLAN
ROOM 208
TELECOMMUNCIATIONS AREA
4' -7
SBB
CABINET
RR00.01 (NOT
LABELED)
CABINET
SHELF REFRIGERATOR
POWER PANEL L-2N
BACKBOARD
L5-20
Category Work Operation Descriptor UM Qty ISP Label Existing Enclosure LABEL-EXISTING EA 1 Power New L5-20 to 5-20R PDU (x1) PDU-L520P-520R EA 1
New L5-20 Circuit from Panel L-2N AC-120V-1PH-20AMP EA 1 ISP Label Existing EAS Switch LABEL-EXISTING EA 1
Label Existing Copper Jumpers (x17) LABEL-EXISTING EA 17 Ground #6 GND from RBB to new PBB (20') GND-CABLE-#6-AWG FT 20
New RBB RBB-19IN EA 1 New PBB PBB EA 1 #6 GND from PBB to Panel L-2N (50') GND-CABLE-#6-AWG FT 50
ISP Label Existing FOPP LABEL-EXISTING EA 1 Label Existing Fiber Jumper (x2) LABEL-EXISTING EA 2 Label Existing COPP LABEL-EXISTING EA 1
LABEL-EXISTING EA 1
LABEL-EXISTING EA 1
LABEL-EXISTING EA 1
LABEL-EXISTING EA 1
Cable Managemen t
(x2) 1RU CMP CMP-1RU EA 3
ISP x1 4" sleeve kit FIRE-BARRIER-SLEEVE-KIT-4IN EA 1 x3 Duct Seal DUCT-SEAL-1 EA 3 x3 Fire Stop FIRE-BARRIER-PUTTY-6IN EA 3 x3 fire label FIRESTOP-LABEL EA 3
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: JSS
HARDY BARRACKS (HDBJP)
02/20/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
H D
BJ
P_
1_
8_ Fl oo r_
Pl an
_a nd
_R ac k_ El ev at io n_
.v sd x
2/
/2
:3
AM
Rack Elevation
A
PAK
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20200113EAS SURVEY
1/16 : 1
HDBJP BUILDING 1
ROOM 208
EQUIPMENT DETAIL
3' CABINET
PROPOSED
RR00.01 (NOT LABELED)
RBB
3 FEET
FOPP-24-SC
EAS1 C3850-48F
COPP-24
COPP-24
CMP
COPP-24
CMP
COPP-24
COPP-24
CMP
PDU (L520P-520R)
CMP
CMP
CMP
3' CABINET
EXISTING
RR00.01 (NOT LABELED)
LIGHT
3 FEET
FOPP-24-SC
EAS1 C3850-48F
COPP-24
COPP-24
CMP
COPP-24
CMP
COPP-24
COPP-24
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: JSS
HARDY BARRACKS (HDBJP)
02/20/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
H D
BJ
P_
1_
3_ Fl oo r_
Pl an
_a nd
_R ac k_ El ev at io n_
.v sd x
2/
/2
:1
AM
TR Floor Plan
A
PAK
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20200113EAS SURVEY
16'-3"
HDBJP BUILDING 1
FLOOR PLAN
ROOM 413
TELECOMMUNCIATIONS AREA
'-4
SBB
RR00.02
(CABINET
1)
SHELF
DESK
SHELF
BIN
RR00.01
(CABINET
2)
SIMPLEX L5-20R
BACKBOARD
BACKBOARD
BREAKERBOX
SUB PANEL
POWER PANEL L-4M
Category Work Operation Descriptor UM Qty ISP Label Existing Enclosure (x2) LABEL-EXISTING EA 2 Preparation Remove Shelf (x1) REMOVE/RELOCATE EQUIP EA 1 Power New L5-20P to 5-20R PDU (x1) PDU-L520P-520R EA 1 Preparation Remove Existing PDU (x2) REMOVE/RELOCATE EQUIP EA 2
Remove RBB REMOVE/RELOCATE EQUIP EA 1 Power Repurpose circuit 5-20R from Cabinet REMOVE/RELOCATE EQUIP EA 1 Ground x1 New RBB RBB-19IN EA 1
#6 GND from new RBB to PBB (10') GND-CABLE-#6-AWG FT 10 Power Install new L5-20R from Panel L-4M AC-120V-1PH-20AMP-L520 EA 0 ISP Label Existing EAS Switch LABEL-EXISTING EA 1
Label Existing fiber Jumpers (x2) LABEL-EXISTING EA 2 Label Existing Copper Jumpers (x34) LABEL-EXISTING EA 34 Label Existing FOPP LABEL-EXISTING EA 1 Label Existing COPP LABEL-EXISTING EA 1
LABEL-EXISTING EA 1
LABEL-EXISTING EA 1
Cable Managemen t
(x1) 2RU CMP CMP-2RU EA 1
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: JSS
HARDY BARRACKS (HDBJP)
02/20/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
H D
BJ
P_
1_
3_ Fl oo r_
Pl an
_a nd
_R ac k_ El ev at io n_
.v sd x
2/
/2
:1
AM
Rack Elevation
A
PAK
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20200113EAS SURVEY
1/16 : 1
HDBJP BUILDING 1
ROOM 413
EQUIPMENT DETAIL
SHELF
FOPP-24-SC
EAS1 C3850-48F
3' CABINET
EXISTING
RR00.02 (CABINET 1)
3 FEET
CMP
COPP-24
COPP-24
CMP
SHELF
COPP-24
CMP
PDU
PDU
RBB
SHELF
FOPP-24-SC
EAS1 C3850-48F
3' CABINET
PROPOSED
RR00.02 (CABINET 1)
3 FEET
CMP
COPP-24
COPP-24
CMP
CMP
COPP-24
CMP
PDU (L520P-520R)
RBB
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: JSS
HARDY BARRACKS (HDBJP)
02/20/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
H D
BJ
P_
8_
8_ Fl oo r_
Pl an
_a nd
_R ac k_ El ev at io n_
.v sd x
2/
/2
:5
AM
TR Floor Plan
A
PAK
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20200114EAS SURVEY
18'-6"
HDBJP BUILDING 8
FLOOR PLAN
ROOM 308
TELECOMMUNCIATIONS AREA
'-9
RR00.01
(NOT
LABELED)
CABINET
TABLE
SHELF
CA
BI
N
ET
COUCH
PBB
BACKBOARD
SIMPLEX L5-20R
POWER PANEL 3L-1
DESK
Category Work Operation Descriptor UM Qty ISP Label Existing Enclosure LABEL-EXISTING EA 1 Preparation Remove circuit 5-20R from Cabinet REMOVE_ELECTRICAL_CIRCUIT EA 1 Power New L5-20P to 5-20R PDU (x1) PDU-L520P-520R EA 1 Ground x1 New RBB RBB-19IN EA 1 Preparation Remove Rack Mount Light (RU16) REMOVE/RELOCATE EQUIP EA 1 Power Install new L5-20R from Panel 3L-1 (100') AC-120V-1PH-20AMP EA 1 ISP Label Existing EAS Switch LABEL-EXISTING EA 1
Label Existing fiber Jumpers (x3) LABEL-EXISTING EA 3 Label Existing Copper Jumpers (x19) LABEL-EXISTING EA 19
Preparation Remove / Relocate EAS Switch x1 RELOCATE-EQUIPMENT EA 1 Network X7 New CAT6 Jumpers 3' Green PATCH CAT6 1M EA 7 Ground #6 GND (5') to 3L-1 GND Bar GND-CABLE-#6-AWG FT 5' Preparation Remove Grounding Box REMOVE/RELOCATE EQUIP EA 1 Ground New PBB PBB EA 1
#6 GND from new RBB to PBB (10') GND-CABLE-#6-AWG FT 10 #6 GND from new PBB to Panel 3L-1 (100') GND-CABLE-#6-AWG FT 100
ISP Label Existing FOPP LABEL-EXISTING EA 1
LABEL-EXISTING EA 1
LABEL-EXISTING EA 1
Copper Terminate 19 User Drops TERM-CAT6 EA 19 Replace CAT5Drops with CAT6 (x13) CAT6-WAO-DUPLEX EA 13 New 2RU 48port COPP COPP-48-CAT6 EA 1 Patch 7 home runs to COPP48 CAT6-HOMERUN-REPLACE EA 7
Preparation Remove Existing COPP REMOVE/RELOCATE EQUIP EA 1
REMOVE/RELOCATE EQUIP EA 1
REMOVE/RELOCATE EQUIP EA 1
Cable Managemen t
(x3) 1RU CMP CMP-2RU EA 3
Preparation Remove / Relocate FOPP x1 REMOVE-REINSTALL-FOPP EA 1 Remove CMP x2 REMOVE/RELOCATE EQUIP EA 2
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: JSS
HARDY BARRACKS (HDBJP)
02/20/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
H D
BJ
P_
8_
8_ Fl oo r_
Pl an
_a nd
_R ac k_ El ev at io n_
.v sd x
2/
/2
:5
AM
Rack Elevation
A
PAK
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20200114EAS SURVEY
1/16 : 1
HDBJP BUILDING 8
ROOM 308
EQUIPMENT DETAIL
3' CABINET
EXISTING
RR00.01 (NETWORK
SWITCHING HUB)
LIGHT
3 FEET
FOPP-24-SC
EAS8 C3850-48F
FOPP-24-SC
FOPP-24-SC
COPP-24
CMP
COPP-24
COPP-24
CMP
3' CABINET
PROPOSED
RR00.01 (NETWORK
SWITCHING HUB)
3 FEET
FOPP-24-SC
EAS8 C3850-48F
COPP-48
CMP
PDU (L520P-520R)
CMP
CMP
FOPP-24-SC
FOPP-24-SC
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: JSS
HARDY BARRACKS (HDBJP)
04/09/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
H D
BJ
P_
8_
3_ Fl oo r_
Pl an
_a nd
_R ac k_ El ev at io n_
.v sd x
4/ 9/
:4
PM
TR Floor Plan
A
PAK
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20200114EAS SURVEY
18'-6"
HDBJP BUILDING 8
FLOOR PLAN
ROOM 483
TELECOMMUNCIATIONS AREA
SHELF SHELF
SHELF
SHELF
RR01.01
BACKBOARD
SHELF SHELF
PBB
SHELF
SIMPLEX L5-20R
COPPER PUNCH DOWN BLOCK
(MOVED FROM EXISTING CABINET)
POWER PANEL 4L-2
Category Work Operation Descriptor UM Qty Security Replace Door FE-DOOR EA 1 ISP Add Suspended Lighting (x3) LIGHT-CEILING-LED EA 3 Copper Replace 40CAT5 Drops with CAT6 CAT6-WAO-DUPLEX EA 40 ISP New 8'x8' Backboard BACKBOARD EA 1 Preparation Remove existing Cabinet REMOVE-CABINET EA 1 Enclosures Install New 42RU Cabinet CABINET-42U EA 1 Cable Managemen t
(x6) 2RU CMP CMP-2RU EA 6
Power (x2) L5-20P to 5-20R PDU PDU-L520P-520R EA 2 (x2) New L5-20R Circuit from Panel 4L-2 (250') AC-120V-1PH-20AMP EA 2
Preparation Remove Existing PDU Remove/Relocate Equip EA 1 Remove Existing 120V circuit (x2) REMOVE_ELECTRICAL_CIRCUIT EA 2
ISP Label Existing EAS Switch (x2) LABEL-EXISTING EA 2 Label Existing fiber Jumpers (x2) LABEL-EXISTING EA 2
Preparation Remove / Relocate EAS Switch (x2) RELOCATE-EQUIPMENT EA 2 Ground Replace with #6 GND (5') GND-CABLE-#6-AWG FT 5 Preparation Remove/Relocate Equip EA 5 Ground New PBB PBB EA 1
#6 GND from new PBB to RBB (15') GND-CABLE-#6-AWG FT 15 Bond Metallic Structures #6 GND (x20') to New PBB GND-CABLE-#6-AWG FT 20 #6 GND from new PBB to Panel 4L-2 (250') GND-CABLE-#6-AWG FT 250
ISP Label Existing FOPP LABEL-EXISTING EA 1 Label Existing Fiber Jumpers (x2) LABEL-EXISTING EA 2
Preparation Remove / Relocate FOPP REMOVE-REINSTALL-FOPP EA 1 Remove / Relocate 3 Fiber Jumpers RELOCATE-EQUIPMENT EA 3
ISP Label Existing COPP LABEL-EXISTING EA 1 Preparation Remove / Relocate 16 CAT6 Jumpers RELOCATE-EQUIPMENT EA 16 ISP Label Existing COPP LABEL-EXISTING EA 1 Preparation Remove / Relocate COPP RELOCATE-EQUIPMENT EA 1 ISP Label Existing COPP LABEL-EXISTING EA 1 Preparation Remove / Relocate COPP RELOCATE-EQUIPMENT EA 1 ISP Label Existing COPP LABEL-EXISTING EA 1 Preparation Remove / Relocate COPP RELOCATE-EQUIPMENT EA 1 ISP Label Existing COPP LABEL-EXISTING EA 1 Preparation Remove / Relocate COPP RELOCATE-EQUIPMENT EA 1 ISP Label Existing COPP LABEL-EXISTING EA 1 Preparation Remove / Relocate COPP RELOCATE-EQUIPMENT EA 1 ISP Label Existing COPP LABEL-EXISTING EA 1 Preparation Remove / Relocate COPP RELOCATE-EQUIPMENT EA 1
Remove / Relocate Existing Punch Block RELOCATE-EQUIPMENT EA 1 Cable Managemen t
(x1) 2RU CMP CMP-1RU EA 1
Preparation Remove Existing Cable Tray Remove/Relocate Equip EA 1 ISP Install 2' wide Cable Tray (15') CABLE-LADDER-24IN FT 15
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: JSS
HARDY BARRACKS (HDBJP)
04/09/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
H D
BJ
P_
8_
3_ Fl oo r_
Pl an
_a nd
_R ac k_ El ev at io n_
.v sd x
4/ 9/
:4
PM
Rack Elevation
A
PAK
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20200114EAS SURVEY
1/16 : 1
HDBJP BUILDING 8
ROOM 483
EQUIPMENT DETAIL
FOPP-24-SC
EAS8 C3850-48F
COPP-24
5.5' CABINET
EXISTING
(NOT LABELED)
5.5 FEET
COPPER PUNCH DOWN
BLOCK
RBB
COPP-24
COPP-24
EAS8 C3850-48F
COPP-96
COPP-48
COPP-48
COPP-24
PDU (L520P-520R)
RBB
6.5' CABINET
PROPOSED
RR01.01
6.5 FEET
FOPP-24-SC
COPP-24
CMP
COPP-48
COPP-48
COPP-96
CMP
CMP
PDU (L520P-520R)
EAS8 C3850-48F
EAS8 C3850-48F
CMP
COPP-24
COPP-24
COPP-24
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: JJP
SAGAMI DEPOT (SGDJP)
03/17/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
SG
DJ
P_
4- 5_
4_
Fl oo r_ Pl an _a nd _R ac k_
El ev at io n_
.v sd x
3/
/2
:5
PM
TR Floor Plan
A
PAK
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20200124EAS SURVEY
SGDJP BUILDING 144-5
FLOOR PLAN
ROOM 104
TELECOMMUNCIATIONS AREA
RR01.07
H
VA
C
POWER PANEL
9'-9"
19'-8"
H
VA
C
RR01.05
No.3
No.2
No.1
N/A
PBB
4'X8' BACKBOARD
4'X8' BACKBOARD
RR01.06
Category Work Operation Descriptor UM Qty Security Install a door the swings out. FE-DOOR EA 1 Network (x14) Replace CAT5 patch cables with CAT6. PATCH CAT6 1M EA 14 ISP (x2) 4' x 8' Backboard BACKBOARD EA 2 Enclosures (x5) Relabel existing Rack ID RELABEL RACKS EA 5 Preparation (x1) Relocate switch from Rack NO.2 to propsed RR01.06. RELOCATE-EQUIPMENT EA 1
(x1) Remove cabinet to the right of RR01.05 REMOVE-CABINET EA 1 Enclosures (x1) Install a 45RU cabinet with suitable depth for UPS beside RR01.05. CABINET-ZONE4-45U EA 1 Ground (x5) RBB RBB-19IN EA 5
(x60') Bond RBBs to ground ring under raised floor. GND-CABLE-#6-AWG FT 60 Enclosures (x1) Relabel existing switch RELABEL RACKS EA 1 Network (x25) Procure 1M CAT6 patch cables to connect to proposed 48 port COPP. PATCH CAT6 1M EA 25
Power (x1) L6-30P to L6-30R install 208V 30A ckt in Panel 104. AC-240V-3PH-30AMP EA 1 UPS (x1) Install new UPS UPS-5KVA-CONTROLLER EA 1
(x2) UPS Battery Packs UPS-5KVA-BATTERY-BP192V12RT3UTAAEA 2 Power (x1) L6-20P to L6-20R PDU PDU-L620P-L620R EA 1 Network (x2) L6-20 to C15 Power Cords PWR_CABLE_C15_L620P EA 2 ISP (x1) Label existing GND SYSTEM LABEL-EXISTING EA 1
(x1) Replace existing cable OSP cable label LABEL-EXISTING EA 1 (x6) Relabel existing FOPPs LABEL-EXISTING EA 6
Network (x2) Install 10M LC to SC fiber jumper PATCH-LCSC-SM-10M EA 2 ISP (x4) Label existing fiber patches LABEL-EXISTING EA 4
(x18) Label existing fiber patches LABEL-EXISTING EA 18 (x1) Label existing COPP LABEL-EXISTING EA 1
Copper (x1) Install a 48 port COPP in RR01.06. COPP-48-CAT6 EA 1 (x6) Terminate six drops from pairgain to proposed COPP. Procure 1M CAT6 patch cables for EAS to COPP connection.
CAT6-HOMERUN-REPLACE EA 6
(x13) Run new CAT6 user drops and terminate on 110 block of the proposed COPP in RR01.06.
CAT6-DROP-REPLACE EA 13
Cable Management
(x1) Install a 2RU CMP in RR01.06. CMP-2RU EA 1
(x2) Install 1RU CMPs in RR01.06. CMP-1RU EA 2
SIMPLEX-L6-30P
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: JJP
SAGAMI DEPOT (SGDJP)
03/17/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
SG
DJ
P_
4- 5_
4_
Fl oo r_ Pl an _a nd _R ac k_
El ev at io n_
.v sd x
3/
/2
:5
PM
Rack Elevation
A
PAK
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20200124EAS SURVEY
1/16 : 1
SGDJP BUILDING 144-5
ROOM 104
EQUIPMENT DETAIL
42 RU CABINET
PROPOSED
RR01.03
(No.3)
FOPP -24-SC
FOPP-24-SC
CMP
CMP
F.O JOINT BOX
ARUBA 3600
ARUBA 3200
FOUNDRY ADN
FOPP-24-SC
FOPP-24-SC
FOPP-24-SC
FOPP-24-SC
7' CABINET
PROPOSED
RR01.06
(No.3)
45RBB
EAS106 C3850-48F
CMP
CMP
TRIPPLITE BATTERY
TRIPPLITE BATTERY
UPS 5.0 kVA
PDU (L620P-L620R)
COPP-48
7' CABINET
PROPOSED
RR01.07
(RACK 4)
APC UPS SYSTEM
CISCO 3945
TAC-BOX
42 RU CABINET
EXISTING
RR01.03
(No.3)
FOPP -24-SC
FOPP-24-SC
CMP
CMP
EAS106 C3850-48F
F.O JOINT BOX
ARUBA 3600
ARUBA 3200
FOUNDRY ADN
FOPP-24-SC
FOPP-24-SC
FOPP-24-SC
FOPP-24-SC
7' CABINET
EXISTING
RR01.07
(RACK 4)
APC UPS SYSTEM
CISCO 3945
7' CABINET
EXISTING
RR01.06
(NOT LABELED)
TA
C-
BO
X
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: NDF
SAGAMI DEPOT (SGDJP)
05/15/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
SG
DJ
P_
6- 1_
RM
_1
D ra w in gs
.v sd x
5/
/2
:5
PM
Floor Plan Template
A
ETA
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20191112EAS SURVEY
SGDJP BUILDING 156-1
FLOOR PLAN
ROOM 147
TELECOMMUNCIATIONS AREA
14'08"
11'
INSTALL
CUSTOMER
BLACK BOX
CABINET
BACKBOARD
4' X 8'
BACKBOARD
4' X 8'
PBB
POWER PANEL
L6-30R
FRO
N
T
L5-20R
TRIPLITE
5KVA WITH
BATTERIES
1 X 24 FOPP
6 X 1RU CMP
5 X COPP-24
1 X COPP-48
4 X 2RU CMP
3 X C3850
FE-DOOR
CABLE LADDER
L5-20R
TR
PP
Category Work Operation Descriptor UM Qty Security (X1) DOOR FE-DOOR EA 1
ISP (X2) 4X8 BACKBOARD BACKBOARD EA 2
ISP (X1) Label Existing Enclosure LABEL-EXISTING EA 1 Preparation (x1) Remove Existing Light RELOCATE-EQUIPMENT EA 1 Preparation (X1) REMOVE CABINET REMOVE-CABINET EA 1 Enclosures (X2) CABINET-ZONE4-45U CABINET-24U-42D EA 2 Ground (X2) RBB RBB-19IN EA 2 ISP (x2) Label Existing Fiber Jumpers LABEL-EXISTING EA 2 ISP (x103) Label Existing CAT6 jumpers LABEL-EXISTING EA 103 Power (X1) AC-Sub-Panel-240V/100A AC-Sub-Panel-240V/100A EA 1
UPS (X1) UPS-1.5KVA-8HR UPS-1.5KVA-CONTROLLER EA 1
ISP (X1) LABEL POWER PANAL LABEL-EXISTING EA 1
Power (X1) AC-120V-2PH-30AMP AC-120V-2PH-30AMP EA 1 Power (X2)PDU-L620P-L620R PDU-L620P-L620R EA 2 UPS (x4) Battery UPS-1.5/2.2kVA-BATTERY EA 4 Power (X1) REPURPOSE EXISTING AC 120V CIRCUIT TO L5-20R AC-120V-1PH-20AMP-L520 EA 1
ISP (X1) LABEL GROUND LABEL-EXISTING EA 1
ISP (1) LABEL OSP LABEL-EXISTING EA 1
ISP (x1) Label Existing FOPP LABEL-EXISTING EA 1 Preparation (x1) Relocate Existing FOPP RELOCATE-EQUIPMENT EA 1 Preparation (X6) RELOCATE EXISTING COPP RELOCATE-EQUIPMENT EA 6 ISP (x6) Label Existing COPPs LABEL-EXISTING EA 6 Preparation (x2) Remove Existing CMP RELOCATE-EQUIPMENT EA 2 Cable (X12) ADD NEW CMP-1RU CMP-1RU EA 12 ISP (x2) FIRE-STOP FIRE-STOP EA 2
ISP (X2) FIRESTOP LABEL FIRESTOP-LABEL EA 2
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: NDF
SAGAMI DEPOT (SGDJP)
05/15/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
SG
DJ
P_
6- 1_
RM
_1
D ra w in gs
.v sd x
5/
/2
:5
PM
Rack Template
A
ETA
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20191112EAS SURVEY
SGDJP BUILDING 156-1
ROOM 147
EQUIPMENT DETAIL
FOPP-24-SC
16RU WALL MOUNTED
CABINET
EXISTING
NO LABEL
16RU
1:16
CMP
COPP-24
CMP
EAS157-1 C3850-48F
COPP-48
CMP
CMP
EAS157-1 C3850-48F
EAS157-1 C3850-48F
COPP-24
COPP-24
COPP-24
COPP-24
7' CABINET
NEW
RR01.02
7 FEET
RBB (REAR)
FOPP-24-SC
COPP-24
EAS157-1 C3850-48F
COPP-48
EAS157-1 C3850-48F
EAS157-1 C3850-48F
COPP-24
COPP-24
COPP-24
CMP
CMP
CMP
CMP
CMP
CMP
CMP
CMP
PDU L6-20R
PDU L6-20R
6' CABINET
EXISTING
NOT INSTALLED
RR01.03
6 FEET
7' CABINET
NEW
RR01.01
7 FEET
RBB (REAR)
PDU L6-30R
TRIPPLITE BATTERY
TRIPPLITE 5kVA
TRIPPLITE BATTERY
TRIPPLITE BATTERY
RBB (REAR)
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: NDF
SCHOFIELD BARRACKS (SCHHI)
04/14/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
SH
AJ
P_
1-
_R m
D ra w in gs .v sd x
4/
/2
:2
AM
Floor Plan Template
A
ETA
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20191112EAS SURVEY
SHAJP BUILDING 127-01
FLOOR PLAN
ROOM 127
TELECOMMUNCIATIONS AREA
16'
6'9"
NEW CABINET
1 X 2RU CMP
1 X 1RU CMP
RBB
PDU
L5-20R
REPREPOSE CURRENT OUTLET
TR
ELECTRICAL ROOM
F
RO
N T
FR
O
N T
BACKBOARD 4' X 8'
AC
PBB
BACKBOARD 4' X 8'
Category Work Operation Descriptor UM Qty
ISP (X2) 4X8 BACKBOARD BACKBOARD EA 2
Preparation (X1) REMOVE CABINET REMOVE-CABINET EA 1 Enclosures (X1) CABINET-ZONE4-45U CABINET-ZONE4-45U EA 1 Power (x1) Install 120v 20a circuit AC-120V-1PH-20AMP-L520 EA 1 Ground (X1) PDU (L5-20P TO 5-20R) PDU-L520P-520R EA 1
ISP (X1) RBB RBB-19IN EA 1
Preparation (x1) Label Existing EAS Siwtch LABEL-EXISTING EA 1 ISP (x1) Relocate Existing EAS Switch REMOVE/RELOCATE EQUIP EA 1
(x3) Label Existing Fiber Jumpers LABEL-EXISTING EA 3 (x5) Label Existing CAT6 jumpers LABEL-EXISTING EA 5
Preparation (x1) Label Existing FOPP LABEL-EXISTING EA 1 (x1) Relocate Existing FOPP REMOVE/RELOCATE EQUIP EA 1
ISP (X3) RELOCATE EXISTING COPP REMOVE/RELOCATE EQUIP EA 3
Cable (x3) Label Existing COPPs LABEL-EXISTING EA 1
(X1) ADD NEW CMP-1RU CMP-1RU EA 1
(X1) ADD NEW CMP-2RU CMP-2RU EA 1
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: NDF
SCHOFIELD BARRACKS (SCHHI)
04/14/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
SH
AJ
P_
1-
_R m
D ra w in gs .v sd x
4/
/2
:2
AM
Rack Template
A
ETA
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20191112EAS SURVEY
SGDJP BUILDING 121-01
ROOM 127
EQUIPMENT DETAIL
1:16
DSN PUNCH DOWN
42RU CABINET
EXISTING
L-M
42COPP-24 VOICE
COPP-24
COPP-24 VOICE
EAS121-06 C3850-48F
SHELF
SHELF
SHELF
FOPP-24-SC
45RU CABINET
PROPOSED
RR01.01 (RR.1.1)
45FOPP-24-SC
COPP-24
CMP
EAS127-01 C3850-48F
CMP
RBB (REAR)
PDU L5-20
COPP-24 VOICE
COPP-24 VOICE
DSN PUNCH DOWN
SHELF
CMP
CMP
CMP
SHELF
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: NDF
SCHOFIELD BARRACKS (SCHHI)
04/14/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
SH
AJ
P_
1-
_C om m s_
Rm D ra w in gs
.v sd x
4/
/2
:3
AM
Floor Plan Template
A
ETA
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20191112EAS SURVEY
SHAJP BUILDING 121-14
FLOOR PLAN
ROOM Comms RM
TELECOMMUNCIATIONS AREA
8'
6'5"
NEW CABINET
1 X 2RU CMP
1 X 1RU CMP
RBB
PDU
L5-20R
FRO
N
T
FRONT
BACKBOARD 4' X 8'
AC
SBB
BACKBOARD 4' X 8'
TR
Weight Room
PP
SUBPANEL
Category Work Operation Descriptor UM Qty
ISP (X2) 4X8 BACKBOARD BACKBOARD EA 2
Preparation (X1) REMOVE CABINET REMOVE-CABINET EA 1 Enclosures (X1) CABINET-ZONE4-45U CABINET-ZONE4-45U EA 1 Power (x1) install 120v 20a AC-120V-1PH-20AMP-L520 EA 1 Ground (X1) PDU (L5-20P TO 5-20R) PDU-L520P-520R EA 1
ISP (X1) RBB RBB-19IN EA 1
Preparation (x1) Label Existing EAS Siwtch LABEL-EXISTING EA 1 ISP (x1) Relocate Existing EAS Switch REMOVE/RELOCATE EQUIP EA 1
(x3) Label Existing Fiber Jumpers LABEL-EXISTING EA 3 Power (x4) Label Existing CAT6 jumpers LABEL-EXISTING EA 4 Ground (x1) Install Subpanel in TR. AC-Sub-Panel-240V/100A EA 1 Preparation (x1) Install SBB SBB EA 1
(x1) Label Existing FOPP REMOVE/RELOCATE EQUIP EA 3 (x1) Relocate Existing FOPP REMOVE/RELOCATE EQUIP EA 1
ISP (X3) RELOCATE EXISTING COPP REMOVE/RELOCATE EQUIP EA 1
Cable (x3) Label Existing COPPs LABEL-EXISTING EA 1
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: NDF
SCHOFIELD BARRACKS (SCHHI)
04/14/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
SH
AJ
P_
1-
_C om m s_
Rm D ra w in gs
.v sd x
4/
/2
:3
AM
Rack Template
A
ETA
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20191112EAS SURVEY
SGDJP BUILDING 121-14
ROOM Comms Rm
EQUIPMENT DETAIL
1:16
45RU CABINET
PROPOSED
RR01.01
45FOPP-24-SC
COPP-24
CMP
EAS127-14 C3850-48F
CMP
RBB (REAR)
PDU L5-20
COPP-24 VOICE
COPP-24 VOICE
DSN PUNCH DOWN
DSN PUNCH DOWN
28RU CABINET
EXISTING
L-M
COPP-24 VOICE
COPP-24
COPP-24 VOICE
EAS121-14 C3850-48F
FOPP-24-SC
CMP
CMP
CMP
CMP
CMP
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: JSS
SAGAMIHARA HOUSING AREA
(SHAJP)
04/14/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
SH
AJ
P_
2-
_1
_F lo or _P la n_ an d_
Ra ck
_E le va tio n_
.v sd x
4/
/2
1:
P M
TR Floor Plan
A
PAK
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20200309EAS SURVEY
ROOM 167
TELECOMMUNICATION AREA
SHAJP BUILDING 122-01
FLOOR PLAN
RR01.01 (D-M)
SIMPLEX L5-20R
BACKBOARD
PBB
VERTICAL CABLE LADDER
MDF
POWER PANEL L-14
TV-M S-12
HVAC VERTICAL CABLE LADDER
DUPLEX 5-15R
DUPLEX 5-15R
DUPLEX 5-15R
Category Work Operation Descriptor UM Qty ISP (x1) ADD BACKBOARD-4x4 BACKBOARD-4X4 EA 1
(x1) ADD RACK ID LABEL LABEL-EXISTING EA 1 (x2) ADD RU LABELS LABEL-EXISTING EA 2
Power (x1) ADD PDU L520P TO 520R PDU-L520P-520R EA 1 Ground (x1) ADD ENCLOSURE RBB RBB-19IN EA 1
(30') GND-AWG-#6-CABLE GND-CABLE-#6-AWG FT 30
ISP (x1) RELABEL EXISTING EAS SWITCH LABEL-EXISTING EA 1 Preparation (x1) RELOCATE EAS SWITCH RELOCATE-EQUIPMENT EA 1 Power (x1) ADD 20A 120V AC-120V-1PH-20AMP EA 1 Ground (x1) ADD PBB/SBB PBB EA 1
(100') GND-AWG-#6 FOR PBB GND-CABLE-#6-AWG FT 100
(x2) ADD BONDING FOR 1IN. CONDUIT GND-CONDUIT-1.00IN EA 2
(50') GND-AWG-#6 FOR METALLIC BONDING GND-CABLE-#6-AWG FT 50
(x1) ADD BONDING FOR 2.0IN. CONDUIT GND-CONDUIT-2.00IN EA 1
ISP (x1) LABEL OSP CABLE LABEL-EXISTING EA 1 (x1) Relabel Existing FOPP LABEL-EXISTING EA 3
Preparation (x1)RELOCATE FOPP RELOCATE-EQUIPMENT EA 1 ISP (x3) Label existing Fiber jumper LABEL-EXISTING EA 3 Copper (x6) REPLACE HOMERUN CAT6-HOMERUN-REPLACE EA 6
(12x)ADD CAT6-WAO-DUPLEX CAT6-WAO-DUPLEX EA 12 Network (x12) ADD CAT6 PATCH CABLES PATCH CAT6 1M EA 2 Cable (x1) ADD 24 COPP COPP-24-CAT6 EA 1 ISP (x3) ADD 1-RU CMPs CMP-1RU EA 3
(x1) ADD PUTTY (FIRE-STOP ALTERNATE) FIRE-BARRIER-PUTTY-6IN EA 1
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: JSS
SAGAMIHARA HOUSING AREA
(SHAJP)
04/14/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
SH
AJ
P_
2-
_1
_F lo or _P la n_ an d_
Ra ck
_E le va tio n_
.v sd x
4/
/2
1:
P M
Rack Elevation
A
PAK
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20200309EAS SURVEY
1/16 : 1
SHAJP BUILDING 122-01
ROOM 167
EQUIPMENT DETAIL
EAS122-01 C3850-48F
COPP-24
BLANK PANEL
COPP-24
COPP-24
COPP-24
COPP-24
ICX 6450-48P
CMP
ICX 6450-24P
COPP-24
CMP
FOPP-24-SC
5.5' CABINET
EXISTING
RR01.01 (D-M)
5.5 FEET
COPP-24
FOPP-12-ST
FOPP-24-ST
EAS122-01 C3850-48F
COPP-24
BLANK PANEL
COPP-24
COPP-24
COPP-24
COPP-24
ICX 6450-48P
CMP
ICX 6450-24P
COPP-24
CMP
FOPP-24-SC
5.5' CABINET
EXISTING
RR01.01 (D-M)
5.5 FEET
COPP-24
FOPP-12-ST
FOPP-24-ST
CMP
COPP-24
CMP
CMP
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: JSS
SAGAMIHARA HOUSING AREA
(SHAJP)
04/14/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
SH
AJ
P_
3-
_O ffi ce _F lo or
_P la n_ an d_ Ra ck _E le va tio n_
.v sd x
4/
/2
1:
P
M
TR Floor Plan
A
PAK
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20200309EAS SURVEY
DESK
OFFICE
TELECOMMUNICATION AREA
SHAJP BUILDING 123-15
FLOOR PLAN
RR00.01 (NOT
LABELED)
SIMPLEX L5-20R
BACKBOARD
PBB
SHELF
POWER PANEL L-1
MONITOR
DESK TABLE
ALARM
DESK
BAY
BAY
BAY
Category Work Operation Descriptor UM Qty ISP (x1) ADD ENCLOSURE ID LABEL LABEL-EXISTING EA 1
(x2) ADD RU LABELS LABEL-EXISTING EA 2 Preparation (x1) REMOVE ENCLOSURE MOUNTED LITEBAR REMOVE/RELOCATE EQUIP EA 1 Power (x1) ADD PDU L520P TO 520R PDU-L520P-520R EA 1 Ground (x1) ADD ENCLOSURE RBB RBB-19IN EA 1
(10') GND-AWG-#6-CABLE GND-CABLE-#6-AWG FT 10
ISP (x1) RELABEL EXISTING EAS SWITCH LABEL-EXISTING EA 1 Power (x1) ADD 20A 120V AC-120V-1PH-20AMP EA 1 ISP (x1) LABEL GND per PAC LABEL GUIDE LABEL-EXISTING EA 1
(x1)RE-LABEL OSP CABLE LABEL-EXISTING EA 1 (x1) Relabel Existing FOPP LABEL-EXISTING EA 1 (x6) Label existing Fiber jumper LABEL-EXISTING EA 6
Copper (x1) CAT6 HOMERUN REPLACE CAT6-HOMERUN-REPLACE EA 1 ISP (x1) LABEL EXISTING COPP LABEL-EXISTING EA 1 Network (x7) REPLACE PATCH CABLES WITH BLUE PATCH CAT6 1M EA 7 Preparation (x2) REMOVE CMPs REMOVE/RELOCATE EQUIP EA 2 Cable Managemen
(x3) ADD 1-RU CMPs CMP-1RU EA 3
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: JSS
SAGAMIHARA HOUSING AREA
(SHAJP)
04/14/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
SH
AJ
P_
3-
_O ffi ce _F lo or
_P la n_ an d_ Ra ck _E le va tio n_
.v sd x
4/
/2
1:
P
M
Rack Elevation
A
PAK
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20200309EAS SURVEY
1/16 : 1
SHAJP BUILDING 123-15
OFFICE ROOM
EQUIPMENT DETAIL
EAS123-15 C3850-48F
3' WALL CABINET
EXISTING
RR00.01 (NOT LABELED)
COPP-24
3 FEET
FOPP-24-SC
CMP
CMP
LIGHT
EAS123-15 C3850-48F
3' WALL CABINET
PROPOSED
RR00.01 (NOT LABELED)
COPP-24
3 FEET
FOPP-24-SC
RBB
CMP
CMP
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: JJP
SAGAMIHARA HOUSING (SHAJP)
01/24/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
SH
AJ
P_
0-
_1
_F lo or _P la n_ an d_
Ra ck
_E le va tio n_
.v sd x
5/
4/
:3
AM
TR Floor Plan
A
PAK
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20200124EAS SURVEY
SHAJP BUILDING 130-01
FLOOR PLAN
ROOM 101
TELECOMMUNCIATIONS
AREA16'-5 3/4"
12'-0"
13'-0"
30'-0"
H
VA
C H
VA
C
MDF
REMOVE 5 EXISTING CABINETS
REMOVE UPS
INSTALL 5 NEW CABINETS
RELOCATE ALL EXISTING EQUIPMENT
EXISTING GROUNDING RING
SBB UNDER RACK 6
GROUND CABLE LADDER TO SBB
PBB
GND PNL TO PNL GND - #6
GND PANEL GND TO PBB - #6
Category Work Operation Descriptor UM Qty ISP (x1) 8'x8' Backboard BACKBOARD EA 1 Preparation Remove Existing Cabinet (x5) REMOVE-CABINET EA 5 Fiber (x5) New 45RU Cabinet (45RU-FOPP-Cabinet) 45RU-FOPP-CABINET EA 5 Preparation (x1) Remove / Relocate Existing EAS Switch (Rack2) RELOCATE-EQUIPMENT EA 1
(x2) Remove / Relocate Existing CMP (Rack2) RELOCATE-EQUIPMENT EA 2 (x1) Remove / Relocate Existing ADN Switch (Rack2) RELOCATE-EQUIPMENT EA 1 (x2) Remove / Relocate Existing PDU (Rack2) RELOCATE-EQUIPMENT EA 2 (x1) Remove Existing RBB (Rack2) RELOCATE-EQUIPMENT EA 1 (x19) Remove / Relocate Existing Fiber Jumpers (Rack2) RELOCATE-EQUIPMENT EA 19 (x20) Remove / Relocate Existing CAT6 Jumpers (Rack2) RELOCATE-EQUIPMENT EA 20
ISP Label Existing EAS Switch LABEL-EXISTING EA 1 Preparation (x1) Remove Existing UPS (Rack 1) REMOVE-UPS EA 1
(x1) Remove Existing RBB (Rack 1) RELOCATE-EQUIPMENT EA 1 (x1) Remove / Reterminate Existing GND (Rack1) Remove/Relocate Equip EA 1 (x12) Remove / Relocate Existing FOPP (Rack3) REMOVE-REINSTALL-FOPP EA 12 (x8) Remove / Relocate Existing CMP (Rack3) RELOCATE-EQUIPMENT EA 8 (x1) Remove / Relocate Existing COPP (Rack3) RELOCATE-EQUIPMENT EA 1 (x1) Remove / Relocate Existing Shelf (Rack 3) RELOCATE-EQUIPMENT EA 1 (x1) Remove / Relocate Existing PDU (Rack3) RELOCATE-EQUIPMENT EA 1 (x1) Remove /Relocate Existing RBB (Rack3) RELOCATE-EQUIPMENT EA 1 (x5) Remove / Relocate Existing Innerduct (Rack3) RELOCATE-EQUIPMENT EA 5 (x31) Remove / Relocate Fiber Jumpers (Rack3) RELOCATE-EQUIPMENT EA 31 (x9) Remove / Relocate Existing CAT6 Jumpers (Rack3) RELOCATE-EQUIPMENT EA 9 (x1) Remove / Relocate Cisco ONS (Rack4) RELOCATE-EQUIPMENT EA 1 (x1) Remove / Relocate Phone (Rack4) RELOCATE-EQUIPMENT EA 1 (x1) Remove / Relocate Shelf (Rack4) RELOCATE-EQUIPMENT EA 1 (x1) Remove / Relocate DSX Patch Panel (Rack4) RELOCATE-EQUIPMENT EA 1 (x1) Remove / Relocate COPP (Rack4) RELOCATE-EQUIPMENT EA 1 (x2) Remove / Relocate CMP (Rack4) RELOCATE-EQUIPMENT EA 2 (x1) Remove / Relocate FOPP (Rack4) REMOVE-REINSTALL-FOPP EA 1 (x1) Remove / Relocate DC Panel (Rack4) RELOCATE-EQUIPMENT EA 1 (x2) Remove / Relocate PDU (Rack4) RELOCATE-EQUIPMENT EA 2 (x1) Remove / Relocate RBB (Rack4) RELOCATE-EQUIPMENT EA 1 (x1) Remove / Relocate Innerduct (Rack4) RELOCATE-EQUIPMENT EA 1 (x7) Remove / Relocate Fiber Jumper (Rack4) RELOCATE-EQUIPMENT EA 7 (x5) Remove / Relocate CAT6 Jumper (Rack4) RELOCATE-EQUIPMENT EA 5 (x2) Remove / Relocate Cisco 350 (Rack5) RELOCATE-EQUIPMENT EA 2 (x1) Remove / Relocate Cisco ISR (Rack5) RELOCATE-EQUIPMENT EA 1 (x2) Remove / Relocate PDU (Rack5) RELOCATE-EQUIPMENT EA 2 (x1) Remove / Relocate Shelf (Rack5) RELOCATE-EQUIPMENT EA 1 (x1) Remove / Relocate Hitachi NT (Rack5) RELOCATE-EQUIPMENT EA 1 (x1) Remove / Relocate Innerduct (Rack5) RELOCATE-EQUIPMENT EA 1 (x1) Remove / Relocate RBB (Rack5) RELOCATE-EQUIPMENT EA 1 (x12) Remove / Relocate CAT6 Jumper (Rack5) RELOCATE-EQUIPMENT EA 12 (x5) Remove / Relocate GND cable (Rack5) RELOCATE-EQUIPMENT EA 5
Ground #6 GND from Panel GND to Panel GND Bar (5') GND-CABLE-#6-AWG FT 5 #6 GND from Panel GND Bar to Panel GND Bar (20'') GND-CABLE-#6-AWG FT 20
ISP (x1) Label Existing PBB LABEL-EXISTING EA 1 (x1) Label Existing SBB LABEL-EXISTING EA 1
Ground #6 GND from Cable Tray to SBB (20') GND-CABLE-#6-AWG FT 20 ISP (x1) Label Existing Fiber Jumper LABEL-EXISTING EA 1
(x13) Label ExistingCAT6 Jumpers LABEL-EXISTING EA 13 (x1) Label Existing COPP LABEL-EXISTING EA 1
Copper (x6) Terminate CAT6 into new COPP CAT6-HOMERUN-REPLACE EA 6 (x1) 48port COPP COPP-48-CAT6 EA 1
Network (x6) New CAT6 Jumpers (Blue 1M) PATCH CAT6 1M EA 6 ISP Label enclosure 6 & 7 LABEL-EXISTING EA 2
LABEL EXISTING ENCLOSURES
EXISTING CABLE LADDER
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: JJP
SAGAMIHARA HOUSING (SHAJP)
01/24/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
SH
AJ
P_
0-
_1
_F lo or _P la n_ an d_
Ra ck
_E le va tio n_
.v sd x
5/
4/
:3
AM
Rack Elevation
A
PAK
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20200124EAS SURVEY
1/ 16 :
SHAJP BUILDING 130-01
ROOM 101
EQUIPMENT DETAIL
43RU CABINET
EXISTING
RR01.03
RACK 3
43 43
FOPP-48
FOPP-24
SHELF
CMP
FOPP-24
COPP-24
CMP
FOPP-24
CMP
FOPP-24
FOPP-24
CMP
FOPP-24
FOPP-24
CMP
FOPP-24
FOPP-24
CMP
FOPP-24
CMP
FOPP-24
CMP
43RU CABINET
EXISTING
RR01.02
RACK 2
43 43
CMP
S-ADN-130-01
CMP
C3850 EAS 48P
45RU CABINET
EXISTING
RR01.01
RACK 1
APC
SYMMETRA UPS LX
42RU CABINET
EXISTING
RR01.05
RACK 5
CISCO 3945
FJC203P104
HITACHI NT-235C
SHELF
MEDO-R/M-11
CISCO VG350
42RU CABINET
EXISTING
RR01.04
RACK 4
SHELF
MSPP
UMUPSAG010
MAJOR POWER ONS
COPP-24
TO MSPP, MDFB4
DSX PP1
FOPP-24
CMP
CMP
PHONE
7' CABINET
PROPOSED
RR01.03
RACK 3
43 43
FOPP-48
FOPP-24
SHELF
CMP
FOPP-24
COPP-24
CMP
FOPP-24
CMP
FOPP-24
FOPP-24
CMP
FOPP-24
FOPP-24
CMP
FOPP-24
FOPP-24
CMP
FOPP-24
CMP
FOPP-24
CMP
7' CABINET
PROPOSED
RR01.02
RACK 2
43 43
CMP
S-ADN-130-01
CMP
C3850 EAS 48P
7' CABINET
PROPOSED
RR01.01
RACK 1
7' CABINET
PROPOSED
RR01.05
RACK 5
CISCO 3945
FJC203P104
HITACHI NT-235C
SHELF
MEDO-R/M-11
CISCO VG350
7' CABINET
PROPOSED
RR01.04
RACK 4
SHELF
MSPP
UMUPSAG010
MAJOR POWER ONS
COPP-24
TO MSPP, MDFB4
DSX PP1
FOPP-24
CMP
CMP
PHONE
GND BAR (REAR) GND BAR (REAR) GND BAR (REAR) GND BAR (REAR) GND BAR (REAR)
COPP-48
PDU-L520P-520R
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: JSS
SAGAMIHARA HOUSING AREA
(SHAJP)
04/14/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
SH
AJ
P_
6_ _O ffi ce
_F lo or _P la n_ an d_
Ra ck
_E le va tio n_
.v sd x
4/
/2
1:
P M
TR Floor Plan
A
PAK
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20200311EAS SURVEY
OFFICE
TELECOMMUNICATION AREA
SHAJP BUILDING 146
FLOOR PLAN
DESK
PRINTER
POWER PANEL L-1
BACKBOARD
K E Y
K E Y
TELEPHONE TERMINAL BOXTV
BOX
COUCH
RR00.01
(NOT
LABELED)
SIMPLEX L5-20R
(REPURPOSE EXISTING CKT)
BACKBOARD
PBB
CABINET
Category Work Operation Descriptor UM Qty ISP (x1) ADD ENCLOSURE ID LABEL LABEL-EXISTING EA 1
(x2) ADD RU LABELS LABEL-EXISTING EA 2 Preparation (x1) REMOVE ENCLOSURE MOUNTED LITEBAR REMOVE/RELOCATE EQUIP EA 1 Power (x1) ADD PDU L520P TO 520R PDU-L520P-520R EA 1 Ground (x1) ADD ENCLOSURE RBB RBB-19IN EA 1
(10') GND-AWG-#6-CABLE GND-CABLE-#6-AWG FT 10
ISP (x1) RELABEL EXISTING EAS SWITCH LABEL-EXISTING EA 1 Preparation (x1) RELOCATE SWITCH RELOCATE-EQUIPMENT EA 1 Power (x1) ADD 20A 120V AC-120V-1PH-20AMP EA 1 ISP (x1) LABEL GND per PAC LABEL GUIDE LABEL-EXISTING EA 1
(x1)RE-LABEL OSP CABLE LABEL-EXISTING EA 1 (x1) Relabel Existing FOPP LABEL-EXISTING EA 1 (x3) Label existing Fiber jumper LABEL-EXISTING EA 3
Copper (x1) CAT6 HOMERUN REPLACE CAT6-HOMERUN-REPLACE EA 1 ISP (x1) LABEL EXISTING COPP LABEL-EXISTING EA 1 Network (x14) REPLACE PATCH CABLES WITH BLUE PATCH CAT6 1M EA 14 Preparation (x2) REMOVE CMPs REMOVE/RELOCATE EQUIP EA 2 Cable Managemen
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: JSS
SAGAMIHARA HOUSING AREA
(SHAJP)
04/14/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
SH
AJ
P_
6_ _O ffi ce
_F lo or _P la n_ an d_
Ra ck
_E le va tio n_
.v sd x
4/
/2
1:
P M
Rack Elevation
A
PAK
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20200311EAS SURVEY
1/16 : 1
SHAJP BUILDING 146
OFFICE
EQUIPMENT DETAIL
EAS146 C3850-48F
3' WALL CABINET
EXISTING
RR00.01 (NOT LABELED)
COPP-24
3 FEET
FOPP-24-SC
CMP
CMP
LIGHT
EAS146 C3850-48F
3' WALL CABINET
PROPOSED
RR00.01 (NOT LABELED)
COPP-24
3 FEET
FOPP-24-SC
RBB
CMP
CMP
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: JSS
SAGAMIHARA HOUSING AREA
(SHAJP)
04/14/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
SH
AJ
P_
0_ O ffi ce
_F lo or _P la n_ an d_
Ra ck
_E le va tio n_
.v sd x
4/
/2
1:
P M
TR Floor Plan
A
PAK
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20200311EAS SURVEY
BREAK ROOM
TELECOMMUNICATION AREA
SHAJP BUILDING 150
FLOOR PLAN
COUCH
RR00.01
(NOT
LABELED)
SIMPLEX L5-20R
(REPURPOSE EXISTING CKT)
BACKBOARD
PBB
TABLE
COUNTER
CABINET
REFRIDGERATOR
LOCKERS
LOCKERS
COUCH
4X DUPLEX 5-15R
POWER PANEL
Category Work Operation Descriptor UM Qty ISP (x1) ADD ENCLOSURE ID LABEL LABEL-EXISTING EA 1
(x2) ADD RU LABELS LABEL-EXISTING EA 2 Preparation (x1) REMOVE ENCLOSURE MOUNTED LITEBAR REMOVE/RELOCATE EQUIP EA 1 Power (x1) ADD PDU L520P TO 520R PDU-L520P-520R EA 1 Ground (x1) ADD ENCLOSURE RBB RBB-19IN EA 1
(10') GND-AWG-#6-CABLE GND-CABLE-#6-AWG FT 10
ISP (x1) RELABEL EXISTING EAS SWITCH LABEL-EXISTING EA 1 Preparation (x1) RELOCATE SWITCH RELOCATE-EQUIPMENT EA 1 Power (x1) ADD 20A 120V AC-120V-1PH-20AMP EA 1 ISP (x1) LABEL GND per PAC LABEL GUIDE LABEL-EXISTING EA 1
(x1)RE-LABEL OSP CABLE LABEL-EXISTING EA 1 (x1) Relabel Existing FOPP LABEL-EXISTING EA 1 (x3) Label existing Fiber jumper LABEL-EXISTING EA 3 (x1) LABEL EXISTING COPP LABEL-EXISTING EA 1
Network (x14) REPLACE PATCH CABLES WITH BLUE PATCH CAT6 1M EA 14 Preparation (x2) REMOVE CMPs REMOVE/RELOCATE EQUIP EA 2 Cable Managemen
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: JSS
SAGAMIHARA HOUSING AREA
(SHAJP)
04/14/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
SH
AJ
P_
0_ O ffi ce
_F lo or _P la n_ an d_
Ra ck
_E le va tio n_
.v sd x
4/
/2
1:
P M
Rack Elevation
A
PAK
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20200311EAS SURVEY
1/16 : 1
SHAJP BUILDING 150
BREAK ROOM
EQUIPMENT DETAIL
EAS150 C3850-48F
3' WALL CABINET
EXISTING
RR00.01 (NOT LABELED)
COPP-24
3 FEET
FOPP-24-SC
CMP
CMP
LIGHT
EAS150 C3850-48F
3' WALL CABINET
PROPOSED
RR00.01 (NOT LABELED)
COPP-24
3 FEET
FOPP-24-SC
RBB
CMP
CMP
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: JSS
SAGAMIHARA HOUSING AREA
(SHAJP)
04/14/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
SH
AJ
P_
7_ O ffi ce
_F lo or _P la n_ an d_
Ra ck
_E le va tio n_
.v sd x
4/
/2
2:
P M
TR Floor Plan
A
PAK
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20200311EAS SURVEY
OFFICE
TELECOMMUNICATION AREA
SHAJP BUILDING 337
FLOOR PLAN
RR00.01
(NOT
LABELED)
SIMPLEX L5-20R
BACKBOARD
PBB
TABLE
CABINET
REFRIDGERATOR
LOCKERS
DESK
DUPLEX 5-15R
POWER PANEL
DESK
CABINET
CABINET
Category Work Operation Descriptor UM Qty ISP (x1) ADD ENCLOSURE ID LABEL LABEL-EXISTING EA 1
(x2) ADD RU LABELS LABEL-EXISTING EA 2 Preparation (x1) REMOVE ENCLOSURE MOUNTED LITEBAR REMOVE/RELOCATE EQUIP EA 1 Power (x1) ADD PDU L520P TO 520R PDU-L520P-520R EA 1 Ground (x1) ADD ENCLOSURE RBB RBB-19IN EA 1
(10') GND-AWG-#6-CABLE GND-CABLE-#6-AWG FT 10
ISP (x1) RELABEL EXISTING EAS SWITCH LABEL-EXISTING EA 1 Preparation (x1) RELOCATE SWITCH RELOCATE-EQUIPMENT EA 1 ISP (x1) LABEL POWER PANEL LABEL-EXISTING EA 1 Power (x1) ADD 20A 120V AC-120V-1PH-20AMP EA 1 ISP (x1) LABEL GND per PAC LABEL GUIDE LABEL-EXISTING EA 1
(x1)RE-LABEL OSP CABLE LABEL-EXISTING EA 1 (x1) Relabel Existing FOPP LABEL-EXISTING EA 1 (x3) Label existing Fiber jumper LABEL-EXISTING EA 3 (x1) LABEL EXISTING COPP LABEL-EXISTING EA 1
Network (x11) REPLACE PATCH CABLES WITH BLUE PATCH CAT6 1M EA 11 Preparation (x3) REMOVE CMPs REMOVE/RELOCATE EQUIP EA 3 Cable Managemen
(x4) ADD 1-RU CMPs CMP-1RU EA 4
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: JSS
SAGAMIHARA HOUSING AREA
(SHAJP)
04/14/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
SH
AJ
P_
7_ O ffi ce
_F lo or _P la n_ an d_
Ra ck
_E le va tio n_
.v sd x
4/
/2
2:
P M
Rack Elevation
A
PAK
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20200311EAS SURVEY
1/16 : 1
SHAJP BUILDING 337
OFFICE
EQUIPMENT DETAIL
EAS150 C3850-48F
3' WALL CABINET
EXISTING
RR00.01 (NOT LABELED)
COPP-24
3 FEET
FOPP-24-SC
CMP
CMP
LIGHT
EAS150 C3850-48F
3' WALL CABINET
PROPOSED
RR00.01 (NOT LABELED)
COPP-24
3 FEET
FOPP-24-SC
RBB
CMP
CMP
CMP
PDU (L520P-520R)
CMP
COPP-24
COPP-24
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: NDF
SCHOFIELD BARRACKS (SCHHI)
04/14/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
SH
AJ
P_
6_ O ffi ce
D ra w in gs .v sd x
4/
/2
2:
P M
Floor Plan Template
A
ETA
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20191112EAS SURVEY
SHAJP BUILDING 726
FLOOR PLAN
ROOM OFFICE
TELECOMMUNCIATIONS AREA
8'
6'5"
NEW CABINET
1 X 2RU CMP
1 X 1RU CMP
RBB
PDU
L5-20R
FRO
N
T
FRONT
BACKBOARD 4' X 8'
AC
SBB
BACKBOARD 4' X 8'
TR
Weight Room
PP
SUBPANEL
Category Work Operation Descriptor UM Qty ISP (x2) Add 2 backboards BACKBOARD EA 2 Preparation (X1) REMOVE CABINET REMOVE-CABINET EA 1 Enclosures (x1) CABINET-24U-42D CABINET-24U-42D EA 1 Power (X1) PDU (L5-20P TO 5-20R) PDU-L520P-520R EA 1 Ground (X1) RBB RBB-19IN EA 1 ISP (x1) Label Existing EAS Siwtch LABEL-EXISTING EA 1 Preparation (x1) Relocate Existing EAS Switch REMOVE/RELOCATE EQUIP EA 1 ISP (x3) Label Existing Fiber Jumpers LABEL-EXISTING EA 3 ISP (x3) Label Existing CAT6 jumpers LABEL-EXISTING EA 3 Power (x1) AC power circuit L5-20R AC-120V-1PH-20AMP-L520 EA 1 ISP (x1) Install Sub Panel AC-Sub-Panel-240V/100A EA 1 Preparation (x1) Isntall SBB SBB EA 1 Preparation (x1) Label Existing FOPP LABEL-EXISTING EA 1 ISP (x1) Relocate Existing FOPP REMOVE/RELOCATE EQUIP EA 1 Cable (X1) RELOCATE EXISTING COPP REMOVE/RELOCATE EQUIP EA 1 Cable (x5) Label Existing COPPs LABEL-EXISTING EA 5
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: NDF
SCHOFIELD BARRACKS (SCHHI)
04/14/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
SH
AJ
P_
6_ O ffi ce
D ra w in gs .v sd x
4/
/2
2:
P M
Rack Template
A
ETA
DATE:
ZONEREV DATEREVISION DESCRIPTION APPROVED
20191112EAS SURVEY
SGDJP BUILDING 726
ROOM OFFICE
EQUIPMENT DETAIL
1:16
16RU CABINET
EXISTING
NO LABEL
COPP-24
EAS726 C3850-48F
FOPP-24-SC
LIGHT
CMP
CMP
24RU CABINET
PROPOSED
RR01.01
24FOPP-24-SC
COPP-24
CMP
EAS127-14 C3850-48F
CMP
RBB (REAR)
PDU L5-20
COPP-24 VOICE
COPP-24 VOICE
DSN PUNCH DOWN
CMP
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: JJP
YOKOHAMA NORTH DOCK
(YNDJP)
01/24/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
YN
D
JP
_2
_1
_F lo or
_P la n _a n d_
R ac k_ E le va ti on
.v sd x
/1
/2
:4
A
M
TR Floor Plan
A
PAK
DAT E:
ZONEREV DAT EREVIS IO N DESCRIPTIO N APPROVED
20200124EAS SURVEY
YNDJP BUILDING 200
FLOOR PLAN
ROOM 110
TELECOMMUNCIATIONS AREA
29'-0"
RR01.01
Category Work Operation Descriptor UM Qty
ISP Install two 4'x8' backboards. BACKBOARD EA 2
Enclosures x1 45-RU Cabinet CABINET-ZONE4-45U EA 1
Ground x1 PBB/SBB needed PBB EA 1
ISP x1 Label existing cables LABEL-EXISTING EA 1 x2 Label existing switches LABEL-EXISTING EA 2
Preparation x1 Remove existing UPS REMOVE-UPS EA 1
Copper 6x -Install 48-port COPPs COPP-48-CAT6 EA 6
Preparation 1x Remove 96-port COPPS REMOVE/RELOCATE EQUIP EA 1
3x -Remove 64-port COPPs REMOVE/RELOCATE EQUIP EA 3
3x Remove 1RU CMPS REMOVE/RELOCATE EQUIP EA 3
3x Remove 2RU CMPS REMOVE/RELOCATE EQUIP EA 3
ISP x2 Duct Seal for 4" pipe. DUCT-SEAL-1 EA 2
Network 73 Cat5 patch cables needed to be replaced with Cat6. PATCH CAT6 1M EA 80
Copper 276 user drops need to be replaced and terminated on proposed
COPPs.
CAT6-DROP-REPLACE EA 276
Network Install an additional EAS for 25% growth sparing. EAS-48PORT EA 1
Cable Management Install 6 2RU CMPs for proper cable management. CMP-2RU EA 6
Install 4 1RU CMPs for proper cable management. CMP-1RU EA 4
Power Install 2 L520P-520R PDUs. PDU-L520P-520R EA 2
Install 2 120V 20A CKTs (Replace breaker 12 with a 20A breaker for one of the CKTs on panel 1PL2).
AC-120V-1PH-20AMP EA 2
Ground Bond PBB to Panel 1PL2. GND-CABLE-#6-AWG FT 100
Bond RBB to PBB. GND-CABLE-#6-AWG FT 20
ISP Add 12" cable ladder CABLE-LADDER-12IN-SYSTEM FT 20
X2 SIMPLEX L5-20R
BACKBOARD
BACKBOARD
POWER PANEL LPL2
CABLE LADDER
10'
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: JJP
YOKOHAMA NORTH DOCK
(YNDJP)
01/24/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
YN
D
JP
_2
_1
_F lo or
_P la n _a n d_
R ac k_ E le va ti on
.v sd x
/1
/2
:4
A
M
Rack Elevat ion
A
PAK
DAT E:
ZONEREV DAT EREVIS IO N DESCRIPTIO N APPROVED
20200124EAS SURVEY
1/16 : 1
YNDJP BUILDING 200
ROOM 110
EQUIPMENT DETAIL
7' CABINET
PROPOSED
RR01.01
RBB (REAR)
CMP
COPP-48
EAS200 C3850-48F
EAS200 C3850-48F
EAS200 C3850-48F
CMP
CMP
CMP
COPP-48 CAT6
CMP
COPP-48 CAT6
CMP
COPP-48 CAT6
CMP
COPP-48 CAT6
CMP
COPP-48 CAT6
CMP
PDU (L520P-520R)
PDU (L520P-520R)
7 FEET
7 FEET
FOPP-24-SC
CMP
7' CABINET
PROPOSED
RR01.01
RBB (REAR)
CMP
COPP-48
EAS200 C3850-48F
EAS200 C3850-48F
EAS200 C3850-48F
CMP
CMP
CMP
COPP-48 CAT6
CMP
COPP-48 CAT6
CMP
COPP-48 CAT6
CMP
COPP-48 CAT6
CMP
COPP-48 CAT6
CMP
PDU (L520P-520R)
PDU (L520P-520R)
7 FEET
FOPP-24-SC
CMP
7' CABINET
EXISTING
7 FEET
(NOT LABELED)
APC UPS (DEAD)
CMP
46 46
OPEN
CMP
COPP 64P CAT5
CMP
COPP 64P CAT5
CMP
COPP 64P CAT5
COPP 96P CAT5
COPP 24P CAT5
CMP
FOPP 24P 12T
EAS200 C3850-48F
CMP
EAS200 C3850-48F
7' CABINET
EXISTING
7 FEET
(NOT LABELED)
APC UPS (DEAD)
CMP
46 46
OPEN
CMP
COPP 64P CAT5
CMP
COPP 64P CAT5
CMP
COPP 64P CAT5
COPP 96P CAT5
COPP 24P CAT5
CMP
FOPP 24P 12T
EAS200 C3850-48F
CMP
EAS200 C3850-48F
7' CABINET
PROPOSED
RR01.01
RBB (REAR)
CMP
COPP-48
EAS200 C3850-48F
EAS200 C3850-48F
EAS200 C3850-48F
CMP
CMP
CMP
COPP-48 CAT6
CMP
COPP-48 CAT6
CMP
COPP-48 CAT6
CMP
COPP-48 CAT6
CMP
COPP-48 CAT6
CMP
PDU (L520P-520R)
PDU (L520P-520R)
7 FEET
FOPP-24-SC
CMP
7' CABINET
EXISTING
7 FEET
(NOT LABELED)
APC UPS (DEAD)
CMP
46 46
OPEN
CMP
COPP 64P CAT5
CMP
COPP 64P CAT5
CMP
COPP 64P CAT5
COPP 96P CAT5
COPP 24P CAT5
CMP
FOPP 24P 12T
EAS200 C3850-48F
EAS200 C3850-48F
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: JJP
YOKOHAMA NORTH DOCK
(YNDJP)
01/24/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
YN
D
JP
_2
_1
A
_F lo o r_
P la n_ a nd _R ac k_
E le v at io n.
vs dx
/1 4/
:4
PM
TR Floor Plan
A
PAK
DAT E:
ZONEREV DAT EREVIS IO N DESCRIPTIO N APPROVED
20200124EAS SURVEY
YNDJP BUILDING 200
FLOOR PLAN
ROOM 120/120A
TELECOMMUNCIATIONS AREA
25'-0"
25'-0"
UPS
CABINET
#1
UPS
CABINET
#2
UPS
CABINET
#3
AC
COLUMN
RR01.02RR01.01
H V A C
ROOM 120
ROOM 120A
Category Work Operation Descriptor UM Qty
ISP (x2) 4'x8' Bacboard BACKBOARD EA 2
(x4) RU Labels (for 42RU Cabinet Rails) RU-LABELS EA 4
Preparation (x10) Relocate Existing Equipment (FOPPS, COPPS, CMP, EAS) RELOCATE-EQUIPMENT EA 10
(x1) Remove Existing PDU REMOVE/RELOCATE EQUIP EA 1
Power (x1) New PDU L5-20P to 5-20R PDU-L520P-520R EA 1
ISP (x1) Label Existing EAS Switch LABEL-EXISTING EA 1
(x2) Label Existing Fiber Jumpers LABEL-EXISTING EA 2
(x32) Label Existing CAT6 Jumpers LABEL-EXISTING EA 32
Power (x1) New L5-20R Circuit from Panel "Emergency Circuit" AC-120V-1PH-20AMP-L520 EA 1
Preparation (x1) Remove Existing UPS (APC) REMOVE-UPS EA 1
ISP (x1) Label Existing FOPP LABEL-EXISTING EA 1
(x3) Label Exising Fiber Jumpers LABEL-EXISTING EA 3
(x1) Label Existing FOPP LABEL-EXISTING EA 1
(x1) Label Existing Fiber Jumper LABEL-EXISTING EA 1
(x4) Label Existing COPP LABEL-EXISTING EA 4
Cable Management (x2) 1RU CMP CMP-1RU EA 5
ISP (x2) 4" Sleeve Kit for Cable penetration FIRE-BARRIER-SLEEVE-KIT-4IN EA 2
(x1) Fire Putty for 4 penetrations FIRE-BARRIER-PUTTY-11IN EA 1
(5) Fire Labels FIRESTOP-LABEL EA 5
BACKBOARD
BACKBOARD
POWER PANEL L-200
POWER PANEL P-200
AC
BATTERY DISCONNECT
CABLE LADDER
PBB
SIMPLEX L6-30R
POWER PANEL L-200-1
SIMPLEX L5-20R
derrick.matsuda Highlight derrick.matsuda Highlight derrick.matsuda Highlight derrick.matsuda Highlight derrick.matsuda Highlight derrick.matsuda Highlight derrick.matsuda Highlight derrick.matsuda Highlight derrick.matsuda Highlight derrick.matsuda Highlight derrick.matsuda Highlight derrick.matsuda Highlight derrick.matsuda Highlight derrick.matsuda Highlight derrick.matsuda Highlight derrick.matsuda Highlight
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: JJP
YOKOHAMA NORTH DOCK
(YNDJP)
01/24/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
YN
D
JP
_2
_1
A
_F lo o r_
P la n_ a nd _R ac k_
E le v at io n.
vs dx
/1 4/
:4
PM
Rack Elevat ion
A
PAK
DAT E:
ZONEREV DAT EREVIS IO N DESCRIPTIO N APPROVED
20200124EAS SURVEY
1/16 : 1
YNDJP BUILDING 200
ROOM 120A
EQUIPMENT DETAIL
7' CABINET
PROPOSED
7 FEET
RR01.02
TRIPPLITE BATT
PDU (L620P-L620R)
CMP
CMP
TEMP-CE C3850-24XS s1
CMP
PDU (L620P-L620R)
CMP
ACS 200
N77-C7706
CMP
TRIPPLITE 5.0 kVA
UPS MGT C3850-24
CMP
TEMP-CE C3850-48F s2
CMP
CMP
VTB C3850-48F s2
CMP
VTB C3850-48F s1
7' CABINET
PROPOSED
RR01.01
FOPP
COPP-24
EAS200 C3850-48F
CMP
COPP-24
COPP-24
CMP
CMP
COPP-24
FOPP-18
CMP
CMP
CMP
CMP
CMP
PDU (L520P-520R)
RBB (REAR)
7' CABINET
EXISTING
7 FEET
RR01.02
TRIPPLITE BATT
PDU L620P-L620R
CMP
CMP
TEMP-CE C3850-24XS s1
CMP
PDU L620P-L620R
CMP
ACS 200
N77-C7706
CMP
TRIPPLITE 5.0 kVA
UPS MGT C3850-24
CMP
TEMP-CE C3850-48F s2
CMP
CMP
VTB C3850-48F s2
CMP
VTB C3850-48F s1
7' CABINET
EXISTING
7 FEET
RR01.02
TRIPPLITE BATT
PDU L620P-L620R
CMP
CMP
TEMP-CE C3850-24XS s1
CMP
PDU L620P-L620R
CMP
ACS 200
N77-C7706
CMP
TRIPPLITE 5.0 kVA
UPS MGT C3850-24
CMP
TEMP-CE C3850-48F s2
CMP
CMP
VTB C3850-48F s2
CMP
VTB C3850-48F s1
7' CABINET
EXISTING
7 FEET
RR01.01
FOPP
COPP-24
EAS200 C3850-48F
CMP
APC SYMMETRA UPS
COPP-24
COPP-24
CMP
CMP
COPP-24
FOPP-18
RBB (REAR)
7 FEET
7' CABINET
PROPOSED
7 FEET
RR01.02
TRIPPLITE BATT
PDU (L620P-L620R)
CMP
CMP
TEMP-CE C3850-24XS s1
CMP
PDU (L620P-L620R)
CMP
ACS 200
N77-C7706
CMP
TRIPPLITE 5.0 kVA
UPS MGT C3850-24
CMP
TEMP-CE C3850-48F s2
CMP
CMP
VTB C3850-48F s2
CMP
VTB C3850-48F s1
7' CABINET
PROPOSED
RR01.01
FOPP
COPP-24
EAS200 C3850-48F
CMP
COPP-24
COPP-24
CMP
CMP
COPP-24
FOPP-18
CMP
CMP
CMP
CMP
CMP
PDU (L520P-520R)
RBB (REAR)
7' CABINET
EXISTING
7 FEET
RR01.02
TRIPPLITE BATT
PDU L620P-L620R
CMP
CMP
TEMP-CE C3850-24XS s1
CMP
PDU L620P-L620R
CMP
ACS 200
N77-C7706
CMP
TRIPPLITE 5.0 kVA
UPS MGT C3850-24
CMP
TEMP-CE C3850-48F s2
CMP
CMP
VTB C3850-48F s2
CMP
VTB C3850-48F s1
7' CABINET
EXISTING
7 FEET
RR01.01
FOPP
COPP-24
EAS200 C3850-48F
CMP
APC SYMMETRA UPS
COPP-24
COPP-24
CMP
CMP
COPP-24
FOPP-18
7 FEET
C
B
D
C
B
1234567
A
FOUO (FOR OFFICIAL USE ONLY)
APPROVED BY: SCALE:
B
SIZE FSCM NO
SHEET
54233
DRAWN BY: JSS
YOKOHAMA NORTH DOCK
(YNDJP)
05/14/2020
DWG. NO.
FLOORPLANS AND RACK ELEVATIONS
YN
D
JP
_2
_1
_F lo or
_P la n _a n d_
R ac k_ E le va ti on
_2
1.
vs d x
5/
/2
1:
P M
TR Floor Plan
A
PAK
DAT E:
ZONEREV DAT EREVIS IO N DESCRIPTIO N APPROVED
20200121EAS SURVEY
YNDJP BUILDING 208
FLOOR PLAN
ROOM 116
TELECOMMUNCIATIONS AREA
9'-10 1/2"
RR01. 01 (NO T L ABELED)
RR01. 02 (RR01.01)
RR01. 03 (NETWO RK -
02)
RR01. 04
(RR01.03)
POWER PANEL 1 L-2
BACKBOARD
BACKBOARD
SIMPLEX L6-30R
PBB
HVAC
Category Work Operation Descriptor UM Qty
Security (x2) INSTALL DOOR FE-DOOR EA 2
ISP Install 2 4x4 backboard. BACKBOARD EA 2
Label existing cabinet per ICAN-DI. LABEL-EXISTING EA 1
Installl RU labels. RU-LABELS EA 1
Preparation Re-purpose L5-20R in cabinet. REMOVE-UPS EA 1
Power Install PDU-L5-20P - 5-20R. AC-120V-1PH-20AMP-L520 EA 1
Install new RBB. PDU-L520P-520R EA 1
Ground Move to RU 11. RBB-19IN EA 1
ISP Label…