This document contains a justification and approval for other than full and open competition for a federal contract opportunity. The contract will require a Siemens HVAC control software and associated hardware as a sole source component for renovations to Building 654 at Wright Patterson Air Force Base to tie into the base-wide Siemens Talon control system. The estimated cost for the Siemens Talon control system parts is between $100,000 and $250,000. The justification cites that only the Siemens system can ensure compatibility with the proprietary base-wide energy management control system currently limited to Siemens and Johnson Controls systems, and a non-proprietary system would prevent integration or require costly separate monitoring. The related federal contract opportunity is for lab renovations to Building 654 at Wright Patterson AFB with an estimated construction cost between $5-10 million under NAICS code 236220. The solicitation number is W912QR21R0051 and responses are due by 1 July 2021.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REPLY TO

ATTENTION OF

DEPARTMENT OF THE ARMY

LOUISVILLE DISTRICT, CORPS OF ENGINEERS

P.O. BOX 59 LOUISVILLE, KY 40201-0059

JUSTIFICATION AND APPROVAL

FOR OTHER THAN FULL AND OPEN COMPETITION

1. Contracting Agency: US Army Engineer District, Corps of Engineers, PO Box 59, Louisville, KY 40201-0059

2. Description of Action: Approval is requested to utilize a Siemens HVAC Control Software and associated equipment as a sole source component for the Air Force Research Laboratory (AFRL) Building 654 XTAL Renovation Project at Wright Patterson Air Force Base (WPAFB). The estimated cost for the Siemen Talon Control System parts are . AF RDT&E (57 3600) funding will be used for this action.

3. Description of the Supplies/Service: Description of the Supplies/Service: The contract solicitation will include a sole-source brand requirement for a Siemens HVAC Control Software and associated hardware. This software and hardware are required for the Building 654 XTAL Renovation to be able to tie into the current base-wide system that WPAFB has standardized on.

4. Authority Cited: The statutory authority permitting acquisition of the requirement by other than full and open competition is 10 U.S.C. 2304 (c)(1) as implemented by FAR 6.302-1, only one responsible source and no other supplies or services will satisfy agency requirements. This authority is applicable to brand name acquisitions in accordance with FAR 6.302-1(c).

5. Reason for Authority Cited: Currently all buildings at WPAFB use the Siemen Talon Control System or Johnson Controls Metasys System. This project will be designed to tie-in to existing building systems so that there is only one (1) HVAC control system serving the entire facility.

WPAFB CE shop currently monitors their HVAC systems Base-wide with an Energy Management Control System (EMCS). The current configuration of that system is limited to two (2) manufacturer systems: Johnson Controls Metasys System Extended Architecture (MSEA) supervisory and facility controls system, and the Siemens Talon (BACnet) supervisory and control system. The EMCS controls the operations of HVAC equipment throughout the Base. The Base’s Installation Facility Standard dictates that any new Direct Digital Controls (DDC) must provide 100% interface with facility and the existing Metasys Controls or Talon Controls system without the use of third-party interface hardware/software. Due to the proprietary nature of the EMCS, no other manufacturer’s products can connect to and function with the existing control system. If a Johnson Controls or Siemens system is not installed, this facility will not satisfy the user’s requirement to be integrated with the base-wide system. The installation would either have to monitor via two different programs or replace the entire system at significant cost.

If equipment other than the specified Johnson Controls or Siemens DDC equipment is installed in this facility it will prevent the facility from connecting to the base-wide monitoring system. The facility would have to be monitored separately from the rest of WPAFB, which would require the establishment of a separate service contract at a significant cost to the government.

6. Efforts to Obtain Competition: None, for the reasons cited above.

7. Actions to Increase Competition: None, for the reasons cited above.

8. Market Research: A technical review and evaluation was conducted of the system requirements for the XTAL Renovation project. As discussed above in paragraph above, only Siemens HVAC Control Software will ensure compatibility with the existing systems.

LRL-FY21-74

9. Interested Sources: Siemens is the sole provider of parts that tie into the existing system at Wright Patterson Air Force Base.

10. Other Facts: N/A

11. Technical Certification: I certify that the supporting data under my cognizance, which are included in this justification, are accurate and complete to the best of my knowledge and belief.

Date

12. Requirements Certification: I hereby determine that the supporting data under my cognizance, which are included in this justification, are accurate and complete to the best of my knowledge and belief.

Date

13. I have reviewed this J&A and find the justification adequate to support other than full and open competition.

Date

14. Fair and Reasonable Cost Determination/Contracting Officer Certification: I hereby determine that the anticipated cost to the Government for this contract action will be fair and reasonable based on comparison with existing contract prices and/or established catalog prices for similar items. I further certify that this justification is accurate and complete to the best of my knowledge and belief.

Date