J5 - 20250509_Updated Schedule of Items.pdf

PDF 79 KB Posted

Attached to
ACP LTR Bridge Trail Crossing Fence Replacement
Solicitation number
12445525B0010
Issued by

About this file

This document is a Schedule of Items for the ACP LTR Bridge Trail Crossing Fence Replacement project. The schedule outlines four line items for a fence replacement project, including clearing 18,000 square feet, removing 11,000 linear feet of existing fencing, and installing 11,000 linear feet of new 3-strand barbed wire fence with steel posts. The estimated quantities are consistent across most line items, with zero quantity specified for corner, end, and brace panel installations. The project involves comprehensive fence replacement, including removal of existing fencing, clearing, and installing new fencing with associated hardware and labor.

The project is a Department of Agriculture Forest Service solicitation with a contract value between $100,000 and $250,000. The scope requires removing and replacing fence line at the SRS Tail Bridge Crossing area, with a 90-day performance period after notice to proceed. A mandatory site visit is scheduled for June 10th, 2025, requiring advance facility access coordination. Proposals are due on Wednesday, June 18th, 2025, at 3:00 PM EST, to be submitted via email to Dennis.koba@usda.gov. The contract will be awarded to the lowest-priced, responsible offeror who is responsive to all solicitation requirements.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITEM NO. DESCRIPTION PAY UNIT

ESTIMATED

QUANTITY

UNIT PRICE TOTAL PRICE

20104(A) Clearing, disposal method (f) Scattering (Conform to FSSS Section 201.04 (d) and FSSS 201.04(e) for clearing requirements and dispose of to FSSS 203.05 (f))

Sq. Ft 18000

20303(A) Removal of existing woven fence & posts and 3-strand barb wire fence & posts, disposal method Removal from project (Conform to FP-14 Section 203.05(a))

LF 11000

61901(C) Fence, Furnishing and Installation of Barbed Wire Fence, 3-strand with Steel Post (Includes furnishing posts, hardware, barbed-wire, fastening, and all labor in its entirety to construct and install 3-strand barbed wire fence)

LF 11000

61910(A) Corner, End, Intersection, intermediate line brace, and Gate Brace Panel, Furnishing and Installation of brace panel with 9-gage twisted tension brace wires or 4-in dia. diagonal brace posts with posts set in concrete, for woven wire fences and 3-strand barbed wire fences

Each 0

ACP LTR Bridge Trail Crossing Fence Replacement - Schedule of Items

TOTAL:

Schedule of Items

File details come from the government source that posted it. Updated .