This document is a Schedule of Items for the ACP LTR Bridge Trail Crossing Fence Replacement project. The schedule outlines four line items for a fence replacement project, including clearing 18,000 square feet, removing 11,000 linear feet of existing fencing, and installing 11,000 linear feet of new 3-strand barbed wire fence with steel posts. The estimated quantities are consistent across most line items, with zero quantity specified for corner, end, and brace panel installations. The project involves comprehensive fence replacement, including removal of existing fencing, clearing, and installing new fencing with associated hardware and labor.
The project is a Department of Agriculture Forest Service solicitation with a contract value between $100,000 and $250,000. The scope requires removing and replacing fence line at the SRS Tail Bridge Crossing area, with a 90-day performance period after notice to proceed. A mandatory site visit is scheduled for June 10th, 2025, requiring advance facility access coordination. Proposals are due on Wednesday, June 18th, 2025, at 3:00 PM EST, to be submitted via email to Dennis.koba@usda.gov. The contract will be awarded to the lowest-priced, responsible offeror who is responsive to all solicitation requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amd 0001_Sol_12445525B0010 with RFIs.pdf | ||
| Amd 0001_Pre-bid PowerPoint Slides.pptx | PPTX presentation | |
| Amd 0001_UPDATED SOI.xlsx | XLSX spreadsheet | |
| Amd 0001_Drawings.pdf | ||
| Amd 0001_UPDATED SOW.pdf | ||
| J3 - Fence Specifications.pdf | ||
| J7 - 20250521_Wage Determiantion 2015-4461_Allendale_Barnwell county.pdf | ||
| J2 - SRS Special Requirements.docx | DOCX document | |
| Sol_12445525B0010.pdf | ||
| J6- 20250521_Wage Determiantion 2015-4465_Aiken county.pdf | ||
| J1 - Statement of Work.pdf | ||
| J4 - Map.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITEM NO. DESCRIPTION PAY UNIT
ESTIMATED
QUANTITY
UNIT PRICE TOTAL PRICE
20104(A) Clearing, disposal method (f) Scattering (Conform to FSSS Section 201.04 (d) and FSSS 201.04(e) for clearing requirements and dispose of to FSSS 203.05 (f))
Sq. Ft 18000
20303(A) Removal of existing woven fence & posts and 3-strand barb wire fence & posts, disposal method Removal from project (Conform to FP-14 Section 203.05(a))
LF 11000
61901(C) Fence, Furnishing and Installation of Barbed Wire Fence, 3-strand with Steel Post (Includes furnishing posts, hardware, barbed-wire, fastening, and all labor in its entirety to construct and install 3-strand barbed wire fence)
LF 11000
61910(A) Corner, End, Intersection, intermediate line brace, and Gate Brace Panel, Furnishing and Installation of brace panel with 9-gage twisted tension brace wires or 4-in dia. diagonal brace posts with posts set in concrete, for woven wire fences and 3-strand barbed wire fences
Each 0
ACP LTR Bridge Trail Crossing Fence Replacement - Schedule of Items
TOTAL:
Schedule of Items