J3-Drawing Pisgah Septip System Layout.pdf

PDF 343 KB Posted

Attached to
Pisgah Admin Complex Optical Fiber Cable Emergency Replacement
Solicitation number
12445225B0002
Issued by

About this file

The file J3-Drawing Pisgah Septip System Layout.pdf appears to be a technical drawing related to the Pisgah Admin Complex Optical Fiber Cable Emergency Replacement project. The drawing likely depicts the proposed route and layout for installing a 12-fiber OM3 optical fiber cable between the Pisgah Ranger Station and the Pisgah Work Center.

The solicitation, issued by the Department of Agriculture Forest Service, requires installation of the fiber optic cable using methods including horizontal directional drilling, aerial installation, open trench, or a combination of these techniques. A mandatory site visit is scheduled for Tuesday, March 18th, 2025 at 9:00 AM at 1600 Pisgah Hwy, Pisgah Forest, NC 28768. Potential bidders must submit all questions by Thursday, March 20th, 2025 at 1:00 PM. The project involves creating physical infrastructure connections between two government facilities through precise fiber optic cable deployment.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .