J5-Pisgah Admin Fiber_Map.pdf

PDF 514 KB Posted

Attached to
Pisgah Admin Complex Optical Fiber Cable Emergency Replacement
Solicitation number
12445225B0002
Issued by

About this file

The document is a schematic map showing the proposed fiber optic line replacement for the Pisgah Administrative Complex. The map depicts an aerial view of a forested area with a red line indicating the proposed fiber alignment connecting the Pisgah Ranger Station and the Pisgah Work Center. The schematic illustrates the planned route through wooded terrain, providing a visual representation of the fiber optic cable installation path between the two facilities.

The map supports the associated federal contract opportunity solicitation (12445225B0002) for the Pisgah Admin Complex Optical Fiber Cable Emergency Replacement project. The proposed installation involves a 12-fiber OM3 optical cable, with potential installation methods including horizontal directional drilling, aerial, open trench, or a combination of these techniques. The project is being conducted by the Department of Agriculture Forest Service, with a site visit scheduled for Tuesday, March 18th, 2025, at 9:00 AM, located at 1600 Pisgah Hwy, Pisgah Forest, NC 28768, and all questions are due by Thursday, March 20th, 2025, at 1 PM.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PISGAH ADMINISTRATIVE COMPLEX FIBER OPTIC LINE

REPLACEMENT MAP

PROPOSED FIBER ALIGNMENT

(SCHEMATIC)

PISGAH RANGER

STATION

PISGAH WORK CENTER

File details come from the government source that posted it. Updated .