J2- Pricing List.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
Procurement of Three (3) Media Recording Sound Booths and Disassembly/Reassembly and Relocation of One (1) Media Recording Sound Booth.
Solicitation number
2024-NLS-0090
Issued by

About this file

This solicitation requests proposals for the procurement of three media recording sound booths and the disassembly, reassembly, and relocation of one media recording sound booth. Offerors must propose services for both performance areas to be eligible for award. The Library of Congress seeks these services with a period of performance from March 2024 through December 2024. A Best Value Trade-Off evaluation approach will be used. Offerors must attend two mandatory preliminary site visits before submitting proposals. The solicitation includes a pricing list with line items for project phases like design, construction, and post-construction services for both performance areas.

View the file

Other files

File Type Posted
LA-310 Suite.pdf PDF
Questions and Answers - Part 2.docx DOCX document
Preliminary Site Visit Walkthrough Contractor QA.docx DOCX document
030ADV24Q0062 -0001.pdf PDF
030ADV24Q0062.pdf PDF
J1 - Past Performance Questionnaire.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3 New Sound Booths

(NLS Media Lab Booths & Solicitation #)THIS DOCUMENT HAS TWO TABS
Performance Area 1- Procurement of Three (3) Media Lab Recording Sound BoothsONE TAB FOR EACH PERFORMANCE AREA
Period of Performance: 03/01/2024 - 12/31/2024OFFERORS MUST COMPLETE BOTH TABS
FOR THEIR PRICING TO BE CONSIDERED VALID
Description of Event/DeliverablePrice
Pre-Construction Phase:
Post-Award Kick off meeting$0.00
Project Proposal Schedule$0.00
Communications Plan$0.00
End User Interviews$0.00
Site Visit Assessment$0.00
Alternative Site Visit Assessment (if applicable)$0.00
Program of Requirements Document$0.00
Quality Control Plan (QCP)$0.00
Ad hoc and pre-scheduled onsite meetings$0.00
Testing/Commission Requirement Document$0.00
Subtotal$0.00
Design and Permitting Phase:
Review period for construction, fabrication, and installation: 50%$0.00
Architectural Drawings$0.00
Structural Drawings$0.00
Acoustic Design Plans$0.00
Material Specifications$0.00
Mechanical, Electrical, and Plumbing (MEP) Plans$0.00
Fire Alarm Plans$0.00
Sprinkler Plans$0.00
Safety Plan: ADA Compliance & Regulations (Wheelchair Accessibility)$0.00
Safety Plan: Mechanical and Fire Protection$0.00
Safety Plan: Electrical Systems$0.00
As-Built Drawings (updated drawings reflecting any modifications and/or changes during construction) *If applicable$0.00
Subtotal$0.00
Construction Phase:
Review period for construction, fabrication, and installation: 75%$0.00
Backcheck/Follow-Up Review:$0.00
Testing/Commissioning$0.00
Subtotal$0.00
Post-Construction Phase:
Final Site Visit Assessment$0.00
Final Acceptance Documentation$0.00
Review period for construction, fabrication, and installation: 95%$0.00
Walk Thru: Punch list management$0.00
Final Acceptance Documentation$0.00
Project Completion and Closeout Documentation$0.00
Subtotal$0.00
Final Price
Grand Total

Moving 1 Sound Booth

(NLS Media Lab Booths & Solicitation #)
Performance Area 2- Disassembly/Reassembly & Relocation of one (1) Eckel Media Recording Sound Both
Period of Performance: 03/01/2024 - 12/31/2024
Description of Event/DeliverablePrice
Pre-Disassembly Phase:
Project Proposal Document$0.00
Site Visit Assessment Report$0.00
Alternative Site Visit Assessment Report (if applicable)$0.00
End User Interviews$0.00
Mechanical, Electrical & Plumbing (MEP) Plan, Design and Drawings$0.00
Fire Alarm Plan, Design and Drawings$0.00
Sprinkler Plan, Design and Drawings$0.00
Safety Plan: ADA Compliance (Wheelchair Accessibility)$0.00
As-Built Drawings (updated drawings reflecting any modifications and/or changes during construction) *If applicable$0.00
Subtotal$0.00
Disassembly Phase:
Disassembly Plan$0.00
Component Labeling System Plan$0.00
Inventory List$0.00
Subtotal$0.00
Relocation Phase:
Transportation Plan$0.00
Subtotal$0.00
Reassembly Phase:
Reassembly Plan$0.00
Testing and Commissioning Plan$0.00
Documentation of Reassembly Process$0.00
Subtotal$0.00
Post-Relocation Phase:
Final Inspection Report$0.00
Client Acceptance Documentation$0.00
Project Closeout Documentation$0.00
Subtotal$0.00
Final Price
Grand Total

File details come from the government source that posted it. Updated .