J1b. TMB ATCT Facility Rehab Final Drawings 12.01.20.pdf

PDF 11 MB Posted

Attached to
TMB ATCT Rehabilitation Federal contract opportunity
Solicitation number
697DCK-22-R-00166
Issued by
Department of Transportation Federal Aviation Administration Southwestern Region

About this file

This solicitation is for repairs to the Air Traffic Control Tower at Miami Executive Airport in Miami, Florida. The Federal Aviation Administration requires repairs to the existing ATCT facility and is seeking proposals in response to solicitation number 697DCK-22-R-00166. Offerors must be registered in the System for Award Management and submit proposals in accordance with Sections L and M of the solicitation by the specified due date. Questions regarding the solicitation are due by March 9th, 2022 and must be submitted in writing to the identified point of contact. A site visit date has not yet been set but information will be provided through an amendment posted on SAM.gov once scheduled. Only direct costs will be considered for payment and the Government is not liable for any costs associated with proposal preparation or submission.

View the file

Other files for this federal contract opportunity

Other files attached to TMB ATCT Rehabilitation, newest first.
File Type Posted
RFI Set 2 Photos.pdf PDF
RFI Set 2.pdf PDF
697DCK-22-R-00166 Amend 0002.pdf PDF
RFI Set 1.pdf PDF
697DCK-22-R-00166 0001.pdf PDF
L3. Price Proposal - TMB ATCT Rehab.xlsx XLSX spreadsheet
697DCK-22-R-00166 Final.pdf PDF
J4. Wage Rate.pdf PDF
L2. TMB Past Performance Questionnaire.pdf PDF
J1. TMB ATCT Facility Rehab Final Specifications 12.01.20.pdf PDF
J1a. TMB - Addendum #1 - 031721.pdf PDF
J2. Operational Risk Management Plan.pdf PDF
L1. BidBond.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Croft & Associates

0 2020-12-01 100% SUBMITTAL

11/25/202011/25/5///202222222 20// /////

A 2019-12-20 CHECK SET

B 2020-01-10 95% CHECK SET

0 2020-11-30 100% SUBMITTAL

11/30/2020

B 2020-01-10 95% CHECK SET

B 2020-01-10 95% CHECK SET

B 2020-01-10 95% CHECK SET

GENERAL REQUIREMENTS:

1. ALL WORK SHALL CONFORM TO THE 2017 EDITION

OF THE NATIONAL ELECTRICAL CODE (NFPA 70),

ALL STATE AND LOCAL CODES, RULES, AND

REGULATIONS, AND PROJECT SPECIFICATIONS.

2. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL

FEES, PERMITS, AND LICENSES FOR THE

COMPLETE INSTALLATION OF THE WORK

OUTLINED IN THESE CONTRACT DOCUMENTS.

3. THE CONTRACT DOCUMENTS ARE

DIAGRAMMATIC IN NATURE AND NOT EVERY

DETAIL OR EXACT LOCATION OF EQUIPMENT

AND/OR CONDUIT IS SHOWN. VERIFY ALL

CONDITIONS AND DIMENSIONS PRIOR TO

ORDERING ANY MATERIAL OR PERFORMING ANY

WORK. NOTIFY THE ENGINEER OF RECORD OF

ANY CONDITIONS OR DIMENSIONS WHICH WOULD

AFFECT PERFORMANCE OF WORK IN

ACCORDANCE WITH THE CONTRACT DRAWINGS

AND/OR SPECIFICATIONS.

4. CONTRACTOR IS TO COORDINATE W/ GENERAL

CONTRACTOR IN REGARDS TO PROJECT

TIMELINE, WORK HOURS, AS WELL AS ANY

BONDING OR INSURANCE REQUIREMENTS.

5. HANDLE, STORE AND PROTECT EQUIPMENT AND

MATERIALS IN ACCORDANCE WITH THE

MANUFACTURER'S RECOMMENDATIONS.

REPLACE DAMAGED OR DEFECTIVE ITEMS WITH

NEW ITEMS.

COORDINATION:

1. CONTRACTOR SHALL COORDINATE LOCATIONS

AND ELECTRICAL REQUIREMENTS OF

MECHANICAL/PLUMBING EQUIPMENT WITH THE

MECHANICAL/PLUMBING CONTRACTORS PRIOR

TO ORDERING ANY MATERIAL OR PERFORMING

ANY WORK ASSOCIATED WITH SUCH EQUIPMENT.

2. CONTRACTOR SHALL COORDINATE LOCATION OF

LIGHT FIXTURES WITH MECHANICAL

CONTRACTOR, PLUMBING CONTRACTOR, AND

FIRE PROTECTION CONTRACTOR PRIOR TO

INSTALLATION TO AVOID CONFLICT WITH

DUCTWORK, PIPING, AND SPRINKLER SYSTEM

COMPONENTS.

3. EXACT DEVICE LOCATIONS (RECEPTACLES,

DATA/TELEPHONE OUTLETS, LIGHT FIXTURES,

ETC.) SHALL BE COORDINATED WITH

ARCHITECTURAL PLANS.

4. TRACK LIGHTS, FLOOD LIGHTS, AND WALL

WASHERS SHALL HAVE THEIR AIMING ANGLES

ADJUSTED PER GOVERNMENT REQUIREMENTS

PRIOR TO FINALIZATION OF LIGHTING WORK.

MATERIALS:

1. OUTLET BOXES

1.1. GENERAL USE BOXES: GALVANIZED,

PRESSED STEEL UNITS OF PROPER DEPTH

AND GAUGE REQUIRED BY THE OUTLET

LOCATION. EQUIP WITH PLASTER RING OR

COVER AS NECESSARY.

1.2. SPECIAL BOXES: GALVANIZED SHEET METAL

OR CAST CONSTRUCTION AND SIZED IN

ACCORDANCE WITH NFPA 70. FOR SPECIAL

SYSTEM, USE BOXES AS RECOMMENDED BY

THE EQUIPMENT MANUFACTURER.

2. CONDUIT

2.1 RIGID METALLIC CONDUIT (RMC): HOT

DIPPED GALVANIZED STEEL CONFORMING

TO (FS) WW-C581E AND UL 6.

2.2 ELECTRICAL METALLIC TUBING (EMT):

GALVANIZED STEEL CONFORMING TO ASA

C80.3, (FS) WW-C563 AND ULF 797.

2.3 FLEXIBLE METAL CONDUIT (FMC): SPIRAL

WOUND,SQUARE LOCKED, HOT DIPPED

GALVANIZED STEEL CONFORMING TO UL 1

2.4 METAL-CLAD CABLE (MC): INTERLOCKING

STEEL SHEATH, CONFORMING TO UL

1569. ALUMINUM IS PROHIBITED.

3. CONDUIT FITTINGS

3.1 RMC: HOT DIPPED GALVANIZED OR CADMIUM

PLATED. FITTINGS USED WITH COATED RMC

SHALL HAVE A SIMILAR COATING.

3.2 EMT: COMPRESSION TYPE, MADE OF

CADMIUM PLATED STEEL OR HOT DIPPED

GALVANIZED MALLEABLE IRON.

3.3 MC: TWO SCREW, DOUBLE CLAMP

MALLEABLE IRON, HOT DIPPED GALVANIZED

OR CADMIUM PLATED.

4. WIRING

4.1 ALL WIRING SHALL BE COPPER UNLESS

NOTED OTHERWISE.

4.2 INSULATION: HEAT AND MOISTURE

RESISTANT WITH A TEMPERATURE RATING

OF AT LEAST 75 DEGREES THERMAL HIGH

HEAT NYLON (THHN), THERMAL HIGH WATER

RESISTANT NYLON (THWN) AND A 600 VOLT

RATING UNLESS OTHERWISE INDICATED.

4.3 USE STRANDED CONDUCTOR ON ALL

WIRING #8 AWG AND LARGER. ALL OTHER

WIRING MAY BE SOLID.

5. USE ANCHORS AND FASTENERS OF A TYPE

DESIGNED AND INTENDED FOR USE IN THE BASE

MATERIAL TO WHICH THE MATERIAL OR SUPPORT

IS TO BE ATTACHED, AND CAPABLE OF

SUPPORTING THE INTENDED LOAD AND WITH

STANDING ANY ASSOCIATED STRESSES AND

VIBRATIONS. DO NOT USE WOODEN PLUGS FOR

FASTENING.

6. ALL MATERIALS USED FOR CONSTRUCTION SHALL

BE INSTALLED IN A NEAT AND WORK-LIKE MANNER.

7. ALL WIRING DEVICES SHALL BE SPECIFICATION

GRADE AND MATCH BASE BUILDING STANDARD

DEVICE STYLE, COLOR, AND MOUNTING HEIGHT

UNLESS REQUIRED TO BE IN COMPLIANCE WITH

ADA.

8. CONTRACTOR SHALL PROVIDE ALL COMPONENTS

NECESSARY TO INSTALL LIGHT FIXTURES PER

MANUFACTURER'S RECOMMENDATIONS. THIS

INCLUDES, BUT IS NOT LIMITED TO, MOUNTING

HARDWARE, SLOPED-CEILING ADAPTORS, GYP

BOARD TRIM KITS, ETC.

9. FOR ALL TELEPHONE/DATA OUTLETS, PROVIDE AN

OUTLET BOX WITH 3/4” CONDUIT AND A PULL

STRING TO THE ACCESSIBLE CEILING SPACE.

10. ALL MATERIALS AND EQUIPMENT FURNISHED AND

INSTALLED BY THE CONTRACTOR SHALL BE NEW,

UL LISTED OR LABELED, AND CONFORM TO NEMA

ANS/ANSI STANDARDS WHERE APPLICABLE.

11. FURNISH AND INSTALL PULL BOXES, JUNCTION

BOXES, AND DEVICE BOXES OF SUITABLE GAUGE

AND SIZE AS NECESSARY TO PROVIDE A FULLY

FUNCTIONAL AND CODE COMPLIANT SYSTEM.

EXECUTION:

1. MAINTAIN THE INTEGRITY OF ALL EXISTING

CIRCUITS IN SERVICE THAT MAY BE AFFECTED BY

THIS WORK. IDENTIFY ALL SOURCES OF POWER

AND DE-ENERGIZE REQUIRED CIRCUITS BEFORE

BEGINNING WORK.

2. PERFORM ALL CUTTING AND DRILLING TO PROVIDE

PENETRATIONS THROUGH WALLS AND FLOORS

FOR ELECTRICAL INSTALLATION WORK.

3. WHERE CONDUITS PASS THROUGH FIRE RATED

OR SMOKE RATED ASSEMBLIES, CONTRACTOR

SHALL FOLLOW UL GUIDELINES FOR

SEALING/STOPPING PENETRATIONS TO MAINTAIN

FIRE AND/OR SMOKE RATING OF WALL ASSEMBLY.

4. ALL DEVICES AND JUNCTION BOXES SHALL BE

ACCESSIBLE. PROVIDE ACCESS PANELS AS

REQUIRED TO ENSURE ACCESS TO DEVICES.

COORDINATE ACCESS PANEL LOCATIONS AND

TYPES WITH RESIDENT ENGINEER PRIOR TO

ORDERING AND INSTALLATION.

5. DISCONNECT SWITCHES SHALL BE MOUNTED ON

INDIVIDUAL STRUCTURAL SUPPORTS, OR

OTHERWISE DIRECTLY ON EQUIPMENT, PROVIDED

NO MODIFICATION TO EQUIPMENT IS NECESSARY.

ALL STRUCTURAL SUPPORTS FOR ELECTRICAL

EQUIPMENT SHALL BE PROVIDED AND INSTALLED

BY CONTRACTOR.

6. ALL ELECTRICAL DEVICE CONNECTIONS SHALL BE

TIGHTENED TO THE TORQUE VALUES

RECOMMENDED BY THE DEVICE MANUFACTURER.

IF THESE VALUES ARE NOT LISTED, TIGHTEN TO

POUND INCH OR POUND FOOT VALUES

RECOMMENDED BY UL STANDARD 486A-B.

7. GROUNDING

7.1 ALL ELECTRICAL EQUIPMENT, WIRING,

CONDUITS, AND BUILDING ELEMENTS SHALL

BE GROUNDED PER THE REQUIREMENTS OF

NFPA 70 AND FAA STANDARD 019F.

7.2 THE BUILDING GROUNDING ELECTRODE

SYSTEM SHALL BE INSTALLED TO MAINTAIN A

RESISTANCE TO EARTH OF 25 OHMS OR LESS.

IF A SINGLE GROUNDING ELECTRODE CAN

NOT MEET THIS REQUIREMENT, THE

CONTRACTOR IS REQUIRED TO INSTALL

SUPPLEMENTAL ELECTRODES PER SECTION

250.53 OF NFPA 70.

7.3 PROVIDE AN EQUIPMENT CONDUCTOR IN ALL

RACEWAYS SIZED IN ACCORDANCE WITH THE

REQUIREMENTS OF NFPA 70. CONDUITS ARE

NOT PERMITTED TO BE USED IN LIEU OF A

GROUND WIRE.

7.4 BOND ALL BRANCH CIRCUIT DEVICES TO THE

BUILDING GROUND SYSTEM BY MEANS OF

THE GROUNDING CONDUCTOR INSTALLED IN

EACH RACEWAY.

8. CABLE INSTALLED OUTSIDE OF RACEWAYS SHALL

BE SUPPORTED INDEPENDENTLY AND NOT FROM

OTHER SYSTEMS. SECURING CABLES TO OR FROM

WATERLINES, ELECTRICAL RACEWAYS, OR ANY

OTHER MECHANICAL SYSTEM IS NOT ACCEPTABLE.

CABLES SHALL BE SUPPORTED FROM BAR JOISTS,

CABLE TRAYS, UNI- STRUT TRAPEZE HANGERS, OR

OTHER HANGERS INSTALLED AND APPROVED FOR

THIS PURPOSE. MAXIMUM SPACING SHALL BE 10'

ON CENTER WITH A MAXIMUM 8” SAG. CABLES

SHALL MAINTAIN A MINIMUM 6” CLEARANCE FROM

ELECTRICAL EQUIPMENT.

9. IDENTIFICATION

9.1 REFER TO SPECIFICATION SECTION 26 05 53

"IDENTIFICATION FOR ELECTRICAL SYSTEMS"

FOR LABELING REQUIREMENTS.

9.2 IDENTIFICATION AND NAMEPLATES SHALL BE

IN ACCORDANCE WITH FAA 1217G

10. WIRING

10.1 ALL WIRING SHALL BE INSTALLED IN

APPROVED CONDUITS OR RACEWAYS UNLESS

NOTED OTHERWISE.

10.2 ALL BRANCH CIRCUITS SHALL HAVE

DEDICATED NEUTRAL CONDUCTORS UNLESS

NOTED OTHERWISE.

10.3 WIRES SHALL BE A MINIMUM #12 AWG IN SIZE.

10.4 COLOR CODE WIRING AS FOLLOWS:

10.4.1 120/240V, 1 PHASE: NEUTRAL - WHITE,

PHASE A - BLACK, PHASE B - RED,

GROUND - GREEN

10.4.2 120/208V, 3 PHASE: NEUTRAL - WHITE,

PHASE A - BLACK, PHASE B - RED,

PHASE C - BLUE, GROUND - GREEN

10.4.3 277/480V, 3 PHASE: NEUTRAL - GREY,

PHASE A - BROWN, PHASE B - ORANGE,

PHASE C -YELLOW, GROUND - GREEN

11. CONDUIT

11.1 ALL CONDUITS SHALL BE INSTALLED IN A

CONCEALED LOCATION WHERE POSSIBLE,

WITH THE EXCEPTION OF DEDICATED

MECHANICAL AND ELECTRICAL SPACES. IN

THOSE AREAS OUTSIDE OF THE EXCEPTION

WHERE IT IS NOT POSSIBLE TO INSTALL

CONDUITS IN A CONCEALED MANNER,

CONTRACTOR SHALL INSTALL

EXPOSED CONDUITS PARALLEL AND AT RIGHT

ANGLES TO THE NEARBY SURFACES AND

STRUCTURAL MEMBERS. IN THESE AREAS,

GROUP RACEWAYS IN MINIMUM GROUPS OF

THREE RACEWAYS ON A COMMON SUPPORT

SYSTEM.

11.2 PROVIDE PULL ROPE IN ALL EMPTY CONDUITS.

11.3 EXTERIOR LOCATIONS: USE RMC CONDUIT.

11.4 INTERIOR LOCATIONS, WHERE SUBJECT TO

DAMAGE BELOW 8' AFF: USE RMC CONDUIT.

11.5 INTERIOR LOCATIONS, WHERE NOT SUBJECT

TO DAMAGE, ABOVE 8' AFF, OR IN CONCEALED

LOCATIONS: USE RMC OR EMT CONDUIT.

11.6 TYPE MC CABLE FOR LIGHTING CIRCUITS IS

PERMITTED IN CONCEALED LOCATION UP TO A

MAXIMUM RUN OF 6'0” FEET AT THE END OF

RUN TO CONNECT LIGHT FIXTURES TO

SUPPLYING BRANCH CIRCUIT.

11.7 FMC IS PERMITTED TO BE USED IN FOR

RUNOUTS FOR EQUIPMENT SUBJECT TO

VIBRATION (MOTORS, HVAC EQUIP, ETC.).

RUNOUT LENGTHS FOR FMC MUST BE 6'0”

FEET OR LESS.

11.8 CONDUIT REQUIREMENTS IN THIS SECTION

ARE PROVIDED FOR GENERAL PRICING AND

INSTALLATION GUIDANCE. CONTRACTOR IS

RESPONSIBLE FOR FOLLOWING NFPA 70

REQUIREMENTS.

12. LIGHTING

12.1 CONTRACTOR SHALL COORDINATE LOCATION

OF LIGHT FIXTURES WITH MECHANICAL

CONTRACTOR, PLUMBING CONTRACTOR, AND

FIRE PROTECTION CONTRACTOR PRIOR TO

INSTALLATION TO AVOID CONFLICT WITH

DUCTWORK, PIPING, AND SPRINKLER SYSTEM

COMPONENTS.

12.2 MANUFACTURERS: SUBJECT TO COMPLIANCE

WITH REQUIREMENTS, MANUFACTURERS

OFFERING PRODUCTS WHICH MAY BE

INCORPORATED IN THE WORK INCLUDE BUT

ARE NOT LIMITED TO THOSE LISTED IN THE

FIXTURE SCHEDULE: LIGHT FIXTURES SHALL

BE SUPPORTED FROM BUILDING STRUCTURE

INDEPENDENT OF THE GRID SYSTEM (2 POINTS

MINIMUM).

12.3 ALL LIGHT FIXTURE LAMPS USED IN THIS

PROJECT SHALL BE BY ONE MANUFACTURER.

ALL LAMPS OF A PARTICULAR TYPE SHALL BE

FROM ONE PRODUCTION RUN. ANSI C78.

13. LIGHTING CONTROLS

13.1 WHERE MORE THAN ONE SWITCH OR DIMMER

OCCURS AT A LOCATION, GANG THE

SWITCHES TOGETHER WITH A COMMON

JUNCTION BOX AND FACEPLATE.

13.2 WHERE OCCUPANCY SENSORS ARE USED IN

OPEN CONFIGURATIONS, CONTRACTOR SHALL

MASK LAST SENSOR AT EACH END TO

PREVENT PASSER-BY ACTIVATION OF LIGHTS.

13.3 TIMEOUT ON OCCUPANCY SENSORS SHALL BE

SET TO 10 MINUTES UNLESS OTHERWISE

NOTED.

14. RECEPTACLES

14.1 ALL RECEPTACLES LOCATED WITHIN 6'-0”

OF A SINK OR LAVATORY SHALL BE GFCI

RATED.

15. CONTRACTOR SHALL BE RESPONSIBLE FOR

PROPERLY BALANCING ALL BRANCH CIRCUITS

AMONG THE PHASES OF THE SYSTEM

ACCORDING TO NFPA 70.

16. PRIOR TO ENERGIZING OF ALL NEW FEEDERS,

CHECK ALL WIRE AND CABLE FOR CONTINUITY

FOR CIRCUITRY AND FOR SHORT CIRCUITS.

CORRECT ANY DEFICIENCIES PRIOR TO

ENERGIZING.

17. RECORD DRAWINGS

17.1 MAINTAIN A SET OF DRAWINGS ON SITE.

THESE DRAWINGS SHALL BE UPDATED

WITH ALL FORMAL FIELD CHANGES AND

OTHER PORTIONS OF THE WORK THAT

VARY SIGNIFICANTLY FROM THE

CONTRACT DOCUMENTS. INDICATE

ACTUAL ROUTING OF ALL MAIN SERVICE,

TRANSFORMER, AND PANELBOARD

FEEDERS.

17.2 DELIVER RECORD DRAWINGS TO OWNER

PRIOR TO CLOSEOUT OF CONSTRUCTION.

18. ALL MATERIALS AND LABOR SHALL BE

UNCONDITIONALLY WARRANTED FOR A PERIOD

OF ONE (1) YEAR FROM DATE OF SUBSTANTIAL

COMPLETION. SPECIFIC MANUFACTURER'S

EQUIPMENT WARRANTIES IN EXCESS OF ONE (1)

YEAR SHALL TAKE PRECEDENCE.

MANUFACTURER'S WARRANTIES SHALL BE

PROVIDED WHENEVER AVAILABLE AND

POSSIBLE. ALL EQUIPMENT SHALL BE NEW AND

UNUSED FROM THE FACTORY AND SHALL NOT

BE MODIFIED OR REBUILT..

GENERAL ELECTRICAL NOTES:

A AMPS, AMPERES

AB AS-BUILT

AC ALTERNATING CURRENT

AFCI ARC FAULT CIRCUIT

INTERRUPTOR

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AHJ AUTHORITY HAVING

JURISDICTION

AIC AMPERE INTERRUPTING

CAPACITY

AL ALARM

AM AMMETER

AT ASTRONOMIC TIMER

ATS AUTOMATIC TRANSFER

SWITCH

AWG AMERICAN WIRE GAUGE

C CONDUIT

CB CIRCUIT BREAKER

CCTV CLOSED CIRCUIT

TELEVISION

CKT CIRCUIT

CL CENTER LINE

CLG CEILING

ELECTRICAL ABBREVIATIONS:

CLR CLEARANCE

CPVC CHLORINATED

POLYVINYL CHLORIDE

CT CURRENT

TRANSFORMER

CTR COUNTER

CU COPPER

DC DIRECT CURRENT

DIA DIAMETER

DS DISCONNECT SWITCH

EA EACH

ELEC ELECTRICAL

EMER EMERGENCY

EMT ELECTRICAL METALLIC

TUBING

ES EMERGENCY STOP

FA FIRE ALARM

FACP FIRE ALARM CONTROL

PANEL

FC FULLY CLOSED

FLA FULL LOAD AMPS

FO FULLY OPEN

FU FUSE

GC GENERAL CONTRACTOR

GFCI GROUND FAULT

CIRCUIT INTERRUPTOR

GND GROUND

HP HORSEPOWER

HZ HERTZ

IMC INTERMEDIATE METAL

CONDUIT

JB JUNCTION BOX

KVA KILO-VOLT AMP(S)

KW KILO-WATT

KWH KILO-WATT HOUR(S)

LTG LIGHTING

LTS LIGHTS

LO LOCKOUT

MC METAL-CLAD CABLE

MCB MAIN CIRCUIT BREAKER

MCC MOTOR CONTROL

CENTER

MFR MANUFACTURER

MLO MAIN LUGS ONLY

MTD MOUNTED

MTG MOUNTING

MTR METER

MTS MANUAL TRANSFER

SWITCH

N NEUTRAL

NC NORMALLY CLOSED

NEC NATIONAL ELECTRICAL

CODE

NEMA NATIONAL ELECTRICAL

MANUFACTURERS

ASSOCIATED

NO NORMALLY OPEN

NOM NOMINAL

NTS NOT TO SCALE

OC OVERCURRENT

OCPD OVERCURRENT

PROTECTION DEVICE

OD OUTSIDE DIAMETER

OL OVERLOAD

P POLE

PB PUSHBUTTON

PH PHASE

PNL PANELBOARD

POE POWERED OVER

ETHERNET

PVC POLYVINYL CHLORIDE

QTY QUANTITY

RA REMOTE

ANNUNCIATOR

RCC RELAY CONTROL

CABINET

REF REFERENCE

REQD REQUIRED

RMC RIGID METAL CONDUIT

SW SWITCH

SWB SWITCHBOARD

SWGR SWITCHGEAR

UC UNDER COUNTER

UL UNDERWRITERS

LABORATORY

UNO UNLESS NOTED

OTHERWISE

V VOLT(S)

VA VOLT-AMPERE(S)

VFD VARIABLE FREQUENCY

DRIVE

VSD VARIABLE SPEED DRIVE

W WATT(S)

WP WATER PROOF

XFMR TRANSFORMER

120V DUPLEX RECEPTACLE

SECURITY CAMERA

ELECTRICAL SYMBOL LEGEND

OBSTRUCTION LIGHT

AIR TERMINAL

JUNCTION BOXJ

Croft & Associates 3400 Blue Springs Road, Suite 200 Kennesaw, Georgia 30144

770.529.7714 (p) 770.529.7716 (f) www.croftae.com

OWNER

SHEET NO.

PROJECT NUMBER

SHEET TITLE

DRAWN:

1 2

B

A

3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

C

D

E

F

G

H

I

J

K

L

M

N

Co py rig ht by

C ro ft

As so cia te s, P

C.

A ll r ig ht s re se rv ed

Th is do cu m en t i s pr op er ty o f C ro ft

As so cia te s, P

C.

I t i s to b e us ed o nl y fo r t he s pe cif ic pr oj ec t r ef er re d to o r i de nt ifie d he re in a nd is n ot to b e us ed o n ot he r p ro je ct s, in w ho le o r i n pa rt, e xc ep t b y th e ex pr es s wr itt en a gr ee m en t o f C ro ft

As so cia te s, P C.

TH

IS

S H

EE

T

PL

O

TS

O

N

2" x

4"

A N

SI

D

CHECKED:

1" 2"

3"

1/ 2"

/3

0/

0:

:4

AM

\\1

0.

0.

.9

0\ Pr oj ec ts \C

O M

M

ER

C

IA

L\

P

R O

JE

C

T

IN

-B O

X\

-2

F

AA

M ia m i E xe cu tiv e

AT

C T\

2.

D ra w in g

In fo

\c . R ev it\

-2

_F

AA

M ia m i E xe cu tiv e

AT

C

T_ E2

0.

rv t

E-001

ELECTRICAL NOTES

2019-245

RER RER

MIAMI EXECUTIVE AIRPORT

AIRPORT TRAFFIC CONTROL

TOWER FACILITY

REHABILITATION

FEDERAL AVIATION ADMINISTRATION

CENTRAL ACQUISTION, AAQ-520

1010 HILLWOOD PARKWAY

FT. WORTH, TX 76177-2324

LIGHTING FIXTURE SCHEDULE

TYPE DESCRIPTION MANUFACTURER MODEL LAMP VOLTAGE WATTAGE COMMENTS

A SURFACE MOUNTED LED FIXTURE RATED FOR WET LOCATIONS HUBBELL LIGHTING LSQ SERIES OR APPROVED EQUIVALENT LSQ1-25 SERIES WITH SILVER FINISH LED, 4000K 120/277V 25 W

ISSUANCE

No. Date Description

A 2019-12-20 CHECK SET

B 2020-01-10 65% CHECK SET

Level 1 0' - 0"

LEVEL 1

0'-0"

LEVEL 2

9'-10"

LEVEL 3

19'-8"

LEVEL 4

29'-6"

LEVEL 5

39'-4"

LEVEL 6

49'-2"

LEVEL 7

59'-0"

LEVEL 8

68'-10"

T.O. WINDOW

81'-11"

T.O. TOWER ROOF

84'-1"

CONTROL ROOM

FLOOR

72'-2"

EG ROOM

ELEVATOR

MACHINE ROOM

STAIR

ELEVATOR

LINK

RECEPTION

MANAGER

STORAGE /

BREAK ROOM

CONFERENCE

ROOM

AREA

SUPERVISOR

CORRIDOR

RESTROOM

RESTROOM

E-101

A A A A

Croft & Associates 3400 Blue Springs Road, Suite 200 Kennesaw, Georgia 30144

770.529.7714 (p) 770.529.7716 (f) www.croftae.com

OWNER

SHEET NO.

PROJECT NUMBER

SHEET TITLE

DRAWN:

1 2

B

A

3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

C

D

E

F

G

H

I

J

K

L

M

N

Co py rig ht by

C ro ft

As so cia te s, P

C.

A ll r ig ht s re se rv ed

Th is do cu m en t i s pr op er ty o f C ro ft

As so cia te s, P

C.

I t i s to b e us ed o nl y fo r t he s pe cif ic pr oj ec t r ef er re d to o r i de nt ifie d he re in a nd is n ot to b e us ed o n ot he r p ro je ct s, in w ho le o r i n pa rt, e xc ep t b y th e ex pr es s wr itt en a gr ee m en t o f C ro ft

As so cia te s, P C.

TH

IS

S H

EE

T

PL

O

TS

O

N

2" x

4"

A N

SI

D

CHECKED:

1" 2"

3"

1/ 2"

/3

0/

0:

:4

AM

\\1

0.

0.

.9

0\ Pr oj ec ts \C

O M

M

ER

C

IA

L\

P

R O

JE

C

T

IN

-B O

X\

-2

F

AA

M ia m i E xe cu tiv e

AT

C T\

2.

D ra w in g

In fo

\c . R ev it\

-2

_F

AA

M ia m i E xe cu tiv e

AT

C

T_ E2

0.

rv t

E-101

FLOOR PLANS -

LIGHTING & POWER

2019-245

RER RER

MIAMI EXECUTIVE AIRPORT

AIRPORT TRAFFIC CONTROL

TOWER FACILITY

REHABILITATION

FEDERAL AVIATION ADMINISTRATION

CENTRAL ACQUISTION, AAQ-520

1010 HILLWOOD PARKWAY

FT. WORTH, TX 76177-2324

0 5 10 FT

3/16" = 1'-0"

E-101

TOWER ELEVATION - REFERENCE ONLY

10 FT50

1/4" = 1'-0"

E-101

FLOOR PLAN LEVEL 1 - LIGHTING & POWER

GENERAL NOTES:

KEY NOTES:

1. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT

CAB EQUIPMENT FIXTURE AND EXTERIOR CANOPY

LOCATIONS.

1. ROUTE #1/0 TINNED COPPER DOWN CONDUCTOR IN

1" PVC CONDUIT MOUNTED TO EXTERIOR OF TOWER

DOWN TO GROUND ROD AT GRADE TO MATCH

EXISTING INSTALLATION. SEE DETAIL 2/E-201 FOR

MORE INFORMATION.

2. CONNECT TO EXISTING BRANCH SERVING AREA.

3. ROUTE CONDUIT IN TOP CORNER OF DECK FLUTE.

SEE CANOPY SECTION DETAIL G14 ON SHEET A-351

FOR MORE INFORMATION.

4. INSTALL NEW SURFACE MOUNTED LIGHT FIXTURE

UNDER CANOPY.

X

PLAN

NORTH

4 4 4 4

ISSUANCE

No. Date Description

A 2019-12-20 CHECK SET

B 2020-01-10 65% CHECK SET

J

J

MECHANICAL

ROOM

MENS

RESTROOM

WOMENS

RESTROOM

ELEVATOR

STAIR

EXISTING

PANEL H

CAB

Croft & Associates 3400 Blue Springs Road, Suite 200 Kennesaw, Georgia 30144

770.529.7714 (p) 770.529.7716 (f) www.croftae.com

OWNER

SHEET NO.

PROJECT NUMBER

SHEET TITLE

DRAWN:

1 2

B

A

3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

C

D

E

F

G

H

I

J

K

L

M

N

Co py rig ht by

C ro ft

As so cia te s, P

C.

A ll r ig ht s re se rv ed

Th is do cu m en t i s pr op er ty o f C ro ft

As so cia te s, P

C.

I t i s to b e us ed o nl y fo r t he s pe cif ic pr oj ec t r ef er re d to o r i de nt ifie d he re in a nd is n ot to b e us ed o n ot he r p ro je ct s, in w ho le o r i n pa rt, e xc ep t b y th e ex pr es s wr itt en a gr ee m en t o f C ro ft

As so cia te s, P C.

TH

IS

S H

EE

T

PL

O

TS

O

N

2" x

4"

A N

SI

D

CHECKED:

1" 2"

3"

1/ 2"

/3

0/

0:

:0

AM

\\1

0.

0.

.9

0\ Pr oj ec ts \C

O M

M

ER

C

IA

L\

P

R O

JE

C

T

IN

-B O

X\

-2

F

AA

M ia m i E xe cu tiv e

AT

C T\

2.

D ra w in g

In fo

\c . R ev it\

-2

_F

AA

M ia m i E xe cu tiv e

AT

C

T_ E2

0.

rv t

E-102

FLOOR PLANS - POWER

2019-245

RER RER

MIAMI EXECUTIVE AIRPORT

AIRPORT TRAFFIC CONTROL

TOWER FACILITY

REHABILITATION

FEDERAL AVIATION ADMINISTRATION

CENTRAL ACQUISTION, AAQ-520

1010 HILLWOOD PARKWAY

FT. WORTH, TX 76177-2324

GENERAL NOTES:

KEY NOTES:

1. PROVIDE AND INSTALL WALL MOUNTED DOME

CAMERA MOUNTED 7'-6" AFF ADJACENT TO CAB

ENTRY DOOR. TIE INTO EXISTING MONITOR SYSTEM

LOCATED ON THE CAB FLOOR. CAMERA

MANUFACTURER TO MATCH EXISTING CAMERAS IN

SPACE. PROVIDE CABLING/CONDUIT PER

MANUFACTURERS RECOMMENDATIONS. ROUTE

BRANCH CIRCUIT TO 20A/1P SPARE BREAKER #23 IN

EXISTING LOCKED PANEL H LOCATED ON 7TH FLOOR

UTILIZING 2#12, 1#12G IN 3/4"C.

2. PROVIDE AND INSTALL (2) ADDITIONAL COPPER AIR

TERMINALS AS INDICATED TO MATCH EXISTING AIR

TERMINALS ON CAB ROOF. MOUNT AIR TERMINALS

ON RIGID 10'-0" SUPPORT. BOND TERMINAL TO

GUARD RAIL AND OBSTRUCTION LIGHT ON CAB ROOF

WITH #1/0 TINNED COPPER CONDUCTOR. ROUTE

ADDITIONAL #1/0 TINNED COPPER DOWN

CONDUCTOR FROM TERMINAL TO DRIVEN GROUND

ROD AT GRADE BELOW UTILIZING 1" PVC CONDUIT

MOUNTED TO EXTERIOR OF TOWER TO MATCH

EXISTING INSTALLATION. SEE DETAIL 1/E-201 FOR

MORE INFORMATION.

3. REMOVE EXISTING OBSTRUCTION LIGHTS AND

REPLACE WITH NEW STRUCTURE MOUNTED

OBSTRUCTION LIGHT TO MATCH EXISTING.

RECONNECT TO EXISTING BRANCH CIRCUIT AND

PROVIDE ALL REQUIRED CONTROLS AND

INTERFACES FOR A COMPLETE AND OPERABLE

SYSTEM. SEE DETAIL 3/E-201 FOR MORE

INFORMATION.

4. ROUTE #1/0 TINNED COPPER DOWN CONDUCTOR

FROM CAB ROOF ACROSS CATWALK AND ROUTE

DOWN BUILDING UTILIZING 1" PVC CONDUIT TO

MATCH EXISTING INSTALLATION.

5. MOUNT RECEPTACLES IN KICKPLATE OF EXISTING

CONSOLE. ROUTE BRANCH CIRCUIT TO 20A/1P SPARE

BREAKER #9 IN EXISTING PANEL H LOCATED ON 7TH

FLOOR UTLIZING 2#12, 1#12G IN 3/4"C.

6. PROVIDE AND INSTALL 120V/1PH BRANCH CIRCUIT

FOR AUTOMATIC WINDOW WASHING POWER

PANEL. ROUTE BRANCH CIRCUIT TO 20A/1P SPARE

BREAKER #26 IN EXISTING PANEL H LOCATED ON 7TH

FLOOR UTILIZING 2#12, 1#12G IN 3/4"C. VERIFY EXACT

LOCATION OF CONTROL PANEL IN FIELD. PROVIDE

AND INSTALL ALL CONTROL CONDUITS AS REQUIRED

FOR A COMPLETE AND OPERABLE SYSTEM. REFER

TO PLUMBING SHEETS P-201 THROUGH P-204 FOR

MORE INFORMATION AND CONDUIT REQUIREMENTS.

COORDINATE EXACT LOCATION OF PANEL IN FIELD.

7. ROUTE #4/0 TINNED COPPER CONDUCTOR FROM

NEW COPPER AIR TERMINAL TO EXISTING AIR

TERMINAL ON ROOF TO MATCH EXISTING

INSTALLATION. SEE DETAIL 1/E-201 FOR MORE

INFORMATION.

8. CAB WINDOW WASHING CONTROL PANEL LOCATION.

COORDINATE EXACT LOCATION IN FIELD.

9. INSTALL NEW #4/0 BARE COPPER CONDUCTOR

AROUND PERIMETER OF CAB ROOF.

X

10 FT50

1/4" = 1'-0"

E-102

FLOOR PLAN LEVEL 7 - POWER

10 FT50

1/4" = 1'-0"

E-102

FLOOR PLAN CAB - POWER

10 FT50

1/4" = 1'-0"

E-102

FLOOR PLAN CAB ROOF - POWER

1. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT

CAB EQUIPMENT FIXTURE AND EXTERIOR CANOPY

LOCATIONS.

1. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT

CAB EQUIPMENT FIXTURE AND EXTERIOR CANOPY

LOCATIONS.

2. DOWN CONDUCTORS SHALL BE TINNED COPPER,

THOMPSON LIGHTNING PROTECTION, ZEUS 506T.

PLAN

NORTH

PLAN

NORTH

PLAN

NORTH

ISSUANCE

No. Date Description

A 2019-12-20 CHECK SET

B 2020-01-10 65% CHECK SET

0 2020-12-01 100% SUBMITTAL

B 2020-01-10 65% CHECK SET

File details come from the government source that posted it. Updated .