RFI Set 2.pdf
PDF 46 KB Posted
- Attached to
- TMB ATCT Rehabilitation Federal contract opportunity
- Solicitation number
- 697DCK-22-R-00166
About this file
This document contains a request for information and responses regarding repairs to the Miami Executive Airport Air Traffic Control Tower located in Miami, Florida. The Federal Aviation Administration is seeking proposals to repair the tower in accordance with specifications provided. A superintendent may serve as quality control manager but cannot fill the roles of project manager, superintendent, and quality control manager simultaneously. A LEED-certified coordinator is not required provided all specification and code requirements are met. Site photos from four years ago are provided for reference but may not reflect current conditions. Proposals are due by the date specified in the solicitation of record number 697DCK-22-R-00166. Questions regarding the request for information must be submitted to the contact provided by March 9, 2022.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI Set 2 Photos.pdf | ||
| 697DCK-22-R-00166 Amend 0002.pdf | ||
| RFI Set 1.pdf | ||
| 697DCK-22-R-00166 0001.pdf | ||
| 697DCK-22-R-00166 Final.pdf | ||
| J4. Wage Rate.pdf | ||
| J1. TMB ATCT Facility Rehab Final Specifications 12.01.20.pdf | ||
| J1a. TMB - Addendum #1 - 031721.pdf | ||
| J2. Operational Risk Management Plan.pdf | ||
| L1. BidBond.pdf | ||
| L2. TMB Past Performance Questionnaire.pdf | ||
| J1b. TMB ATCT Facility Rehab Final Drawings 12.01.20.pdf | ||
| L3. Price Proposal - TMB ATCT Rehab.xlsx | XLSX spreadsheet |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Response Set #2 TMB ATCT Rehabilitation
697DCK-22-R-00166
Q1. As per spec 01 40 00, section 3.3. are we required to hire an independent QC organization?
R1. No an independent QC organization is not required
Q2. Can the superintendent performs the duties of the QCM?
R2. A superintendent may serve as QC manager; however, they may not serve the role of Project Manager, Superintendent and QC manager. If the superintendent becomes the QC manager, they assume all responsibilities of the QC manager as well.
Q3. Spec 017419 section 1.7. are we required to employ at LEED coordinator for this project?
R3. No, a LEED certified coordinator is not required as long as all requirements of the specification section are met and in compliance with local code, whichever is more stringent.
Q4. Do you have any photos of the roof that you can provide?
R4. Please see document entitled, “RFI Set 2 Photos”. Please note these photos are from four years ago and may not represent the most current condition.