J06 Price Schedule MDRR.xlsx
XLSX spreadsheet 24 KB Posted
- Attached to
- Multi-Door Replacement & Repair Federal contract opportunity
- Solicitation number
- 75H70125R00065
About this file
This file is a price schedule (IGCE) for a Multi-Door Replacement & Repair project at the Quentin N. Burdick Memorial Health Facility in Belcourt, North Dakota. The project involves replacing and repairing multiple doors, including Stanley sliding doors, steel and wood swinging doors, and aluminum exterior doors. The price schedule is organized by construction divisions (02-33), with detailed line items for demolition, door hardware replacement, and associated work like sheetrock repair, but notably shows all line items currently valued at $0.
The project is a firm-fixed-price contract issued by the Indian Health Service (IHS) with a 180-day performance period, estimated between $100,000 and $250,000. The specific facility location is 1300 Francis Sinclair St in Rolette County, and the work will be coordinated by Brad Weekley from IHS/ABR/OEH, who is responsible for project logistics, scheduling, submittals, and general project management requirements. The solicitation number is 75H70125R00065, and the project includes a Statement of Work and design package for comprehensive door replacement and repair services.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B05 Amendment 2 QAs.pdf | ||
| J09 Company Specialized Experience Form Construction.pdf | ||
| J05 Self Performed Calculation Sheet.docx | DOCX document | |
| J04 IHS IEE Representation Form MDRR.pdf | ||
| J01 SOW_Multi-Door Replacement Repair.pdf | ||
| B01 75H70125R00065 RFP MDRR.pdf | ||
| J10 Past Performance Questionnaire.docx | DOCX document | |
| J02 Design Package Multi-Door Replacement Repair.pdf | ||
| J07 WH-347 Payrolls Exp 31Jan2028.pdf | ||
| J03 Wage Det ND20250029 1Aug2025.pdf | ||
| J08 Release of Claims.docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Roof
| IGCE | |||
| PREPARED BY: | DATE: | ||
| SUMMARY | Taylor Strand | 13-Feb-25 |
| Project Number and Name: | GP25TM400H06 Multi-Door Replacement & Repair |
| Building Number and Name: | 00N28, Quentin N. Burdick Memorial Health Facility |
DIVISION DESCRIPTION MATERIAL LABOR EQUIPMENT TOTAL COMMENTS
Division 02 Existing Conditions Weekley, Brad (IHS/ABR/OEH): demolision, site assessments, investigations
| $ - 0 | Demolition, Dumpster Fees, Mobilization | ||||
| Division 03 | Concrete | $ - 0 | |||
| Division 04 | Masonry | $ - 0 | |||
| Division 05 | Metals | $ - 0 | Door Hardware Replacement | ||
| Division 06 | Wood, Plastics and Composites | $ - 0 | |||
| Division 07 | Thermal and Moisture Protection | $ - 0 | |||
| Division 08 | Openings | $ - 0 | Stanley Sliding Doors (5 ) | ||
| Division 08 | Openings | $ - 0 | Steel Swinging Doors Pair (1) w/New Frame | ||
| Division 08 | Openings | $ - 0 | Wood Swinging Doors Pair (1) Fire Rated | ||
| Division 08 | Openings | $ - 0 | 4' Steel Swinging Doors (1) | ||
| Division 08 | Openings | $ - 0 | 4' Wood Swinging Doors (4) w/New Frame | ||
| Division 08 | Openings | $ - 0 | Aluminum Exterior Swinging Doors (2) | ||
| Division 08 | Openings | $ - 0 | Installation of Existing Pair of Wood Doors (1) | ||
| Division 09 | Finishes | $ - 0 | Sheet Rock & Wall Repair in Clinic | ||
| Division 10 | Specialties | $ - 0 | |||
| Division 11 | Equipment | $ - 0 | |||
| Division 12 | Furnishings | $ - 0 | |||
| Division 13 | Special Construction | $ - 0 | |||
| Division 14 | Conveying Equipment | $ - 0 | |||
| Division 21 | Fire Suppression | $ - 0 | |||
| Division 22 | Plumbing | $ - 0 | |||
| Division 23 | Heating, Ventilation and Air Conditioning | $ - 0 | |||
| Division 25 | Integrated Automation | $ - 0 | |||
| Division 26 | Electrical | $ - 0 | |||
| Division 27 | Communications | $ - 0 | |||
| Division 28 | Electronic Safety and Security | $ - 0 | |||
| Division 31 | Earthwork | $ - 0 | |||
| Division 32 | Exterior Improvements | $ - 0 | |||
| Division 33 | Utilities | $ - 0 |
Subtotal $ - 0 $ - 0 $ - 0 $ - 0
Division 1 General Requirements Weekley, Brad (IHS/ABR/OEH): A clearinghouse for items that don't apply directly to construction.
Constructability, logistics & schedule all play into these values.
Submittals, scheduling, payment apps, inspections, daily logs, RFIs, progress meetings, project docs.
| $ - 0 | ||
| Division 1 | General Conditions |
Weekley, Brad (IHS/ABR/OEH): General Conditions is the bigger bubble of what is expected of how the project will run and General Requirements is the bubble within that lays out more detailed rules for said project.
Project Manager, estimator, principals, project engineers, bookkeeping, & admin.
$ - 0
Subtotal $ - 0 $ - 0 $ - 0 $ - 0
| Subtotal | $ - 0 | |
| Overhead | $ - 0 | |
| Subtotal | $ - 0 | |
| Profit | $ - 0 | |
| Subtotal | $ - 0 | |
| Bonds | $ - 0 | |
| Subtotal | $ - 0 | |
| TERO/EPA | $ - 0 |
TOTAL $ - 0
File details come from the government source that posted it. Updated .