About this file
This is a Statement of Work (SOW) for the construction of a new lift station at Rosebud Hospital in Rosebud, South Dakota, under Indian Health Service (IHS) contract 75H70126R00030. The project involves the complete removal and replacement of the existing wastewater lift station that currently serves the hospital, hospital quarters units, and several tribal program buildings. The new lift station will be sized to accommodate current sanitary loads and future expansion, incorporating a wet well, dry well, chopper pumps (to handle debris), force main connections, and a new control system for monitoring flow and equipment status. The existing lift station, which has required pump replacements every 1-2 years due to unanticipated growth and has shown signs of deterioration including standing water in the dry well and corroded fittings, will be demolished following installation of the new system.
The contract is a firm-fixed-price award with a 240 calendar day period of performance from Notice to Proceed and a construction magnitude between $500,000 and $1,000,000. This is a total small business set-aside solicitation under Product Service Code Y1ND (Construction of Sewage and Waste Facilities) and NAICS Code 237110. The project location is 1319 Soldier Creek Road, Rosebud, SD 57570, in Todd County. TERO (Tribal Employment Rights Office) compliance is required, including a 4% fee on the contract price and $250 annual work permits per non-local Indian employee. Contractors must submit invoices through the Invoice Processing Platform (IPP) and are required to have an onsite superintendent during all work performance. The Contracting Officer's Representative is Logan Gayton (605-945-5451; logan.gayton@ihs.gov), and the Facility Manager is Edward Arcoren. All work shall be conducted in accordance with the technical specifications and plans referenced in Appendix C, and progress payments will be made following government acceptance and invoice approval.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| J02a RB Geotech Report from 300 feet away.pdf | ||
| A03 Add Geotech Report from 300 fT Away RLSC.pdf | ||
| A02 Pump Specs RLSC.pdf | ||
| A01 Add Attachment RLSC.pdf | ||
| J03a Plans RLSC.pdf | ||
| J07 Release of Claims.docx | DOCX document | |
| J03 Tech Specs RLSC.pdf | ||
| Optional Past Performance Questionnaire.docx | DOCX document | |
| J05 Self Performed Calculation Sheet.docx | DOCX document | |
| J02 Block 17 Support Schedule RLSC.docx | DOCX document | |
| B01 RFP RLSC 75H70126R00030.pdf | ||
| Optional Company Specialized Experience Form.pdf | ||
| J04 Wage Det SD20260018 18May2026.pdf | ||
| J06 WH-347 Payrolls Exp 31Jan2028.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
ROSEBUD NEW HOSPITAL LIFT STATION
INDIAN HEALTH SERVICE
ROSEBUD, SD
ROSEBUD HOSPITAL
APRIL 2026
Table of Contents
| 1. | Project Description | 3 |
| 2. | Scope of Work (SOW) | 4 |
| 3. | Period of Performance. | 4 |
| 4. | Submittals | 5 |
| 5. | Schedule/Meetings | 5 |
| 6. | Miscellaneous | 5 |
| 7. | Payments to the Contractor | 6 |
| 8. | IHS Personnel | 6 |
| 9. | Invoice Format | 7 |
| 10. | Closeout Documents | 7 |
| Appendix A – Quote Schedule | 7 | |
| Appendix B –Timeline Coordination | 7 | |
| Appendix C – Existing Construction Drawings | 7 |
STATEMENT OF WORK
Rosebud New Hospital Lift Station Rosebud Service Unit Rosebud, SD
1. Project Description A. Title:
B. Location: This project is at the Rosebud Hospital, in Rosebud, SD.
C. Period of Performance: 240 calendar days from Notice to Proceed.
D. Description: This project will include the full removal and replacement of the lift station for the Rosebud complex. The existing lift station provides wastewater service to the hospital quarters units, and several tribal program buildings. Once installation is complete the new lift station will take the full sanitary load for the area currently being serviced by the existing lift station and be sized to handle expansion in the future. Then the existing lift station consisting of the wet well, dry well, pumps and piping will be demolished. The new lift station will consist of a wet well, a dry well, installation of chopper pumps, and force main connection. This project will also include a new control system to allow the facility to monitor flow into the lift station and the status of the equipment.
E. Background: The Rosebud Comprehensive Health Care Facility needs to replace the existing sewer lift station due to deterioration and sizing limitations. The existing lift station provides wastewater service to the hospital, hospital quarters units, and several tribal program buildings. Currently the lift station pumps are replaced every other year due to excess wear and overuse. Additionally, the manholes upstream of the lift station have been observed to fill between 25-85% full, which indicates that the current system isn’t keeping up and that there is possible infiltration and inflow (I&I) occurring. A recent field visit showed that the existing dry well had standing water in it and the existing fittings and valves that connect to the force main showed signs of deterioration. The lift station project will incorporate the demolition of the existing wet well, dry well, piping, and pumps, along with the construction of a new lift station, installation of chopper pumps and connection to upstream manholes and gravity sewer.
F. Related Documents
1. This SOW and any other standard government or IHS documents are included and considered a part of this contract.
2. IHS Architecture and Engineering Design Manual – 2019 G. Common Acronyms or Definitions
1. IHS – Indian Health Service
2. CMS – Centers for Medicare & Medicaid Services
3. RB – Rosebud
4. BAS – Building Automation System
5. Metasys – Name of the existing BAS
6. CO – Contracting Officer
7. COR – Contracting Officer’s Representative
8. PM – Project Manager
9. IGCE – Independent Government Cost Estimate
10. BIM – Building Information Model
11. LOD – Level of Design
12. CAD – Computer Aided Design
13. RFI – Request For Information
Scope of Work (SOW): The contractor shall conduct all work in accordance to the Plans (Appendix B) and Technical Specifications (Appendix C).
2. Submittals A. Contractor to refer to the technical specifications for all required submittal procedures, and submittal items.
3. Warranty A. See project technical specifications (Appendix C)
4. Schedule/Meetings A. Contractor to refer to technical specifications for all schedule and meeting information.
5. Miscellaneous A. Occupancy of Government Facilities. The contractor shall be responsible for properly informing the COR of any condition which would jeopardize the building or its contents, such as loss of heat, air conditioning, danger of pipes freezing, loss of electrical power, water, sewer or loss of building security.
B. Correspondence. All correspondence shall be addressed to the COR. Each letter, document, etc., shall contain the following information:
1. Date
2. Project Numbers, Contract Number, Delivery Order Number and Service Unit Name/Location.
3. Name of those who were sent copies.
C. Superintendent. The prime contractor shall have an onsite superintendent for this project while any and all work is being performed unless prior approval is grant from the COR.
D. Tribal Requirements.
1. The Contractor and all subcontractors engaging in work on the Rosebud Indian Reservation will be required to comply with the Indian preference and Indian preference program requirements administered by the Oglala Sioux Tribe Tribal Employment Rights Office (TERO).
2. Before commencing work, contractors and sub-contractors are required to submit an acceptable “Compliance Agreement” to the TERO office. Copies of this form can be obtained from the TERO office. Typical requirements of TERO include a fee of 4% on the total contract price, and submission of weekly certified payroll reports to TERO.
3. Additionally, the rules and regulations of the TERO Ordinance require that no person who is not a local Indian shall be employed by a covered employer until a work permit has been obtained for them from TERO. The annual work permit fee for each employee is $250.00.
4. Contractors are strongly encouraged to contact the TERO office at (605) 867-5167 for an explanation of tribal requirements. Other fees may apply.
A.
B.
C.
D.
E.
F.
E. Hours Of Operation
1. Contractor to refer to Technical Specification 01310 – Project Management and Coordination.
6. Payments to the Contractor
1. The Government will pay the Contractor a fixed price, as indicated below, which will constitute full compensation for all Contractor professional and incidental services, travel expenses, and materials necessary to furnish complete project as required and specified in this SOW.
2. Progress payments will be paid following acceptance by the Government of that particular schedule item and a properly submitted and approved invoice.
3. Contractor to refer to Section 01270 for Price and Payment information.
7. IHS Personnel Contracting Officer’s Representative (COR) Logan Gayton will be designated as the Contracting Officer’s Representative (COR) for this Order. His address and telephone are:
Logan Gayton Great Plains Area Indian Health Service Division of Facilities Management & Engineering 3200 Canyon Lake Dr.
Rapid City, SD 57702 Mobile: 605-945-5451 Email: logan.gayton@ihs.gov
Any change in COR designation will be documented by the Contracting Officer in writing.
Facility Manager (FM) Edward Arcoren is the acting Facility Manager for the Rosebud Hospital. His contact information is:
Edward Arcoren Maintenance Supervisor Rosebud Service Unit Office #: 605-747-0424 edward.arcoren@ihs.gov
8. Invoice Format Invoice Processing Platform (IPP) The Indian Health Service (IHS) is in the process of implementing an electronic invoicing system In compliance with the Office of Management and Budget (OMB) M-15-19 memorandum, Improving Government Efficiency and Saving Taxpayer Dollars Through Electronic Invoicing, directing Federal agencies to adopt electronic invoicing as the primary means to disburse payment to vendors. Invoices submitted under any award resulting from this solicitation will be required to utilize the Invoice Processing Platform (IPP) in accordance with HHSAR 352.232-71, Electronic Submission and Processing of Payment Requests.
IPP is a secure, web-based electronic invoicing system provided by the U.S. Department of the Treasury’s Bureau of the Fiscal Service, in partnership with the Federal Reserve Bank of St. Louis (FRSTL). Respondents to this solicitation are encouraged to register an account with IPP if they have not already done so. If your organization is already registered to use IPP, you will not be required to re-register- however, we encourage you make sure your organization and designated IPP user accounts are valid and up to date.
The IPP website address is: https://www.ipp.gov If you require assistance registering or IPP account access, please contact the IPP Helpdesk at (866) 973-3131 (M-F 8AM to 6PM ET), or IPPCustomerSupport@fiscal.treasury.gov Should the contractor feel that use of the IPP would be unduly burdensome, their response to this solicitation should include an explanation of this position for a determination by the contracting officer.
9. Closeout Documents The contractor shall refer to the Technical Specifications for all Closeout Documents, Procedures, and Record Documents.
Appendix A – Quote Schedule Appendix B –Plans Appendix C – Technical Specifications *All brand names listed in the technical specifications are for description purposes Appendix D – Solar Array Geotechnical Report Appendix E – Tribal Sewer Branch Appendix F – Rosebud Comprehensive Health Care Facility Site Development & Utilities – Original Lift Station
Statement of Work Page 9
ROSEBUD NEW HOSPITAL LIFT STATION
APRIL 2026
File details come from the government source that posted it. Updated .