This is a Standard Form 30 (Amendment of Solicitation/Modification of Contract) for the Rosebud Lift Station Construction project. The amendment is issued by the Indian Health Service (IHS), Division of Engineering Services (DES) in Seattle, WA and is numbered A00002 with an effective date of 06/16/2026. The solicitation number is 75H70126R00030, with requisition number GP25RB500Z10 and project number PA#141.
The amendment updates pump requirements specified in Attachment J03 Technical Specifications RLSC, paragraph 2.4 Sewage Pumps, section F (Pump Performance Requirements). Specifically, Item 1 (Capacity) is revised from 95 GPM to 125 GPM, and Item 3 (Total Dynamic Head) is changed from 63 feet to 80 feet. The amendment instructs offerors that acknowledgment of this amendment is required prior to the hour and date specified in the solicitation, either by completing items 8 and 15 on the SF-30 form, acknowledging receipt on each copy of the offer, or by separate letter or electronic communication referencing the solicitation and amendment numbers. All other terms and conditions of the original solicitation remain unchanged.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| J02a RB Geotech Report from 300 feet away.pdf | ||
| A03 Add Geotech Report from 300 fT Away RLSC.pdf | ||
| A01 Add Attachment RLSC.pdf | ||
| J03a Plans RLSC.pdf | ||
| J07 Release of Claims.docx | DOCX document | |
| B01 RFP RLSC 75H70126R00030.pdf | ||
| Optional Company Specialized Experience Form.pdf | ||
| J04 Wage Det SD20260018 18May2026.pdf | ||
| J03 Tech Specs RLSC.pdf | ||
| Optional Past Performance Questionnaire.docx | DOCX document | |
| J05 Self Performed Calculation Sheet.docx | DOCX document | |
| J01 SOW Rosebud Lift Station Construction.docx | DOCX document | |
| J02 Block 17 Support Schedule RLSC.docx | DOCX document | |
| J06 WH-347 Payrolls Exp 31Jan2028.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
A00002
Daniel Cotto
Read the Continuation Sheet.
Indian Health Service (IHS) Division of Engineering Services (DES) - Seattle 701 5th Ave, Suite 1650 Seattle, WA 98104
75H70126R00030
GP25RB500Z10, PA#141
1 1
Same as 16C
06/16/2026
Rosebud Lift Station Construction Solicitation: 75H70126R00030
1. The purpose of this solicitation amendment A02 is to:
a. Update the pump requirements.
2. Attachment J03 Tech Specs RLSC, paragraph 2.4 Sewage Pumps, F. Pump Performance Requirements is amended as follows:
- Item 1. Capacity is changed from:
95 gpmto125 GPM.
- Item 3. Total Dynamic head is changed from:
63 feetto80 feet.
3. Remember to acknowledge all amendments. Block 11 of the SF-30 provides instructions for acknowledging amendments; it is acceptable to acknowledge on block 19 of the SF-1442.
4. All other terms and conditions remain unchanged.