J.7 Pricing Sheet.xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- Exterior Temporary Food Service Facility
- Solicitation number
- AOCSSB25R0005
- Issued by
-
Architect of the Capitol
About this file
This is a pricing sheet template for a temporary food service facility contract at the U.S. Capitol Building. The contract structure includes a base period requiring preconstruction services, site visits, and submittals, followed by a 12-month base lease period of the kitchen facility. The option periods include Option Year 1 (365 days), Option 2 (90 days), Option 3 (90 days), Option 4 (6-month FAR 52.217-8 extension), and Option 5 for demobilization and removal of the facility.
The pricing sheet requires contractors to provide unit prices for each Contract Line Item Number (CLIN), with setup to be completed by July 28, 2025. The sheet includes spaces for contractors to input prices for each period, with separate totals for the base period, each option period, and an overall contract total including all options. Pricing is structured as job (JB) units for setup/removal and monthly rates for the lease periods.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Site sketch and rendering.pdf | ||
| Revised Solicitation.pdf | ||
| Revised SOW.docx | DOCX document | |
| J.8 DOL Service Contract Labor Standards wage determination (DC).pdf | ||
| Amendment 0001.pdf | ||
| J.2 Instructions to Quoters and Basis for Award (L&M).docx | DOCX document | |
| J.5 USCP Request for Check of Criminal History (Form CP-491).pdf | ||
| J.6 Sample Certificate of Liability Insurance (COI - Master) (8-4-22).pdf | ||
| J.4 Past Performance Questionnaire.docx | DOCX document | |
| J.1 Statement of Work (SOW).docx | DOCX document | |
| J.3 Corporate Experience Template.docx | DOCX document | |
| AOCSSB25R0005 (solicitation).pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| CLIN | SUPPLIES / SERVICES | QTY | UNIT | UNIT/ PRICE | AMOUNT |
| PERIOD OF PERFORMANCE, To be completed by contractor - setup must be completed by 7/28/2025) | |||||
| 0001 | Preconstruction services including site visit and submittals per section 5.1 of Statement of Work (SOW); Delivery and Setup of temporary facility per section 5.1 of attached SOW | 1 | JB | $____________ | |
| 0002 | 12 month base lease period of the kitchen facitlity per section 5.2 of attached SOW | 12 | Month | $____________ | |
| Total Base Period – 0001, 0002 | Total | $_____________ |
| OPTION 1 - PERIOD OF PERFORMANCE, 365 days after expiration of Base period. | |||||
| 1001 | 12 month option lease period of the kitchen facitlity per section 5.3 of attached SOW | 12 | Month | $____________ | |
| Total Option Year 1 – 1001 | Total | $____________ |
| OPTION 2 - PERIOD OF PERFORMANCE, 90 days after expiration of Option 1 | |||||
| 2001 | 3 month option lease period of the kitchen facility per section 5.4 of attached SOW | 3 | Month | $____________ | |
| Total Option 2 – 2001 | Total | $____________ |
| OPTION 3 - PERIOD OF PERFORMANCE, 90 days after expiration of Option 2 | |||||
| 3001 | 3 month option lease period of the kitchen facitlity per sectin 5.5 of attached SOW | 3 | Month | $____________ | |
| Total Option 3 – 3001 | Total | $____________ |
| OPTION 4 - FAR 52.217-8, 6 months after expiration of Option 3 | |||||
| 4001 | 6 month option lease period of the kitchen facitlity per section 5.6 of attached SOW | 6 | Month | $____________ | |
| Total FAR 52.217-8 extension – 4001 | Total | $____________ |
| OPTION 5 - PERIOD OF PERFORMANCE, two weeks (or to be completed by contractor) | |||||
| 5001 | Demobilization and removal of facility per section 5.7 of attached SOW | 1 | JB | $____________ | |
| Total Option 5 – 5001 | Total | $____________ |
Total for Contract including base and all Option Years $ ___________
File details come from the government source that posted it. Updated .