J.6 - Cost-Price Proposal - Excel NARA.xlsx
XLSX spreadsheet 11 KB Posted
- Solicitation number
- 040ADV-26-R-0016
- Issued by
-
Government Publishing Office
About this file
This is a Cost-Price Proposal template in Excel format for the National Archives and Records Administration (NARA) 4th Floor Renovation Project, solicitation number 040ADV-26-R-0016, issued by the Government Publishing Office (GPO). The template is structured as a Firm Fixed Price proposal with six Contract Line Item Numbers (CLINs) covering distinct work packages over a 540-calendar-day project period at NARA's main campus in Washington DC.
The six CLINs encompass: (1) Mobilization of Personnel & Equipment and Construction Management; (2) General Construction labor and materials; (3) Electrical work; (4) HVAC systems; (5) Plumbing and Fire Protection; and (6) Quality Assurance/Quality Control. Each CLIN requires offerors to break down pricing into Labor, Materials, Overhead, General & Administrative (G&A), and Profit components. The proposal also includes line items for Bonds, Design Contingency, and overall Overhead and G&A allocation. The template currently shows a total price of $0.00, indicating it is a blank form awaiting completion by contractors. The project scope includes demolition, structural modifications, mechanical-electrical-plumbing (MEP) systems installation, fire protection measures, and interior finishes in compliance with Architectural and Engineering Design Specifications.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| CLIN | Description | Firm Fixed Price | Notes/Comment |
| CLIN 0001 | Mobilization of Personnel & Equipment | ||
| Construction Management for 540 Calander Days | |||
| Demolition | |||
| Labor and Materials | |||
| Overhead, G&A | |||
| Profit |
| CLIN 0002 | General Construction |
| Labor and Materials | |
| Overhead, G&A | |
| Profit |
| CLIN 0003 | Electrical |
| Labor and Materials | |
| Overhead, G&A | |
| Profit |
| CLIN 0004 | HVAC |
| Labor and Materials | |
| Overhead, G&A | |
| Profit |
| CLIN 0005 | Pluming and Fire Protection |
| Labor and Materials | |
| Overhead, G&A | |
| Profit |
| CLIN 0006 | Quality Assurance/Quality Control |
| Bonds | |
| Design Contingency | |
| Overhead, G&A | |
| Profit |
Total Price $0.00
File details come from the government source that posted it. Updated .