J.3_PRELIMINARY CONSTRUCTION SITE PLAN.pdf
PDF 1 MB Posted
- Attached to
- Manchester Campus Addition Construction at the Manchester Research Station in Port Orchard, Washington
- Solicitation number
- 1305M4-24-R-0071
About this file
This is a preliminary construction site plan drawing showing the overall campus layout for the NOAA Manchester Research Station in Port Orchard, Washington. The plan depicts the locations of existing facilities including the main building, labs + offices building, and RAS (Recirculating Aquaculture System) building, along with various support structures numbered 1-30 in the campus legend.
The drawing indicates the base scope and RAS bid option scope areas, with red hatched sections showing potential contractor staging, laydown and parking areas. It includes primary vehicular pathways marked with red arrows, access lanes, and limits of disturbance. The site borders Clam Bay and includes topographical contour lines. Critical details such as emergency access requirements and security gate notes are marked on the plan. This drawing provides contractors with essential site logistics information needed to bid on the new 24,000 GSF campus addition construction project.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LABS + OFFICES
BUILDING
RAS BUILDING
NOAA MANCHESTER
RESEARCH STATION
29 19
12 28
15B
15A
15C
CLAM BAY
RAS BID OPTION SCOPE BASE SCOPE
amiezemer Snapshot amiezemer Snapshot amiezemer Text Box
CAMPUS LEGEND:
1 Main Building 2 Main Building 3 Main Building 4 Navy Annex I 5 Navy Annex II 6 Pathology Lab 8 Warehouse 9 Emergency Power Generator 10 Chemical Storage Container 11 Fish Rearing 12 Saltwater Marine Lab
13 BPA
14 Fish Behavior Lab 15A Ozone Generator 15B Oxygen Generator 15C Restroom 16 Stream Channel Electrical 17 Stream Channel support 18 Recirculation for B14 19 Shop AND storage building 21 Kenneth Chew Center 22 Nooksack 23 Salmon Stream 24 Storage and Kelp Lab 25 Behavior Ecology Covered Tanks 26 Algae Growing Building 27 Albalone/Sea Cucumber Nursery 28 Tarp Covered Work Area 29 Covered Storage 30 Pump House
Mark.Benne Polygon
Mark.Benne Polygon
Mark.Benne Polygon
Mark.Benne Text Box Area 1
Mark.Benne Text Box Area 2
Mark.Benne Text Box Area 7
Mark.Benne Polygon
Mark.Benne Text Box Area 4
Mark.Benne Arrow
Mark.Benne Arrow
Mark.Benne Arrow
Mark.Benne Arrow
Mark.Benne Arrow
Mark.Benne Arrow
Mark.Benne Arrow
Mark.Benne Arrow
Mark.Benne Arrow
Mark.Benne Arrow
Mark.Benne Arrow
Mark.Benne Arrow
Mark.Benne Arrow
Mark.Benne Line
Mark.Benne Line
Mark.Benne Arrow
Mark.Benne Text Box Primary NOAA/EPA Roadway. Minimum one-way traffic must remain open at all times during construction.
Limits of disturbance
Access Loop. Must maintain one way access to facilities at all times. One way access must be coordinated 7 days in advance.
Potential contractor laydown, field office and parking areas.
Mark.Benne Arrow
Mark.Benne Arrow
Mark.Benne Polygon
Mark.Benne Text Box Area 6
Mark.Benne Line
Mark.Benne Arrow
Mark.Benne Arrow
Mark.Benne Arrow
Mark.Benne Arrow
Mark.Benne Arrow
Mark.Benne Arrow
Mark.Benne Arrow
Mark.Benne Arrow
Mark.Benne Arrow
Mark.Benne Arrow
Mark.Benne Arrow
Mark.Benne Arrow
Mark.Benne Arrow
Mark.Benne Arrow
Mark.Benne Arrow
Mark.Benne Arrow
Mark.Benne Arrow
Mark.Benne Arrow
Mark.Benne Arrow
Mark.Benne Arrow
Mark.Benne Rectangle
Mark.Benne Polygon
Mark.Benne Callout Contractor Parking (16 stalls)
Mark.Benne Arrow
Mark.Benne Arrow
Mark.Benne Arrow
Mark.Benne Polygon
Mark.Benne Polygon
Mark.Benne Arrow
Mark.Benne Callout Maintain emergency access through this gate. Premission to temporarily restrict access must be coordinated 21 calendar days in advance.
Mark.Benne Text Box Area 3
Mark.Benne Text Box Area 5
Mark.Benne Line
Mark.Benne Callout Security Gate open from 5am - 6pm Monday thru Friday
| Floor Plans (Site Plan) |
| SITE PLAN_Full Campus Copy 2 |