J.10 PROPOSAL TEMPLATE (Feb 2025).xlsx
XLSX spreadsheet 32 KB Posted
- Attached to
- Manchester Campus Addition Construction at the Manchester Research Station in Port Orchard, Washington
- Solicitation number
- 1305M4-24-R-0071
About this file
This is a detailed proposal pricing template for the Manchester Research Station Campus Addition construction project, organized by Contract Line Item Numbers (CLINs) using the Uniformat classification system. The template covers two main buildings - a Laboratory and Office (L+O) Building (CLINs 0001-0007) and a RAS Building (CLINs 0008-0013), along with additional optional components including landscaping, lab equipment, signage, premium finishes, and parking (CLINs 0014-0018).
The template requires contractors to provide costs across major construction categories including substructure, shell, interiors, services, equipment/furnishings, special construction, and sitework. Each section includes detailed line items and requires markup percentages for general administrative, bond, insurance, overhead, and profit. The base CLINs (0001-0004, 0006, 0007) have a total construction budget of $21,352,305, while the optional CLINs (0005, 0008-0018) do not have a specified budget due to unavailable funds. The project is being solicited by NOAA under solicitation #1305M4-24-R-0071 as an unrestricted competition under NAICS code 236220 with a $45.0 million size standard.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
L+O Manchester Research Station Campus Addition Proposal Template - Laboratory and Office Building
| CLIN | Uniformat | Description | Cost (w/ mark-ups) |
| 0001 | A | Substructure | |
| 1010 | Standard Foundations | ||
| 1020 | Special Foundations | ||
| 1030 | Slab on Grade | ||
| 0002 | B | Shell | |
| 1010 | Floor Construction | ||
| 1020 | Roof Construction | ||
| 2010 | Exterior Walls | ||
| 2020 | Exterior Windows | ||
| 2030 | Exterior Doors | ||
| 3010 | Roof Coverings | ||
| 0003 | C | Interiors | |
| 1010 | Partitions | ||
| 1020 | Interior Doors | ||
| 1030 | Specialities | ||
| 2010 | Stair Construction | ||
| 3010 | Wall Finishes | ||
| 3020 | Floor Finishes | ||
| 3030 | Ceiling Finishes | ||
| 0004 | D | Services | |
| 1010 | Elevator | ||
| 2010 | Plumbing Fixtures | ||
| 2020 | Domestic Water Distribution | ||
| 2030 | Sanitary Waste | ||
| 2040 | Rain Water Drainage | ||
| 2090 | Other Plumbing Systems | ||
| 3020 | Heat Generating Systems | ||
| 3030 | Cooling Generating Systems | ||
| 3040 | Distribution Systems | ||
| 3050 | Terminal & Package Units | ||
| 3060 | Controls & Instrumentation | ||
| 3070 | Systems Testing & Balancing | ||
| 3090 | Other HVAC Systems and Equipment | ||
| 4040 | Sprinklers | ||
| 5010 | Electrical Service & Distribution | ||
| 5020 | Lighting & Branch Wiring | ||
| 5030 | Communications & Security | ||
| 5090 | Other Electrical Services | ||
| E | Equipment and Furnishings | ||
| 2010 | Fixed Furnishings | ||
| 0006 | F | Special Construction | |
| 1020 | Integrated Construction - Controlled Envirionment Labs | ||
| 0007 | G | Sitework | |
| 1010 | Site Clearing | ||
| 1020 | Site Demolition& Relocation | ||
| 1030 | Site Earthwork | ||
| 1040 | Hazardous Waste Remediation | ||
| 2020 | Parking Lots | ||
| 2030 | Pedestrian Paving | ||
| 2040 | Site Development | ||
| 2050 | Landscaping | ||
| 3010 | Water Supply | ||
| 3020 | Sanitary Sewer | ||
| 3030 | Storm Sewer | ||
| 3090 | Other Site Mechanical Utilities | ||
| 4010 | Electrical Distribution | ||
| 4020 | Site Lighting | ||
| 4030 | Site Communication |
Grand Total
| Mark-up Percentages | |
| General Administrative | |
| Bond | |
| Insurance | |
| Overhead (Home Office & Field Office) | |
| Profit |
| Contaminated Soil | ||
| Unit cost for disposal of contaminated soil at a subtitle D landfill (20 cubic yard minimum). | $/yd | |
| Unit cost for disposal of contaminated soil at a subtitle C landfill (20 cubic yard minimum). | $/yd |
CLIN 0005
Manchester Research Station Campus Addition - L+O Furniture, Fixtures and Equipment
| CLIN | Uniformat | Description | Cost (w/ mark-ups) |
| 0005 | E | Equipment & Furnishings | |
| 1090 | FF+E Schedule (Ref. LO A8.5.3) |
Grand Total
| Mark-up Percentages | |
| General Administrative | |
| Bond | |
| Insurance | |
| Overhead (Home Office & Field Office) | |
| Profit |
RAS
Manchester Research Station Campus Addition Proposal Template - RAS Building
| CLIN | Uniformat | Description | Cost (w/ mark-ups) |
| 0008 | A | Substructure | |
| 1010 | Standard Foundations | ||
| 1020 | Special Foundations | ||
| 1030 | Slab on Grade | ||
| 0009 | B | Shell | |
| 1020 | Roof Construction | ||
| 2010 | Exterior Walls | ||
| 2020 | Exterior Windows | ||
| 2030 | Exterior Doors | ||
| 3010 | Roof Coverings | ||
| 0010 | C | Interiors | |
| 1010 | Partitions | ||
| 1020 | Interior Doors | ||
| 1030 | Specialities | ||
| 3010 | Wall Finishes | ||
| 3020 | Floor Finishes | ||
| 3030 | Ceiling Finishes | ||
| 0011 | D | Services | |
| 2010 | Plumbing Fixtures | ||
| 2020 | Domestic Water Distribution | ||
| 2030 | Sanitary Waste | ||
| 2040 | Rain Water Drainage | ||
| 2090 | Other Plumbing Systems | ||
| 3020 | Heat Generating Systems | ||
| 3030 | Cooling Generating Systems | ||
| 3040 | Distribution Systems | ||
| 3050 | Terminal & Package Units | ||
| 3060 | Controls & Instrumentation | ||
| 3070 | Systems Testing & Balancing | ||
| 3090 | Other HVAC Systems and Equipment | ||
| 4040 | Sprinklers | ||
| 5010 | Electrical Service & Distribution | ||
| 5020 | Lighting & Branch Wiring | ||
| 5030 | Communications & Security | ||
| 5090 | Other Electrical Services | ||
| 0012 | E | Equipment and Furnishings | |
| 1090 | Other Equipment | ||
| 2010 | Fixed Furnishings | ||
| 2020 | Moveable Furnishings | ||
| 0013 | G | Sitework | |
| 1010 | Site Clearing | ||
| 1020 | Site Demolition& Relocation | ||
| 1030 | Site Earthwork | ||
| 1040 | Hazardous Waste Remediation | ||
| 2020 | Parking Lots | ||
| 2030 | Pedestrian Paving | ||
| 2040 | Site Development | ||
| 2050 | Landscaping | ||
| 3010 | Water Supply | ||
| 3020 | Sanitary Sewer | ||
| 3030 | Storm Sewer | ||
| 3040 | Heating Distribution | ||
| 3050 | Cooling Distribution | ||
| 4010 | Electrical Distribution | ||
| 4020 | Site Lighting | ||
| 4030 | Site Communication |
Grand Total
| Mark-up Percentages | |
| General Administrative | |
| Bond | |
| Insurance | |
| Overhead (Home Office & Field Office) | |
| Profit |
| Contaminated Soil | ||
| Unit cost for disposal of contaminated soil at a subtitle D landfill (20 cubic yard minimum). | $/yd | |
| Unit cost for disposal of contaminated soil at a subtitle C landfill (20 cubic yard minimum). | $/yd |
CLIN 0014
Manchester Research Station Campus Addition - L+O Landscaping
| CLIN | Uniformat | Description | Cost (w/ mark-ups) |
| 0014 | B | Roof Coverings | |
| 3010 | Garden Roof Plantings | ||
| G | Site Improvements | ||
| 2050 | Trees | ||
| 2050 | Roof Terrace Planter and Integral Bench | ||
| 2050 | Boulder/Decorative Rocks | ||
| 2050 | Shrubs and Groundcover | ||
| 2050 | Irrigation System |
Grand Total
| Mark-up Percentages | |
| General Administrative | |
| Bond | |
| Insurance | |
| Overhead (Home Office & Field Office) | |
| Profit |
CLIN 0015
Manchester Research Station Campus Addition - L+O Lab Equipment
| CLIN | Uniformat | Description | Cost (w/ mark-ups) |
| 0015 | E | Equipment | |
| 1090 | 4ft Hatchery Tanks (Ref. FTH Tank Schedule LO HO.1.2) | ||
| 1090 | 6ft Hatchery Tanks (Ref. FTH Tank Schedule LO HO.1.2) | ||
| 2010 | Lab Casework - Movable tables and base cabinets | ||
| 2010 | Tall Storage Cabinets | ||
| 2010 | Wire & Industrial Shelving |
Grand Total
| Mark-up Percentages | |
| General Administrative | |
| Bond | |
| Insurance | |
| Overhead (Home Office & Field Office) | |
| Profit |
CLIN 0016
Manchester Research Station Campus Addition - L+O Exterior Building Signage
| CLIN | Uniformat | Description | Cost (w/ mark-ups) |
| 0016 | B | Exterior Enclosure | |
| 2010 | Exterior Building Signage |
Grand Total
| Mark-up Percentages | |
| General Administrative | |
| Bond | |
| Insurance | |
| Overhead (Home Office & Field Office) | |
| Profit |
CLIN 0017
Manchester Research Station Campus Addition - L+O Premium Finishes
| CLIN | Uniformat | Description | Cost (w/ mark-ups) |
| 0017 | B | Exterior Windows | |
| 2010 | Premium for Operable Windows | ||
| C | Interior Finishes | ||
| 3010 | Premium for wood wall panel (WD3) | ||
| 3030 | Premium for wood ceiling |
Grand Total
| Mark-up Percentages | |
| General Administrative | |
| Bond | |
| Insurance | |
| Overhead (Home Office & Field Office) | |
| Profit |
CLIN 0018
Manchester Research Station Campus Addition - L+O East Parking Lot
| CLIN | Uniformat | Description | Cost (w/ mark-ups) |
| 0018 | G | Site Improvements | |
| 10 - 40 | East Parking Lot |
Grand Total
| Mark-up Percentages | |
| General Administrative | |
| Bond | |
| Insurance | |
| Overhead (Home Office & Field Office) | |
| Profit |