J.1(b)1 Cost-Price Template Workbook COSMC.xlsx

XLSX spreadsheet 58 KB Posted

Attached to
Center Occupational Safety, Health, Medical, System Safety and Mission Assurance Contract (COSMC)
Solicitation number
80ARC024R0009
Issued by

About this file

This document is a pricing template titled "J.1(b)1 Cost-Price Template Workbook COSMC.xlsx" related to a federal contract opportunity for the Center Occupational Safety, Health, Medical, System Safety and Mission Assurance Contract (COSMC).

The template provides instructions and worksheets for the offeror to input their pricing for the contract, including a Firm Fixed Price for a 42-day Phase-In period, as well as Cost-Plus-Fixed-Fee (CPFF) pricing for the Core Contract Management and IDIQ task orders. The template includes worksheets for the offeror to provide labor rates, indirect rate buildups, ODC pricing, and a schedule of subcontractors. The total evaluated price for the opportunity is $2,551,679. The contract has a base period of 1 year and 4 option periods. The procurement is being conducted by the National Aeronautics and Space Administration (NASA) Ames Research Center, and may also support the Armstrong Flight Research Center through task orders.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1-1 Instructions

Insert Offeror's Name
COSMC PRICING MATRIX
Instructions:
Overall Offeror Instructions for COSMC Pricing Matrix. Reference section L of the solicitation for additional details and requirements.
1. Enter Company Name in cell A1 of this sheet. Your company name will auto-populate on all worksheets/templates.
GREEN FIELDS are to be completed by the Offeror.
YELLOW FIELDS are auto-calculated.
WHITE FIELD are information only no actions are required.
2. Price Schedule Tab Instructions:

a. 1-2 Total Evaluated Price: Calculations for the Total Evaluated Price based on the evaluated prices for Phase-In, Core Contract Management and the IDIQ with CPFF task orders. This tab is auto-calculated.

b. 1-3 Phase-in: offeror to provide FFP price for 42 day Phase-In period, which shall show the price build-up that is consistent with the proposed phase-in plan.

c. 1-4 Core Contract Management: The Offerors shall complete all sections highlighted in GREEN with your most favorable pricing for each line item. The evaluated price for the Core Contract Mangement is auto-calculated and offerors shall not adjust the estimated hours included. Add/delete rows as necessary

e. 1-5 IDIQ with CPFF Task Orders: The Offerors shall complete all sections highlighted in GREEN with your most favorable pricing for each line item. The evaluated price for the IDIQ is auto-calculated and offerors shall not adjust the estimated hours included.

f. 1-6 CPFF Labor Rate Build-up: The Offerors shall complete all sections of the CPFF labor rate build-up tab for the base year and all option periods. The offerors shall propose their direct labor rate, all applicable indirect rates, FCCOM (if applicable), fixed fee amount, and any Prime burdens on subcontractors (if applicable). The offeror may insert additional columns if needed. The offeror shall include all formulas intact in thier proposal submission.

g. 1-7 Summary of Indirect Rates: The Offerors shall complete the summary and include all calculations used in deriving their composite indirect rates and FCCOM (if applicable) being proposed.

h. 1-8 Overhead-Fringe Build-up and 1-9 G&A Build-up: Offerors shall complete the indirect rate build-up exhibits in accordance with Section L of the solicitation.

i. 1-10 ODCs: Offerors shall fill-in and identify all burdens and fixed fee being applied to the estimated ODCs. Offerors shall include all calculations in their proposal.
j. 1-11 Schedule of Subcontractors: Offerors shall fill-in and identify all subcontractors (Major and Minor). This includes but not limited to, subcontractors address, contract type, and basis of selection. Reference section L of the solicitation for more detailed instructions.

80ARC024R0009 Attachment J.1(b)1

&P

1-2 Total Evaluated Price

Insert Offeror's Name
DescriptionEvaluated Price
Phase-In$0
Core Contract Management$0
IDIQ$2,551,679
Total Evaluated Price$2,551,679

80ARC024R0009 Attachment J.1(b)1

&P

1-3 Phase-In

Insert Offeror's Name
CLIN 001 Phase-InOfferors Proposed Amount
Firm Fixed Price-Phase-In
Evaluated Phase-in Price$0.00
*Phase-In Period of Performance is 42-days (1/2/2025 - 2/13/2025)
Enter FFP and buildup demonstrating consistency with Phase In Plan
Show build up of Price supporting approach

80ARC024R0009 Attachment J.1(b)1

&P

1-4 CPFF Core Contract Mgmt.

Insert Offeror's Name
Base PeriodOption Period 1Option Period 2Option Period 3Option Period 4Option to Extend
Evaluated Price per Period$0.00$0.00$0.00$0.00$0.00$0.00
Evaluated CPFF Labor Price$0.00
TypeNASA Labor Categories:Base Period (CLIN 002) 2/14/2025 - 2/13/2026Option Period 1 (CLIN 004) 2/14/2026 - 2/13/2027Option Period 2 (CLIN 005) 2/14/2027 – 2/13/2028Option Period 3 (CLIN 006) 2/14/2028 – 2/13/2029Option Period 4 (CLIN 007) 2/14/2029 – 2/13/2030
Year 1Year 2Year 3Year 4Year 5
Estimated HoursLabor RateExtendedEstimated HoursLabor RateExtendedEstimated HoursLabor RateExtendedEstimated HoursLabor RateExtendedEstimated HoursLabor RateExtended
CPFF$0.00$0.00$0.00$0.00$0.00
CPFF$0.00$0.00$0.00$0.00$0.00
CPFF$0.00$0.00$0.00$0.00$0.00
CPFF$0.00$0.00$0.00$0.00$0.00
CPFF$0.00$0.00$0.00$0.00$0.00
Evaluated Amount by Contract Year$0.00$0.00$0.00$0.00$0.00

80ARC024R0009 Attachment J.1(b)1

&P

1-5 CPFF IDIQ

Insert Offeror's Name
Year 1Year 2Year 3Year 4Year 5Option to Extend
Evaluated Price per Period$0.00$0.00$0.00$0.00$0.00$0.00
Evaluated CPFF Labor Price$0.00
CLIN 003
TypeNASA Labor Categories:Estimated Hours2/14/2025 – 2/13/20262/14/2026 – 2/13/20272/14/2027 – 2/13/20282/14/2028 – 2/13/20292/14/2029 – 2/13/2030
Year 1Year 2Year 3Year 4Year 5
Labor RateExtendedLabor RateExtendedLabor RateExtendedLabor RateExtendedLabor RateExtended
CPFFPhysician (Part Time Backup)376.0$0.00$0.00$0.00$0.00$0.00
CPFFMedical Director1,880.0$0.00$0.00$0.00$0.00$0.00
CPFFNurse Practitioner (NP)1,880.0$0.00$0.00$0.00$0.00$0.00
CPFFRegistered Nurse (RN)1,880.0$0.00$0.00$0.00$0.00$0.00
CPFFLicensed Vocational Nurse (LVN)1,880.0$0.00$0.00$0.00$0.00$0.00
CPFFOptomitrist188.0$0.00$0.00$0.00$0.00$0.00
CPFFClinic Operations Manager1,880.0$0.00$0.00$0.00$0.00$0.00
CPFFFitness Center Monitor1,880.0$0.00$0.00$0.00$0.00$0.00
CPFFFitness Trainer/Manager1,880.0$0.00$0.00$0.00$0.00$0.00
CPFFSenior Industrial Hygienist1,880.0$0.00$0.00$0.00$0.00$0.00
CPFFIndustrial Hygienist (Lead and Asbestos)1,880.0$0.00$0.00$0.00$0.00$0.00
CPFFIndustrial Hygiene Technician5,640.0$0.00$0.00$0.00$0.00$0.00
CPFFHealth Physics Technician1,880.0$0.00$0.00$0.00$0.00$0.00
CPFFHealth Physicist1,880.0$0.00$0.00$0.00$0.00$0.00
CPFFFire Protection Engineer1,880.0$0.00$0.00$0.00$0.00$0.00
CPFFSafety Engineer (Generalist)4,230.0$0.00$0.00$0.00$0.00$0.00
CPFFSafety Analyst3,760.0$0.00$0.00$0.00$0.00$0.00
CPFFSenior Safety Engineer5,640.0$0.00$0.00$0.00$0.00$0.00
CPFFTraining Specialist1,880.0$0.00$0.00$0.00$0.00$0.00
CPFFQuality Assurance Engineer Level I2,538.0$0.00$0.00$0.00$0.00$0.00
CPFFSoftware Assurance & Systems Safety Level I1,880.0$0.00$0.00$0.00$0.00$0.00
CPFFSystems Safety Engineer, Electrical Level I1,880.0$0.00$0.00$0.00$0.00$0.00
CPFFSoftware Assurance & Software Safety Level II1,880.0$0.00$0.00$0.00$0.00$0.00
CPFFSystems Safety Engineer Level I1,880.0$0.00$0.00$0.00$0.00$0.00
CPFFPressure Systems Safety Engineer1,880.0$0.00$0.00$0.00$0.00$0.00
CPFFAFRC SME I3,760.0$0.00$0.00$0.00$0.00$0.00
CPFFAFRC SME II3,760.0$0.00$0.00$0.00$0.00$0.00
Evaluated Amount by Contract Year$0.00$0.00$0.00$0.00$0.00

80ARC024R0009 Attachment J.1(b)1

&P

1-6 CPFF Labor Rate Build-up Insert Offeror's Name

TypeNASA Labor Categories:Offeror/Subcontractor NameLabor Category per DOLWD, CBA, GSA, or Offeror's established positionBasis of Direct Labor Rate (Ex. FPRP, Payroll, ERI Salary Survey, etc.)Year 1Year 2Year 3Year 4Year 5
Direct Labor RateFringeOverheadG&AFeeSubtotalPrime Burdens on SubconractorsFully Loaded Labor RateDirect Labor RateFringeOverheadG&AFeeSubtotalPrime Burdens on SubconractorsFully Loaded Labor RateDirect Labor RateFringeOverheadG&AFeeSubtotalPrime Burdens on SubconractorsFully Loaded Labor RateDirect Labor RateFringeOverheadG&AFeeSubtotalPrime Burdens on SubconractorsFully Loaded Labor RateDirect Labor RateFringeOverheadG&AFee
Escalation FactorEscalation FactorEscalation FactorEscalation Factor
(Insert Rate)(Insert Rate)(Insert Rate)(Insert Rate)(Insert Rate)(Insert Rate)(Insert Rate)(Insert Esc. Rate)(Insert Rate)(Insert Rate)(Insert Rate)(Insert Rate)(Insert Rate)(Insert Rate)(Insert Rate)(Insert Esc. Rate)(Insert Rate)(Insert Rate)(Insert Rate)(Insert Rate)(Insert Rate)(Insert Rate)(Insert Rate)(Insert Esc. Rate)(Insert Rate)(Insert Rate)(Insert Rate)(Insert Rate)(Insert Rate)(Insert Rate)(Insert Rate)(Insert Esc. Rate)(Insert Rate)(Insert Rate)(Insert Rate)(Insert Rate)
CPFFPhysician (Part Time Backup)
CPFFMedical Director
CPFFNurse Practitioner (NP)
CPFFRegistered Nurse (RN)
CPFFLicensed Vocational Nurse (LVN)
CPFFOptomitrist
CPFFClinic Operations Manager
CPFFFitness Center Monitor
CPFFFitness Trainer/Manager
CPFFSenior Industrial Hygienist
CPFFIndustrial Hygienist (Lead and Asbestos)
CPFFIndustrial Hygiene Technician
CPFFHealth Physics Technician
CPFFHealth Physicist
CPFFFire Protection Engineer
CPFFSafety Engineer (Generalist)
CPFFSafety Analyst
CPFFSenior Safety Engineer
CPFFTraining Specialist
CPFFSME I - Quality Assurance Engineer
CPFFSME I - Software Assurance & Systems Safety
CPFFSME I - Systems Safety Engineer, Electrical
CPFFSME II - Software Assurance & Software Safety
CPFFSME II - Systems Safety Engineer
CPFFPressure Systems Safety Engineer
CPFFAFRC SME I
CPFFAFRC SME II

80ARC024R0009 Attachment J.1(b)1

&P

1-7 Summary of Indirect Rates Summary of Indirect Cost Rates

[ ] Prime Contractor: __________________________________
[ ] Major Subcontractor: __________________________________
Fringe Benefits*Overhead**G&A
Example:
Portion of Contractor FY 16 From: _11/1/16_ to _4/30/17_46.00%75.00%25.00%
Portion of Contractor FY 17 From: _5/1/17_ to _10/31/1744.00%80.00%26.00%
Base Period Weighted Average45.00%77.50%25.50%
Base Period; Contract Year 1:
Portion of Contractor FY __ From: ________ to ________
Portion of Contractor FY __ From: ________ to ________
Base Period Average
Base Period; Contract Year 2:
Portion of Contractor FY __ From: ________ to ________
Portion of Contractor FY __ From: ________ to ________
Base Period Average
Option Period 1; Contract Year 3:
Portion of Contractor FY __ From: ________ to ________
Portion of Contractor FY __ From: ________ to ________
Option Period 1 Average
Option Period 1; Contract Year 4:
Portion of Contractor FY __ From: ________ to ________
Portion of Contractor FY __ From: ________ to ________
Option Period 1 Average
Option Period 2; Contract Year 5:
Portion of Contractor FY __ From: ________ to ________
Portion of Contractor FY __ From: ________ to ________
Option Period 2 Average
* Disregard if it is your normal accounting practice to include fringe benefits with overhead.
** If you plan to propose more than one overhead rate (e.g., Contractor Site OH and Customer Site OH), modify this
exhibit by adding the necessary number of columns to display all proposed overhead rates.
Offeror shall remove examples when submitting its proposal.
The example is provided to demonstrate formatting and how the data is to be submitted. The data in the example is not real and should not be interpreted as such.

80ARC024R0009 Attachment J.1(b)1

&P

1-8 Overhead-Fringe Build-up Overhead and/or Fringe Benefits (Composition of Burden Pool)

[ ] Prime Contractor: __________________________________
[ ] Major Subcontractor: _________________________________Overhead or Service Center Pool* = ___________________
Base of Application = __________________________

* Specify Type of Overhead Burden: Fringe Benefits, Labor, Onsite, Offsite, Engineering, Procurement, Service Center(s), etc.

OFFEROR'S FISCAL YEAR BEGINS ____________ AND ENDS ____________.

ActualForecast
Prior Year 3Prior Year 2Prior Year 1
Cost Elements withinContractorContractorContractorContractorContractorContractorContractorContractorContractorContractorContractor
the Overhead Burden PoolFiscal YearFiscal YearFiscal YearFiscal YearFiscal YearFiscal YearFiscal YearFiscal YearFiscal YearFiscal YearFiscal Year
20xx20xx20xx20xx20xx20xx20xx20xx20xx20xx20xx
Payroll Taxes
FICA (Social Security)
HIT (Medicare)
FUI (Federal Unemployment)
SUI (State Unemployment)
WC (Workers Comp)
Fringes:
Retirement
Health/Life Insurance
Paid Leave
Other
Other (Identify)
Facilities
Depreciation
Total Overhead Expenses$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Application Base ($)
Contractor FY Rate (%)ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!

80ARC024R0009 Attachment J.1(b)1

&P

1-9 G&A Build-up General and Administrative Expense (G&A)

[ ] Prime Contractor: __________________________________
[ ] Major Subcontractor: _________________________________Base of Application = __________________________

OFFEROR'S FISCAL YEAR BEGINS ____________ AND ENDS ____________.

ActualForecast
Prior Year 3Prior Year 2Prior Year 1
Cost Elements withinContractorContractorContractorContractorContractorContractorContractorContractorContractorContractorContractor
the Overhead Burden PoolFiscal YearFiscal YearFiscal YearFiscal YearFiscal YearFiscal YearFiscal YearFiscal YearFiscal YearFiscal YearFiscal Year
20xx20xx20xx20xx20xx20xx20xx20xx20xx20xx20xx

Labor: (Identify)

Labor Related Cost: (Taxes & Fringes Etc.)

B&P
IR&D
Corporate Allocations:
Other (Specify):
Facilities
Depreciation
Total G&A Expenses$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Distribution Base Dollars:
Existing Business Base
This Contract Base
Forecasted Business Base
Total Distribution Base $$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Calculated G&A Rates (%)ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!

80ARC024R0009 Attachment J.1(b)1

&P

1-10 ODCs

DescriptionCLINYearODC DescriptionEstimated AmountIndirect RateIndirect RateIndirect RateFixed FeeIndirect Evaluated AmountEvaluated Amount
(Specify)(Specify)(Specify)(Insert Rate)
IDIQ0031EAP$200,787$0$200,787
Supplies, Equipment, Calibration, Travel, Training$250,000$0$250,000
2EAP$206,709$0$206,709
Supplies, Equipment, Calibration, Travel, Training$250,000$0$250,000
3EAP$212,621$0$212,621
Supplies, Equipment, Calibration, Travel, Training$250,000$0$250,000
4EAP$218,766$0$218,766
Supplies, Equipment, Calibration, Travel, Training$250,000$0$250,000
5EAP$225,197$0$225,197
Supplies, Equipment, Calibration, Travel, Training$250,000$0$250,000
Option to Extend Services$237,599
Evaluated IDIQ ODC Price$2,551,679

80ARC024R0009 Attachment J.1(b)1

&P

1-11 Schedule of Subcontractors Schedule of Subcontracts

[ ] Prime Contractor: ______________________________________

Description of Work:

Number of quotes solicited/received
Subcontractor selected:Subcontract (1) Name and AddressSubcontract (2) Name and AddressSubcontract (3) Name and AddressSubcontract (4) Name and Address

Basis of Selection:*

Type of Subcontract:**

Cost
Fee/Profit
Total Amount Proposed$ - 0$ - 0$ - 0$ - 0
Affiliation with Prime:***

Cost/Price Analysis Performed by Prime:****

* Lowest price, teaming partner, technical qualifications, etc.
** FFP, CPAF, CPFF, T&M, etc.
*** Subcontractor, subsidiary, interdivisional, etc.
**** FAR 15.404-3(b) requires that contractors conduct appropriate cost or price analyses to establish the reasonableness of proposed subcontract prices
and include the results of these analyses in the price proposal. If response above is "No", explain why cost or price analysis was not performed and how
the Offeror determined that the proposed subcontract price was reasonable.

80ARC024R0009 Attachment J.1(b)1

&P

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .