J.1.b.7 - ARTS Past Performance Relevancy Matrix.xlsx
XLSX spreadsheet 23 KB Posted
- Attached to
- Aerospace Research, Technology, and Simulation (ARTS) Federal contract opportunity
- Solicitation number
- 80ARC024R0001
About this file
This document contains a template and instructions for an offeror's proposal in response to solicitation number 80ARC024R0001 from the National Aeronautics and Space Administration Ames Research Center. The solicitation is for the Aerospace Research, Technology, and Simulation contract to provide engineering services including operation, maintenance, and upgrades to simulation facilities and software located at NASA Ames Research Center and Langley Research Center. Offerors must complete matrices describing the proposed allocation of work under the contract's Performance Work Statement by the prime contractor and any major subcontractors. A separate matrix requires offerors to identify which of their past performance references included work relevant to each requirement in the Performance Work Statement. The templates provide instructions and examples for offerors to demonstrate their proposed breakdown of work and relevance of past performance references.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ARTS Industry Day Registration List.pdf | ||
| ARTS Industry Day Slides.pdf | ||
| 00. ARTS DRFP Cover Letter - Signed.pdf | ||
| J.1.a.9 - SCA WD 15-5641 REV 23.pdf | ||
| J.1.a.1 - ARTS PWS Aug 16 2023.pdf | ||
| J.1.a.2 - ARTS CDRLs.pdf | ||
| J.1.a.10 ARTS Government Funished Software.pdf | ||
| J.1.b.6 - ARTS Past Performance Questionnaire.docx | DOCX document | |
| J.1.b.1 - Cost Price Template Workbook.xlsx | XLSX spreadsheet | |
| J.1.b.2 - ARTS Labor Categories Descriptions.pdf | ||
| J.1.b.4 - Form CASB-CMF.pdf | ||
| 01. ARTS Sections A-M DRFP 80ARC024R0001.pdf | ||
| J.1.a.3 - ARTS IAGP.pdf | ||
| J.1.b.3 - SF1408-14e.pdf | ||
| J.1.b.5 - Contract Facilities Capital Cost of Money DD1861.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Proposed PWS Matrix
| Proposed Allocation of PWS Requirements by Team Member | |||||||
| State Percentage of Requirements Proposed to be Performed on this Contract for the Offeror and its Major Subcontractor(s) | |||||||
| PWS | |||||||
| Section | PWS | ||||||
| Description | (Insert Company Name of Prime Offeror) | (Insert Company Name of Major Subcontract #1, if proposed) | (Insert Company Name of Major Subcontract #2, if proposed) | (Insert Company Name of Major Subcontract #3, if proposed) | (Insert Company Name of Major Subcontract #4, if proposed) | Total | |
| 4.2.1 | Management/ | ||||||
| Administration | 0% | ||||||
| 4.3.3 | Software Development | 0% | |||||
| 4.3.4 | Systems Administration | 0% | |||||
| 4.3.5 | Aerospace Engineering and Applications Programming | 0% | |||||
| 4.3.6 | Graphics Programming | 0% | |||||
| 4.3.7 | Simulator Hardware and Mechanical Systems Engineering | 0% | |||||
| 4.3.7.1 | Maintenance of Facilities | 0% |
Instructions to Offerors:
The Offeror (Prime Contractor and its Major Subcontractor(s), if proposed) must complete this PWS Requirements Matrix to state its proposed approach for which PWS requirements for this contract will be performed by the Prime Contractor, and its Major Subcontractors, if proposed. For each PWS Section above, state the percentage of work the Prime Contractor and each of its Major Subcontractors, if proposed, will perform on this contract. The percentages assigned to the Prime Contractor and its Major Subcontractor(s), if proposed, should sum to 100% for each PWS Section in Column H. In any instance where the total for a PWS Section is less than 100% in Column H then the Government will conclude that the remaining percentage of work will be performed by the Offeror's subcontracts that do not meet the criteria to classify as a Major Subcontractor. In any instance where the total for a PWS Section is greater than 100% in Column H then the Government will reduce the percentage of work to be performed for that PWS Section for the Prime and each Major Subcontractor by the average percentage over 100% (i.e., (Proposed percentage over 100%/total prime and major subcontracts = amount each prime and major subcontractor proposed to perform). Enter numbers in the green fields only. The template will automatically sum the inputs. The Offeror may add additional columns between current Column E and F if the Offeror has more than 4 Major Subcontractors.
Examples to Offeror to Demonstrate How to Provide Inputs in Matrix:
Example 1 (1 Prime/1 Sub): Prime Contractor is proposed to perform all the work for Section 4.2.1 Management/Administration. Enter "100" in cell D4 and "0" in cells E4 through H4. Cell I4 will display "100%". Example 2 (1 Prime/2 Major Subs): Major Subs are proposed to perform all the work for PWS Section 4.3.7 Simulator Hardware and Mechanical equally. Enter "0" in cell D9, "50" in cell E9, "50" in cell F9, and "0" in cell G9 and H9. Cell H9 will display "100%". Please verify that inputs accurately reflect your proposed breakdown of PWS work before submitting the completed Matrix with the Offerors proposal.
DRFP Past Performance Relevancy Matrix 80ARC024R0001 Attachment J.1(b) 7
Past Performance Ref Matrix
| Proposed Relevance of Past Performance Contract References in Relations to the Contract PWS Requirements by Team Member (Prime and Major Subcontractors) | ||||||||
| Identify which PWS Requirements from this Contract were Performed on Each Past Performance Reference by Team Member (Prime and Major Subcontractors) | ||||||||
| Performed as a Prime or Subfactor on Past Performance Contract Reference | PWS Section 4.2.1 Management/Administration | PWS Section 4.3.3 Software Development | PWS Section 4.3.4 Systems Administration | PWS Section 4.3.5 Aerospace Engineering and Applications Programming | PWS Section 4.3.6 Graphics Programming | PWS Section 4.3.7 Simulator Hardware and Mechanical Systems Engineering | PWS Section 4.3.7.1 Maintenance of facilities | |
| Prime Offeror Past Performance References: |
(Insert Company Name)
| (Insert Contract Number and Name) |
| (Insert Contract Number and Name) |
| (Insert Contract Number and Name) |
| Major Subcontractor #1 Past Performance References: |
(Insert Company Name)
| (Insert Contract Number and Name) |
| (Insert Contract Number and Name) |
| (Insert Contract Number and Name) |
| Major Subcontractor #2 Past Performance References: |
(Insert Company Name)
| (Insert Contract Number and Name) |
| (Insert Contract Number and Name) |
| (Insert Contract Number and Name) |
| Major Subcontractor #3 Past Performance References: |
(Insert Company Name)
| (Insert Contract Number and Name) |
| (Insert Contract Number and Name) |
| (Insert Contract Number and Name) |
| Major Subcontractor #4 Past Performance References: |
(Insert Company Name)
| (Insert Contract Number and Name) |
| (Insert Contract Number and Name) |
| (Insert Contract Number and Name) |
Instructions to Offerors:
Offerors shall complete this past performance contract reference proposed relevancy matrix. In Column A, for each individual past performance contract reference, provide the name of the Prime Contractor or Major Subcontractor the past performance contract reference applies to. Also, include the contract number and contract name for each past performance contract reference. In Column B, include a “P” or “S” to indicate whether the Prime Offeror or its Major Subcontractor(s) was a Prime Contractor or a Subcontractor for that particular past performance contract reference. For all remaining columns, state an “X” in each column where the individual past performance contract reference included similar experience to the requirements in PWS Section identified in Row 3 of Columns B-L. The Offeror may add additional rows after row 23 if the Offeror has more than 4 Major Subcontractors.
&"Times New Roman,Regular"&10DRFP &"Times New Roman,Regular"&10Past Performance Relevancy Matrix &"Times New Roman,Regular"&10 80ARC024R0001 Attachment J.1(b)7
File details come from the government source that posted it. Updated .