This document package includes construction drawings and specifications for a basement water leakage abatement project at the U.S. Embassy in London. The drawings detail repair methods such as chemical grout injection of cracks and joints, cutting collector slots, and modifying drainage systems. Repair locations include the mat slab, walls, and geothermal heat pump vaults. Specifications require the contractor to follow all applicable codes, coordinate work, protect existing structures, and provide safety and security measures. The contractor must have experience injecting proprietary grouts and installing specified materials. This project is solicited under opportunity number 19GE5023Q0090 issued by the Department of State Office of Acquisition Management to address ongoing water leakage issues in the embassy basement.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TITLE:
SHEET No.:
CLIENT:
PROJECT:
SEAL:
1 2 3 4 5 6 7 8
A
B
C
D
E
F
Drawn by:
Checked by:
Date:
Project No:
Scale: AS NOTED
MARK
AV
MPC
06 MAY 2022
2021.2613.0
DATE DESCRIPTION
UNITED STATES
EMBASSY, LONDON
33 Nine Elms Lane, London SW11 7US, UK
BASEMENT
LEAKAGE REPAIRS
Contact: Mr. Thomas McCarthy, Senior Principal Ph. 202.909.4900
WISS, JANNEY, ELSTNER LIMITED
320 City Road, London EC1V 2NZ Registered Office: 10 John Street, London, WC1N 2EB.
The Registrar of Companies for England and Wales 10005377. Vat No.285 7984 31
1 2 3 4 5 6 7 8
WJE MATERIALS SCIENTISTS
Atlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | Detroit Doylestown | Honolulu | Houston | Indianapolis | London | Los Angeles Minneapolis | New Haven | Northbrook (HQ) | New York | Philadelphia Pittsburgh | Portland | Princeton | Raleigh | San Antonio | San Diego
San Francisco | Seattle South Florida | Washington, D.C.
Page Southerland Page, LLP 1615 M Street, NW, Suite 700 Washington, D.C., 20036
84594
06 MAY 2022
COVER & SHEET INDEX
S1.0
UNITED STATES EMBASSY, LONDON
PROJECT LOCATION:
UNITED STATES EMBASSY, LONDON
33 Nine Elms Lane, London SW11 7US UK
CLIENT:
PAGE SOUTHERLAND PAGE, LLP
1615 M Street, NW, Suite 700
Washington, D.C., 20036
CONTACT INFORMATION:
Mr. Thomas McCarthy, Senior Principal
(202) 909-4900
CONSULTING ENGINEER:
WISS, JANNEY, ELSTNER ASSOCIATES, INC.
9511 North Lake Creek Parkway
Austin, Texas 78717
512.257.4800 tel | 512.219.9883 fax
TEXAS REGISTERED ENGINEERING FIRM F-0093
- BASEMENT LEAKAGE REPAIRS -
No. SHEET TITLE
COVER & SHEET INDEX
LOWER LEVEL PLAN
REPAIR DETAILS
GENERAL NOTES & PROJECT INFORMATION
TASK ORDER 19GE5021F0304
REVISION 11
S1 .0
R
EV
IS
IO
N N
O . A
N D
D A
TE
S1 .1
S2 .0
S3 .0
REVISED SHEET
REVISION 1
06-22-2022 X X X
TITLE:
SHEET No.:
CLIENT:
PROJECT:
SEAL:
1 2 3 4 5 6 7 8
A
B
C
D
E
F
Drawn by:
Checked by:
Date:
Project No:
Scale: AS NOTED
MARK
AV
MPC
06 MAY 2022
2021.2613.0
DATE DESCRIPTION
UNITED STATES
EMBASSY, LONDON
33 Nine Elms Lane, London SW11 7US, UK
BASEMENT
LEAKAGE REPAIRS
Contact: Mr. Thomas McCarthy, Senior Principal Ph. 202.909.4900
WISS, JANNEY, ELSTNER LIMITED
320 City Road, London EC1V 2NZ Registered Office: 10 John Street, London, WC1N 2EB.
The Registrar of Companies for England and Wales 10005377. Vat No.285 7984 31
1 2 3 4 5 6 7 8
WJE MATERIALS SCIENTISTS
Atlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | Detroit Doylestown | Honolulu | Houston | Indianapolis | London | Los Angeles Minneapolis | New Haven | Northbrook (HQ) | New York | Philadelphia Pittsburgh | Portland | Princeton | Raleigh | San Antonio | San Diego
San Francisco | Seattle South Florida | Washington, D.C.
Page Southerland Page, LLP 1615 M Street, NW, Suite 700 Washington, D.C., 20036
84594
06 MAY 2022
GENERAL NOTES &
PROJECT INFORMATION
S1.1
GENERAL PROJECT NOTES
SCOPE OF PROJECT
THE SCOPE OF WORK IS DEFINED BY THE CONTRACT DRAWINGS AND SPECIFICATIONS,
INCLUDES ALL LABOR, MATERIALS, AND EQUIPMENT REQUIRED TO ACCOMPLISH THE
WORK. IN GENERAL, THE SCOPE OF WORK INCLUDES:
1. CHEMICAL GROUT INJECTION OF CONSTRUCTION JOINTS AND CRACKS TO MITIGATE
GROUND WATER LEAKAGE
2. AT LOCATIONS WHERE LIMITED ACCESS PREVENTS GROUTING OPERATIONS, CUTTING
AND GRINDING CHANNELS IN THE CONCRETE SURFACE TO COLLECT WATER AND
CONDUCT IT TO THE NEAREST DRAINAGE SOURCE.
CODE COMPLIANCE
1. ALL WORK PERFORMED SHALL BE COMPLETED IN ACCORDANCE WITH THE CURRENT
INTERNATIONAL BUILDING CODE, AS ADOPTED BY THE OFFICE OF OVERSEAS BUILDINGS
(OBO) OF THE UNITED STATES GOVERNMENT AND ANY OTHER OBO STANDARDS RULES
AND REGULATIONS .
COORDINATION
1. THE CONTRACTOR SHALL COORDINATE WORK BETWEEN ALL TRADES AND BRING ANY
CONFLICTS TO THE ENGINEER'S ATTENTION PRIOR TO THE WORK BEING PERFORMED.
CONTRACTOR IS RESPONSIBLE FOR ALL COSTS FOR CORRECTIONS ASSOCIATED WITH
THE CONTRACTOR'S FAILURE TO PROPERLY COORDINATE THE WORK.
FAMILIARITY WITH CONDITIONS
1. THE CONTRACTOR SHALL VISIT THE SITE OF THE PROPOSED WORK AND BECOME FULLY
ACQUAINTED WITH THE EXISTING CONDITIONS RELATING TO THE CONSTRUCTION, LABOR,
FACILITIES INVOLVED, DIFFICULTIES, RESTRICTIONS, AND THE LOGICAL EXTENSIONS OF
THE SCOPE ATTENDING THE PERFORMANCE OF THE CONTRACT.
2. THE CONTRACTOR SHALL THOROUGHLY EXAMINE AND BECOME FAMILIAR WITH THE
REQUIREMENTS OF THE CONTRACT DOCUMENTS.
3. THE CONTRACTOR SHALL IN NO WAY BE RELIEVED OF ANY OBLIGATION UNDER THE
CONTRACT BECAUSE OF THE CONTRACTOR'S FAILURE TO RECEIVE OR EXAMINE ANY
REQUIRED FORMS AND LEGAL DOCUMENTS, OR VISIT THE SITE AND BECOME FULLY
INFORMED OF ANY AND ALL CONDITIONS AND REQUIREMENTS THAT MAY IN ANY MANNER
AFFECT THE WORK TO BE PERFORMED.
EXISTING CONDITIONS
1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING DIMENSIONS AND CONDITIONS.
DIMENSIONS SHOWN ON THE PLANS ARE APPROXIMATE, AND FIELD MEASUREMENTS AND
VERIFICATION WILL BE REQUIRED TO COMPLETE THE WORK. CONTRACTOR SHALL OBTAIN
ALL FIELD MEASUREMENTS AS NECESSARY TO COORDINATE WITH, AND MATCH NEW
CONSTRUCTION TO EXISTING CONDITIONS.
2. SOME INFORMATION SHOWN IN THE DRAWINGS, IN REGARDS TO EXISTING FEATURES, IS
NECESSARILY CONJECTURAL DUE TO HIDDEN CONDITIONS AT THE TIME OF PREPARATION.
IF CONDITIONS EXIST THAT DIFFER FROM THE DRAWINGS, OR ARE NOT ADEQUATELY
DETAILED, INFORM THE ENGINEER AND ADDITIONAL DETAILS OR INTERPRETATION WILL BE
PROVIDED. DO NOT PROCEED WITHOUT VERIFICATION FROM THE ENGINEER.
USE OF THE PREMISES
1. ALL ON-SITE EQUIPMENT ACCESS STORAGE AND STAGING SHALL BE SCHEDULED WITH
THE OWNER'S REPRESENTATIVE 48 HOURS IN ADVANCE.
2. TYPICAL HOURS OF WORK, UNLESS ARRANGEMENTS ARE MADE WITH THE OWNER'S
REPRESENTATIVE: MONDAY - FRIDAY, 8:00am - 5:00pm
3. PRIOR TO COMMENCING WORK, COORDINATE HOURS OF WORK WITH THE OWNER OR
OWNER'S REPRESENTATIVE TO MINIMIZE THE IMPACT TO THE BUILDING'S DAILY
OPERATIONS.
4. PUBLIC ACCESS SHALL BE MAINTAINED DURING BUSINESS HOURS FOR THE DURATION
OF THE PROJECT.
5. ALL WORKERS SHALL BE PROPERLY AND SAFELY DRESSED, AND DISPLAY APPROPRIATE
BEHAVIOR AT ALL TIMES IN CONSTRUCTION AND ADJACENT AREAS.
TEMPORARY FACILITIES
1. ACCESS TO THE EXISTING WATER SUPPLY AND ELECTRICAL POWER WILL BE PROVIDED
BY THE OWNER. COORDINATE LOCATION AND PLACEMENT OF FIELD OFFICE, STAGING
AREAS, MATERIAL STORAGE, PORTABLE TOILETS, DUMPSTERS, AND ANY OTHER
FACILITIES REQUIRED FOR CONSTRUCTION WITH THE ENGINEER AND OWNER PRIOR TO
CONSTRUCTION.
SAFETY
1. CONTRACTOR IS SOLELY RESPONSIBLE FOR THEIR MEANS AND METHODS OF
CONSTRUCTION, AND SHALL PERFORM ALL WORK IN A SAFE AND CONSCIENTIOUS
MANNER TO PREVENT INJURIES.
2. CONTRACTOR IS SOLELY RESPONSIBLE FOR JOBSITE SAFETY, AND SHALL ENSURE
THEIR COMPLIANCE WITH OSHA STANDARDS FOR JOB SAFETY AND WORKER PROTECTION.
SAFETY MEASURES INCLUDE, BUT ARE NOT LIMITED TO ADEQUATE FALL PROTECTION,
ERECTION BRACING, BARRICADES, FENCING, SIGNS, FIRST-AID STATIONS, ETC.
3. THE CONTRACTOR SHALL PROVIDE WARNING SIGNS, BARRIERS OR BARRICADES, AS
REQUIRED AND OTHERWISE NECESSARY TO SEPARATE THE WORK AREAS FROM THE
PUBLIC, TO PREVENT PEDESTRIANS AND TRAFFIC FROM ENTERING THE WORK AREAS,
AND TO PROVIDE A SAFE AND ORDERLY FLOW OF PEDESTRIAN AND VEHICLE TRAFFIC
THROUGH REQUIRED ENTRANCES AND EXITS DURING THE REPAIR WORK.
FIRE PROTECTION
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIRE PROTECTION AND FIRE WATCH
DURING ALL CONSTRUCTION OPERATIONS.
2. NO SMOKING SHALL BE PERMITTED IN THE BUILDING. CONTRACTOR SHALL PROVIDE
AND MAINTAIN TEMPORARY FIRE EXTINGUISHERS UNTIL SUBSTANTIAL COMPLETION.
PROTECTION OF BUILDING & SITE
1. CONTRACTOR SHALL PROTECT ALL EXISTING BUILDING SURFACES FOR THE DURATION
OF THE PROJECT. ANY DAMAGE TO THE EXISTING STRUCTURE OR BUILDING CONTENTS
THAT HAS BEEN DETERMINED TO BE CAUSED BY THE CONTRACTOR, OR CONSTRUCTION
PRACTICES THAT OCCUR FOLLOWING THE NOTICE TO PROCEED, SHALL BE CORRECTED
TO PRE-CONSTRUCTION CONDITION AT NO EXPENSE TO THE OWNER.
2. CONTRACTOR SHALL PROTECT ALL EXISTING TREES, LANDSCAPING, SITE LIGHTING,
SIDEWALKS, AND SITE FEATURES FROM DAMAGE FOR THE DURATION OF THE PROJECT. IF
DAMAGED DURING THE COURSE OF WORK, THE CONTRACTOR SHALL REPAIR THE
DAMAGED AREAS TO PRE-CONSTRUCTION CONDITION PRIOR TO THE COMPLETION OF THE
PROJECT AT NO EXPENSE TO THE OWNER.
3. DO NOT PLACE LOADS ON THE STRUCTURE OR STORE DEMOLISHED MATERIALS ON THE
STRUCTURE IN A MANNER THAT WILL ENDANGER IT.
4. CONTRACTOR SHALL KEEP THE BUILDING SECURE AND WEATHER-TIGHT AT ALL TIMES.
5. ALL CONSTRUCTION MATERIALS KEPT IN ELEVATED AREAS, SUCH AS BALCONIES AND
ROOFS, SHALL REMAIN SECURED TO ENSURE THE MATERIALS DO NOT BECOME AIRBORNE
AND CAUSE INJURY OR DAMAGE TO THE BUILDING OR ITS OCCUPANTS.
BUILDING MAINTENANCE
1. CONTRACTOR SHALL PERFORM SITE CLEAN UP ON A REGULAR BASIS, AND MAINTAIN
THE SITE IN A CLEAN AND ORDERLY MANNER.
2. AREAS THAT ARE NOT DIRECTLY UNDER CONSTRUCTION THAT ARE USED AS PATHWAYS
TO TRANSPORT MATERIALS, OR TO REMOVE TRASH, ARE TO BE KEPT CLEAN AT ALL TIMES.
THIS MAINTENANCE INCLUDES, BUT NOT LIMITED TO DUSTING, SWEEPING, MOPPING, AND
PICKING UP TRASH AS REQUIRED TO KEEP THE AREAS FREE OF WASTE MATERIALS,
DEBRIS, AND RUBBISH.
QUALITY ASSURANCE
1. WHERE APPLICABLE, THE CONTRACTOR SHALL BE A LICENSED APPLICATOR OR
INSTALLER OF ALL SPECIFIED PROPRIETARY PRODUCTS AND MATERIALS.
2. THE PRESENCE OF THE ENGINEER OR TESTING AGENCY AT THE JOBSITE DOES NOT
RELIEVE CONTRACTOR OF THE OBLIGATION TO PERFORM THE WORK IN ACCORDANCE
WITH THE CONTRACT DOCUMENTS.
WARRANTY
1. ALL WORK PERFORMED SHALL BE WARRANTED BY THE GENERAL CONTRACTOR AS
REQUIRED BY THE CONTRACT.
4B - GROUT INJECTION REPAIR AT TYPICAL CRACK
DRILL INJECTION PORTS
@ 45° TO INTERSECT CRACK
AT MID-DEPTH OF ELEMENT
INTERIOR
ALTERNATE PORTS FROM
OTHER SIDE OF CRACK
4A - TYPICAL CRACK
INJECTION
PORT BELOW,
REF. 4B/S3.0
REPAIRED CRACK
BELOW, REF. 4B/A3.0
NOTE
NOTE 2
REMOVE / CLEAN EXCESS GROUT
OVERFLOW FROM INJECTION
PORTS AND CRACK PROFILE
S3.0 4B
4 TYPICAL INJECTION DETAIL AT MAT SLAB OR WALL
SCALE 1:10
NOTES
1. INJECT CRACKS AND JOINTS
WITH ACTIVE LEAKAGE, STAINING,
OR WIDTH GREATER THAN 0.5 mm.
INSPECT CONCRETE SURFACES
AND MARK CRACKS AND JOINT
WIDTHS PER SPECIFICATIONS.
2. SPACE INJECTION PORTS AS
REQUIRED TO ACHIEVE COMPLETE
FILLING OF CRACKS. REFERENCE
SPECIFICATIONS.
EXISTING
CRACK
2 TYPICAL COLLECTOR SLOT
SCALE 1:5
5 MAX.
CUT AND GRIND
TO FORM 50x50 SLOT
ADJACENT DIAPHRAGM WALL
OR INTERIOR PARTITION
1 TYPICAL INJECTION DETAILS AT MAT SLAB-TO-DIAPHRAGM WALL INTERFACE
SCALE 1:20
EXISTING VOID FORM
EXISTING MUD SLAB
EXISTING MUD SLAB
EXISTING MAT SLAB,
NOMINALLY 1M THICK
LOCATE ALL EXISTING
CONFLICTING
REINFORCEMENT
NON-DESTRUCTIVELY
PRIOR TO DRILLING
INJECTION HOLES, TYP.
EXISTING
DIAPHRAGM WALL
EXISTING
WATERSTOP, TYP.
WATER STOP AT
VERTICAL DIAPHRAGM
WALL PANEL JOINT
BEYOND, REF. 1B/S3.0
±5
1A - TYPICAL INJECTION SECTION BETWEEN VERTICAL PANEL JOINTS
DRILL INJECTION HOLE AS REQUIRED TO
INTERCEPT CONSTRUCTION JOINT AT
MID-DEPTH OF MAT SLAB. SET SPACINGS
AS NECESSARY TO FILL INTERFACE
EXISTING
DIAPHRAGM WALL
45°
EXISTING
WATERSTOP, TYP.
WATER STOP AT
VERTICAL DIAPHRAGM
WALL PANEL JOINT,
REF. 1C/S3.0
±5
1B - TYPICAL INJECTION SECTION AT VERTICAL PANEL JOINTS
EXISTING
WATERPROOFING
MEMBRANE
DRILL INJECTION HOLE AS REQUIRED TO
INTERCEPT CONSTRUCTION JOINT AT
MID-DEPTH OF MAT SLAB. SET SPACINGS
AS NECESSARY TO FILL INTERFACE
LOCATE ALL EXISTING
CONFLICTING REINFORCEMENT
NON-DESTRUCTIVELY PRIOR TO
DRILLING INJECTION HOLES, TYP.
REFER TO DETAIL 1A FOR TYPICAL
INFORMATION NOT SHOWN
3 TYPICAL REPAIR AT GSHP VAULTS
NOT TO SCALE
ROUTE OUT 20 MM GROOVE AND PACK WITH
KOSTER W 532 025 REPAIR MORTAR MIXED
WITH KOSTER SB BONDING EMULSION
EXISTING FLOOR SLAB
EXISTING
VAPOR BARRIER
EXISTING GRAVEL
DRAINAGE LAYER
EXISTING MUD SLAB,
NOMINALLY 1M THICK
EXISTING
GSHP PIPING
KOSTER NB SYSTEM
COATING ON SIDES
PUMP EQUIPMENT
PLATFORM
LL020
5A - BASE BID
5B - ALTERNATE 2
LL020
REMOVE AND
REINSTALL STEEL
STAIRS AS REQUIRED
INJECT JOINT BETWEEN RAISED
SLAB AND MAT SLAB SURFACE
INJECT JOINT
BETWEEN WALL
AND MAT SLAB
PUMP EQUIPMENT
PLATFORM
EXISTING CONCRETE
BASEMENT WALL
EXISTING 200 MM
CONCRETE
MASONRY WALL
SAWCUT CONCRETE SLAB AS
REQUIRED TO ACCESS MAT SURFACE.
EXTEND COLLECTOR CHANNEL TO
EXTERIOR WALL.
INSTALL COLLECTOR CHANNEL
PER DETAIL 2/S3.0 SIM.
EXISTING FLOOR DRAIN
SAWCUT/CHIP LEDGE AROUND PERIMETER TO
SUPPORT 25 MM GALVANIZED BAR GRATING
5 REPAIRS AT LL020, POND EQUIPMENT ROOM
SCALE 1:75
INJECT JOINT
BETWEEN WALL
AND MAT SLAB
INJECT JOINT BETWEEN
WALL AND MAT SLAB
EXISTING CONCRETE
BASEMENT WALL
EXISTING 200 MM
CONCRETE
MASONRY WALL
INJECT JOINT BETWEEN RAISED
SLAB AND MAT SLAB SURFACE
REMOVE AND
REINSTALL STEEL
STAIRS AS REQUIRED
TITLE:
SHEET No.:
CLIENT:
PROJECT:
SEAL:
1 2 3 4 5 6 7 8
A
B
C
D
E
F
Drawn by:
Checked by:
Date:
Project No:
Scale: AS NOTED
MARK
AV
MPC
06 MAY 2022
2021.2613.0
DATE DESCRIPTION
UNITED STATES
EMBASSY, LONDON
33 Nine Elms Lane, London SW11 7US, UK
BASEMENT
LEAKAGE REPAIRS
Contact: Mr. Thomas McCarthy, Senior Principal Ph. 202.909.4900
WISS, JANNEY, ELSTNER LIMITED
320 City Road, London EC1V 2NZ Registered Office: 10 John Street, London, WC1N 2EB.
The Registrar of Companies for England and Wales 10005377. Vat No.285 7984 31
1 2 3 4 5 6 7 8
WJE MATERIALS SCIENTISTS
Atlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | Detroit Doylestown | Honolulu | Houston | Indianapolis | London | Los Angeles Minneapolis | New Haven | Northbrook (HQ) | New York | Philadelphia Pittsburgh | Portland | Princeton | Raleigh | San Antonio | San Diego
San Francisco | Seattle South Florida | Washington, D.C.
Page Southerland Page, LLP 1615 M Street, NW, Suite 700 Washington, D.C., 20036
84594
06 MAY 2022
REPAIR DETAILS
S3.0
1C - PERSPECTIVE VIEW AT VERTICAL PANEL JOINTS
EXISTING MAT SLAB,
NOMINALLY 1M THICK
INJECTION HOLE. SET
SPACINGS AS NECESSARY
TO FILL INTERFACE
WATER STOP AT
VERTICAL DIAPHRAGM
WALL PANEL JOINT
EXISTING
WATERSTOP, TYP.
EXISTING
DIAPHRAGM WALL
TYPICAL AT ALL VERTICAL PANEL JOINTS WHERE
CHEMICAL GROUT INJECTION IS INDICATED.
REVISION 11