J-6 Pricing Sheet Sec B.xlsx

XLSX spreadsheet 48 KB Posted

Attached to
CPP Temporary Boiler Rental Installation & Removal Contract
Solicitation number
AOCSSB24R0069
Issued by

About this file

This document contains a pricing sheet for a federal contract opportunity issued by the Architect of the Capitol (AOC) for a Capitol Power Plant (CPP) Temporary Boiler Rental Installation & Removal Contract with Solicitation Number AOCSSB24R0069.

The contract has a base period from September 27, 2024 to September 26, 2025 with four additional one-year option periods and a final six-month option period exercisable under FAR 52.217-8. The pricing sheet provides a detailed breakdown of contract line items for mobilization, installation, rental, maintenance, and removal of the temporary boiler, as well as optional services like spare parts, emergency services, and scaffolding. Pricing is provided for the base period and each option period, with the total potential contract value over the full period of performance being $65,038.68. The North American Industry Classification System (NAICS) code is 238220 - Plumbing, Heating, and Air-Conditioning Contractors, and the Product Service Code is 4520 - Space and Water Heating Equipment.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sec-B Summary

Architect of the Capitol
RFP - AOCSSB24R0069
CAPITOL POWER PLANT (CPP)
CPP Temporary Boiler Rental Install & Removal Service Contract
Period of perfromance date
Base Period$10,500.00Period of performance - Base :9/27/24-9/26/25
Option Period 1$11,025.00Period of performance - Option Period 1 :9/27/25-9/26/26
Option Period 2$11,576.25Period of performance - Option Period 2 :9/27/26-9/26/27
Option Period 3$12,155.06Period of performance - Option Period 3 :9/27/27-9/26/28
Option Period 4$12,762.82Period of performance - Option Period 4:9/27/28-9/26/29
Option Period 5$7,019.55Period of performance Option 5: (FAR 52.217-8) :9/27/29-3/31/30
Base Period Total:$10,500.00Base Period
All Option Periods Total:$54,538.68ALL Option Periods

(To include FAR 52.217-8) Base & Option Periods Total: $65,038.68 Base & ALL Option Periods

________________________
LNAME, FNAME, MIDATE

SIGNATURE

***NOTE**

THIS PAGE WILL BE PRINTED, SIGNED, SCANNED AND SUBMITTED WITH ELECTRIONIC (EXEL)COPY OF PRICING SPREADSHEET

June 02, 2022

Base Period Section B - Supplies or Services and Prices/Costs

BASE PERIOD

Contract Line Item Number (CLIN) Commodity Name Quantity Unit of Issue Unit Price ($) Discounted Total Cost ($) 001 Mobilization and delivery of the Boiler 1.00 EA $0.00

002 Installation and start-up of the boiler 1.00 EA $0.00

003 Rental of the Boiler 6.00 Monthly $0.00

004 Demobilization and removal of the boiler 1.00 EA $0.00

005 (Optional) Boiler Maintenance - business hours (8 hr min) 1.00 JB $0.00

006 (Optional) Boiler Maintenance (afterhours hourly rate) 1.00 JB $0.00

007 (Optional) Emergency Services - business hours (8 hr min) 1.00 JB $0.00

008 (Optional) Emergency Services (afterhours hourly rate) 1.00 JB $0.00

009 (Optional) Spare Parts & Supplies (as needed only) 1.00 NTE $10,500.00 $10,500.00

010 (Optional) Pump Out of boiler 1.00 JB $0.00

011 (Optional) Gas Flow Meter 1.00 EA $0.00

012 Project Management 1.00 Service $0.00

013 (Optional) Scaffolding / Steps rental 1.00 EA $0.00

Base Period $10,500.00

Option Period 1 Section B - Supplies or Services and Prices/Costs

OPTION PERIOD 1

Contract Line Item Number (CLIN) Commodity Name Quantity Unit of Issue Unit Price ($) Discounted Total Cost ($)

101 Mobilization and delivery of the Boiler 1.00 EA $0.00

102 Installation and start-up of the boiler 1.00 EA $0.00

103 Rental of the Boiler 6.00 Monthly $0.00

104 Demobilization and removal of the boiler 1.00 EA $0.00

105 (Optional) Boiler Maintenance - business hours (8 hr min) 1.00 JB $0.00

106 (Optional) Boiler Maintenance (afterhours hourly rate) 1.00 JB $0.00

107 (Optional) Emergency Services - business hours (8 hr min) 1.00 JB $0.00

108 (Optional) Emergency Services (afterhours hourly rate) 1.00 JB $0.00

109 (Optional) Spare Parts & Supplies (as needed only) 1.00 NTE $11,025.00 $11,025.00

110 (Optional) Pump Out of boiler 1.00 EA $0.00

111 (Optional) Gas Flow Meter 1.00 EA $0.00

112 Project Management 1.00 Service $0.00

113 (Optional) Scaffolding / Steps rental 1.00 EA $0.00

Option Period 1: $11,025.00

Option Period 2 Section B - Supplies or Services and Prices/Costs

OPTION PERIOD 2

Contract Line Item Number (CLIN) Commodity Name Quantity Unit of Issue Unit Price ($) Discounted Total Cost ($)

201 Mobilization and delivery of the Boiler 1.00 EA $0.00

202 Installation and start-up of the boiler 1.00 EA $0.00

203 Rental of the Boiler 6.00 Monthly $0.00

204 Demobilization and removal of the boiler 1.00 EA $0.00

205 (Optional) Boiler Maintenance - business hours (8 hr min) 1.00 JB $0.00

206 (Optional) Boiler Maintenance (afterhours hourly rate) 1.00 JB $0.00

207 (Optional) Emergency Services - business hours (8 hr min) 1.00 JB $0.00

208 (Optional) Emergency Services (afterhours hourly rate) 1.00 JB $0.00

209 (Optional) Spare Parts & Supplies (as needed only) 1.00 NTE $11,576.25 $11,576.25

210 (Optional) Pump Out of boiler 1.00 EA $0.00

211 (Optional) Gas Flow Meter 1.00 EA $0.00

212 Project Management 1.00 Service $0.00

213 (Optional) Scaffolding / Steps rental 1.00 EA $0.00

Option Period 2: $11,576.25

Option Year 3 Section B - Supplies or Services and Prices/Costs

OPTION YEAR 3

Contract Line Item Number (CLIN)Commodity NameQuantityUnit of IssueUnit Price ($)Total Cost ($, Inc. disc)
301Option Year 3 - 6.2 General Requirements12.00MONTHLY$0.00$0.00
Labor rates table below shall be filled out for every option year.
302Option Year 3 - 6.3 Facility Management12.00MONTHLY$0.00$0.00

303 Option Year 3 - 6.4 Operations and Maintenance 12.00 MONTHLY $0.00 $0.00

304 Option Year 3 - 6.5 Project Manager 12.00 MONTHLY $0.00 $0.00

305 Option Year 3 - 6.6 On-Site Supervisor 12.00 MONTHLY $0.00 $0.00

306 Option Year 3 - 6.7 Stationary Engineer 12.00 MONTHLY $0.00 $0.00

307 Option Year 3 - 6.8 Pipefitter 12.00 MONTHLY $0.00 $0.00

308 Option Year 3 - 6.9 Designated Entry Attendant 12.00 MONTHLY $0.00 $0.00

309 Option Year 3 - 6.10 CMMS Technician 12.00 MONTHLY $0.00 $0.00

310 Option Year 3 - 6.11 Independent Safety Officer 12.00 MONTHLY $0.00 $0.00

Option Year 3 $0.00

LABOR RATES (OPTION YEAR 3)

List below all Labor Categories that will be used in the performance of the Time & Material portion of the services under this BPA.
Labor Category (Technician, Plumber,Welder, etc)Type of time worked: (Standard,Overtime,Holiday Overtime, Weekend Overime)QuantityUnit of IssueUnit Price ($)Discounted

Unit Price ($)

Project ManagerStandard time (Monday through Friday from 6:00 a.m. through 2:30 p.m. ET)1HR$0.00$0.00
On-Site SupervisorStandard time (Monday through Friday from 6:00 a.m. through 2:30 p.m. ET)1HR$0.00$0.00
Stationary EngineerStandard time (Monday through Friday from 6:00 a.m. through 2:30 p.m. ET)1HR$0.00$0.00
PipefitterStandard time (Monday through Friday from 6:00 a.m. through 2:30 p.m. ET)1HR$0.00$0.00
Designated Entry AttendantStandard time (Monday through Friday from 6:00 a.m. through 2:30 p.m. ET)1HR$0.00$0.00
CMMS TechnicianStandard time (Monday through Friday from 6:00 a.m. through 2:30 p.m. ET)1HR$0.00$0.00
Independent Safety OfficerStandard time (Monday through Friday from 6:00 a.m. through 2:30 p.m. ET)1HR$0.00$0.00
ElectricianStandard time (Monday through Friday from 6:00 a.m. through 2:30 p.m. ET)1HR$0.00$0.00
Electrician HelperStandard time (Monday through Friday from 6:00 a.m. through 2:30 p.m. ET)1HR$0.00$0.00
HVAC MechanicStandard time (Monday through Friday from 6:00 a.m. through 2:30 p.m. ET)1HR$0.00$0.00
Maintennace MechanicStandard time (Monday through Friday from 6:00 a.m. through 2:30 p.m. ET)1HR$0.00$0.00
WelderStandard time (Monday through Friday from 6:00 a.m. through 2:30 p.m. ET)1HR$0.00$0.00
Welding InspectorStandard time (Monday through Friday from 6:00 a.m. through 2:30 p.m. ET)1HR$0.00$0.00
PlumberStandard time (Monday through Friday from 6:00 a.m. through 2:30 p.m. ET)1HR$0.00$0.00
Pipe InsulatorStandard time (Monday through Friday from 6:00 a.m. through 2:30 p.m. ET)1HR$0.00$0.00
LaborerStandard time (Monday through Friday from 6:00 a.m. through 2:30 p.m. ET)1HR$0.00$0.00
WelderStandard time (Monday through Friday from 6:00 a.m. through 2:30 p.m. ET)1HR$0.00$0.00
Welding InspectorStandard time (Monday through Friday from 6:00 a.m. through 2:30 p.m. ET)1HR$0.00$0.00
PlumberStandard time (Monday through Friday from 6:00 a.m. through 2:30 p.m. ET)1HR$0.00$0.00
Pipe InsulatorStandard time (Monday through Friday from 6:00 a.m. through 2:30 p.m. ET)1HR$0.00$0.00
LaborerStandard time (Monday through Friday from 6:00 a.m. through 2:30 p.m. ET)1HR$0.00$0.00
Project ManagerOvertime (Monday through Friday outside of standard time hours or any time on Saturday)1HR$0.00$0.00
On-Site SupervisorOvertime (Monday through Friday outside of standard time hours or any time on Saturday)1HR$0.00$0.00
Stationary EngineerOvertime (Monday through Friday outside of standard time hours or any time on Saturday)1HR$0.00$0.00
PipefitterOvertime (Monday through Friday outside of standard time hours or any time on Saturday)1HR$0.00$0.00
Designated Entry AttendantOvertime (Monday through Friday outside of standard time hours or any time on Saturday)1HR$0.00$0.00
CMMS TechnicianOvertime (Monday through Friday outside of standard time hours or any time on Saturday)1HR$0.00$0.00
Independent Safety OfficerOvertime (Monday through Friday outside of standard time hours or any time on Saturday)1HR$0.00$0.00
ElectricianOvertime (Monday through Friday outside of standard time hours or any time on Saturday)1HR$0.00$0.00
Electrician HelperOvertime (Monday through Friday outside of standard time hours or any time on Saturday)1HR$0.00$0.00
HVAC MechanicOvertime (Monday through Friday outside of standard time hours or any time on Saturday)1HR$0.00$0.00
Maintennace MechanicOvertime (Monday through Friday outside of standard time hours or any time on Saturday)1HR$0.00$0.00
WelderOvertime (Monday through Friday outside of standard time hours or any time on Saturday)1HR$0.00$0.00
Welding InspectorOvertime (Monday through Friday outside of standard time hours or any time on Saturday)1HR$0.00$0.00
PlumberOvertime (Monday through Friday outside of standard time hours or any time on Saturday)1HR$0.00$0.00
Pipe InsulatorOvertime (Monday through Friday outside of standard time hours or any time on Saturday)1HR$0.00$0.00
LaborerOvertime (Monday through Friday outside of standard time hours or any time on Saturday)1HR$0.00$0.00
WelderOvertime (Monday through Friday outside of standard time hours or any time on Saturday)1HR$0.00$0.00
Welding InspectorOvertime (Monday through Friday outside of standard time hours or any time on Saturday)1HR$0.00$0.00
PlumberOvertime (Monday through Friday outside of standard time hours or any time on Saturday)1HR$0.00$0.00
Pipe InsulatorOvertime (Monday through Friday outside of standard time hours or any time on Saturday)1HR$0.00$0.00
LaborerOvertime (Monday through Friday outside of standard time hours or any time on Saturday)1HR$0.00$0.00
Project ManagerSunday Overtime (any time worked on a Sunday)1HR$0.00$0.00
On-Site SupervisorSunday Overtime (any time worked on a Sunday)1HR$0.00$0.00
Stationary EngineerSunday Overtime (any time worked on a Sunday)1HR$0.00$0.00
PipefitterSunday Overtime (any time worked on a Sunday)1HR$0.00$0.00
Designated Entry AttendantSunday Overtime (any time worked on a Sunday)1HR$0.00$0.00
CMMS TechnicianSunday Overtime (any time worked on a Sunday)1HR$0.00$0.00
Independent Safety OfficerSunday Overtime (any time worked on a Sunday)1HR$0.00$0.00
ElectricianSunday Overtime (any time worked on a Sunday)1HR$0.00$0.00
Electrician HelperSunday Overtime (any time worked on a Sunday)1HR$0.00$0.00
HVAC MechanicSunday Overtime (any time worked on a Sunday)1HR$0.00$0.00
Maintennace MechanicSunday Overtime (any time worked on a Sunday)1HR$0.00$0.00
WelderSunday Overtime (any time worked on a Sunday)1HR$0.00$0.00
Welding InspectorSunday Overtime (any time worked on a Sunday)1HR$0.00$0.00
PlumberSunday Overtime (any time worked on a Sunday)1HR$0.00$0.00
Pipe InsulatorSunday Overtime (any time worked on a Sunday)1HR$0.00$0.00
LaborerSunday Overtime (any time worked on a Sunday)1HR$0.00$0.00
WelderSunday Overtime (any time worked on a Sunday)1HR$0.00$0.00
Welding InspectorSunday Overtime (any time worked on a Sunday)1HR$0.00$0.00
PlumberSunday Overtime (any time worked on a Sunday)1HR$0.00$0.00
Pipe InsulatorSunday Overtime (any time worked on a Sunday)1HR$0.00$0.00
LaborerSunday Overtime (any time worked on a Sunday)1HR$0.00$0.00

Option Period 3 Section B - Supplies or Services and Prices/Costs

OPTION PERIOD 3

Contract Line Item Number (CLIN) Commodity Name Quantity Unit of Issue Unit Price ($) Discounted Total Cost ($)

301 Mobilization and delivery of the Boiler 1.00 EA $0.00

302 Installation and start-up of the boiler 1.00 EA $0.00

303 Rental of the Boiler 6.00 Monthly $0.00

304 Demobilization and removal of the boiler 1.00 EA $0.00

305 (Optional) Boiler Maintenance - business hours (8 hr min) 1.00 JB $0.00

306 (Optional) Boiler Maintenance (afterhours hourly rate) 1.00 JB $0.00

307 (Optional) Emergency Services - business hours (8 hr min) 1.00 JB $0.00

308 (Optional) Emergency Services (afterhours hourly rate) 1.00 JB $0.00

309 (Optional) Spare Parts & Supplies (as needed only) 1.00 NTE $12,155.06 $12,155.06

310 (Optional) Pump Out of boiler 1.00 EA $0.00

311 (Optional) Gas Flow Meter 1.00 EA $0.00

312 Project Management 1.00 Sevice $0.00

313 (Optional) Scaffolding / Steps rental 1.00 EA $0.00

Option Period 3: $12,155.06

Option Period 4 Section B - Supplies or Services and Prices/Costs

OPTION PERIOD 4

Contract Line Item Number (CLIN) Commodity Name Quantity Unit of Issue Unit Price ($) Discounted Total Cost ($)

401 Mobilization and delivery of the Boiler 1.00 EA $0.00

402 Installation and start-up of the boiler 1.00 EA $0.00

403 Rental of the Boiler 6.00 Monthly $0.00

404 Demobilization and removal of the boiler 1.00 EA $0.00

405 (Optional) Boiler Maintenance - business hours (8 hr min) 1.00 JB $0.00

406 (Optional) Boiler Maintenance (afterhours hourly rate) 1.00 JB $0.00

407 (Optional) Emergency Services - business hours (8 hr min) 1.00 JB $0.00

408 (Optional) Emergency Services (afterhours hourly rate) 1.00 JB $0.00

409 (Optional) Spare Parts & Supplies (as needed only) 1.00 NTE $12,762.82 $12,762.82

410 (Optional) Pump Out of boiler 1.00 EA $0.00

411 (Optional) Gas Flow Meter 1.00 EA $0.00

412 Project Management 1.00 Service $0.00

413 (Optional) Scaffolding / Steps rental 1.00 EA $0.00

Option Period 4: $12,762.82

Option 5 FAR 52.217-8 Section B - Supplies or Services and Prices/Costs

OPTION PERIOD 5 (PER FAR 52-217-8) 6 MONTH EXTENTION

Contract Line Item Number (CLIN) Commodity Name Quantity Unit of Issue Unit Price ($) Discounted Total Cost ($)

501 Option 5: Mobilization and delivery of the Boiler (PER FAR 52-217-8) 1.00 EA $0.00

502 Option 5: Installation and start-up of the boiler (PER FAR 52-217-8) 1.00 EA $0.00

503 Option 5: Rental of the Boiler (PER FAR 52-217-8) 6.00 Monthly $0.00

504 Option 5: Demobilization and removal of the boiler (PER FAR 52-217-8) 1.00 EA $0.00

505 (Optional) Option 5: Boiler Maintenance - business hours (8 hr min) (PER FAR 52-217-8) 1.00 JB $0.00

506 (Optional) Option 5: Boiler Maintenance (afterhours hourly rate) (PER FAR 52-217-8) 1.00 JB $0.00

507 (Optional) Option 5: Emergency Services - business hours (8 hr min)(PER FAR 52-217-8) 1.00 JB $0.00

508 (Optional) Option 5: Emergency Services (afterhours hourly rate) (PER FAR 52-217-8) 1.00 JB $0.00

509 (Optional) Option 5: Parts & Supplies (as needed only) (PER FAR 52-217-8) 1.00 NTE $7,019.55 $7,019.55

510 (Optional) Option 5: Pump Out of boiler (PER FAR 52-217-8) 1.00 EA $0.00

511 (Optional) Option 5: Gas Flow Meter (PER FAR 52-217-8) 1.00 EA $0.00

512 Option 5: Project Management (PER FAR 52-217-8) 1.00 Service $0.00

513 (Optional) Option 5: Scaffolding / Steps (PER FAR 52-217-8) 1.00 EA $0.00

Option Period 5: $7,019.55