J-6 Pricing Sheet Sec B.xlsx
XLSX spreadsheet 48 KB Posted
- Solicitation number
- AOCSSB24R0069
- Issued by
-
Architect of the Capitol
About this file
This document contains a pricing sheet for a federal contract opportunity issued by the Architect of the Capitol (AOC) for a Capitol Power Plant (CPP) Temporary Boiler Rental Installation & Removal Contract with Solicitation Number AOCSSB24R0069.
The contract has a base period from September 27, 2024 to September 26, 2025 with four additional one-year option periods and a final six-month option period exercisable under FAR 52.217-8. The pricing sheet provides a detailed breakdown of contract line items for mobilization, installation, rental, maintenance, and removal of the temporary boiler, as well as optional services like spare parts, emergency services, and scaffolding. Pricing is provided for the base period and each option period, with the total potential contract value over the full period of performance being $65,038.68. The North American Industry Classification System (NAICS) code is 238220 - Plumbing, Heating, and Air-Conditioning Contractors, and the Product Service Code is 4520 - Space and Water Heating Equipment.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sec-B Summary
| Architect of the Capitol |
| RFP - AOCSSB24R0069 |
| CAPITOL POWER PLANT (CPP) |
| CPP Temporary Boiler Rental Install & Removal Service Contract |
| Period of perfromance date | |||||
| Base Period | $10,500.00 | Period of performance - Base : | 9/27/24 | - | 9/26/25 |
| Option Period 1 | $11,025.00 | Period of performance - Option Period 1 : | 9/27/25 | - | 9/26/26 |
| Option Period 2 | $11,576.25 | Period of performance - Option Period 2 : | 9/27/26 | - | 9/26/27 |
| Option Period 3 | $12,155.06 | Period of performance - Option Period 3 : | 9/27/27 | - | 9/26/28 |
| Option Period 4 | $12,762.82 | Period of performance - Option Period 4: | 9/27/28 | - | 9/26/29 |
| Option Period 5 | $7,019.55 | Period of performance Option 5: (FAR 52.217-8) : | 9/27/29 | - | 3/31/30 |
| Base Period Total: | $10,500.00 | Base Period |
| All Option Periods Total: | $54,538.68 | ALL Option Periods |
(To include FAR 52.217-8) Base & Option Periods Total: $65,038.68 Base & ALL Option Periods
| ________________________ | |
| LNAME, FNAME, MI | DATE |
SIGNATURE
***NOTE**
THIS PAGE WILL BE PRINTED, SIGNED, SCANNED AND SUBMITTED WITH ELECTRIONIC (EXEL)COPY OF PRICING SPREADSHEET
June 02, 2022
Base Period Section B - Supplies or Services and Prices/Costs
BASE PERIOD
Contract Line Item Number (CLIN) Commodity Name Quantity Unit of Issue Unit Price ($) Discounted Total Cost ($) 001 Mobilization and delivery of the Boiler 1.00 EA $0.00
002 Installation and start-up of the boiler 1.00 EA $0.00
003 Rental of the Boiler 6.00 Monthly $0.00
004 Demobilization and removal of the boiler 1.00 EA $0.00
005 (Optional) Boiler Maintenance - business hours (8 hr min) 1.00 JB $0.00
006 (Optional) Boiler Maintenance (afterhours hourly rate) 1.00 JB $0.00
007 (Optional) Emergency Services - business hours (8 hr min) 1.00 JB $0.00
008 (Optional) Emergency Services (afterhours hourly rate) 1.00 JB $0.00
009 (Optional) Spare Parts & Supplies (as needed only) 1.00 NTE $10,500.00 $10,500.00
010 (Optional) Pump Out of boiler 1.00 JB $0.00
011 (Optional) Gas Flow Meter 1.00 EA $0.00
012 Project Management 1.00 Service $0.00
013 (Optional) Scaffolding / Steps rental 1.00 EA $0.00
Base Period $10,500.00
Option Period 1 Section B - Supplies or Services and Prices/Costs
OPTION PERIOD 1
Contract Line Item Number (CLIN) Commodity Name Quantity Unit of Issue Unit Price ($) Discounted Total Cost ($)
101 Mobilization and delivery of the Boiler 1.00 EA $0.00
102 Installation and start-up of the boiler 1.00 EA $0.00
103 Rental of the Boiler 6.00 Monthly $0.00
104 Demobilization and removal of the boiler 1.00 EA $0.00
105 (Optional) Boiler Maintenance - business hours (8 hr min) 1.00 JB $0.00
106 (Optional) Boiler Maintenance (afterhours hourly rate) 1.00 JB $0.00
107 (Optional) Emergency Services - business hours (8 hr min) 1.00 JB $0.00
108 (Optional) Emergency Services (afterhours hourly rate) 1.00 JB $0.00
109 (Optional) Spare Parts & Supplies (as needed only) 1.00 NTE $11,025.00 $11,025.00
110 (Optional) Pump Out of boiler 1.00 EA $0.00
111 (Optional) Gas Flow Meter 1.00 EA $0.00
112 Project Management 1.00 Service $0.00
113 (Optional) Scaffolding / Steps rental 1.00 EA $0.00
Option Period 1: $11,025.00
Option Period 2 Section B - Supplies or Services and Prices/Costs
OPTION PERIOD 2
Contract Line Item Number (CLIN) Commodity Name Quantity Unit of Issue Unit Price ($) Discounted Total Cost ($)
201 Mobilization and delivery of the Boiler 1.00 EA $0.00
202 Installation and start-up of the boiler 1.00 EA $0.00
203 Rental of the Boiler 6.00 Monthly $0.00
204 Demobilization and removal of the boiler 1.00 EA $0.00
205 (Optional) Boiler Maintenance - business hours (8 hr min) 1.00 JB $0.00
206 (Optional) Boiler Maintenance (afterhours hourly rate) 1.00 JB $0.00
207 (Optional) Emergency Services - business hours (8 hr min) 1.00 JB $0.00
208 (Optional) Emergency Services (afterhours hourly rate) 1.00 JB $0.00
209 (Optional) Spare Parts & Supplies (as needed only) 1.00 NTE $11,576.25 $11,576.25
210 (Optional) Pump Out of boiler 1.00 EA $0.00
211 (Optional) Gas Flow Meter 1.00 EA $0.00
212 Project Management 1.00 Service $0.00
213 (Optional) Scaffolding / Steps rental 1.00 EA $0.00
Option Period 2: $11,576.25
Option Year 3 Section B - Supplies or Services and Prices/Costs
OPTION YEAR 3
| Contract Line Item Number (CLIN) | Commodity Name | Quantity | Unit of Issue | Unit Price ($) | Total Cost ($, Inc. disc) |
| 301 | Option Year 3 - 6.2 General Requirements | 12.00 | MONTHLY | $0.00 | $0.00 |
| Labor rates table below shall be filled out for every option year. | |||||
| 302 | Option Year 3 - 6.3 Facility Management | 12.00 | MONTHLY | $0.00 | $0.00 |
303 Option Year 3 - 6.4 Operations and Maintenance 12.00 MONTHLY $0.00 $0.00
304 Option Year 3 - 6.5 Project Manager 12.00 MONTHLY $0.00 $0.00
305 Option Year 3 - 6.6 On-Site Supervisor 12.00 MONTHLY $0.00 $0.00
306 Option Year 3 - 6.7 Stationary Engineer 12.00 MONTHLY $0.00 $0.00
307 Option Year 3 - 6.8 Pipefitter 12.00 MONTHLY $0.00 $0.00
308 Option Year 3 - 6.9 Designated Entry Attendant 12.00 MONTHLY $0.00 $0.00
309 Option Year 3 - 6.10 CMMS Technician 12.00 MONTHLY $0.00 $0.00
310 Option Year 3 - 6.11 Independent Safety Officer 12.00 MONTHLY $0.00 $0.00
Option Year 3 $0.00
LABOR RATES (OPTION YEAR 3)
| List below all Labor Categories that will be used in the performance of the Time & Material portion of the services under this BPA. | |||||
| Labor Category (Technician, Plumber,Welder, etc) | Type of time worked: (Standard,Overtime,Holiday Overtime, Weekend Overime) | Quantity | Unit of Issue | Unit Price ($) | Discounted |
Unit Price ($)
| Project Manager | Standard time (Monday through Friday from 6:00 a.m. through 2:30 p.m. ET) | 1 | HR | $0.00 | $0.00 |
| On-Site Supervisor | Standard time (Monday through Friday from 6:00 a.m. through 2:30 p.m. ET) | 1 | HR | $0.00 | $0.00 |
| Stationary Engineer | Standard time (Monday through Friday from 6:00 a.m. through 2:30 p.m. ET) | 1 | HR | $0.00 | $0.00 |
| Pipefitter | Standard time (Monday through Friday from 6:00 a.m. through 2:30 p.m. ET) | 1 | HR | $0.00 | $0.00 |
| Designated Entry Attendant | Standard time (Monday through Friday from 6:00 a.m. through 2:30 p.m. ET) | 1 | HR | $0.00 | $0.00 |
| CMMS Technician | Standard time (Monday through Friday from 6:00 a.m. through 2:30 p.m. ET) | 1 | HR | $0.00 | $0.00 |
| Independent Safety Officer | Standard time (Monday through Friday from 6:00 a.m. through 2:30 p.m. ET) | 1 | HR | $0.00 | $0.00 |
| Electrician | Standard time (Monday through Friday from 6:00 a.m. through 2:30 p.m. ET) | 1 | HR | $0.00 | $0.00 |
| Electrician Helper | Standard time (Monday through Friday from 6:00 a.m. through 2:30 p.m. ET) | 1 | HR | $0.00 | $0.00 |
| HVAC Mechanic | Standard time (Monday through Friday from 6:00 a.m. through 2:30 p.m. ET) | 1 | HR | $0.00 | $0.00 |
| Maintennace Mechanic | Standard time (Monday through Friday from 6:00 a.m. through 2:30 p.m. ET) | 1 | HR | $0.00 | $0.00 |
| Welder | Standard time (Monday through Friday from 6:00 a.m. through 2:30 p.m. ET) | 1 | HR | $0.00 | $0.00 |
| Welding Inspector | Standard time (Monday through Friday from 6:00 a.m. through 2:30 p.m. ET) | 1 | HR | $0.00 | $0.00 |
| Plumber | Standard time (Monday through Friday from 6:00 a.m. through 2:30 p.m. ET) | 1 | HR | $0.00 | $0.00 |
| Pipe Insulator | Standard time (Monday through Friday from 6:00 a.m. through 2:30 p.m. ET) | 1 | HR | $0.00 | $0.00 |
| Laborer | Standard time (Monday through Friday from 6:00 a.m. through 2:30 p.m. ET) | 1 | HR | $0.00 | $0.00 |
| Welder | Standard time (Monday through Friday from 6:00 a.m. through 2:30 p.m. ET) | 1 | HR | $0.00 | $0.00 |
| Welding Inspector | Standard time (Monday through Friday from 6:00 a.m. through 2:30 p.m. ET) | 1 | HR | $0.00 | $0.00 |
| Plumber | Standard time (Monday through Friday from 6:00 a.m. through 2:30 p.m. ET) | 1 | HR | $0.00 | $0.00 |
| Pipe Insulator | Standard time (Monday through Friday from 6:00 a.m. through 2:30 p.m. ET) | 1 | HR | $0.00 | $0.00 |
| Laborer | Standard time (Monday through Friday from 6:00 a.m. through 2:30 p.m. ET) | 1 | HR | $0.00 | $0.00 |
| Project Manager | Overtime (Monday through Friday outside of standard time hours or any time on Saturday) | 1 | HR | $0.00 | $0.00 |
| On-Site Supervisor | Overtime (Monday through Friday outside of standard time hours or any time on Saturday) | 1 | HR | $0.00 | $0.00 |
| Stationary Engineer | Overtime (Monday through Friday outside of standard time hours or any time on Saturday) | 1 | HR | $0.00 | $0.00 |
| Pipefitter | Overtime (Monday through Friday outside of standard time hours or any time on Saturday) | 1 | HR | $0.00 | $0.00 |
| Designated Entry Attendant | Overtime (Monday through Friday outside of standard time hours or any time on Saturday) | 1 | HR | $0.00 | $0.00 |
| CMMS Technician | Overtime (Monday through Friday outside of standard time hours or any time on Saturday) | 1 | HR | $0.00 | $0.00 |
| Independent Safety Officer | Overtime (Monday through Friday outside of standard time hours or any time on Saturday) | 1 | HR | $0.00 | $0.00 |
| Electrician | Overtime (Monday through Friday outside of standard time hours or any time on Saturday) | 1 | HR | $0.00 | $0.00 |
| Electrician Helper | Overtime (Monday through Friday outside of standard time hours or any time on Saturday) | 1 | HR | $0.00 | $0.00 |
| HVAC Mechanic | Overtime (Monday through Friday outside of standard time hours or any time on Saturday) | 1 | HR | $0.00 | $0.00 |
| Maintennace Mechanic | Overtime (Monday through Friday outside of standard time hours or any time on Saturday) | 1 | HR | $0.00 | $0.00 |
| Welder | Overtime (Monday through Friday outside of standard time hours or any time on Saturday) | 1 | HR | $0.00 | $0.00 |
| Welding Inspector | Overtime (Monday through Friday outside of standard time hours or any time on Saturday) | 1 | HR | $0.00 | $0.00 |
| Plumber | Overtime (Monday through Friday outside of standard time hours or any time on Saturday) | 1 | HR | $0.00 | $0.00 |
| Pipe Insulator | Overtime (Monday through Friday outside of standard time hours or any time on Saturday) | 1 | HR | $0.00 | $0.00 |
| Laborer | Overtime (Monday through Friday outside of standard time hours or any time on Saturday) | 1 | HR | $0.00 | $0.00 |
| Welder | Overtime (Monday through Friday outside of standard time hours or any time on Saturday) | 1 | HR | $0.00 | $0.00 |
| Welding Inspector | Overtime (Monday through Friday outside of standard time hours or any time on Saturday) | 1 | HR | $0.00 | $0.00 |
| Plumber | Overtime (Monday through Friday outside of standard time hours or any time on Saturday) | 1 | HR | $0.00 | $0.00 |
| Pipe Insulator | Overtime (Monday through Friday outside of standard time hours or any time on Saturday) | 1 | HR | $0.00 | $0.00 |
| Laborer | Overtime (Monday through Friday outside of standard time hours or any time on Saturday) | 1 | HR | $0.00 | $0.00 |
| Project Manager | Sunday Overtime (any time worked on a Sunday) | 1 | HR | $0.00 | $0.00 |
| On-Site Supervisor | Sunday Overtime (any time worked on a Sunday) | 1 | HR | $0.00 | $0.00 |
| Stationary Engineer | Sunday Overtime (any time worked on a Sunday) | 1 | HR | $0.00 | $0.00 |
| Pipefitter | Sunday Overtime (any time worked on a Sunday) | 1 | HR | $0.00 | $0.00 |
| Designated Entry Attendant | Sunday Overtime (any time worked on a Sunday) | 1 | HR | $0.00 | $0.00 |
| CMMS Technician | Sunday Overtime (any time worked on a Sunday) | 1 | HR | $0.00 | $0.00 |
| Independent Safety Officer | Sunday Overtime (any time worked on a Sunday) | 1 | HR | $0.00 | $0.00 |
| Electrician | Sunday Overtime (any time worked on a Sunday) | 1 | HR | $0.00 | $0.00 |
| Electrician Helper | Sunday Overtime (any time worked on a Sunday) | 1 | HR | $0.00 | $0.00 |
| HVAC Mechanic | Sunday Overtime (any time worked on a Sunday) | 1 | HR | $0.00 | $0.00 |
| Maintennace Mechanic | Sunday Overtime (any time worked on a Sunday) | 1 | HR | $0.00 | $0.00 |
| Welder | Sunday Overtime (any time worked on a Sunday) | 1 | HR | $0.00 | $0.00 |
| Welding Inspector | Sunday Overtime (any time worked on a Sunday) | 1 | HR | $0.00 | $0.00 |
| Plumber | Sunday Overtime (any time worked on a Sunday) | 1 | HR | $0.00 | $0.00 |
| Pipe Insulator | Sunday Overtime (any time worked on a Sunday) | 1 | HR | $0.00 | $0.00 |
| Laborer | Sunday Overtime (any time worked on a Sunday) | 1 | HR | $0.00 | $0.00 |
| Welder | Sunday Overtime (any time worked on a Sunday) | 1 | HR | $0.00 | $0.00 |
| Welding Inspector | Sunday Overtime (any time worked on a Sunday) | 1 | HR | $0.00 | $0.00 |
| Plumber | Sunday Overtime (any time worked on a Sunday) | 1 | HR | $0.00 | $0.00 |
| Pipe Insulator | Sunday Overtime (any time worked on a Sunday) | 1 | HR | $0.00 | $0.00 |
| Laborer | Sunday Overtime (any time worked on a Sunday) | 1 | HR | $0.00 | $0.00 |
Option Period 3 Section B - Supplies or Services and Prices/Costs
OPTION PERIOD 3
Contract Line Item Number (CLIN) Commodity Name Quantity Unit of Issue Unit Price ($) Discounted Total Cost ($)
301 Mobilization and delivery of the Boiler 1.00 EA $0.00
302 Installation and start-up of the boiler 1.00 EA $0.00
303 Rental of the Boiler 6.00 Monthly $0.00
304 Demobilization and removal of the boiler 1.00 EA $0.00
305 (Optional) Boiler Maintenance - business hours (8 hr min) 1.00 JB $0.00
306 (Optional) Boiler Maintenance (afterhours hourly rate) 1.00 JB $0.00
307 (Optional) Emergency Services - business hours (8 hr min) 1.00 JB $0.00
308 (Optional) Emergency Services (afterhours hourly rate) 1.00 JB $0.00
309 (Optional) Spare Parts & Supplies (as needed only) 1.00 NTE $12,155.06 $12,155.06
310 (Optional) Pump Out of boiler 1.00 EA $0.00
311 (Optional) Gas Flow Meter 1.00 EA $0.00
312 Project Management 1.00 Sevice $0.00
313 (Optional) Scaffolding / Steps rental 1.00 EA $0.00
Option Period 3: $12,155.06
Option Period 4 Section B - Supplies or Services and Prices/Costs
OPTION PERIOD 4
Contract Line Item Number (CLIN) Commodity Name Quantity Unit of Issue Unit Price ($) Discounted Total Cost ($)
401 Mobilization and delivery of the Boiler 1.00 EA $0.00
402 Installation and start-up of the boiler 1.00 EA $0.00
403 Rental of the Boiler 6.00 Monthly $0.00
404 Demobilization and removal of the boiler 1.00 EA $0.00
405 (Optional) Boiler Maintenance - business hours (8 hr min) 1.00 JB $0.00
406 (Optional) Boiler Maintenance (afterhours hourly rate) 1.00 JB $0.00
407 (Optional) Emergency Services - business hours (8 hr min) 1.00 JB $0.00
408 (Optional) Emergency Services (afterhours hourly rate) 1.00 JB $0.00
409 (Optional) Spare Parts & Supplies (as needed only) 1.00 NTE $12,762.82 $12,762.82
410 (Optional) Pump Out of boiler 1.00 EA $0.00
411 (Optional) Gas Flow Meter 1.00 EA $0.00
412 Project Management 1.00 Service $0.00
413 (Optional) Scaffolding / Steps rental 1.00 EA $0.00
Option Period 4: $12,762.82
Option 5 FAR 52.217-8 Section B - Supplies or Services and Prices/Costs
OPTION PERIOD 5 (PER FAR 52-217-8) 6 MONTH EXTENTION
Contract Line Item Number (CLIN) Commodity Name Quantity Unit of Issue Unit Price ($) Discounted Total Cost ($)
501 Option 5: Mobilization and delivery of the Boiler (PER FAR 52-217-8) 1.00 EA $0.00
502 Option 5: Installation and start-up of the boiler (PER FAR 52-217-8) 1.00 EA $0.00
503 Option 5: Rental of the Boiler (PER FAR 52-217-8) 6.00 Monthly $0.00
504 Option 5: Demobilization and removal of the boiler (PER FAR 52-217-8) 1.00 EA $0.00
505 (Optional) Option 5: Boiler Maintenance - business hours (8 hr min) (PER FAR 52-217-8) 1.00 JB $0.00
506 (Optional) Option 5: Boiler Maintenance (afterhours hourly rate) (PER FAR 52-217-8) 1.00 JB $0.00
507 (Optional) Option 5: Emergency Services - business hours (8 hr min)(PER FAR 52-217-8) 1.00 JB $0.00
508 (Optional) Option 5: Emergency Services (afterhours hourly rate) (PER FAR 52-217-8) 1.00 JB $0.00
509 (Optional) Option 5: Parts & Supplies (as needed only) (PER FAR 52-217-8) 1.00 NTE $7,019.55 $7,019.55
510 (Optional) Option 5: Pump Out of boiler (PER FAR 52-217-8) 1.00 EA $0.00
511 (Optional) Option 5: Gas Flow Meter (PER FAR 52-217-8) 1.00 EA $0.00
512 Option 5: Project Management (PER FAR 52-217-8) 1.00 Service $0.00
513 (Optional) Option 5: Scaffolding / Steps (PER FAR 52-217-8) 1.00 EA $0.00
Option Period 5: $7,019.55