Site Visit Agenda-AOCSSB24R0069.pdf
PDF 228 KB Posted
- Solicitation number
- AOCSSB24R0069
- Issued by
-
Architect of the Capitol
About this file
This document is a Site Visit Agenda for Solicitation No. RFP-AOCSSB24R0069, which is for the Capitol Power Plant (CPP) Temporary Boiler (Rental) Installation & Removal Service contract in Washington, DC.
The key details are:
- The contract is a five-year Firm Fixed Price (FFP) contract from September 2024 to April 2029, with five 6-month performance periods from November to April each year. It includes an option to extend services for up to 6 months, if necessary.
- The pre-proposal site visit is scheduled for August 16, 2024 at 9:00 AM EST. All questions related to the solicitation are due by August 30, 2024 at 12:00 PM EST. Proposals are due on September 9, 2024 at 12:00 PM EST.
- The Architect of the Capitol (AOC) is the contracting agency. The NAICS code is 238220 - Plumbing, Heating, and Air-Conditioning Contractors, and the Product Service Code is 4520 - Space and Water Heating Equipment.
- The solicitation requires the submission of a Technical Approach, Key Personnel and Staffing, Corporate Experience and Expertise, Experience Modification Rate, and Pricing in the proposal.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| J-4 Offeror Questions.v3.xlsx | XLSX spreadsheet | |
| SF_30_Amend-003.pdf | ||
| SF_30_Amend-002.pdf | ||
| J-1 CPP Temp Boiler Rent Install_Remov PWS.v1.pdf | ||
| J-4 Offeror Questions.v2.xlsx | XLSX spreadsheet | |
| SF_30_Amend-001.pdf | ||
| J-4 Offeror Questions.v1.xlsx | XLSX spreadsheet | |
| Site Visit Sign In Sheet.pdf | ||
| J-2 Instruct to Offer and Basis for Award - CPP Temp Boiler Rental.pdf | ||
| J-11 CUI-NDA Agreement.pdf | ||
| J-1 CPP Temp Boiler Rent Install_Remov PWS.pdf | ||
| J-3 CP-491 Criminal History.pdf | ||
| J-7 COI.pdf | ||
| J-14 Chapter 2 Permit No-7298 CPP Temporary Boiler.pdf | ||
| AOCSSB24R0069.pdf | ||
| J-4 Offeror Questions Template.xlsx | XLSX spreadsheet | |
| J-5 Offsite Vendor Procedures (updated 3-28-2022).pdf | ||
| J-13 Employee Rights on Government contracts poster.pdf | ||
| J-15 28-8 AOC Design Standards - December 2018.pdf | ||
| J-6 Pricing Sheet Sec B.xlsx | XLSX spreadsheet | |
| J-8 WD 2015-4281 Rev 30.pdf | ||
| J-12 EEO Poster (November 2009).pdf |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P a g e 1 | 3
Solicitation No. RFP-AOCSSB24R0069 Capitol Power Plant (CPP)
Temporary Boiler (Rental) Installation & Removal Service Washington DC
PRE-PROPOSAL SITE VISIT
Date August 16, 2024 9:00 A.M. (EST) the doors open at 8:45.
Participants attending the site visit are requested to gather near the entrance to the Police Kiosk on E St SE where they will obtain visitor badges. AOC staff will escort participants to the site visit space by 9:00 am. Each participant will need to have valid, government-issued identification (i.e., driver’s license) on their person the day of the site visit in order to participate. There is no public parking at the Capitol Power Plant, therefore, it is imperative that participants properly plan their travel to be on time for the site visit. AOC will not host another site visit prior to award.
Introduction -- Purpose of meeting is to ensure that everyone visits the work site and understands the requirements and solicitation procedures.
Solicitation Number: RFP- AOCSSB24R0069
A. Sign- In Roster - Please sign in legibly.
B. Introductions:
Contracting Officer – Donald Fuqua Contracting Officer’s Representative – Purnell Summers Procurement Agents - Andrew Eichhorn
C. WELCOME REMARKS –
This is an informational briefing only and does not encompass all solicitation data but is intended to provide an overview of the scope of this effort.
The formal solicitation and any amendments are the only documents that should be relied upon to determine the Government’s requirements.
D. Contract Time: The work consists of a five-year period from September 2024 to April
2029 with five (5) six-month performance periods from November to April of each year.
This requirement will also include an option to extend services for up to six months, if necessary, in accordance with FAR 52.217-8.
E. Deficiencies in Contract Documents: It is the offeror’s responsibility to notify (in writing) the Contracting Officer of any ambiguities or deficiencies in the solicitation documents prior to submitting the proposal.
F. Partial Proposals, Altering the proposal quantities will not be considered.
P a g e 2 | 3
A. Pre-Proposal Conference /Site Visit Questions and ALL remaining Questions pertaining to this solicitation are due:
12:00 PM, Eastern Time (ET) on August 30, 2024.
Questions received after that time may not be answered.
G. Proposals are due: 12:00 PM, Eastern Time (ET) on September 9, 2024.
H. This pertains to proposal submission. NO HAND CARRIED PROPOSALS WILL BE
ACCEPTED. EMAIL ONLY
I. Questions will be permitted during the site visit; however, all government responses during the visit are unofficial. For an official response, offerors shall provide a written question by the question due date. In addition, no photography will be permitted.
Notwithstanding any remarks or clarifications given at the site visit, all terms and conditions of the solicitation remain unchanged unless they are changed by amendment to the solicitation. If the answers to conference questions, or any solicitation amendment, are unclear, it is the responsibility of the offeror to seek clarification prior to submitting a proposal.
Communications and clarifications concerning this RFP must be submitted in writing through the Contracting Officer, Donald Fuqua, via email at Donald.Fuqua@aoc.gov. Responses to proposal questions will be shared with all offerors via solicitation amendment.
J. Important Sections of the Solicitation:
1. Solicitation, Standard Form (SF-33), See Block 15A -C (offeror Name & Address), Block 16 (Signer’s name & Title), Block 17 (Signature) Block 18 (Date of proposal)
2. ** Fully complete and return SECTION K - Representations and Certifications
(starting on page 73-77) section of the Solicitation with your proposal.
3. REMEMBER TO SIGN YOUR PROPOSAL (SF-30 AMENDMENTS)
4. Offerors are reminded that ALL pages of ALL SF_30_Amendments SHALL be signed and returned along with proposal, per Standard form 30, item 13(E).
5. It is the sole responsibility of the offeror to monitor their emails and Sam.gov website for ALL changes to the solicitation or for information released by the Contracting Officer.
6. Offerors are reminded that any information pertaining to this solicitation (e.g.
Questions, proposals, Etc.) not submitted to the Contracting Officer Donald.Fuqua@aoc.gov will not be considered.
mailto:Donald.Fuqua@aoc.gov mailto:Donald.Fuqua@aoc.gov
P a g e 3 | 3
7. Documents that are required to be submitted in the Proposal package.
Volume I (The documents below are required within this volume)
a. Introductory Letter (Volume I) (non-evaluated)
b. Technical Approach (Volume I) (Evaluated)
c. Key Personnel and Staffing (Volume I) (Evaluated)
d. Corporate Experience and Expertise (Volume I) (Evaluated)
e. Experience Modification Rate (Volume I) (Evaluated)
Volume II (The documents below are required within this volume)
a. Price (Excel attachment J.6) (Volume II) (Evaluated)
b. Standard Form 33 (Provision Fill-Ins), Sign Page 1
c. Standard Form 33 (Fill in Section K (Starts on page 73 of 79 and ends on page
77 of 79, and return within) (Volume II)
d. SF-30 amendments- (Each Amendment Signed)
Contact:
If you are having issues entering the building. Please call the number below. This is intended for the site visit only. Please refrain from calling this number for questions pertaining to the solicitation. Again, this is intended for the site visit only.
Donald Fuqua (Cell) - 202.329-6763
Location:
Capitol Power Plant (CPP), located at 25 E St SE Washington, District of Columbia 20515 United States
Solicitation Number: