This document is a set of questions and answers (Q&A) related to a federal contract opportunity for the Capitol Power Plant (CPP) Temporary Boiler 2024 Services Contract.
The key details are:
- This is a new requirement, with no incumbent currently providing these services.
- The contract will be a five-year Firm Fixed Price contract from September 2024 to April 2029, with five six-month performance periods per year.
- The contract will cover the rental, installation, and removal of temporary boilers. Specific requirements include permits, a site-specific safety plan, and having key personnel on-site during work activities.
- The North American Industry Classification System (NAICS) code is 238220 - Plumbing, Heating, and Air-Conditioning Contractors, and the Product Service Code is 4520 - Space and Water Heating Equipment.
- The solicitation will use the negotiated acquisition procedures in the Architect of the Capitol (AOC) Contracting Manual.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q & A
| Q # | Date Received | Reference | Section | Question / Comment | AOC/ CPP Response | Amendment Released |
| Is there an incumbent currently providing these services? Will the Government please provide the current incumbent, contract number, and dollar value for this effort? Any information you are able to provide is greatly appreciated. | This is a new requirement. | Amendment -001 | ||||
| 1 | Are there Permits that already exist ? | Yes, there are existing permits. Contractor may be required to produce additional permits needed as noted in 013100 PROJECT MANAGEMENT AND COORDINATION | Amendment -001 | |||
| 2 | What Permits are we required to provide ? | Permit requirements can be found on spec. section 013100 PROJECT MANAGEMENT AND COORDINATION | Amendment -001 | |||
| 3 | What are the specific requirements for the Safety Plan? | Site- Specific Safety Plan reqirements are noted in spec. section 013000 CONSTRUCTION SAFETY AND HEALTH | Amendment -001 | |||
| 4 | Is there a baseline for the Safety Plan ? | Yes, refer to spec. section 013000 CONSTRUCTION SAFETY AND HEALTH | Amendment -001 | |||
| 5 | Is the Superintendant required only for set up and Breakdown periods? | At least one member of the identified key personnel (PM or SUP) should be present during any on-site work activities. | ||||
| 6 | Does the Superintendant have to be onsite each day of the contract ? | No, but one member of key personel is required during any on-site work activities. | ||||
| 7 | SECTION 23 52 33 | 1.04 | Relating to the exhaust stack, does it have to be 75 feet above grade ? Is that correct? | Yes, that is correct. |
However, Please refer to the cover page dated August 13, 2024 Item 4,a,i and ii where it states under "Scope Removal", All requirements for the following are excluded from Contract No. PP24011.
i. Boiler Fuel Oil Pump Skid and Piping Arrangement
| ii. Boiler Exhaust Stack | Amendment -001 |
| 8 |