Table 1

SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION
Building 1170 Breakroom RenovationCONTRACTOR
A C T I V I T Y
N OT R A N S M I T T A L
N OS P E C
S E C TDESCRIPTION ITEM SUBMITTEDP A R A

G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W

N RCONTRACTOR: SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITYMAILED TO CONTR/
DATE RCD FRM APPR AUTHREMARKS
SUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYA C T I O N
C O D EDATE OF ACTIONDATE FWD TO APPR AUTH/
DATE RCD FROM CONTRDATE FWD TO OTHER REVIEWERDATE RCD FROM OTH REVIEWERA C T I O N
C O D EDATE OF ACTION
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
1 14 00SD-01 Preconstruction Submittals
Personnel List1.3.1.1G
Visit Request1.4.1G
01 20 00.00 20SD-01 Preconstruction Submittals
Schedule of Prices1.2G
1 30 00SD-01 Preconstruction Submittals
Superintendent Qualifications1.4.2G
01 32 16.00 20SD-01 Preconstruction Submittals
Baseline Construction Schedule1.2G
SD-07 Certificates
Monthly Updates1.4
01 33 00SD-01 Preconstruction Submittals
Submittal Register1.8G
01 35 26SD-01 Preconstruction Submittals
Accident Prevention Plan (APP)1.8G
SD-06 Test Reports
Monthly Exposure Reports1.4
Notifications and Reports1.13
Accident Reports1.13.2G
LHE Inspection Reports1.13.3
SD-07 Certificates
Contractor Safety Self-Evaluation1.5
Checklist
Crane Operators/Riggers1.7.1.4
Standard Lift PlanG
Critical Lift PlanG
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION
Building 1170 Breakroom RenovationCONTRACTOR
A C T I V I T Y
N OT R A N S M I T T A L
N OS P E C
S E C TDESCRIPTION ITEM SUBMITTEDP A R A

G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W

N RCONTRACTOR: SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITYMAILED TO CONTR/
DATE RCD FRM APPR AUTHREMARKS
SUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYA C T I O N
C O D EDATE OF ACTIONDATE FWD TO APPR AUTH/
DATE RCD FROM CONTRDATE FWD TO OTHER REVIEWERDATE RCD FROM OTH REVIEWERA C T I O N
C O D EDATE OF ACTION
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
01 35 26Activity Hazard Analysis (AHA)1.9
Confined Space Entry Permit1.10.1
Hot Work Permit1.10.1
Certificate of Compliance
01 45 00.10 20SD-01 Preconstruction Submittals
QC Plan1.6G
01 50 00SD-01 Preconstruction Submittals
Construction Site Plan1.3G
Traffic Control PlanG
01 57 19SD-01 Preconstruction Submittals
Solid Waste Management Permit1.8G
Environmental Protection Plan1.6G
Employee Training Records1.5.1G
SD-06 Test Reports
Monthly Solid Waste Disposal1.8.1G
Report
SD-07 Certificates
Employee Training Records1.5.1G
SD-11 Closeout Submittals
Waste Determination3.3.1G
Documentation
Assembled Employee Training1.5.1G
Records
Solid Waste Management Permit1.8G
Project Solid Waste Disposal3.3.2.1G
Documentation Report
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION
Building 1170 Breakroom RenovationCONTRACTOR
A C T I V I T Y
N OT R A N S M I T T A L
N OS P E C
S E C TDESCRIPTION ITEM SUBMITTEDP A R A

G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W

N RCONTRACTOR: SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITYMAILED TO CONTR/
DATE RCD FRM APPR AUTHREMARKS
SUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYA C T I O N
C O D EDATE OF ACTIONDATE FWD TO APPR AUTH/
DATE RCD FROM CONTRDATE FWD TO OTHER REVIEWERDATE RCD FROM OTH REVIEWERA C T I O N
C O D EDATE OF ACTION
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
01 57 19Hazardous Waste/Debris3.3.3.1G
Management
Contractor Certification3.3.2.1
01 74 19SD-01 Preconstruction Submittals
Construction Waste Management1.6G
Plan
01 78 00SD-03 Product Data
Spare Parts Data1.4
SD-10 Operation and Maintenance
Data
Operation and Maintenance3.2G
Manuals
SD-11 Closeout Submittals
As-Built Drawings3.1G
02 41 00SD-01 Preconstruction Submittals
Demolition Plan1.2.2G
Deconstruction PlanG
Existing Conditions1.9
SD-07 Certificates
Notification1.6G
SD-11 Closeout Submittals
Receipts
02 82 00SD-03 Product Data
Amended Water1.2.2
Safety Data Sheets (SDS) for All1.3.9
Materials
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION
Building 1170 Breakroom RenovationCONTRACTOR
A C T I V I T Y
N OT R A N S M I T T A L
N OS P E C
S E C TDESCRIPTION ITEM SUBMITTEDP A R A

G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W

N RCONTRACTOR: SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITYMAILED TO CONTR/
DATE RCD FRM APPR AUTHREMARKS
SUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYA C T I O N
C O D EDATE OF ACTIONDATE FWD TO APPR AUTH/
DATE RCD FROM CONTRDATE FWD TO OTHER REVIEWERDATE RCD FROM OTH REVIEWERA C T I O N
C O D EDATE OF ACTION
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
02 82 00Encapsulants2.1
Respirators3.1.2.1
Local Exhaust Equipment3.1.7
Pressure Differential Automatic3.1.7
Recording Instrument
Vacuums3.1.8
SD-06 Test Reports
Air Sampling Results1.5.5
Pressure Differential Recordings1.5.6
for Local Exhaust System
Clearance Sampling3.2.13.5
Asbestos Disposal Quantity3.3.3.2
Report
SD-07 Certificates
Employee Training1.3.4
Notifications1.3.5
Respiratory Protection Program1.3.7
Asbestos Hazard Abatement1 3 10
Plan
Testing Laboratory1 3 11
Landfill Approval1 3 12
Delivery Tickets1 3 12
Waste Shipment Records1 3 12
Transporter Certification1 3 13
Medical Certification1 3 14
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION
Building 1170 Breakroom RenovationCONTRACTOR
A C T I V I T Y
N OT R A N S M I T T A L
N OS P E C
S E C TDESCRIPTION ITEM SUBMITTEDP A R A

G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W

N RCONTRACTOR: SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITYMAILED TO CONTR/
DATE RCD FRM APPR AUTHREMARKS
SUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYA C T I O N
C O D EDATE OF ACTIONDATE FWD TO APPR AUTH/
DATE RCD FROM CONTRDATE FWD TO OTHER REVIEWERDATE RCD FROM OTH REVIEWERA C T I O N
C O D EDATE OF ACTION
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
02 82 00Private Qualified Person1.5.1
Documentation
Designated Competent Person1.5.2
Worker's License1.5.3
Contractor's License1.5.4
Federal, State or Local Citations1.5.7
on Previous Projects
Encapsulants2.1
Equipment Used to Contain3.1
Airborne Asbestos Fibers
Water Filtration Equipment3.1.3.3
Vacuums3.1.8
Ventilation Systems3.1.8
SD-11 Closeout Submittals
Permits and Licenses1.3.5
Notifications1.3.5
Respirator Program Records1.3.7.1
Rental Equipment1.7.1
07 84 00SD-02 Shop Drawings
Firestopping System2.1
SD-03 Product Data
Firestopping Materials2.2
SD-06 Test Reports
Inspection3.3
SD-07 Certificates
Inspector Qualifications1.5.2
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION
Building 1170 Breakroom RenovationCONTRACTOR
A C T I V I T Y
N OT R A N S M I T T A L
N OS P E C
S E C TDESCRIPTION ITEM SUBMITTEDP A R A

G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W

N RCONTRACTOR: SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITYMAILED TO CONTR/
DATE RCD FRM APPR AUTHREMARKS
SUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYA C T I O N
C O D EDATE OF ACTIONDATE FWD TO APPR AUTH/
DATE RCD FROM CONTRDATE FWD TO OTHER REVIEWERDATE RCD FROM OTH REVIEWERA C T I O N
C O D EDATE OF ACTION
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
07 84 00Firestopping Materials2.2
Installer Qualifications1.5.1
8 11 13SD-02 Shop Drawings
Doors
Frames2.2
Accessories2.1
SD-03 Product Data
Doors
Accessories2.1
Factory-applied Enamel Finish
8 14 00SD-02 Shop Drawings
Doors2.1
SD-03 Product Data
Doors2.1
Doors2.1
Recycled Content for Door Cores
Accessories2.2
Water-resistant Sealer
Warranty1.4
Door Finish Colors
SD-06 Test Reports
Cycle-Slam
Hinge Loading Resistance
SD-07 Certificates
Certificates of Grade
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION
Building 1170 Breakroom RenovationCONTRACTOR
A C T I V I T Y
N OT R A N S M I T T A L
N OS P E C
S E C TDESCRIPTION ITEM SUBMITTEDP A R A

G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W

N RCONTRACTOR: SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITYMAILED TO CONTR/
DATE RCD FRM APPR AUTHREMARKS
SUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYA C T I O N
C O D EDATE OF ACTIONDATE FWD TO APPR AUTH/
DATE RCD FROM CONTRDATE FWD TO OTHER REVIEWERDATE RCD FROM OTH REVIEWERA C T I O N
C O D EDATE OF ACTION
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
8 14 00Certified Sustainably Harvested2.1.2
Flush Wood Doors
SD-11 Closeout Submittals
Warranty1.4
09 51 00SD-02 Shop Drawings
Approved Detail Drawings2.1
SD-03 Product Data
Acoustical Ceiling Systems
Fire Resistive Ceilings
Recycled Content for Type III
Ceiling Tiles
Recycled Content for Type IV
Ceiling Tiles
Recycled Content for Type IX
Ceiling Tiles
Recycled Content for Type XII
Ceiling Tiles
Recycled Content for Suspension2.3
Systems
Acoustical Performance2.1.1
SD-04 Samples
Acoustical Units2.2
Acoustical Ceiling Tiles
SD-06 Test Reports
Fire Resistive Ceilings
SD-07 Certificates
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION
Building 1170 Breakroom RenovationCONTRACTOR
A C T I V I T Y
N OT R A N S M I T T A L
N OS P E C
S E C TDESCRIPTION ITEM SUBMITTEDP A R A

G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W

N RCONTRACTOR: SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITYMAILED TO CONTR/
DATE RCD FRM APPR AUTHREMARKS
SUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYA C T I O N
C O D EDATE OF ACTIONDATE FWD TO APPR AUTH/
DATE RCD FROM CONTRDATE FWD TO OTHER REVIEWERDATE RCD FROM OTH REVIEWERA C T I O N
C O D EDATE OF ACTION
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
09 51 00Indoor Air Quality for Type III
Ceiling Tiles
Indoor Air Quality for Type IV
Ceiling Tiles
Indoor Air Quality for Type V
Ceiling Tiles
Indoor Air Quality for Type VI
Ceiling Tiles
Indoor Air Quality for Type VII
Ceiling Tiles
Indoor Air Quality for Type IX
Ceiling Tiles
Indoor Air Quality for Type X
Ceiling Tiles
Indoor Air Quality for Type XI
Ceiling Tiles
Indoor Air Quality for Type XII
Ceiling Tiles
Indoor Air Quality for
Impact/Abrasion Resistant Ceiling
Tiles
Indoor Air Quality for Humidity2.2.1.1
Resistant Ceiling Tiles
Indoor Air Quality for Adhesives2.6
Indoor Air Quality for Sealants2.9
09 90 00SD-02 Shop Drawings
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION
Building 1170 Breakroom RenovationCONTRACTOR
A C T I V I T Y
N OT R A N S M I T T A L
N OS P E C
S E C TDESCRIPTION ITEM SUBMITTEDP A R A

G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W

N RCONTRACTOR: SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITYMAILED TO CONTR/
DATE RCD FRM APPR AUTHREMARKS
SUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYA C T I O N
C O D EDATE OF ACTIONDATE FWD TO APPR AUTH/
DATE RCD FROM CONTRDATE FWD TO OTHER REVIEWERDATE RCD FROM OTH REVIEWERA C T I O N
C O D EDATE OF ACTION
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
09 90 00Piping Identification
SD-03 Product Data
Coating2.1
Sealant
SD-04 Samples
Color1.11
Textured Wall Coating System1.5.2
Sample Textured Wall Coating1.5.3
System Mock-Up
SD-07 Certificates
Applicator's Qualifications1.4
Qualification Testing1.5.1.2
Indoor Air Quality for Paints and2.1
Primers
Indoor Air Quality for2.1
Consolidated Latex Paints
SD-08 Manufacturer’s Instructions
Application Instructions3.2.1
Mixing3.4.2
Manufacturer's Safety Data1.8.2
Sheets
SD-10 Operation and Maintenance
Data
Coatings2.1
12 36 00SD-02 Shop Drawings
Fabrication2.2G
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION
Building 1170 Breakroom RenovationCONTRACTOR
A C T I V I T Y
N OT R A N S M I T T A L
N OS P E C
S E C TDESCRIPTION ITEM SUBMITTEDP A R A

G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W

N RCONTRACTOR: SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITYMAILED TO CONTR/
DATE RCD FRM APPR AUTHREMARKS
SUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYA C T I O N
C O D EDATE OF ACTIONDATE FWD TO APPR AUTH/
DATE RCD FROM CONTRDATE FWD TO OTHER REVIEWERDATE RCD FROM OTH REVIEWERA C T I O N
C O D EDATE OF ACTION
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
12 36 00Installation Drawings3.1G
SD-03 Product Data
PlywoodG
HardwoodG
Granite2.2.1G
MarbleG
Synthetic ResinG
Stainless SteelG
Recycled Content for Stainless
Steel Countertops
TileG
FRPG
AdhesivesG
Filler MaterialG
Particle BoardG
Recycled Content for
Particleboard
TurpentineG
VarnishG
FastenersG
Stainless Steel SinksG
Service FixturesG
Joint SealantsG
SoftwoodsG
Plastic LaminateG
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION
Building 1170 Breakroom RenovationCONTRACTOR
A C T I V I T Y
N OT R A N S M I T T A L
N OS P E C
S E C TDESCRIPTION ITEM SUBMITTEDP A R A

G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W

N RCONTRACTOR: SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITYMAILED TO CONTR/
DATE RCD FRM APPR AUTHREMARKS
SUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYA C T I O N
C O D EDATE OF ACTIONDATE FWD TO APPR AUTH/
DATE RCD FROM CONTRDATE FWD TO OTHER REVIEWERDATE RCD FROM OTH REVIEWERA C T I O N
C O D EDATE OF ACTION
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
12 36 00Indoor Air Quality for Laminate
and Wood Member Adhesives
Indoor Air Quality for Mounting
and Stone Adhesives
Indoor Air Quality for Joint
Sealants
SD-04 Samples
Countertop2.2.1G
Backsplash2.2.1G
Manufacturer's Standard Color2.1G
Charts
SD-07 Certificates
Certified Sustainably Harvested
Wood
Indoor Air Quality for Countertop2.1
Products
Indoor Air Quality for
Particleboard
SD-08 Manufacturer’s Instructions
Manufacturer's Instructions2.1
22 00 00SD-02 Shop Drawings
Plumbing System3.4.1
SD-03 Product Data
Recycled Content for Steel Pipe2.1
Recycled Content for Cast Iron
Pipe
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION
Building 1170 Breakroom RenovationCONTRACTOR
A C T I V I T Y
N OT R A N S M I T T A L
N OS P E C
S E C TDESCRIPTION ITEM SUBMITTEDP A R A

G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W

N RCONTRACTOR: SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITYMAILED TO CONTR/
DATE RCD FRM APPR AUTHREMARKS
SUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYA C T I O N
C O D EDATE OF ACTIONDATE FWD TO APPR AUTH/
DATE RCD FROM CONTRDATE FWD TO OTHER REVIEWERDATE RCD FROM OTH REVIEWERA C T I O N
C O D EDATE OF ACTION
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
22 00 00Fixtures2.4
Flush Valve Water Closets2.4.2
WaterSense Label for Flush2.4.2
Valve Water Closet
Flush Valve Urinals2.4.3
WaterSense Label for Urinal2.4.3
Flush Tank Water Closets
WaterSense Label for Flush Tank
Water Closet
Wall Hung Lavatories2.4.4
Countertop Lavatories
WaterSense Label for Lavatory
Faucet
Kitchen Sinks
Service Sinks
Welding1.5.1
Vibration-Absorbing Features
Plumbing System3.4.1
SD-06 Test Reports
Tests, Flushing and Disinfection3.4
Test of Backflow Prevention3.4.1.1
Assemblies
SD-07 Certificates
Materials and Equipment1.3
Bolts2.1.1
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION
Building 1170 Breakroom RenovationCONTRACTOR
A C T I V I T Y
N OT R A N S M I T T A L
N OS P E C
S E C TDESCRIPTION ITEM SUBMITTEDP A R A

G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W

N RCONTRACTOR: SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITYMAILED TO CONTR/
DATE RCD FRM APPR AUTHREMARKS
SUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYA C T I O N
C O D EDATE OF ACTIONDATE FWD TO APPR AUTH/
DATE RCD FROM CONTRDATE FWD TO OTHER REVIEWERDATE RCD FROM OTH REVIEWERA C T I O N
C O D EDATE OF ACTION
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
22 00 00SD-10 Operation and Maintenance
Data
Plumbing System3.4.1
26 20 00SD-02 Shop Drawings
Panelboards
Transformers
Busway
Cable Trays
Motor Control Centers
Wireways2.14
Load Centers for Housing Units
Marking Strips3.1.7.1
SD-03 Product Data
Receptacles2.8
Circuit Breakers
Switches2.7
Transformers
Enclosed Circuit Breakers
Motor Controllers
Combination Motor Controllers
Load Centers for Housing Units
Manual Motor Starters
Residential Load Centers
Metering
Meter Base Only
CATV Outlets
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION
Building 1170 Breakroom RenovationCONTRACTOR
A C T I V I T Y
N OT R A N S M I T T A L
N OS P E C
S E C TDESCRIPTION ITEM SUBMITTEDP A R A

G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W

N RCONTRACTOR: SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITYMAILED TO CONTR/
DATE RCD FRM APPR AUTHREMARKS
SUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYA C T I O N
C O D EDATE OF ACTIONDATE FWD TO APPR AUTH/
DATE RCD FROM CONTRDATE FWD TO OTHER REVIEWERDATE RCD FROM OTH REVIEWERA C T I O N
C O D EDATE OF ACTION
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
26 20 00Grounding Busbar
Surge Protective Devices
SD-06 Test Reports
600-volt Wiring Test
Grounding System Test3.4.4
Transformer Tests
Ground-fault Receptacle Test3.4.2
Arc-fault Receptacle Test3.4.3
SD-07 Certificates
Fuses
SD-09 Manufacturer’s Field
Reports
Transformer Factory Tests2.16.1
SD-10 Operation and Maintenance
Data
Electrical Systems1.5.1
Metering
26 51 00SD-02 Shop Drawings
Luminaire Drawings1.4.1G
Occupancy/Vacancy Sensor1.4.8G
Coverage Layout
Lighting Control System1.6.2G
One-Line Diagram
Sequence of Operation for2.5.1G
Lighting Control System
SD-03 Product Data
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION
Building 1170 Breakroom RenovationCONTRACTOR
A C T I V I T Y
N OT R A N S M I T T A L
N OS P E C
S E C TDESCRIPTION ITEM SUBMITTEDP A R A

G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W

N RCONTRACTOR: SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITYMAILED TO CONTR/
DATE RCD FRM APPR AUTHREMARKS
SUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYA C T I O N
C O D EDATE OF ACTIONDATE FWD TO APPR AUTH/
DATE RCD FROM CONTRDATE FWD TO OTHER REVIEWERDATE RCD FROM OTH REVIEWERA C T I O N
C O D EDATE OF ACTION
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
26 51 00Luminaires2.2G
Light Sources2.3G
LED Drivers2.4G
Luminaire Warranty1.5.1G
Lighting Controls Warranty1.5.2G
Local Area Controller2.5.1.1.1G
Lighting Relay PanelG
Lighting Control PanelG
GatewayG
Lighting ContactorG
Switches2.5.2.1G
Digital Switch Timers2.5.2.2G
Wall Box DimmersG
Scene Wallstations2.5.2.3G
Occupancy/Vacancy Sensors2.5.2.4G
PhotosensorsG
Time ClocksG
Power PacksG
Power Hook Luminaire Hangers2.7.3G
Mini Inverters2.6.5G
Exit Signs2.6.1G
Emergency Drivers2.6.3G
Energy Star Label For2.2
Residential Luminaires
Linear LED Lamps2.3.1.1G
SD-04 Samples
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION
Building 1170 Breakroom RenovationCONTRACTOR
A C T I V I T Y
N OT R A N S M I T T A L
N OS P E C
S E C TDESCRIPTION ITEM SUBMITTEDP A R A

G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W

N RCONTRACTOR: SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITYMAILED TO CONTR/
DATE RCD FRM APPR AUTHREMARKS
SUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYA C T I O N
C O D EDATE OF ACTIONDATE FWD TO APPR AUTH/
DATE RCD FROM CONTRDATE FWD TO OTHER REVIEWERDATE RCD FROM OTH REVIEWERA C T I O N
C O D EDATE OF ACTION
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
26 51 00Luminaire SamplesG
SD-05 Design Data
Luminaire Design Data1.4.2G
SD-06 Test Reports
IES LM-79 Test Report1.4.3G
IES LM-80 Test Report1.4.4G
IES TM-21 Test Report1.4.5G
IES TM-30 Test Report1.4.6G
Occupancy/Vacancy Sensor3.2.1.1G
Verification Test
Photosensor Verification Test3.2.1.1G
SD-07 Certificates
LED Driver and Dimming Switch1.4.7G
Compatibility Certificate
SD-10 Operation and Maintenance
Data
Lighting System1.6.1G
Lighting Control System1.6.2G
Maintenance Staff Training Plan3.3.2.1G
End-User Training Plan3.3.2.2G