J-200000-01-N33191-23-R-9012-Definitions.pdf
PDF 99 KB Posted
- Attached to
- Natural Gas Supply, Italy 2023
- Solicitation number
- N33191-23-R-9012
About this file
This document defines terms and acronyms used in solicitation number N33191-23-R-9012 for the supply of natural gas to various U.S. government facilities throughout Italy in 2023. The solicitation is issued by the Naval Facilities Engineering Command on behalf of the Department of the Navy for the supply of natural gas to three locations - Aviano Base, Campania, and NAS Sigonella. The document defines key terms used in the solicitation such as contracting officer, distributor, line item, offeror, parties, supplier, transaction fee, and transporter. Standards for natural gas including heating value, temperature, and pressure are also defined.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N33191-23-R-9012-0002.pdf | ||
| J-200000-04-N33191-23-R-9012-0001.xlsx | XLSX spreadsheet | |
| N33191-23-R-9012-0001.pdf | ||
| N33191-23-R-9012 - RFP Italy Natural Gas.pdf | ||
| J-200000-05-N33191-23-R-9012 Guarantee (Template).pdf | ||
| J-200000-04-N33191-23-R-9012 - Price.xlsx | XLSX spreadsheet | |
| J-200000-02-N33191-23-R-9012-Data and Historical.xlsx | XLSX spreadsheet | |
| J-200000-06-N33191-23-R-9012-Estimate Projection.xlsx | XLSX spreadsheet | |
| J-200000-03-N33191-23-R-9012-Form D.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J-200000-01 Definitions and Acronyms
As used throughout this solicitation/contract:
Government stands for the Government of the United States of America (U.S.);
ADR stands for the Alternative Dispute Resolution;
ARERA (former AEEGSI) stands for the Authority for the Regulation of Energy, Utility Grids, and Environment (Autorita’ per la Regolazione dell’Energia, Reti e Ambiente), established by Lx n. 481 14/11/95 and further modifications. ARERA replaced AEGGSI effective 28 December 2017;
Bank Guarantee is a promise from a bank or other lending institution that if a particular borrower defaults on a loan, the bank will cover the loss (see Attachment D Form J-2000000-03- page three of three);
Contracting Officer is the Government representative in charge for executing the supply contract on behalf of NAVFAC EURAFSWA;
Distributor stands for the Entity running the natural gas distribution and metering activity as per concession set by Italian Law;
DoD Accounts mean the three (3) locations to be serviced which include both Navy and Airforce installations ID Code is NAVFAC EURAFCENT identification code associated with each Natural Gas service as indicated in Column 1 of J-200000-02;
Line Item refers to the three (3) locations to be serviced (AF1 = Aviano Base, NV1 = Campania, NV2 = NAS Sigonella);
Multi-Site Customer stands for a single customer having at least 50 different delivery points to be supplied and invoiced separately;
NAVFAC EURAFCENT stands for Naval Facilities Engineering Command Europe Africa Central NAVFAC is a US Government organization and is authorized to execute natural gas contracts for the US forces in Italy, limited to US Air Force and Navy;
Offeror stands for a sales company (Vendor) that submits a proposal; Parties stands for NAVFAC EURAFSWA and the Supplier;
PCS (HHV) is the higher standard heating value of natural gas. For tariff purposes is assumed to be 38,100 kJ/Sm3 PDC (or REMI) the point of delivery as defined by the ARERA (former AEEGSI) provisions, is identified by a numerical code It is the point where the natural gas is transferred from the transport system to the system of the Distributor;
PDR is the redelivery point as defined in the provisions of the ARERA (former AEEGSI), is identified by an alphanumerical code; it is the demarcation point between the system of the Distributor and the end user;
RFP stands for Request for Proposal; Seller is an entity authorized to sell natural gas, added to the list of Ministry of Economic Development (MSE) in accordance with Article 17, paragraphs 1 and 5, of Legislative Decree 23 May 2000, No. 164 and Article 30 of Legislative Decree 1 June 2011, No. 93, at the date of submission of the technical proposal;
SF stands for Government’s standard form; this acronym is followed by a number identifying what contract action the form is intended for.
Standard conditions of a natural gas are for tariff purposes at the temperature of 15 ° C and absolute pressure of 1.01325 bar;
Standard cubic meter (Sm^3) for tariff purposes is the cubic meter of natural gas at standard conditions;
Supplier stands for an Offeror awarded the contract;
Transaction Fee shall reimburse the Supplier for services performed and costs incurred to supply natural gas to the point of delivery, including management costs, risk, and profit margin. The Transaction fee shall remain constant throughout the contract term;
Transporter is the operator that regulates the transport system and dispatching.
Regulation period is divided and that runs from 1 October to 30 September of the following year.
File details come from the government source that posted it. Updated .