J-2 HCF ROOF METALWORK - DRAWINGS - IFSC - 8-29-2022.pdf
PDF 3 MB Posted
- Solicitation number
- 697DCK-23-R-00101
About this file
This package includes construction drawings and specifications for a roof metalwork project at the Honolulu Control Facility in Hawaii. The project involves replacement of various roof sections, installation of guardrails and handrails, and construction of a new access stair. Key elements include removal and replacement of existing roofing systems; installation of new metal roofing, parapets, and flashing; addition of guardrails around roof perimeters and openings; and construction of a freestanding stair with landings to provide roof access. The solicitation number is 697DCK-23-R-00101 and responses are due on an unspecified date. The federal contracting agency is the Department of Transportation Federal Aviation Administration Southwestern Region.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REV. APPROVED
DATE
DESCRIPTION JCN
REDLINE
DATE
APVD
REVIEWED BY SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE APPROVER'S TITLE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
JACOBS
1100 N GLEBE RD.
SUITE 500
ARLINGTON, VA 22201
P L O
T D
A T
E /T
IM
E
Department of Transportation Federal Aviation Administration
AARON SHAW VANCE WHITESEL
MANAGER. AJW-2W11CPROJECT ENGINEER/ARCHITECT. AJW-2W11C
/9
/2
:2
:4
P M
HONOLULU HIHONOLULU CONTROL FACILITY (HCF)
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
ENGINEERING
SERVICES
TERMINAL
August 29, 2022
HCF - D - ATCT - G001
COVER SHEET
HONOLULU CONTROL FACILITY
HCF ROOF METALWORK
R.SIMMONS
M.KANG
W.STEVENS
HONOLULU CONTROL FACILITY
HONOLULU
Honolulu Control Facility HCF Roof Metalwork Honolulu, Hawaii
Issue for Solicitation and Construction August 29, 2022
1604158
HAWAII
PROJECT ADDRESS:
FEDERAL AVIATION ADMINISTRATION
HONOLULU CONTROL FACILITY
760 WORCHESTER AVE, HONOLULU, HI 96818
FAA FACILITY DESIGNATIONS WITHIN THE HCF, FOR REFERENCE ONLY:
HNL ATCT = HONOLULU AIRPORT TRAFFIC CONTROL TOWER
ZHN CERAP = ZHN CENTER AND RADAR APPROACH CONTROL
PROJECT
LOCATION
N
N
HONOLULU
DANIEL K. INOUYE
INTERNATIONAL AIRPORT
HONOLULU
CONTROL
FACILITY
HIGHWAY H1
JBPHH
VISITOR CENTER
COLUMN LINE GRID DESIGNATION
CENTER LINES
MATCH LINE SYMBOL
BREAK LINES
ELEVATION SYMBOL
DRAWING/DETAIL TITLE
DETAIL TITLE REFERENCE
SECTION CUT
ELEVATION REFERENCE
PLAN NORTH/PROJECT NORTH
DEMOLITION
NEW WORK KEYNOTE
DEMOLITION KEYNOTE
GRAPHIC SCALE
Name Elevation
A8 View Name
1/8" = 1'-0"AXXX
SHEET ON WHICH DETAIL
IS DRAWN OR SCHEDULED
DETAIL NUMBER
A1
A001SHEET ON WHICH
DETAIL IS DRAWN
DETAIL DESIGNATION
A1
A001
A701
A7
A6
A5
A8 E1
A001
PROJECT NORTH
TRUE NORTH
KEY NORTH
04 8 16268
SCALE: 1/8"=1'-0"
N
A1
A001
DETAIL DESIGNATION
SHEET ON WHICH
DETAIL IS DRAWN
DETAIL
DESIGNATION
SHEET ON WHICH
DETAIL IS DRAWN
AYYY
SHEET ON WHICH DETAIL
IS REFERENCED FROM
WORK
REV. APPROVED
DATE
DESCRIPTION JCN
REDLINE
DATE
APVD
REVIEWED BY
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
E D
M
THIS DRAWING PRODUCED ON THE XXXXXXXXXXXX REGION AUTOCAD SYSTEM
S N
IS
S
U E
D F
O R
1604158
SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE APPROVER'S TITLE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
AARON SHAW VANCE WHITESEL
MANAGER. AJW-2W11CPROJECT ENGINEER/ARCHITECT. AJW-2W11C
HONOLULU HIHONOLULU CONTROL FACILITY (HCF)
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
ENGINEERING SERVICES
TERMINAL
August 29, 2022
INDEX OF DRAWINGS, GENERAL NOTES, LEGEND,
LOCATION MAP & BUILDING CODE ANALYSIS
HONOLULU CONTROL FACILITY
HCF ROOF METALWORK
R.SIMMONS
M.KANG
W.STEVENS
HONOLULU CONTROL FACILITY
HONOLULU
H C
F
A T
C T
G
.d w g
HCF - D - ATCT- G002
INDEX OF DRAWINGS GENERAL NOTES LOCATION MAP
BUILDING CODE ANALYSIS
KEY PLAN
A. DIMENSION LINES SHOWN ON ARCHITECTURAL SHEETS ARE FROM COLUMN CENTER
LINES AND FACE OF MASONRY, CONCRETE OR FINISHED FACE OF WALL, UNLESS
OTHERWISE NOTED.
B. FIELD VERIFY EXISTING CONDITIONS & DIMENSIONS BEFORE DEMOLITION OF BUILDING
SYSTEMS. COORDINATE DEMOLITION WITH THE WORK AND NOTIFY COR OF
CONFLICTS. NO DEMOLITION WORK MUST PROCEED UNTIL CONFLICTS ARE RESOLVED
TO SATISFACTION OF COR.
C. FINISHES & ASSOCIATED ADJACENT FINISHES AFFECTED BY THE WORK MUST BE
PATCHED AND REPAIRED TO MATCH EXISTING ADJACENT FINISHES.
D. VERIFY DEMOLITION REQUIRED TO FACILITATE ROUTING OF MECHANICAL, ELECTRICAL
AND FIRE PROTECTION SYSTEMS. FOR DEMOLITION REQUIRED OUTSIDE OF AREA
SHOWN ON ARCHITECTURAL DRAWINGS, REFER TO MECHANICAL, ELECTRICAL AND
FIRE PROTECTION FOR ITEMS TO BE REMOVED.
E. HCF WILL BE OCCUPIED BY FAA DURING CONSTRUCTION. COORDINATE THE WORK IN
ADVANCE WITH COR TO AVOID DISRUPTING FAA OPERATIONS. MAINTAIN MEANS OF
EGRESS DURING DEMOLITION AND CONSTRUCTION ACTIVITIES. IF AN EXIT IS
TEMPORARILY PLACED OUT OF USE DURING THE WORK, COORDINATE WITH COR FOR
TEMPORARY EGRESS MEASURES. PROVIDE NECESSARY SIGNAGE WARNING BUILDING
OCCUPANTS OF THE CHANGE, AND THE DIRECTION TO THE NEAREST EXIT. WORK
AFFECTING EGRESS MUST BE COORDINATED WITH AND APPROVED IN WRITING BY
COR, A MINIMUM OF 30 DAYS PRIOR TO PERFORMANCE OF WORK.
F. CLEAN CONSTRUCTION AREAS DAILY. CONSTRUCTION DEBRIS & EQUIPMENT MUST NOT
BE LEFT IN OCCUPIED AREAS.
G. MAINTAIN FIRE RATINGS OF FIRE RATED ASSEMBLIES IN FLOORS, WALLS, CEILINGS,
ROOFS OR SMOKE BARRIERS PENETRATED BY DUCTS, ELECTRICAL CONDUITS, PIPES
AND OTHER PENETRATIONS CAUSED BY THE WORK OF THIS PROJECT WITH AN
APPROVED U.L. SYSTEM. WHERE WORK IS REQUIRED ON BUILDINGS WHICH ARE PART
OF THE FACILITY, COORDINATE WITH COR TO VERIFY EXISTING CONDITION OF BUILDING
SYSTEMS (INCLUDING EXTERIOR WALLS, PARTITIONS, FLOORS, CEILINGS AND ROOFS)
BEFORE DEMOLITION OR CONSTRUCTION.
H. DO NOT SCALE DRAWINGS.
I. EXISTING FAA COMPUTER AND OTHER SENSITIVE EQUIPMENT MUST REMAIN
OPERATIONAL DURING CONSTRUCTION. COORDINATE WITH COR DEMOLITION WORK
THAT MAY CAUSE VIBRATION OR DISRUPTION TO EQUIPMENT IN THE WORK AREA.
PROVIDE DUST PROOF PARTITIONS AND BARRIERS AS REQUIRED BY COR TO PROTECT
ACTIVE EQUIPMENT. COORDINATE WITH COR NOT TO DISRUPT FAA OPERATIONS, TYP.
ACCOMMODATE THE 24-HOUR OPERATIONAL FACILITY SCHEDULE AND REQUIREMENTS.
J. IF HAZMAT, INCLUDING ACM OR LCC, IS ENCOUNTERED, CEASE WORK IN THAT AREA,
NOTIFY THE COR, AND AWAIT DIRECTION ON HOW TO PROCEED.
K. AS REQUIRED, REMOVE, SAVE FOR REUSE, AND REINSTALL EQUIPMENT THAT IS
AFFECTED BY THE WORK. PROTECT EQUIPMENT FROM DAMAGE AND DUST. DOCUMENT
EXISTING EQUIPMENT CONDITIONS AND COORDINATE WITH COR.
L. UNSCHEDULED INTERRUPTIONS TO BUILDING SERVICES/UTILITIES WILL NOT BE
TOLERATED. WORK REQUIRING PERMANENT, TEMPORARY OR PARTIAL OUTAGES
MUST BE SCHEDULED AND APPROVED IN WRITING BY COR AT LEAST 10 WORKING DAYS
IN ADVANCE OF PERFORMANCE OF THE WORK.
M. EXISTING BUILDING FLOOR PLANS AND SITE PLANS FOR THE EXISTING BUILDING
CONSTRUCTION PRESENTED IN THIS DOCUMENT WERE OBTAINED FROM THE FAA.
FIELD VERIFY EXISTING CONDITION PRIOR TO ANY CONSTRUCTION WORK REQUIRED.
N. PROVIDE TEMPORARY DUST PROOF PARTITIONS (DP) WITH ACCESS DOORS AS
APPROVED AND COORDINATED WITH COR. TEMPORARY DP PARTITIONS MUST BE
ACCESSIBLE TO FAA PERSONNEL AND NOT RESTRICT ACCESS TO MECH, ELEC, FAA, OR
FIRE PROTECTION EQUIPMENT. VERIFY FINAL LOCATIONS & SPECIAL REQUIREMENTS
WITH COR BEFORE INSTALLATION. ANCHORING DEVICES FOR DUSTPROOF
CONSTRUCTIONS, INTO CONCRETE, MUST BE REMOVED UPON COMPLETION OF THE
WORK. ANCHORING HOLES IN CONCRETE SURFACES MUST BE PATCHED AND
REPAIRED TO MATCH ADJACENT SURFACES.
O. WORK SPECIFIED IN ROOMS/AREAS WITH BREAKLINES INCLUDES WORK FOR ENTIRE
AREA, UNLESS OTHERWISE NOTED.
P. PRIOR TO CUTTING CONCRETE, USE MAGNETIC STEEL LOCATOR TO LOCATE
ELECTRICAL CONDUITS EMBEDDED IN CONCRETE. AVOID CUTTING CONDUITS AS THEY
MAY BE CRITICAL TO THE OPERATION OF THE FACILITY. CONCRETE WORK MUST
COMPLY WITH SILICA MANAGEMENT REQUIREMENTS.
Q. DIMENSIONS (LAYOUTS, MOUNTING HEIGHTS, HEIGHTS ABOVE FINISH FLOOR, ETC.)
AND CLEARANCES SHOWN ON THE DRAWINGS, IDENTIFIED IN SPECIFICATIONS,
IDENTIFIED IN MANUFACTURERS' PRODUCT DATA, OR REFERENCED IN APPLICABLE ABA
DOCUMENTS, CODES, AND CRITERIA FOR THE HANDICAPPED ACCESSIBILITY MUST BE
HELD TRUE; PLUS OR MINUS TOLERANCES FROM THESE DIMENSIONS ARE NOT
ALLOWED.
R. REFER TO OTHER DISCIPLINES FOR ADDITIONAL DEMOLITION REQUIRED. COORDINATE
REMOVING EXISTING PARTITIONS AND ENCLOSURES TO ENABLE DEMOLITION OF
CONCEALED SYSTEMS TO BE DEMOLISHED. PATCH AND REPAIR DAMAGED FINISHES,
AND/OR FIRE RATED ASSEMBLIES TO MATCH EXISTING ADJACENT SURFACES.
CAFETERIA
CANOPY
ATCT
WEATHER
OBSERVATION
GUARDHOUSE
APPLICABLE CODES AND REGULATIONS 2018 INTERNATIONAL BUILDING CODE (IBC)
2018 INTERNATIONAL FIRE CODE
2018 INTERNATIONAL MECHANICAL CODE
2018 INTERNATIONAL PLUMBING CODE
ARCHITECTURAL BARRIERS ACT (ABA) STANDARDS (2015)
OCCUPATIONAL SAFETY & HEALTH ADMINISTRATION (OSHA) INDUSTRY SAFETY & HEALTH
STANDARDS (29 CFR 1910 AND 1926 - CURRENT ISSUE)
NFPA 101, LIFE SAFETY CODE, 2021 EDITION
NFPA 13, INSTALLATION OF SPRINKLER SYSTEMS, 2019 EDITION
NFPA 14, STANDARD FOR THE INSTALLATION OF STANDPIPE AND HOSE SYSTEMS, 2019 EDITION
NFPA 70, NATIONAL ELECTRICAL CODE (NEC), 2020 EDITION
NFPA 72, NATIONAL FIRE ALARM AND SIGNALING CODE, 2019 EDITION
NFPA 75, STANDARD FOR THE FIRE PROTECTION OF INFORMATION TECHNOLOGY EQUIPMENT,
2020 EDITION
NFPA 90A, STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING SYSTEMS, 2018 EDITION
NFPA 780, STANDARD FOR THE INSTALLATION OF LIGHTNING PROTECTION SYSTEMS
CODE SUMMARY HCF BUILDING
OCCUPANCY CLASSIFCIATION: BUSINESS (GROUP B) / LOW-HAZARD STORAGE (GROUP S-2) /
ACCESSORY ASSEMBLY (GROUP A-3)
CONSTRUCTION TYPE: IBC, TYPE IIB
SPRINKLERED: YES
FIRE ALARM: YES, WITH VOICE
STORIES: 1 (ACTUAL) / 4 (MAXIMUM ALLOWED PER IBC)
HEIGHT: 26 FT (ACTUAL) / 75 FT (MAXIMUM ALLOWED PER IBC)
AREA: 70,180 SQFT (ACTUAL) / 92,000 (MAXIMUM ALLOWED PER IBC)
ATCT BUILDING
OCCUPANCY CLASSIFCIATION: BUSINESS (GROUP B) / LOW-HAZARD STORAGE (GROUP S-2)
CONSTRUCTION TYPE: IBC, TYPE IB
SPRINKLERED: YES
FIRE ALARM: YES, WITH VOICE
STORIES: 11 (ACTUAL) / 12 (MAXIMUM ALLOWED PER IBC)
HEIGHT: 169 FT (ACTUAL) / 240 FT (MAXIMUM ALLOWED PER IBC)
AREA: 1,035 SQFT (ACTUAL) / UNLIMITED ALLOWED PER IBC
WEST MAIN
ROOF
OPS
ROOM
ROOF
EQUIPMENT
ROOM ROOF
LOWER MAIN
ROOF
MAIN
ENTRANCE
CANOPY
EAST MAIN
ROOF
EQUIPMENT
YARD
N
LINK
SOC
ROOF
LOUNGE
PATIO
CANOPY
EMPLOYEE
ENTRANCE
CANOPY
VICINITY MAP
HAWAII
JURISDICTION AND PROJECT PERMITTING REQUIREMENTS
PER 40 USC 3312 (PUBLIC BUILDINGS AMENDMENT, 1988), THE FOLLOWING APPLY TO THIS PROJECT:
1. STATE AND LOCAL CODES, EXCEPT ZONING CODES AND SITE-WORK STANDARDS, ARE NOT APPLICABLE TO THIS PROJECT.
2. THE PROJECT WORK SHALL COMPLY WITH THE LATEST EDITION OF THE NATIONALLY RECOGNIZED BUILDING CODES, INCLUDING ELECTRICAL CODES, FIRE AND LIFE SAFETY CODES AND PLUMBING CODES, NOTED ON THE DRAWINGS AND IN THE
SPECIFICATIONS.
3. STATE AND LOCAL PERMITTING ARE NOT REQUIRED FOR THIS PROJECT, UNLESS NOTED OTHERWISE IN THE SPECIFICATIONS
FOR SPECIFIC PERMITS AND PERMITTING.
GENERAL LEGEND
DRAWING NUMBER DRAWING TITLE
GENERAL
G001 COVER SHEET
G002 INDEX OF DRAWINGS, GENERAL NOTES, LEGEND, LOCATION MAP & BUILDING
CODE ANALYSIS
G003 GENERAL ABBREVIATIONS
G004 CONSTRUCTION STAGING PLAN
ARCHITECTURAL
A101 OVERALL ROOF PLAN
A201 EXTERIOR ELEVATIONS
A401 RAILING DETAILS
A402 STAIR TO ROOF
A403 PERSPECTIVE VIEWS
STRUCTURAL
S001 STRUCTURAL GENERAL NOTES
S101 STRUCTURAL STAIR PLANS
S201 STRUCTURAL STAIR ELEVATIONS
S501 STRUCTURAL TYPICAL DETAILS
S502 STRUCTURAL TYPICAL DETAILS
DATE
DESCRIPTION JCN
REDLINE
DATE
APVD
REVIEWED BY
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
E D
M
THIS DRAWING PRODUCED ON THE XXXXXXXXXXXX REGION AUTOCAD SYSTEM
S N
IS
S
U E
D F
O R
1604158
SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE APPROVER'S TITLE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
AARON SHAW VANCE WHITESEL
MANAGER. AJW-2W11CPROJECT ENGINEER/ARCHITECT. AJW-2W11C
HONOLULU HIHONOLULU CONTROL FACILITY (HCF)
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
ENGINEERING SERVICES
TERMINAL
August 29, 2022
GENERAL ABBREVIATIONS
HONOLULU CONTROL FACILITY
HCF ROOF METALWORK
R.SIMMONS
M.KANG
W.STEVENS
HONOLULU CONTROL FACILITY
HONOLULU
H C
F
A T
C T
G
.d w g
HCF - D - ATCT- G003
GENERAL ABBREVIATIONS
HAWAII
STGP SIGNAL TRANSPORT GROUND PLANE
STL STEEL
STOR STORAGE
STRUC STRUCTURAL, STRUCTURE
SUCT SUCTION
SUSP SUSPENDED
SW SWITCH
SYM SYMMETRICAL
T T THERMOSTAT, TREAD
TBD TO BE DETERMINED
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
TC TEMPERATURE CONTROL SWITCH
TELCO TELECOMMUNICATION, TELEPHONE COMPANY LINE
TEMP TEMPERATURE
TI TEMPERATURE INDICATOR
TIC TEMPERATURE INDICATING CONTROLLER
TK TANK
TM&O TELECOMMUNICATIONS MANAGEMENT AND OPERATIONS
TOC TOP OF CONCRETE
TOS TOP OF STEEL
TOW TOP OF WALL
TRACON TERMINAL RADAR APPROACH CONTROL FACILITY
TRANS TRANSVERSE
TS TEMPERATURE SENSOR, TAMPER SWITCH
TYP TYPICAL
U UBC UNIFORM BUILDING CODE
UH UNIT HEATER
UL UNDERWRITER'S LABORATORIES, INC.
UON UNLESS OTHERWISE NOTED
UPS UNINTERRUPTIBLE POWER SYSTEM
UTIL UTILITY
UV UNIT VENTILATOR
V V VOLT
VAT VINYL ASBESTOS TILE
VAV VARIABLE VOLUME TERMINAL
VB VINYL BASE
VBT VINYL BASE & TRIM COMPONENTS
VC VERTICAL CURVE
VCT VINYL COMPOSITION TILE
VD VOLUME DAMPER
VERT VERTICAL
VF VERTICAL FEET, VENTILATION FAN
VFD VARIABLE FREQUENCY DRIVE
VGWB VINYL SURFACED GYPSUM WALL BOARD
VIF VERIFY IN FIELD
VP VELOCITY PRESSURE, VACUUM PRODUCER
VS VIBRATION SWITCH
W W WATT
W/ WITH
WD WOOD
WG WATER GAGE
WJHTC WILLIAM J. HUGHES TECHNICAL CENTER
W/O WITHOUT
WP WEATHERPROOF
WT WEIGHT
X XFER,
XFR
TRANSFER
XFMR TRANSFORMER
Y Y WYE CONNECTION
YD YARD
MECH MECHANICAL
MET METAL
MFG(R) MANUFACTURER
MG MOTOR GENERATOR
MIL MILLIMETER
MIN MINIMUM
MO MASONRY OPENING
MOD MODIFICATION
MS MOISTURE SENSOR
MTG MOUNTING, MOUNTED
N N/A NOT APPLICABLE
NAM NEGATIVE AIR MACHINE
NARACS NATIONAL RADIO COMMUNICATIONS SYSTEM
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NIC NOT IN CONTRACT
NO, # NUMBER
NOM NOMINAL
NPT NATIONAL PIPE THREAD
NTS NOT TO SCALE
O OA OUTSIDE AIR
OC ON CENTER
OD OUTSIDE DIAMETER, OPEN DRAIN
OF OUTSIDE FACE
OFD OVERFLOW ROOF DRAIN
OH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OSHA OCCUPATIONAL SAFETY & HEALTH ADMINISTRATION
OSW OPERATIONS SUPPORT WING
P P PUMP, PHASE, POLE
PACM PRESSUMED ASBESTOS CONTAINING MATERIAL
PBX PRIVATE BRANCH EXCHANGE
PC PRESSURE CONTROL SWITCH
PCB POLYCHLORINATED BIPHENYLS
PCF POUNDS PER CUBIC FOOT
PD PRESSURE DIFFERENTIAL
PDI PRESSURE DIFFERENTIAL INDICATOR
PDS PRESSURE DIFFERENTIAL SENSOR
PH PHASE
PHC PREHEAT COIL
PI POINT OF INTERSECTION, PRESSURE INDICATOR
PIV POST INDICATOR VALVE
PL PROPERTY LINE, PLATE
PLAM PLASTIC LAMINATE
PLF POUNDS PER LINEAR FOOT
PNL PANEL
POC POINT OF CONNECTION
PRV PRESSURE REDUCING VALVE
PS PRESSURE SENSOR
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PSM POWER SYSTEMS MODIFICATION
PT PAINT, POINT OF TANGENCY
PTVC POINT OF VERTICAL CURVATURE
PVC POLYVINYL CHLORIDE
PVDS PORTABLE VISUAL DISPLAY SYSTEM
PVI POINT OF VERTICAL INTERSECTION
PVMT PAVEMENT
PVT POINT OF VERTICAL TANGENCY
R R RISER, RADIUS
RA RETURN AIR
RAD RADIUS
RCP REFLECTED CEILING PLAN
RCRA RESOURCE CONSERVATION AND RECOVERY ACT
RD ROOF DRAIN
RECEPT,
RPTS
RECEPTACLE
REF REFERENCE
REG REGISTER
REINF REINFORCING
REQ'D REQUIRED
REV REVERSE, REVISION
RF RETURN FAN
RGS RIGID GALVANIZED STEEL
RHC REHEAT COIL
RM ROOM
RO ROUGH OPENING
RV REFRIGERANT VENT
S S SMOKE DETECTOR
SA SUPPLY AIR
SAN SANITARY
SAP SOUND ABSORBING PANEL
SCH,
SCHED
SCHEDULE
SCWD SOLID CORE WOOD
SD SMOKE DAMPER
SEC SECTION
SF SUPPLY FAN, SQUARE FEET
SHT SHEET
SIG SIGNAL
SIM SIMILAR
SM SPRINKLER MAIN
SP SUMP PUMP/SEWAGE PUMP, STATIC PRESSURE INDICATOR
SPEC SPECIFICATIONS
SQ SQUARE
SRF SAFETY RUBBER FLOOR TILE
SRGG SIGNAL REFERENCE GROUND GRID
SRS SIGNAL REFERENCE STRUCTURE
SSDI SECURITY SYSTEMS DESIGN AND INTEGRATION
SSTL, SS STAINLESS STEEL
ST STEAM, STREET
STA STATION
STC SOUND TRANSMISSION CLASS
STD STANDARD
STE STANDARD TAPERED END
FLEX FLEXIBLE DUCT
FLG FLANGE
FLUOR FLUORESCENT
FM FLOW METER, FIRE MAIN
FO FIBER OPTIC
FOL FUEL OIL LEVEL
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FOT FIBER OPTIC TERMINAL
FOV FUEL OIL VENT
FPM FEET PER MINUTE
FPU FIELD PROGRAMMING UNIT
FRP FIBER GLASS REINFORCED PLASTIC
FS FLOW SWITCH
FT, ' FEET
FTR FINNED TUBE RADIATION
FV FULL VOLTAGE
FZ FREEZESTAT
G G GAS
GA GAGE, GAUGE
GALV GALVANIZED
GEN GENERATOR
GFE GOVERNMENT FURNISHED EQUIPMENT
GFM GOVERNMENT FURNISHED MATERIAL
GL GLASS
GND GROUND, GROUND CONNECTOR
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GR GRILLE
GRV GRAVITY VENT
GS GAS SENSOR
GV GATE VALVE
GW GLYCOL WASTE
GWB GPYSUM WALLBOARD
GWH GAS WATER HEATER
H H HUMIDISTAT
HAZMAT HAZARDOUS MATERIALS
HB HOSE BIBB
HC HEATING COIL
HCF HONOLULU CONTROL FACILITY
HCS HOST COMPUTER ROOM
HDW HARDWARE
HE HEAT EXCHANGER
HERM HERMETIC
HM HOLLOW METAL
HORIZ HORIZONTAL
HP HORSE POWER, HEAT PUMP, HIGH PRESSURE
HPL HIGH PRESSURE LAMINATE
HPS HIGH PRESSURE SODIUM, HIGH PRESSURE STEAM
HPT HIGH POINT
HR HOUR
HS HIGH STRENGTH, HUMIDITY SENSOR
HT HEIGHT
HTG HEATING
HTP HOT TAP (W/ STOPPLE FITTING)
HTR HEATER
HU HUMIDIFIER
HVAC HEATING/VENTILATING/AIR CONDITIONING
HW DOMESTIC HOT WATER
HWL HIGH WATER LEVEL
HWR HOT WATER RETURN
HWS HOT WATER SUPPLY
HZ HERTZ
HWY HIGHWAY
I IBC INTERNATIONAL BUILDING CODE
ID INSIDE DIAMETER
IEWH INSTANTANEOUS ELECTRIC WATER HEATER
IF INSIDE FACE, INTERNAL FILTER
IN, " INCH
INST INSTRUMENTATION
INSUL INSULATION
INT INTERIOR
INT'L INTERNATIONAL
INV INVERT
ITEA INFORMATION TECHNOLOGY EQUIPMENT AREA
ITER INFORMATION TECHNOLOGY EQUIPMENT ROOM
J J JUNCTION
JB JUNCTION BOX
JC JANITOR'S CLOSET
K KCMIL THOUSAND CIRCULAR MILS
KVA KILOVOLT AMPERE
KW KILOWATTS
L LAN LOCAL AREA NETWORK
LBS, # POUNDS
LCC LEAD CONTAINING COATING
LCP LOCAL CONTROL PANEL
LCV LEVEL CONTROL VALVE
LF LINEAR FEET
LG LEVEL GAUGE
LL LIVE LOAD
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LONG LONGITUDINAL
LP LOW POINT
LPS LOW PRESSURE STEAM
LS LEVEL SWITCH
LT LIGHT
LTG LIGHTING
M M MOTOR
MAS MASONRY
MAT MATERIAL
MAX MAXIMUM
MCC MOTOR CONTROL CENTER
COMM COMMUNICATIONS
COMP COMPRESSIBLE, COMPRESSED
CONC CONCRETE
COND CONDITION, CONDENSATE
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUOUS, CONTINUATION
CONTR CONTRACTOR
COORD COORDINATE
COR CONTRACTING OFFICERS REPRESENTATIVE
CP CONTROL PANEL, CIRCULATING PUMP
CPC CRITICAL POWER CENTER
CPDS CRITICAL POWER DISTRIBUTION SYSTEM
CPT CARPET
CPU CENTRAL PROCESSING UNIT
CR CEILING REGISTER, CONTROL RELAY
CRAC COMPUTER ROOM AIR CONDITIONING UNIT
CRAH COMPUTER ROOM AIR HANDLING UNIT
CRU COMPUTER ROOM UNIT
CS CONTROL SWITCH
CT CABLE TRAY, COOLING TOWER
CTR CENTER, COOLING TOWER WATER RETURN
CTS COOLING TOWER WATER SUPPLY
CU CONDENSING UNIT
CW DOMESTIC COLD WATER
CWR CHILLER WATER RETURN
CWS CHILLER WATER SUPPLY
CWV COMBINATION WASTE AND VENT
CU CONDENSING UNIT
CV CONTROL VALVE, CONSTANT VOLUME TERMINAL
CYD CUBIC YARD
D D DRAIN, DELTA CONNECTION, DIFFUSER, DAMPER
DB DIRECT BURIAL, DRY BULB
DBL DOUBLE
DC DIRECT CURRENT
DDCP DIRECT DIGITAL CONTROL PANEL
DEG DEGREE(S)
DET DETAIL
DGP DATA GATHERING PANEL
DI DROP INLET, DAMPER POSITION INDICATOR, DIGITAL INPUT
DIA DIAMETER
DIAG DIAGONAL
DISC DISCONNECT
DISP DISPENSER
DIST DISTRIBUTION
DL DEAD LOAD
DM DEMAND METER
DN DOWN
DO DIGITAL OUTPUT
DOM DOMESTIC
DP DUSTPROOF PARTITION, DIFFERENTIAL PRESSURE SWITCH
DPDT DOUBLE POLE DOUBLE THROW
DPNL DISTRIBUTION PANEL
DPST DOUBLE POLE SINGLE THROW
DR DOOR
DWG(S) DRAWING(S)
E EA EACH, EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
ECP ENGINE CONTROL PANEL
EDAM ELECTRICAL DATA ACQUISITION AND MONITORING
EF EXHAUST FAN
EFF EFFICIENCY
EG ENGINE GENERATOR, EXHAUST GRILLE
EH ELECTRIC HEATER
EHC ELECTRIC HEATING COIL
EL, ELEV ELEVATION, ELEVATOR
ELEC ELECTRIC(AL)
EMD ESTIMATED MAXIMUM DEMAND
EMERG EMERGENCY
EMT ELECTRICAL METAL TUBING
ENT,
ENTR
ENTRANCE
EP EXHAUST PIPE
EPMS ELECTRICAL POWER MONITORING SYSTEM
EPX EPOXY
EQ EQUAL
EQUIP EQUIPMENT
ER EXHAUST REGISTER
ERMS ENVIRONMENTAL REMOTE MONITORING SYSTEM
ES EXHAUST SILENCER
ET ELECTRIC HEAT TRACE
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EXH EXHAUST
EXIST, EX EXISTING
EXP EXPOSED
EXPN EXPANSION
EXT EXTERIOR
F F FILTER, FIRE LINE
FA FAN COOLED
FAA FEDERAL AVIATION ADMINISTRATION
FC FAN COIL UNIT
FCO FLOOR CLEANOUT
FCV FLOW CONTROL VALVE
FD FIRE DAMPER OR FLOOR DRAIN
FD/SD COMBINATION FIRE AND SMOKE DAMPER
FDR FEEDER
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FEPC FRONT END PERSONAL COMPUTER
FFE FINISHED FLOOR ELEVATION
FHC FIRE HOSE CABINET
FI FLANGE INSULATION, FLOW INDICATOR
FIN FINISH
FIX, FIXT FIXTURE
FL, FLR FLOOR
FLA FULL LOAD AMPERES
A A AMPERE, AIR, COMPRESSED AIR LINE
AA AIR COOLED
AAV AUTOMATIC AIR VENT
AC ALTERNATING CURRENT, ASPHALT CONCRETE, AIR
COMPRESSOR
ACC AIR COOLED LIQUID CHILLER
ACD ADDRESSABLE CONTROL DEVICE
ACF ACCESS FLOOR SYSTEM
ACM ASBESTOS CONTAINING MATERIAL
ACP ACOUSTICAL CEILING PANEL
ACT ACCESS CONTROL TERMINAL, ACOUSTICAL CEILING TILE
ACU AIR CONDITIONING UNIT
A/C AIR CONDITIONING
AD AREA DRAIN, ACCESS DOOR
ADJ ADJACENT, ADJUSTABLE
ADR ACCESS DOOR
ADTN ADMINISTRATIVE DATA TRANSMISSION NETWORK
AED AUTOMATED EXTERNAL DEFIBRILLATOR
AF AMPERE FRAME, AIR FLOW SENSOR
AFF ABOVE FINISH FLOOR
AFMS AIR FLOW MEASURING STATION
AH AIR HANDLING UNIT
AHU AIR HANDLING UNIT
AIC AMPERES INTERRUPTING CAPACITY
AID ADDRESSABLE INTERFACE DEVICE
AIF AIR INTAKE FILTER
AL ALUMINUM
ALT ALTERNATE
AM AMP METER
AMM AMMETER
ANN ANNUNCIATOR
AO ANALOG OUTPUT
AP ANNUNCIATOR POINT
APC ACOUSTICAL PANEL CEILING
APPROX APPROXIMATELY
ARCH ARCHITECT(URAL)
ARTCC AIR ROUTE TRAFFIC CONTROL CENTER
ARTS AUTOMATED RADAR TERMINAL SYSTEM
AS AIR SEPARATOR
ASSY ASSEMBLY
AT AMPERE TRIP, AIR TRAFFIC
ATB AIR TERMINAL BOX
ATCT AIRPORT TRAFFIC CONTROL TOWER
ATS AUTOMATIC TRANSFER SWITCH
AUX AUXILIARY
AV ACID VENT
AVG AVERAGE
AWG AMERICAN WIRE GUAGE
AWP ACOUSTICAL WALL PANEL
AWR AUTOMATION WING REHABILITATION
& AND
@ AT
B B BOILER, BUILDING
BAT CHR BATTERY CHARGER
BC BARE COPPER
BD BOARD, BACK-DRAFT DAMPER, BLOWDOWN
BEL BELOW
BF BLIND FLANGE
BFP BACK FLOW PREVENTER
BFV BUTTERFLY VALVE
BFW BOILER FEED WATER
BHP BRAKE HORSE POWER
BKR BREAKER
BLDG BUILDING
BLKG BLOCKING
BLO BLOWER
BLV BALANCING VALVE
BM BENCH MARK, BEAM
BOCA BUILDING OFFICIALS AND CODE ADMINISTRATORS
INTERNATIONAL, INC
BOD BOTTOM OF DUCT, BASIS OF DESIGN
BOP BOTTOM OF PIPE
BOT,
BOTT
BOTTOM
BPU BREAKER PROGRAMMING UNIT
BRG BEARING
BSMT BASEMENT
BTU BRITISH THERMAL UNIT
BTU/H BRITISH THERMAL UNIT PER HOUR
BV BALL VALVE
BWP BACK WATER PREVENTER
BWV BACK WATER VALVE
C C CONDUIT
CA COMBUSTION AIR
CAB CABINET
CB CIRBUIT BREAKER
CC COOLING COIL
CCMS CENTRAL CONTROL AND MONITORING SYSTEM
CD CONTROL DAMPER, CEILING DIFFUSER, CONDENSATE DRAIN
CENT CENTRIFUGAL
CF CONTROL FACILITY
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FOOT
CG CEILING GRILLE
CH CHILLER
CI CURB INLET, CAST IRON
CIP CAST IRON PIPE, CAST IN PLACE
CIR CIRCULATING
CKT CIRCUIT
CL CENTER LINE
CLF CURRENT LIMITING FUSE
CLG CEILING
CLR CLEAR
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNIT
CO CLEANOUT, CONDUIT ONLY
COL COLUMN
COMB COMBINATION, COMBINE, COMBUSTION AIR
8' high chain link fence w barbed wire outrigger
MON WELL-15
MON WELL
MON WELL
A.C.Roadway
P ad
H andhole
B ox
B ox
W aste
O il B ox
P ad
B ox
M C
PARKING
P A
R K
IN
G
PARKING
GATE
LOADING DOCK
EMPLOYEE
ENTRANCE
ATCT
WEATHER
OBSERVATION
BUILDING
GUARDHOUSE
MAIN
SECURITY
GATE
FENCE
MAIN
ENTRANCE
VISITOR
PARKING
MEDIAN
MEDIAN
MEDIAN
BASE BUILDING
CAFETERIA
CANOPY
STRUCTURE
ENTRANCE
CANOPY
STRUCTURE
EQUIPMENT
YARD
NEW OR FUTURE
STAIR TO ROOF
CONTRACTOR
PARKING
CONTRACTOR
STAGING AREA
LOUNGE CANOPY
SEE SHT A402
EXIST SOLAR
CANOPY TO
REMAIN TYP
REV. APPROVED
DATE
DESCRIPTION JCN
REDLINE
DATE
APVD
REVIEWED BY
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
E D
M
THIS DRAWING PRODUCED ON THE XXXXXXXXXXXX REGION AUTOCAD SYSTEM
S N
IS
S
U E
D F
O R
1604158
SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE APPROVER'S TITLE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
AARON SHAW VANCE WHITESEL
MANAGER. AJW-2W11CPROJECT ENGINEER/ARCHITECT. AJW-2W11C
HONOLULU HIHONOLULU CONTROL FACILITY (HCF)
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
ENGINEERING SERVICES
TERMINAL
August 29, 2022
CONSTRUCTION STAGING PLAN
HONOLULU CONTROL FACILITY
HCF ROOF METALWORK
R.SIMMONS
M.KANG
W.STEVENS
HONOLULU CONTROL FACILITY
HONOLULU
H C
F
A T
C T
G
.d w g
HCF - D - ATCT- G004
GENERAL CONSTRUCTION STAGING NOTES
NOTE:
FINAL CONSTRUCTION STAGING AREA MUST BE DETERMINED AT PRECONSTRUCTION MEETING.
1" = 80'-0"G004
A8 CONSTRUCTION STAGING PLAN
THE FOLLOWING NOTES AND ACCOMPANYING "CONSTRUCTION STAGING PLAN" GRAPHICALLY REPRESENT MANY OF THE MAJOR REQUIREMENTS STATED IN "DIVISION 1 GENERAL REQUIREMENTS" OF THE SPECIFICATIONS. THESE NOTES PARAPHRASE DIVISION 1 REQUIREMENTS AND ARE NOT INTENDED TO MODIFY OR REPLACE DIVISION 1 REQUIREMENTS.
CONSTRUCTION ACCESS, PARKING, OFFICES AND EXTENT/SIZE OF CONSTRUCTION STAGING AREA MUST BE COORDINATED WITH SITE PERSONNEL VIA COR; PARTICULARLY IN CONJUNCTION WITH ONGOING PROJECTS. REFER A8/G004 FOR LOCATION OF PROPOSED CONSTRUCTION STAGING AREA AND PROPOSED CONSTRUCTION TRAILER LOCATION. LOCATION OF FINAL CONSTRUCTION STAGING AREA AND CONSTRUCTION TRAILER LOCATION TO BE DETERMINED AT
PRECONSTRUCTION CONFERENCE.
A. ACCESS THROUGH JOINT BASE PEARL HARBOR-HICKUM (JBPHH)
1. TRAVEL TO THE PROJECT SITE REQUIRES GOING THROUGH THE HICKUM AIR FORCE BASE PORTION OF JBPHH.
2. THERE ARE SPECIFIC SECURITY AND BADGING REQUIREMENTS AND PROCEDURES FOR ENTERING JBPHH. SEE THE PROJECT SPECIFICATION AND THE JBPHH INTERNET WEBSITE FOR INFORMATION ON THESE REQUIREMENTS AND
PROCEDURES.
B. FAA SECURITY REQUIREMENTS
1. AN ADVANCE LIST AND WEEKLY LOG OF CONTRACTOR'S PERSONNEL MUST BE PROVIDED TO COR. FAA RESERVES THE RIGHT NOT TO ACCEPT WORKERS. AT THE START OF EACH WORK SHIFT, ALLOW ADEQUATE TIME FOR CONTRACTOR'S PERSONNEL TO SIGN-IN AT GUARDHOUSE. TEMPORARY SECURITY BADGES MUST BE ISSUED TO CONSTRUCTION PERSONNEL. CONTRACTOR'S SUPERVISORY PERSONNEL MUST BE RESPONSIBLE FOR CONDUCT
OF THEIR PERSONNEL WHILE ON SITE. CONTRACTORS VEHICLES MUST BE MARKED.
2. SITE IS A SECURE AREA AND CONSTRUCTION VEHICLES MUST REMAIN IN CONSTRUCTION AREAS.
3. HCF IS A SECURE AREA AND CONSTRUCTION PERSONNEL MUST REMAIN IN CONSTRUCTION AREAS AT ALL TIMES.
CONTRACTOR MUST MINIMIZE INGRESS AND EGRESS.
4. FAA BADGED ESCORTS AND DESIGNATED ESCORTS MUST BE REQUIRED FOR CONSTRUCTION PERSONNEL WORKING ON SITE AND FOR DELIVERIES. COORDINATE WORK WITHIN THE BUILDING IN ADVANCE WITH COR.
ESCORTS OUTSIDE BUILDING MUST BE REQUIRED. OBTAIN FAA SECURITY BADGES FOR A SUFFICIENT NUMBER OF
EMPLOYEES TO PROVIDE ESCORTS FOR EMPLOYEES AND DELIVERIES.
5. CONTRACTOR PERSONNEL MAY BE FINGERPRINTED AND PHOTOGRAPHED FOR FAA SECURITY COMPLIANCE.
SOCIAL SECURITY NUMBERS WILL BE REQUIRED.
C. CONSTRUCTION ACCESS AT THE FAA SITE
1. CONTRACTOR'S VEHICLES, PEDESTRIANS AND DELIVERIES TO SITE MUST BE THROUGH FAA SITE SECURITY GATE.
COR AND THEIR ASSIGNED REPRESENTATIVES WILL ESCORT CONTRACTOR'S PERSONNEL, VEHICLES, AND DELIVERIES THROUGH THE FAA SITE SECURITY GATE. THIS GATE IS MANNED 24 HOURS A DAY.
2. PROVIDE SIGNAGE TO INDICATE ACCESS ROUTE FOR CONSTRUCTION EMPLOYEES AND DELIVERIES ON SITE.
PROVIDE NECESSARY BARRICADES, LIGHTS, SIGNAGE AND FENCING TO PROTECT, WARN AND DIRECT PERSONS NEAR CONSTRUCTION AREAS. BARRICADES, SIGNAGE, LIGHTS, FENCING ETC. MUST BE COORDINATED WITH COR
PRIOR TO BEING IMPLEMENTED.
3. ACCESS TO BUILDING FOR THE WORK MUST BE THROUGH ENTRANCES IDENTIFIED BY COR.
4. KEEP HCF BUILDINGS ACCESSIBLE AT ALL TIMES FOR FAA DELIVERIES. COORDINATE WORK TO MINIMIZE IMPACT FOR FAA BUILDINGS TO RECEIVE DELIVERIES. COORDINATE WITH COR DELIVERY RECEIVING AREA
REQUIREMENTS. CONTRACTOR MUST MAINTAIN FAA ACCESS TO FAA DUMPSTERS AT ALL TIMES.
5. USE OF HCF BUILDING LOADING DOCK MUST BE COORDINATED WITH COR.
6. DELIVERIES MUST BE SCHEDULED AND APPROVED IN ADVANCE WITH COR AND AT TIMES OTHER THAN FAA EMPLOYEE AFTERNOON SHIFT CHANGE TO AVOID CONGESTION. AFTERNOON SHIFT CHANGE OCCURS FROM 3:30 PM TO 5:00 PM. COORDINATE DELIVERIES WITH THE COR. DELIVERY VEHICLES MUST ONLY CONTAIN ITEMS BEING DELIVERED TO FAA. IF VEHICLE CONTAINS OTHER DELIVERIES, VEHICLES MUST NOT BE ALLOWED ON SITE.
7. HCF BUILDING ENTRANCES MUST REMAIN ACCESSIBLE TO FAA EMPLOYEES AND GUESTS, 24 HOURS A DAY, 7 DAYS A WEEK TO PROVIDE ENTRY TO AND EGRESS FROM HCF BUILDINGS. CONSTRUCTION FENCE, CONSTRUCTION, EQUIPMENT, MATERIAL, AND OTHER CONSTRUCTION MATERIAL MUST NOT OBSTRUCT ENTRANCE USE. A CLEAR, UNOBSTRUCTED PATH FOR PEDESTRIAN TRAFFIC MUST BE PROVIDED FROM PARKING LOTS TO EMPLOYEE AND MAIN BASE BUILDING ENTRANCES AND OTHER HCF FACILITIES. CHANGES TO, CLOSURES, OR OTHER ACTIVITY IMPACTING THE USE OF THE BUILDING ENTRANCES OR THE ACCESS/WALKWAY TO THE BUILDING ENTRANCES MUST BE COORDINATED AND APPROVED IN WRITING BY COR WITH A MINIMUM 10 DAYS BEFORE PERFORMANCE OF
THE WORK.
a. PROVIDE TEMPORARY AND ABA-ACCESSIBLE WALKWAY TO HCF BUILDING ENTRANCES AS REQUIRED BY THE WORK. PROVIDE ABA-COMPLIANT RAMPS AT CURBS AND OTHER OBSTRUCTIONS WHERE REQUIRED. GRASS WALKWAY IS NOT ACCEPTABLE. ACCEPTABLE MATERIALS FOR TEMPORARY WALKWAY INCLUDE BOARDWALK, CONCRETE, OR OTHER UNYIELDED MATERIAL APPROVED FOR USE BY COR. PROVIDE FENCING AS REQUIRED TO DIRECT PEDESTRIAN TRAFFIC TO TEMPORARY WALKWAY. PROVIDE SIGNAGE INDICATING PEDESTRIAN ACCESS ROUTE TO HCF BUILDINGS AS REQUIRED AND COORDINATED WITH COR. PROVIDE EXIT/EGRESS LIGHTING ALONG LENGTH OF TEMPORARY WALKWAY. TEMPORARY LIGHTING MUST BE COORDINATED WITH
AND APPROVED BY COR PRIOR TO INSTALLATION.
b. PROVIDE OVERHEAD PROTECTION AT HCF BUILDING ENTRANCES AND ALONG TEMPORARY WALKWAY FROM CONSTRUCTION AND FALLING DEBRIS. EXTENT AND CONSTRUCTION OF OVERHEAD PROTECTION TO BE
COORDINATED WITH AND APPROVED BY COR.
c. DEVELOP RISK MITIGATION PLAN FOR CHANGES TO OR ACTIVITY IMPACTING THE USE OF THE HCF BUILDING ENTRANCES OR THE ACCESS/WALKWAY TO THE HCF BUILDING ENTRANCES. COORDINATE FINAL PLAN REQUIREMENTS WITH COR AND DIVISION 1 SPECIFICATIONS. RISK MITIGATION PLAN MUST ADDRESS, BUT IS NOT LIMITED TO, INFORMING OCCUPANTS AND VISITORS OF CONSTRUCTION ACTIVITY THAT AFFECTS FIRE PROTECTION AND LIFE SAFETY WITHIN THE FACILITY, ALTERNATIVE MEANS OF EGRESS FOR BUILDING OCCUPANTS, SIGNAGE, AND, IF REQUIRED PER COR, TRAINING WHEN THE ENTRANCE AND/OR WALKWAY ARE OUT OF SERVICE. PLAN MUST MINIMIZE TIME THAT ENTRANCE AND/OR WALKWAY ARE OUT OF SERVICE.
D. CONTRACTOR PARKING
1. CONTRACTOR PARKING MUST BE COORDINATED WITH COR. CONTRACTOR'S PARKING MUST BE LIMITED TO:
CONSTRUCTION STAGING AREA AND AS NOTED. ADDITIONAL PARKING MUST BE OFF-SITE AND PROVIDED BY CONTRACTOR. EXISTING PARKING SPACES AT HCF ARE OFF-LIMITS FOR CONTRACTOR PARKING EXCEPT FOR
INDICATED PARKING SPACES.
H. CONSTRUCTION TOILET FACILITIES
1. PORTABLE CHEMICAL TOILETS MUST BE PROVIDED WITHIN THE CONSTRUCTION STAGING AREA. PORTABLE CHEMICAL TOILETS ARE NOT ALLOWED WITHIN THE HCF BUILDINGS. COORDINATE WITH THE COR FOR
SCHEDULING OF SERVICE.
2. PROVIDE WASH STATIONS IN ADDITION TO PORTABLE TOILETS IN CONSTRUCTION STAGING AREA.
3. TOILET ROOMS INSIDE HCF BUILDINGS MUST NOT BE USED.
I. DEMOLITION AND CONSTRUCTION HOURS
1. HCF BUILDINGS ARE A 24 HOUR 7 DAY PER WEEK OPERATING FACILITY. THE OPS CENTER AND ENVIRONMENTAL SUPPORT AREAS OPERATE 24 HOURS 7 DAYS PER WEEK. SELECTIVE CONSTRUCTION ACTIVITY WILL BE LIMITED
TO OFF-HOURS WORK TO MINIMIZE RISK TO THE OPERATIONAL FACILITY.
2. DO NOT INTERFERE WITH THE FUNCTION OF THIS FACILITY. DEMOLITION AND CONSTRUCTION NOISE MUST BE MINIMIZED BETWEEN 6:00 AM TO 6:00 PM. WORK DETERMINED BY THE COR TO BE DISRUPTIVE TO THE
OPERATIONS MUST BE STOPPED AND RESCHEDULED TO BE PERFORMED DURING OFF-HOURS.
3. FAA HAS AND MAINTAINS EQUIPMENT THAT IS CRITICAL TO ITS OPERATION THROUGHOUT THIS FACILITY.
COORDINATE WITH COR LOCATION OF CRITICAL EQUIPMENT THAT MAY BE AFFECTED BY THE WORK AND PROCEDURES TO PROTECT THIS AND OTHER FAA/ GOVERNMENT EQUIPMENT. WORK IN AREAS WITH CRITICAL
EQUIPMENT MUST BE ACCOMPLISHED DURING OFF-HOURS OR AS APPROVED BY COR.
4. CONCRETE SAWING, CORE DRILLING, CONCRETE DEMOLITION AND ANCHOR DRILLING MUST BE ALLOWED ONLY AT PREARRANGED TIMES APPROVED BY COR. SCHEDULE, COORDINATE AND HAVE APPROVAL BY COR IN WRITING, A
MINIMUM OF 10 WORKING DAYS BEFORE THE PERFORMANCE OF THE WORK.
J. PARKING LOT, DRIVEWAY REPAIR, AND LANDSCAPED AREAS
1. PROVIDE TEMPORARY, ABA-ACCESSIBLE PARKING EQUAL TO THE PERMANENT ACCESSIBLE PARKING WHILE PERMANENT ACCESSIBLE PARKING IS INACCESSIBLE OR OUT OF SERVICE. COORDINATE LOCATION WITH COR.
PROVIDE REQUIRED STRIPING AND SIGNAGE AT TEMPORARY, ACCESSIBLE PARKING. AT COMPLETION OF THE WORK REPAIR TEMPORARY SPACES TO ORIGINAL CONDITION. COORDINATE ADDITIONAL REQUIREMENTS WITH
CIVIL.
2. UPON COMPLETION OF WORK, REPAIR PAVED SURFACES AT AFFECTED WORK AREAS TO ORIGINAL CONDITION, INCLUDING STRIPING OF REPAIRED PAVED SURFACES.
3. DISTURBED LAWNS AND LANDSCAPING MUST BE RESTORED TO ORIGINAL CONDITION TO THE SATISFACTION OF COR. LAWN DAMAGED BY THE WORK MUST BE REPLACED TO MATCH EXISTING AND TO SATISFACTION OF COR.
REFER TO CIVIL FOR ADDITIONAL INFORMATION.
K. EQUIPMENT PROTECTION
1. PROTECT NEW AND EXISTING FAA EQUIPMENT, BOTH INSIDE AND OUTSIDE BUILDING, FROM DAMAGE, INCLUDING BUT NOT LIMITED TO, DAMAGE CAUSED BY IMPACT, VIBRATIONS, WATER, ASBESTOS, DEBRIS AND DUST, INCLUDING CORE DRILLING.
2. SHUTDOWNS AND SWITCHOVERS OF MECHANICAL AND ELECTRICAL SYSTEMS MUST BE ACCOMPLISHED DURING OFF-HOURS AS INDICATED UNDER DEMOLITION AND CONSTRUCTION HOURS ON THIS SHEET. ONLY FAA MAY SHUT OFF MECHANICAL VALVES, COORDINATE SHUTTING OFF VALVES WITH COR. PREPARATORY WORK MUST BE COMPLETED PRIOR TO SHUTDOWN AND SWITCHOVER. SCHEDULE, COORDINATE AND HAVE APPROVAL IN WRITING BY COR WITH A MINIMUM OF 10 WORKING DAYS NOTICE IN ADVANCE OF PERFORMANCE OF WORK. ONLY FAA PERSONNEL MAY OPERATE CIRCUIT BREAKERS. REQUEST PERMISSION, COORDINATE, AND HAVE APPROVAL IN WRITING BY COR WITH A MINIMUM OF 10 WORKING DAYS NOTICE IN ADVANCE FOR EACH CASE OF BREAKER
OPERATION. DO NOT OPEN (DE-ENERGIZE) OR CLOSE (ENERGIZE) CIRCUIT BREAKERS.
3. NO WELDING EQUIPMENT MUST BE POWERED BY THE FACILITY ELECTRICAL SYSTEM. WELDING MUST NOT BE PERMITTED IN FAA OCCUPIED AREAS UNLESS APPROVED IN WRITING BY COR. OSHA WORK PRACTICES MUST BE
EXERCISED FOR ALL PHASES OF CONSTRUCTION INCLUDING WELDING OPERATIONS.
4. USE GREAT CARE AND CAUTION WHILE WORKING IN ALL AREAS OF THIS FACILITY. WORK MUST BE COORDINATED
WITH COR. DISRUPTION OF THIS FACILITY MUST NOT BE PERMITTED.
5. EXISTING FAA AIR TRAFFIC EQUIPMENT MUST REMAIN OPERATIONAL THROUGHOUT DURATION OF THIS CONTRACT. PROVIDE CONTINUOUS PROTECTION OF THIS EQUIPMENT FROM PHYSICAL OR ELECTRICAL DAMAGE AS A RESULT OF INCIDENTAL OR ACCIDENTAL NEGLIGENCE SUCH AS, BUT NOT LIMITED TO, DISRUPTION OF POWER TO EQUIPMENT. NOTIFY COR IMMEDIATELY OF DAMAGE OR DISRUPTION OF ELECTRICAL AND/OR
MECHANICAL SERVICES.
6. VENTS MUST NOT DISCHARGE NEAR AIR INTAKES OR WINDOWS. TAKE CARE NOT TO EXPOSE FAA EMPLOYEES TO
FUMES, ODORS, OR OFF GASSING.
L. AIRFIELD FOREIGN OBJECT DAMAGE (FOD) PREVENTION
1. MAKE PROVISIONS FOR SECURING CONSTRUCTION MATERIALS AND DEBRIS ON THE ROOF, ON THE GROUND AND
IN VEHICLES, TO ASSURE THAT NOTHING BECOMES LOOSE AND BLOWS AWAY IN WIND.
E. CONSTRUCTION MATERIAL STORAGE
1. STORAGE OF CONSTRUCTION MATERIALS ON SITE MUST BE LIMITED TO THE CONSTRUCTION
STAGING AREA. MATERIALS MUST BE NEATLY STORED AND PROTECTED. LIGHTING MUST BE
PROVIDED AT THE DISCRETION OF COR. DO NO DIGGING WITHOUT PRIOR PERMISSION FROM COR.
BURIED CABLES (UNDERGROUND UTILITIES) MAY RUN THROUGH STAGING AREA AND ELSEWHERE.
2. THE CONSTRUCTION STAGING AREA MUST BE SURROUNDED BY A LOCKABLE FENCE.
CONSTRUCTION OF THE FENCE MUST BE TO THE SATISFACTION OF THE COR. PROVIDE COR AND
SECURITY WITH KEYS TO FENCE. COORDINATE NUMBER OF KEYS WITH COR.
F. CONSTRUCTION DEBRIS
1. ENCLOSED DUMPSTERS FOR DISPOSAL OF CONSTRUCTION DEBRIS MUST BE PROVIDED WITHIN
THE CONSTRUCTION STAGING AREA. AREAS AROUND DUMPSTERS MUST BE KEPT CLEAN AND
FREE OF EXCESS DEBRIS AND DUST DURING CONSTRUCTION. DEBRIS MUST BE REMOVED DAILY.
PROVIDE SEPARATE DUMPSTER, IF REQUIRED, FOR ABATEMENT MATERIAL. QUANTITY AND
POSITION OF DUMPSTERS MUST BE COORDINATED WITH THE COR PRIOR TO THEIR DELIVERY AND
PLACEMENT.
G. CONSTRUCTION OFFICE
1. CONSTRUCTION TRAILER FOR OFFICE, MATERIALS AND EQUIPMENT STORAGE MUST BE LOCATED
IN PROPOSED CONSTRUCTION TRAILER LOCATION. PROVIDE BOTTLED WATER. TEMPORARY
POWER, DATA, AND TELEPHONE IS AVAILABLE, IF REQUIRED FOR CONSTRUCTION PURPOSES OF
THE WORK. TRAILER POINT OF CONNECTION MUST BE DETERMINED AT PRECONSTRUCTION
CONFERENCE. HOOK-UPS ARE THE RESPONSIBILITY OF CONTRACTOR.N
1 2 3 4 5 6 7 9 10 11 11.1 13 15 17 19 21 23 25 27 28
5.1 10.1 12.1 24.1
A
B
C
D
E
F
F.1
F.2
G
H
J
AA
A.1
B.1
D.1
G.1
T1 T2
M
14 29.1 302618 20 22 24
D.2
D.6
K
L
27.4
G8
A201
C8
A201
A8
A201
E8
A201
E8
A402
SlopeSlope SlopeSlope
RIDGE
SlopeSlope SlopeSlopeSlopeSlopeSlope
Slope
S lo p e
R
ID
G E
SlopeSlope
S lo p e
S lo p e
S lo p e
S lo p e
S lo p e
S lo p e
Slope
SlopeSlope SlopeSlope
SlopeSlope SlopeSlope
S lo p e
S lo p e
S lo p e
S lo p e
S lo p e
S lo p e
RIDGE RIDGE
S lo p e
S lo p e
S lo p e
S lo p e
S lo p e
S lo p e
RIDGE
SIM
E4
A401
E4
A401
TYP
E4
A401
SIM
E4
A401
TYP
E4
A401
TYP
SIM
E4
A401
E4
A401
TYP
E4
A401
A8
A402
EQUIPMENT YARD
EQUIPMENT
ROOM ROOF
OPS ROOM
ROOF
WEST MAIN
ROOF
LOWER MAIN
ROOF
EAST MAIN
ROOF
MAIN
ENTRANCE
CANOPY
+EL 16'-11" (+/-)
+EL 14'-1" (+/-)
+EL 20'-11" (+/-)
+EL 25'-2" (+/-) +EL 21'-9" (+/-)
+EL 16'-2" (+/-)
+EL 16'-10" (+/-)
CAFETERIA
CANOPY
LOUNGE
PATIO
CANOPY
ATCT
LINK
SOC ROOF
EMPLOYEE
ENTRANCE
CANOPY
T
Y P
T
Y P
110' - 8 1/2" (+/-)
18' - 8 1/2" (+/-)
80' - 10" (+/-)
60' - 8" (+/-)
4'-0" TYP
42' - 3 1/2" (+/-)
8' - 6" 105' - 6 1/2" (+/-)
/2
99' - 3" (+/-) 128' - 9" (+/-)
/2
T
Y P
/2
26' - 3" (+/-)
/2
OPS AREA ROOF. NOISE AND
FUME RESTRICTED AREA
NEW ROOF EDGE GUARDRAIL
N
REV. APPROVED
DATE
DESCRIPTION JCN
REDLINE
DATE
APVD
REVIEWED BY
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
KEY NORTH
E D
M
THIS DRAWING PRODUCED ON THE XXXXXXXXXXXX REGION AUTOCAD SYSTEM
S N
IS
S
U E
D F
O R
KEY PLAN
BASE BUILDING
ATCT
WEATHER
OBSERVATIONGUARDHOUSE
1604158
SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE APPROVER'S TITLE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
AARON SHAW VANCE WHITESEL
MANAGER. AJW-2W11CPROJECT ENGINEER/ARCHITECT. AJW-2W11C
HONOLULU HIHONOLULU CONTROL FACILITY (HCF)
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
ENGINEERING SERVICES
TERMINAL
August 29, 2022
OVERALL ROOF PLAN
HONOLULU CONTROL FACILITY
HCF ROOF METALWORK
R.SIMMONS
M.KANG
W.STEVENS
HONOLULU CONTROL FACILITY
HONOLULU
H C
F
A T
C T
A
.d w g
HCF - D - ATCT- A101
1" = 20'-0"A101
B8 OVERALL ROOF PLAN 3030
SCALE: 1"=20'-0"
020 10 3030
SCALE: 1"=20'-0"
020 10
A. ROOF ELEVATIONS NOTED ON THIS PLAN ARE APPROXIMATIONS AND FOR REFERENCE ONLY.
B. LIGHTNING PROTECTION SYSTEM (LPS) REMOVAL AND REINSTALLATION MUST BE DONE IN
PHASES ACCORDING TO ROOF REPLACEMENT PHASING PLAN. THE LPS WORK WILL BE
CONCURRENT TO THE RE-ROOFING WORK (AREA BY AREA). CONTRACTOR MUST NOT REMOVE
ANY LPS PRIOR TO CONFIRMING THE RE-ROOFING WORK AREA. CONTRACTOR MUST MAINTAIN
CONTINUITY OF THE LPS AT ALL TIMES. PROVIDE TEMPORARY LPS AS REQUIRED.
C. COORDINATE WITH FAA FOR EXISTING EQUIPMENT TO BE REMOVED AND REINSTALLED.
GENERAL SHEET NOTES
KEY PLAN
NEW WORK KEYNOTES#
LEGEND
1 LINE OF GUARDRAIL, TYP
2 GUARDRAIL OPENING FOR LOWER ROOF ACCESS
3 ROOF ACCESS STAIR
4 ACCESS SWING GATE
5 ROOF TIE-OFF ANCHOR, REFER TO STRUC
EXISTING GRADE
0"
12345679101111.1131517192123252728 24.1 1426 1820222427.4
TOP OF EXIST PARAPET
17'-5"
HIGH PARAPET
26'-0"
A8
A401
TYP
TYP
EXISTING GRADE
0"
1 2 4 5 11 11.1 13 15 17 19 21 23 25 27 285.1 10.1 12.1 24.114 29.1 302618 20 22 24 27.4
TOP OF CONC. ROOF DECK
14'-8"
TYP
TYP
24 4
EXISTING GRADE
0"
FHJ AAA.1B.1D.1G.1M D.2D.6KL
TOP OF EXIST PARAPET
17'-5"
HIGH PARAPET
26'-0"
TOP OF CONC. ROOF DECK
14'-8"
TYP
TYP
EXISTING GRADE
0"
A B C D E F F.1 F.2 G H JD.1 MD.2 D.6 K L
TOP OF EXIST PARAPET
17'-5"
TOS
14'-11 1/2"
TYP
TYP
REV. APPROVED
DATE
DESCRIPTION JCN
REDLINE
DATE
APVD
REVIEWED BY
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
E D
M
THIS DRAWING PRODUCED ON THE XXXXXXXXXXXX REGION AUTOCAD SYSTEM
S N
IS
S
U E
D F
O R
1604158
SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE APPROVER'S TITLE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
AARON SHAW VANCE WHITESEL
MANAGER. AJW-2W11CPROJECT ENGINEER/ARCHITECT. AJW-2W11C
HONOLULU HIHONOLULU CONTROL FACILITY (HCF)
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
ENGINEERING SERVICES
TERMINAL
August 29, 2022
EXTERIOR ELEVATIONS
HONOLULU CONTROL FACILITY
HCF ROOF METALWORK
R.SIMMONS
M.KANG
W.STEVENS
HONOLULU CONTROL FACILITY
HONOLULU
H C
F
A T
C T
A
.d w g
HCF - D - ATCT- A201
1/16" = 1'-0"A201
G8 NORTH ELEVATION
1/16" = 1'-0"A201
E8 SOUTH ELEVATION
1/16" = 1'-0"A201
C8 EAST ELEVATION
1/16" = 1'-0"A201
A8 WEST ELEVATION
A101
A101
A101
A101
NEW WORK KEYNOTES#
16 0
Scale: 1/16 INCH = 1 FOOT
16 32
1 GUARDRAIL PER SHEET A401, TYP., HOT-DIP GALVANIZED WITH SHOP-APPLIED, HIGH
PERFORMANCE COATING PER 09 06 00 HIGH PERFORMANCE COATING, WITH FIELD TOUCH-UP WITH
THE SAME FINISH.
2 LIGHTNING PROTECTION SYSTEM BONDING AND AIR TERMINALS ON GUARDRAIL, TYP., SEE SHEET A401
3 ROOF ACCESS STAIR. SEE SHEET A402
4 ACCESS SWING GATE
1 1/2" DIA TOP
GUARDRAIL TYP
1 1/2" DIA
INTERMEDIATE RAIL
TYP
A6
A401
4'-0" MAX
LINE OF PARAPET
COPING TYP
EXISTING PVC ROOF
STEEL POST SLEEVE
BRACKET FASTENED TO
PARAPET, SEE STRUC
EXISTING PARAPET
COPING
GUARDRAIL TYP
UL 467 & UL 96 LISTED
IRREVERSIBLE COMPRESSION
TYPE BONDING CONNECTION
CLASS II LPS
CONDUCTOR
ROOF
1/2" X 24" MINIMUM
BULLET TIP AIR
TERMINAL
PIPE CLAMP WITH
AIR TERMINAL BASE
PIPE CLAMP
CLASS II JUMPER
PROVIDE BONDING JUMPER
BETWEEN SECTIONS OF
GUARDRAIL. COORDINATE WITH
FINAL SELECTED GUARDRAIL.
METAL GUARDRAIL
BOND THE LIGHTNING PROTECTION SYSTEM
TO THE GUARDRAIL BASE-METAL AND
PROVIDE AIR TERMINALS ON THE
GUARDRAIL, TYP., PER THE REQUIREMENTS
IN SPEC SECTION 26 41 13 LIGHTNING
PROTECTION FOR STRUCTURES.
EXISTING LPS
ROOF PERIMETER
CONDUCTOR
TOP RAIL SHOP WELDED
TO POST. TYP
MIDRAIL SHOP WELDED
TO POST. TYP
FASTENER TYP
SPLICE BAR AT PIPE
CONNECTIONS TYP
CAP
Slope
1 1/2" MIN
POST WELDED TO
STEEL BRACKET.
SEE STRUCTURE
3" 1 1/2"1 1/2"
6"
TOP AND MID RAIL
WELDED TO POST
W/ SPLICE BAR TYP
TOP RAIL FASTENED TO
SPLICE BAR. PROVIDE
WEEP HOLES TYP
FASTENERS WITH
NEOPRENE
SPACERS TYP
LINE AT TOP OF
PARAPET COPING
POST WELDED TO
PLATE
STEEL POST
BRACKET. SEE
STRUCTURE
A4
A401
EXISTING
PARAPET WALL
STEEL POST SHOP
WELDED TO STEEL PLATE
(055213 Pipe and Tube Railings)
F
R O
M T
O P
O F
P A
R A
P E
T
1 1/2"
STEEL RAILING SHOP
WELDED TO POST
(055213 Pipe and Tube Railings)
E Q
E Q
EXISTING
6"
V A
R
IE
S
M
IN
E X
IS
T
IN
G
TOP OF PARAPET, LEVEL +/-
REV. APPROVED
DATE
DESCRIPTION JCN
REDLINE
DATE
APVD
REVIEWED BY
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
E D
M
THIS DRAWING PRODUCED ON THE XXXXXXXXXXXX REGION AUTOCAD SYSTEM
S N
IS
S
U E
D F
O R
1604158
SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE APPROVER'S TITLE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
AARON SHAW VANCE WHITESEL
MANAGER. AJW-2W11CPROJECT ENGINEER/ARCHITECT. AJW-2W11C
HONOLULU HIHONOLULU CONTROL FACILITY (HCF)
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
ENGINEERING SERVICES
TERMINAL
August 29, 2022
RAILING DETAILS
HONOLULU CONTROL FACILITY
HCF ROOF METALWORK
R.SIMMONS
M.KANG
W.STEVENS
HONOLULU CONTROL FACILITY
HONOLULU
H C
F
A T
C T
A
.d w g
HCF - D - ATCT- A401
1" = 1'-0"A401
A8 PARAPET RAILING ELEVATION
1 0 1
Scale: 1 1/2 INCH = 1 FOOT
- Not to Scale
E2 PARAPET RAILING
- Not to Scale
E8 TYPICAL AIR TERMINAL MOUNTING DETAIL ON GUARDRAIL
GENERAL SHEET NOTES
GRAPHIC SCALE(S)
1 0 1 2
Scale: 1 INCH = 1 FOOT
A. PROVIDE AIR TERMINALS ON GUARDRAIL AT MAXIMUM 20 FEET
INTERVALS. BOND AIR TERMINALS TO BE REINSTALLED WITH LPS LOOP
CONDUCTOR ON THE ROOF.
A201
HAWAII
3" = 1'-0"A401
A4 DETAIL AT RAILING
3" = 1'-0"A401
A6 DETAIL AT RAILING
1 1/2" = 1'-0"A401
E4 TYPICAL RAILING DETAIL
0 12"
Scale: 3 INCH = 1 FOOT
8"4"
UP
UP
20A6
A402
CONCRETE PAD
(03 30 00 Cast-in-
Place Concrete)
MATCH EXISTING
SLAB ELEVATION
EXISTING
CONCRETE WALK
TYP
ROOF
42" WIDE ACCESS
GATE W/ HASP AND
HASP FOR NIC
PADLOCK
(323113 Fences and Gates)
FRP LANDINGS AND
TREADS, SEE STRUC
FOR STEEL
FRAMING, TYP.
(067413 Fiberglass Reinforced Gratings )
EXISTING
LIGHT POLE
TO REMAIN
VERIFY UNDERGROUND
LIGHTPOLE CONDUIT
LOCATION PRIOR TO
EXCAVATION. IF IT CONFLICTS
WITH STAIR FOUNDATION
CONSULT WITH COR FOR HOW
TO PROCEED.
VERIFY
UNDERGROUND
STORM LINE
EXISTING
ROOF DRAIN
REMOVE EXISTING
TREE. PATCH AREA TO
MATCH ADJACENT
LANDSCAPING
R
"M
A X
T
LANDING
8' - 8"
R
"M
A X
T
L A
N D
IN
G
/4
R
"M
A X
T
3' - 5 1/2"
M
F E
N C
E
FENCE
4' - 8"
7' - 0"
5' - 5" (+/-)
EXISTING GRADE
0"
EXISTING GRADE
0"
M
TOP OF EXIST PARAPET
17'-5"
SEE STRUC
3' - 4 1/2" CLEAR, REF.
6' HIGH ACCESS GATE
AND FENCE ENCLOSURE
(323113 Fences and Gates)
TOS
14'-11 1/2"
D6
A402
E6
A402
TOP OF LANDING STEEL
18'-7"
APPROX. ROOF EL +/-
15'-8 1/2"
TOS LANDING
7'-3 3/16"
TOP OF INTERMEDIATE LANDING
7'-7"
CONT. TOEBOARD
FIELD WELDED TO
POSTS AT LANDING
TYP
FRP LANDING AND TREADS TYP
SEE STRUCTURE FOR SUPPORT
FRAMING
STAIR ROOF
CONNECTION
SEE STRUCTURE
C L R
NOTE: OPEN STAIR
TREADS TYP. SEE
DTL D6
1' - 0"
D3
A402
EXISTING BLDG FIRST FLOOR
0'-0" +/-
REF., SEE STRUCT
TOP OF CONC
SLAB AT GRADE
AT BASE OF STAIR
0'-0" +/-
REF. SEE STRUCT
REF., SEE STRUCT
EXISTING GRADE
A6
A402
TOP OF LANDING STEEL
18'-7"
TOP OF INTERMEDIATE LANDING
7'-7"
TOP OF CONC DECK
15'-4"
TOP OF CONC SLAB AT GRADE
AT BASE OF STAIR
00'"-0" +/-
REF. SEE STRUCT
FRP TREAD TYP (06
74 13 Fiberglass Reinforced Gratings)
METAL STRINGER
FRP GRATING AT
LANDING TYP
/4
STAIR FRAMING
SEE STRUCTURE
EXISTING GRADE
0"
METAL STRINGER
SEE STRUCTURE
1 1/2" DIA
GUARDRAIL
FRP TREAD TYP
(067413 Fiberglass
Reinforced Gratings)
6' HIGH ACCESS
FENCE
MIN
11"
M A
X
1 1/2" DIA
HANDRAIL
A B
O V
E N
O S
IN
G
G U
A R
D R
A
IL
A B
O V
E N
O S
IN
G
H A
N D
R A
IL
A B
O V
E N
O S
IN
G
IN
T
E R
M E
D
IA
T E
R A
IL
1' - 0"
STAIR BASE
CONNECTION. SEE
STRUCTURE
TOP OF CONC
SLAB AT GRADE
AT BASE OF STAIR
0'-0" +/-
SEE STRUCT
1' - 0"
STL ANGLE SEE
STRUCT
STAIR STRINGER
ROOFING SYSTEM FLASHING NIC
CUT AND REMOVE EXISTING ROOFING SYSTEM AS
REQUIRED TO INSTALL ANGLE. RE-INSTALL ROOFING
SYSTEM COMPONENTS AND PROVIDE A TEMPORARY
WATERTIGHT ROOFING MEMBRANE. PATCH AND
FLASHING PENDING NIC ROOFING WORK.
ROOF WALKING PAD NIC
N
REV. APPROVED
DATE
DESCRIPTION JCN
REDLINE
DATE
APVD
REVIEWED BY
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
KEY NORTH
E D
M
THIS DRAWING PRODUCED ON THE XXXXXXXXXXXX REGION AUTOCAD SYSTEM
S N
IS
S
U E
D F
O R
1604158
SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE APPROVER'S TITLE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
AARON SHAW VANCE WHITESEL
MANAGER. AJW-2W11CPROJECT ENGINEER/ARCHITECT. AJW-2W11C
HONOLULU HIHONOLULU CONTROL FACILITY (HCF)
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
ENGINEERING SERVICES
TERMINAL
August 29, 2022
STAIR TO ROOF
HONOLULU CONTROL FACILITY
HCF ROOF METALWORK
R.SIMMONS
M.KANG
W.STEVENS
HONOLULU CONTROL FACILITY
HONOLULU
H C
F
A T
C T
A
.d w g
HCF - D - ATCT- A402
1/4" = 1'-0"A402
A8 STAIR PLAN
1/4" = 1'-0"A402
A6 STAIR SECTION
1/4" = 1'-0"A402
E8 STAIR ELEVATION
2 0
Scale: 1/2 INCH = 1 FOOT
1" = 1'-0"A402
D6 STAIR SECTION DETAIL
1" = 1'-0"A402
E6 STAIR SECTION DETAIL
A101
GENERAL SHEET NOTES
GRAPHIC SCALE(S)
4 0 4 8
Scale: 1/4 INCH = 1 FOOT
A. PROVIDE AIR TERMINALS ON THE STAIR HANDRAIL TO ENSURE STAIR IS UNDER THE LPS
ZONE OF PROTECTION. PROVIDE CLASS II CONDUCTOR WITH TWO PATHS FROM THE AIR
TERMINALS TO THE EXISTING #4/0 GROUND LOOP AROUND THE BUILDING. CLASS II
CONDUCTORS MUST BE ROUTED ALONG THE SIDE OF THE STAIR. PROVIDE EXOTHERMIC
WELDING FOR UNDERGROUND CONNECTION.
B. PROVIDE BONDING FROM THE STAIR TO THE EXISTING LPS #4/0 GROUND LOOP.
C. VERIFY ALL EXISTING BUILDING DIMENSIONS AND ELEVATIONS SHOWN.
D. VERIFY EXISTING GRADE IN FIELD.
HAWAII
1 0 1 2
Scale: 1 INCH = 1 FOOT
1" = 1'-0"A402
D3 DETAIL AT STAIR CONNECTION
DATE
DESCRIPTION JCN
REDLINE
DATE
APVD
REVIEWED BY
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
E D
M
THIS DRAWING PRODUCED ON THE XXXXXXXXXXXX REGION AUTOCAD SYSTEM
S N
IS
S
U E
D F
O R
KEY PLAN
BASE BUILDING
ATCT
WEATHER
OBSERVATIONGUARDHOUSE
1604158
SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE APPROVER'S TITLE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
AARON SHAW VANCE WHITESEL
MANAGER. AJW-2W11CPROJECT ENGINEER/ARCHITECT. AJW-2W11C
HONOLULU HIHONOLULU CONTROL FACILITY (HCF)
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
ENGINEERING SERVICES
TERMINAL
August 29, 2022
PERSPECTIVE VIEWS
HONOLULU CONTROL FACILITY
HCF ROOF METALWORK
R.SIMMONS
M.KANG
W.STEVENS
HONOLULU CONTROL FACILITY
HONOLULU
H C
F
A T
C T
A
.d w g
HCF - D - ATCT- A403
A403
A8 VIEW A
A403
D5 VIEW B
VIEW A
VIEW B
GENERAL NOTES:
1. ELEVATIONS INDICATED ON THE STRUCTURAL DRAWINGS ARE BASED ON AN ASSUMED TOP OF GROUND FLOOR ELEVATION OF 0' - 0''. CONTRACTOR TO VERIFY ELEVATIONS PRIOR
TO START OF WORK.
2. ALL DETAILS, SECTIONS, AND NOTES SHOWN ON THE DRAWINGS ARE INTENDED TO BE TYPICAL AND APPLY TO SIMILAR SITUATIONS, UON.
3. NO CHANGE IN SIZE, DIMENSION OR POSITION OF STRUCTURAL ELEMENTS IS PERMITTED WITHOUT THE WRITTEN APPROVAL OF THE COR.
4. FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS BEFORE STARTING CONSTRUCTION AND/OR SUBMITTING SHOP DRAWINGS. REPORT DISCREPANCIES TO THE COR
BEFORE PROCEEDING WITH THE WORK.
5. COORDINATE SIZE AND LOCATION OF EQUIPMENT SUPPORTS, FOUNDATIONS, AND HOUSEKEEPING PADS WITH THE ACTUAL EQUIPMENT DIMENSIONS PRIOR TO SUBMITTING SHOP
DRAWINGS FOR THESE ELEMENTS.
6. REFER TO ARCHITECTURAL, MECHANICAL, PLUMBING, FIRE PROTECTION, AND ELECTRICAL DRAWINGS FOR DIMENSIONS AND LOCATIONS OF OPENINGS, INSERTS, DEPRESSIONS, EQUIPMENT PADS, DRIPS, REVEALS, FINISHES, AND OTHER SUCH PROJECT REQUIREMENTS NOT SHOWN ON STRUCTURAL DRAWINGS.
7. PROTECT EXISTING AND NEW UTILITIES, STRUCTURAL MEMBERS, FINISHES, ETC. ASSUME FULL RESPONSIBILITY FOR ANY DAMAGE DURING CONSTRUCTION. RESTORATION OF DAMAGED AREAS WILL BE TO THE SATISFACTION OF THE GOVERNMENT, AT NO COST TO THE GOVERNMENT.
8. REFER TO ARCHITECTURAL DRAWINGS FOR DETAILED INFORMATION REGARDING FINISHES, WATERPROOFING, LOCATIONS OF LOAD BEARING AND NON-LOAD BEARING PARTITIONS, EXTERIOR FACE OF BUILDING, ETC.
9. DO NOT REPRODUCE ANY PORTION OF THE STRUCTURAL CONTRACT DRAWINGS FOR RESUBMITTAL AS SHOP DRAWINGS. SHOP DRAWINGS PRODUCED IN SUCH A MANNER WILL BE
REJECTED AND RETURNED.
10. DO NOT SCALE THE DRAWINGS FOR PURPOSES OF OBTAINING DIMENSIONS.
11. MAINTAIN STABILITY OF STRUCTURE AT ALL TIMES DURING CONSTRUCTION, PROVIDING TEMPORARY BRACING, SHORING, ETC. AS REQUIRED. RETAIN A QUALIFIED PROFESSIONAL
OR STRUCTURAL ENGINEER TO DESIGN TEMPORARY SUPPORT SYSTEM.
CODES AND STANDARDS:
THE FOLLOWING CODES AND STANDARDS AS MODIFIED BY THE REFERENCED UFC PUBLICATIONS, INCLUDING ALL SPECIFICATIONS REFERENCED, APPLY TO THE DESIGN AND
CONSTRUCTION OF THIS PROJECT:
1. IBC 2018, INTERNATIONAL BUILDING CODE
2. ASCE 7-16, MINIMUM DESIGN LOADS AND ASSOCIATED CRITERIA FOR BUILDINGS AND OTHER STRUCTURES
3. IEBC 2018, INTERNATIONAL EXISTING BUILDING CODE
4. ACI 318-14, BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE
5. AISC 360- 16, SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS
6. AWS D1.1-15, STRUCTURAL STEEL WELDING CODE
DESIGN LOADS AND CRITERIA:
1. STAIR LIVE LOAD 100 PSF
2. STAIR RISK CATEGORY II
3. SNOW LOADS
A. GROUND SNOW LOAD, Pg 0 PSF
4. WIND LOADS (STAIR)
A. ULTIMATE WIND SPEED 150 MPH
B. ENCLOSURE CLASSIFICATION OPEN
C. EXPOSURE CATEGORY C
D. DIRECTIONALITY FACTOR, Kd 0.85 E. TOPOGRAPHIC FACTOR, Kzt 1.0
F. INTERNAL PRESSURE COEFFICIENT 0.0
5. SEISMIC LOADS
A. IMPORTANCE FACTOR, Ie 1.0
B. SITE SOIL CLASSIFICATION D
C. SHORT PERIOD SPECTRAL ACCELERATION, Ss 0.57
D. 1-SECOND PERIOD SPECTRAL ACCELERATION, S1 0.164
E. DESIGN SHORT PERIOD ACCELERATION, SDS 0.51
F. DESIGN 1-SECOND PERIOD ACCELERATION, SD1 0.248
G.…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .