J-1c Full Size Dwgs.pdf
PDF 19 MB Posted
- Solicitation number
- 697DCK-23-R-00048
About this file
This document outlines a federal contract opportunity to replace the HVAC and fire alarm systems at Raleigh-Durham International Airport in Raleigh, North Carolina. The solicitation number is 697DCK-23-R-00048 and is being issued by the Department of Transportation Federal Aviation Administration Southwestern Region. The purpose of the contract is to replace the HVAC and fire alarm at the airport as specified in the attached specifications documents in section J of the solicitation. Interested parties should review the full details of the scope of work and technical requirements in the provided specifications files.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FO
TNEMT
R A
P E
D
N
OI
T
AT
RO
PSNART
U N
IT
E
D
STATES OF
AM
ER
I C A
COVER SHEET
GENERAL
G000
RAB
GMR
CRK
APRIL 1, 2022
RALEIGH, NC
RALEIGH-DURHAM INTERNATIONAL AIRPORT
HVAC REPLACEMENT & FIRE ALARM UPGRADE
AIRPORT TRAFFIC CONTROL TOWER
SUBMITTER'S TITLE APPROVER'S TITLE
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
F
IL
E
D
A T
E
T
IM
E
N
A M
E
DATE
APPROVED
RALEIGH-DURHAM NC
SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALES FOR OTHER SIZES.
WW JOB NUMBER: 220079.00
wileywilson.com
678.320.1888
Atlanta, Georgia 30328-6055
Bldg. C, Ste 515
5901 Peachtree Dunwoody Rd.
Wiley|Wilson
1303936MARCH 2022
(INTERNATIONAL AIRPORT)
ATCT HVAC REPLACEMENT & FIRE ALARM UPGRADE
RALEIGH-DURHAM INTERNATIONAL AIRPORT (RDU)
RDU-D-TOWB-CHECKED
SUBMITTED BY
REVIEWED BY
DRAWN
DESIGNED ISSUED BY
CENTER
ENGINEERING
TERMINAL DRAWING NO
DATE JCN
APPROVED BY
REV
REV DESCRIPTION JCN
DATE
REDLINE
APVD
cknight Stamp cknight Stamp
G001
DRAWING INDEX
TITLEDRAWING NUMBER
TITLEDRAWING NUMBER
RDU-D-TRACO-F120
RDU-D-TRACO-F100
RDU-D-TRACO-F001
RDU-D-TRACO-F000
FIRE PROTECTION
RDU-D-TRACO-E800
RDU-D-TRACO-E600
RDU-D-TRACO-E500
RDU-D-TRACO-E400
RDU-D-TRACO-E120
RDU-D-TRACO-E101
RDU-D-TRACO-E100
RDU-D-TRACO-E000
ELECTRICAL
BASE BUILDING (CONTINUED)
FIRE ALARM LINK PLAN
FIRE ALARM BASE BUILDING FLOOR PLAN
NOTES AND LEGEND
DRAWING INDEX AND CONSTRUCTION STAGING NOTES
ONE LINE DIAGRAM
DETAILS
PANEL SCHEDULES
MECHANICAL ROOM POWER PLAN
BASE BUILDING POWER PLAN
BASE BUILDING ELECTRICAL ROOF PLAN
BASE BUILDING LIGHTING PLAN
LEGEND, SYMBOLS AND NOTES
RDU-D-TRACO-M809
RDU-D-TRACO-M808
RDU-D-TRACO-M807
RDU-D-TRACO-M806
RDU-D-TRACO-M805
RDU-D-TRACO-M804
RDU-D-TRACO-M803
RDU-D-TRACO-M802
RDU-D-TRACO-M801
RDU-D-TRACO-M800
RDU-D-TRACO-M631
RDU-D-TRACO-M630
RDU-D-TRACO-M603
RDU-D-TRACO-M602
RDU-D-TRACO-M601
RDU-D-TRACO-M600
RDU-D-TRACO-M501
RDU-D-TRACO-M500
RDU-D-TRACO-M400
RDU-D-TRACO-M120
RDU-D-TRACO-M100
RDU-D-TRACO-M000
MECHANICAL
RDU-D-TRACO-A660
RDU-D-TRACO-A500
RDU-D-TRACO-A140
RDU-D-TRACO-A120
RDU-D-TRACO-A100
RDU-D-TRACO-A000
ARCHITECTURAL
RDU-D-TRACO-D701
RDU-D-TRACO-D700
RDU-D-TRACO-D502
RDU-D-TRACO-D501
RDU-D-TRACO-D500
RDU-D-TRACO-D302
RDU-D-TRACO-D301
RDU-D-TRACO-D300
RDU-D-TRACO-D120
DEMOLITION
RDU-D-TRACO-G000
BASE BUILDING
RDU-D-TOWB-H002
RDU-D-TOWB-H001
RDU-D-TOWB-G042
RDU-D-TOWB-G041
RDU-D-TOWB-G040
RDU-D-TOWB-G015
RDU-D-TOWB-G011
RDU-D-TOWB-G010
RDU-D-TOWB-G001
RDU-D-TOWB-G000
GENERAL
SEQUENCE OF OPERATION AND SYSTEM POINT LIST
CONTROL SYSTEM EXHAUST FANS & MOTORIZED DAMPERS
SEQUENCE OF OPERATION AND SYSTEM POINT LIST
CONTROL SYSTEM DIAGRAM B-RTU-2
SEQUENCE OF OPERATION AND SYSTEM POINT LIST
CONTROL SYSTEM DIAGRAM B-RTU-1 & TERMINAL UNIT (VAV)
SEQUENCE OF OPERATION AND SYSTEM POINT LIST
CONTROL SYSTEM DIAGRAM B-AHU-2, B-RTU-3A & B-RTU-3B
SEQUENCE OF OPERATION AND SYSTEM POINT LIST
CONTROL SYSTEM DIAGRAM AHU-1, VAV & EXHAUST FANS
SEISMIC DETAILS
SEISMIC DETAILS
HVAC DETAILS
HVAC DETAILS
HVAC DETAILS
HVAC DETAILS
HVAC SCHEDULES
HVAC SCHEDULES
ENLARGED FLOOR PLAN - HVAC
BASE BUILDING ROOF PLAN - HVAC
BASE BUILDING FLOOR PLAN - HVAC
HVAC LEGEND AND GENERAL NOTES
DETAILS
FINISH AND COLOR SCHEDULES
BASE BUILDING ROOF PLAN
BASE BUILDING RCP
BASE BUILDING FLOOR PLAN
LEGEND, SYMBOLS AND GENERAL NOTES
LINK PLAN - FIRE ALARM DEMOLITION
BASE BUILDING FLOOR PLAN - FIRE ALARM DEMOLITION
ENLARGED FLOOR PLAN - ELECTRICAL DEMOLITION
BASE BUILDING ROOF PLAN - ELECTRICAL DEMOLITION
BASE BUILDING FLOOR PLAN - ELECTRICAL DEMOLITION
ENLARGED FLOOR PLAN - HVAC DEMOLITION
BASE BUILDING ROOF PLAN - HVAC DEMOLITION
BASE BUILDING FLOOR PLAN - HVAC DEMOLITION
BASE BUILDING RCP - ARCHITECTURAL DEMOLITION
BASE BUILDING COVER SHEET
HAZARDOUS MATERIAL (HAZMAT) INFORMATION (TOWER)
HAZARDOUS MATERIAL (HAZMAT) INFORMATION (BASE BLDG)
PHASING REQUIREMENTS MATRIX
CONSTRUCTION STAGING NOTES
CONSTRUCTION COORDINATION NOTES
SYMBOL LEGEND
ABBREVIATIONS - SHEET 2
ABBREVIATIONS - SHEET 1
DRAWING INDEX
COVER SHEET
RDU-D-ATCT-F650
RDU-D-ATCT-F600
RDU-D-ATCT-F103
RDU-D-ATCT-F102
RDU-D-ATCT-F101
RDU-D-ATCT-F100
RDU-D-ATCT-F001
FIRE PROTECTION
RDU-D-ATCT-M805
RDU-D-ATCT-M804
RDU-D-ATCT-M803
RDU-D-ATCT-M802
RDU-D-ATCT-M801
RDU-D-ATCT-M800
RDU-D-ATCT-M103
RDU-D-ATCT-M102
RDU-D-ATCT-M101
RDU-D-ATCT-M000
MECHANICAL
RDU-D-ATCT-A200
RDU-D-ATCT-A120
RDU-D-ATCT-A103
RDU-D-ATCT-A102
RDU-D-ATCT-A101
RDU-D-ATCT-A100
RDU-D-ATCT-A000
ARCHITECTURAL
RDU-D-ATCT-D703
RDU-D-ATCT-D702
RDU-D-ATCT-D701
RDU-D-ATCT-D700
DEMOLITION
RDU-D-ATCT-G000
GENERAL
ATCT
SEQUENCE OF OPERATION - FIRE ALARM
RISER DIAGRAM - FIRE ALARM
CAB AND CAB WALKWAY PLAN - FIRE ALARM
SUBJUNCTION LEVEL 1 AND JUNCTION LEVEL - FIRE ALARM
CABLE ACCESS PLAN AND SUBJUNCTION LEVEL 2 - FIRE ALARM
GROUND LEVEL AND SECOND LEVEL PLAN - FIRE ALARM
NOTES AND LEGEND
SEQUENCE OF OPERATION AND SYSTEM POINT LIST
CONTROL SYSTEM DIAGRAM T-AHU-2, T-AHU-3 & T-EF-4
SEQUENCE OF OPERATION AND SYSTEM POINT LIST
CONTROL SYSTEM DIAGRAM T-AHU-1
SEQUENCE OF OPERATION AND SYSTEM POINT LIST
CONTROL SYSTEM DIAGRAM T-AHU-4A AND T-AHU-4B
CAB FLOOR
SUBJUNCTION LEVEL 1 AND JUNCTION LEVEL
GROUND AND SUBJUNCTION 2 PLANS
HVAC LEGEND AND GENERAL NOTES
ELEVATIONS
BASE LEVEL 1 RCP AND ROOF PLAN
CAB FLOOR AND CAB ROOF
SUBJUNCTION LEVEL 1 AND JUNCTION LEVEL
CABLE ACCESS PLAN AND SUBJUNCTION LEVEL 2
BASE LEVEL AND CABLE ACCESS PLAN
LEGEND, SYMBOLS AND GENERAL NOTES
CAB AND CAB WALKWAY PLAN - FIRE ALARM DEMOLITION
SUBJUNCTION LEVEL 1 AND JUNCTION LEVEL - FIRE ALARM DEMOLITION
CABLE ACCESS PLAN AND SUBJUCTION LEVEL 2 - FIRE ALARM DEMOLITION
GROUND LEVEL AND SECOND LEVEL PLAN - FIRE ALARM DEMOLITION
TOWER COVER SHEET
SUBMITTER'S TITLE APPROVER'S TITLE
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
F
IL
E
D
A T
E
T
IM
E
N
A M
E
DATE
APPROVED
RALEIGH-DURHAM NC
SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALES FOR OTHER SIZES.
WW JOB NUMBER: 220079.00
wileywilson.com
678.320.1888
Atlanta, Georgia 30328-6055
Bldg. C, Ste 515
5901 Peachtree Dunwoody Rd.
Wiley|Wilson
1303936MARCH 2022
(INTERNATIONAL AIRPORT)
ATCT HVAC REPLACEMENT & FIRE ALARM UPGRADE
RALEIGH-DURHAM INTERNATIONAL AIRPORT (RDU)
RDU-D-TOWB-CHECKED
SUBMITTED BY
REVIEWED BY
DRAWN
DESIGNED ISSUED BY
CENTER
ENGINEERING
TERMINAL DRAWING NO
DATE JCN
APPROVED BY
REV
REV DESCRIPTION JCN
DATE
REDLINE
APVD
cknight Stamp
ABBREVIATIONS - SHEET 1
G010RAB
COL COLUMN
CO CLEANOUT, CONDUIT ONLY
CMU CONCRETE MASONRY UNIT
CM COMMUNICATION MANHOLE
CLR CLEAR
CLG CEILING
CLF CURRENT LIMITING FUSE
CL CENTERLINE
CKT CIRCUIT
C.I.P. CAST IN PLACE
CWS CHILLED WATER SUPPLY
CWR CHILLED WATER RETURN
CWP CHILLED WATER PUMP
CHWS CHILLED WATER SUPPLY
CHWR CHILLED WATER RETURN
CHW CHILLED WATER
CHKD CHECKERED
CH CHILLER
CFM CUBIC FEET PER MINUTE
CFACC CENTRIFUGAL FAN AIR COOLED CONDENSER
CF CUBIC FOOT/FEET
CAF COMBUSTION AIR FAN
CENTRIF CENTRIFUGAL
CENT CENTRIFUGAL
CD CEILING DIFFUSER, CONDENSATE DRAIN
CCTV CLOSED CIRCUIT TELEVISION
CBCR CURVED BLADE CEILING REG.
CB CIRCUIT BREAKER
CAV CONSTANT AIR VOLUME
CAP CAPACITY
C CONDUIT
C
BTUH BRITISH THERMAL UNIT/HOUR
BTU BRITISH THERMAL UNIT
BSMT BASEMENT
BSDC BARE SOFT DRAWN COPPER
BPU BREAKER PROGRAMMING UNIT
BP BOOSTER PUMP
BOT BOTTOM
BOP BOTTOM OF PIPING
BOF BOTTOM OF FIXTURE
BOD BOTTOM OF DUCT, BACKDRAFT DAMPER
BLK BLACK
BLDG BUILDING
BITS BYPASS ISOLATION TRANSFER SWITCH
BI BACKWARD INCLINED
BFP BACKFLOW PREVENTER
BFC BELOW FINISHED CEILING
BF BELOW FLOOR (PIPE SIZE)
BDD BACKDRAFT DAMPER
BCKP BACKUP
BC BARE COPPER
BBHWH BASEBOARD HOT WATER HEATER
BAT CHGR BATTERY CHARGER
B
AWS AMERICAN WELDING SOCIETY
AWG AMERICAN WIRE GAUGE
AVG AVERAGE
AV AUTOMATIC VENT
AUX AUXILIARY
ATV ATMOSPHERIC VENT
ATS AUTOMATIC TRANSFER SWITCH
ATCT AIRPORT TRAFFIC CONTROL TOWER
ATC AIR TRAFFIC CONTROL
ATC ACOUSTICAL TILE CEILING
ATBM AIRWAY/TERMINAL BUILDING MAINTENANCE FACILITY
AT AMPERE TRIP
ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS
AND AIR CONDITIONING ENGINEERS
ASHRAE AMERICAN SOCIETY OF HEATING, REFRIGERATION
A/S AUDIBLE STROBE
AS AIR SEPARATOR
ARTS AUTOMATED RADAR
ARCH ARCHITECT, ARCHITECTURAL
APPROX APPROXIMATELY
APD AIR PRESSURE DROP
AP ANNUNCIATOR POINT, ACCESS PANEL
AO ANALOG OUTPUT
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
ANN ANNUNCIATOR
AMM AMMETER
ALUM ALUMINUM
AL-GL ALUMINUM AND GLASS
AL AIRPORT LIGHTING, ALUMINUM
AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION
AIC AMPERE INTERRUPTING CAPACITY
AI ANALOG INPUT
AHU AIR HANDLING UNIT
AH AIR HANDLER
AFR ABOVE FINISHED ROOF
AFG ABOVE FINISHED GRADE
AFF ABOVE FINISHED FLOOR
AF AMPERE FRAME
ADJ ADJUSTABLE
AD ACCESS DOOR, AREA DRAIN
ACT ACOUSTICAL CEILING TILE, ACCESS CONTROL TERMINAL
ACM ASBESTOS CONTAINING MATERIAL
ACI AMERICAN CONCRETE INSTITUTE
ACDFC AIR COOLED DRY FLUID COOLER
ACC AIR COOLED CHILLER
A/C AIR CONDITIONING
AC ALTERNATING CURRENT, ABOVE CEILING
ABG ABOVE FINISHED GRADE
AAV AUTOMATIC AIR VENT
AA AIR COOLED
A AMPERE
A
EXP EXPOSED, EXPANSION
EXIST EXISTING
EXH EXHAUST
EWT ENTERING WATER TEMPERATURE
EWH ELECTRIC WALL HEATER, ELECTRIC WATER HEATER
EWC ELECTRICAL WATER COOLER
EW EACH WAY
EUH ELECTRIC UNIT HEATER
ET EXPANSION TANK
ESP EXTERNAL STATIC PRESSURE
ERMS ENVIRONMENTAL REMOTE MONITORING SYSTEM
ER EXHAUST REGISTER
EQUIP EQUIPMENT
EQ EQUAL
ENT ENTERING
EMT ELECTRICAL METALLIC TUBING
EMS ENERGY MANAGEMENT SYSTEM
EMI ELECTROMAGNETIC INTERFACE
EMERG EMERGENCY
EMCS ENERGY MANAGEMENT AND CONTROL SYSTEM
ELEV, EL ELEVATION, ELEVATOR
ELEC ELECTRIC
EIFS EXTERIOR INSULATION FINISH SYSTEM
EHC ELECTRIC HEATING COIL
EH ELECTRIC HEATER, ELECTRONIC HUMIDIFIER
EMERGENCY GENERATOR
EG, E/G ENGINE GENERATOR, EXHAUST GRILLE
EF EXHAUST FAN
EDH ELECTRIC DUCT HEATER
EDAM ELECTRICAL DATA ACQUISITION AND MONITORING
ECP ENGINE CONTROL PANEL
EAT ENTERING AIR TEMPERATURE
EA EACH, EXHAUST AIR
E EAST
E
DWL DOWEL
DWGS DRAWINGS
DWDI DOUBLE WIDTH DOUBLE INLET
DWBP DOMESTIC WATER BOOSTER PUMP
DTS DOUBLE THROW SWITCH
DT DOUBLE THROW, DIAPHRAM TANK
DSF DESTRATIFICATION FAN
DPT DIFFERENTIAL PRESSURE TRANSMITTER
DPST DOUBLE POLE SINGLE THROW
D PNL DISTRIBUTION PANEL
DPDT DOUBLE POLE DOUBLE THROW
DP DIFFERENTIAL PRESSURE
DO DIGITAL OUTPUT
DN DOWN
DM DEMAND METER
DF DEGREES FAHRENHEIT
DISC DISCONNECT
DIM DIMENSION
DIFF DIFFUSER
DIAG DIAGONAL
DIA DIAMETER
DI DIGITAL INPUT
DHW DOMESTIC HOT WATER
DG DOOR GRILLE
DET DETAIL
DEMO DEMOLITION
DEG DEGREE
DDC DIRECT DIGITAL CONTROL
DC DIRECT CURRENT
DBL DOUBLE
DB DRY BULB, DIRECT BURIAL, DUCTBANK
DAMP DAMPER
D DRAIN
D
CY YD CUBIC YARD
CWV COMBINATION WASTE AND VENT
CWS CONDENSER WATER SUPPLY
CWR CONDENSER WATER RETURN
CWP CONDENSER WATER PUMP, CHILLED WATER PUMP
CW COLD (DOMESTIC) WATER
CVC CENTRAL VACUUM CLEANER
CV CONSTANT VOLUME, CONTROL VALVE
CU FT CUBIC FOOT/FEET
CU CONDENSING UNIT, COPPER
CTL CONTROL
CURRENT TRANSFORMER, CERAMIC TILE
CT COOLING TOWER, CABLE TRAY,
CSF CHEMICAL SHOT FEEDER
CS CONTROL SWITCH
CR CONTROL RELAY
CPU CENTRAL PROCESSING UNIT
CPT CARPET
CPC CRITICAL POWER CENTER
COR CONTRACTING OFFICER'S REPRESENTATIVE
CONTR CONTRACTOR
CONT CONTINUATION
CONN CONNECTION
CONFIG CONFIGURATION
COND CONDENSATE
CONC CONCRETE
COMM COMMUNICATIONS
ISMS INTEGRATED SECURITY MANAGEMENT SYSTEM
INV INVERT
INT INTERIOR
INSUL INSULATED
INDIC INDICATOR
INCL INCLUDE
INCAND INCANDESCENT
IN INCHES
IE INVERT ELEVATION
IC INTERCOMMUNICATION, INTERCOM
I
HZ HERTZ
HX HEAT EXCHANGER
HWUH HOT WATER UNIT HEATER
HWS HOT WATER SUPPLY
HWR HOT WATER RETURN
HWP HOT WATER PUMP
HVAC HEATING, VENTILATION AND AIR CONDITIONING
HU HUMIDIFIER
HTR HEATER
HTG HEATING
HT HEIGHT
HSB HIGH STRENGTH BOLT
HS HIGH STRENGTH
HR HOUR
HPS HIGH PRESSURE SODIUM
HP HORSEPOWER
HORIZ HORIZONTAL
HOA HAND-OFF-AUTOMATIC
H. MET. HOLLOW METAL
HM HOLLOW METAL
HH HAND HOLE
HEX HEXAGONAL
HB HOSE BIBB
HAZMAT HAZARDOUS MATERIALS
H
GYP GYPSUM
GWB GYPSUM WALLBOARD
GUH GAS FIRED UNIT HEATER
GRS GALVANIZED RIGID STEEL
GRN GREEN
GPM GALLONS PER MINUTE
GPH GALLONS PER HOUR
GOVT GOVERNMENT
GND GROUND CONNECTOR
GFM GOVERNMENT FURNISHED MATERIAL
GFE GOVERNMENT FURNISHED EQUIPMENT
GFCI GROUND FAULT CIRCUIT INTERRUPTER
GEN GENERAL, GENERATOR
GALV GALVANIZED
GAL GALLON
GA GAUGE
G GROUND
G
FWD FORWARD, FIRE SPRINKLER WATER DRAIN
FWS FIRE WATER SUPPLY
FW FIRE WATER
FVC FIRE VALVE CABINET
FV FULL VOLTAGE
FTG FOOTING, FITTING
FT FEET
FSS FUSIBLE SAFETY SWITCH
FSD FIRE/SMOKE DAMPER
FS FLOW SWITCH, FLOOR SINK
FPU FIELD PROGRAMMING UNIT
FPM FEET PER MINUTE
FP FIRE PUMP
FOT FIBER OPTIC TERMINAL, FUEL OIL TRANSFER
FOS FUEL OIL SUPPLY
FOR FUEL OIL RETURN
FOG FUEL OIL GAGE
FOD FACE OPERATED DAMPER
FO FIBER OPTIC
FM FACTORY MUTUAL, FORCE MAIN
FLUOR FLUORESCENT
FLS FLOW SWITCH, FIRE AND LIFE SAFETY
FLEX FLEXIBLE
FLR FLOOR
FLA FULL LOAD AMPERES
FIN FINISH
FIG FIGURE
FHV FIRE HOSE VALVE
FHC FIRE HOSE CABINET
FH FIRE HYDRANT
FG FIBERGLASS
FFE FINISHED FLOOR ELEVATION
FF FLY FAN
FEC FIRE EXTINGUISHER CABINET
FE FIRE EXTINGUISHER
FDR FEEDER
FDN FOUNDATION
FDC FIRE DEPARTMENT CONNECTION
FD FLOOR DRAIN, FIRE DAMPER
FCV FLOW CONTROL VALVE
FCU FAN COIL UNIT
FCO FLOOR CLEANOUT
FC FACE OF CURB, FLEXIBLE CONNECTION
FACT FACTORY
FACP FIRE ALARM CONTROL PANEL
FAA FEDERAL AVIATION ADMINISTRATION
FA FIRE ALARM, FREE AREA, FAN COOLED, FRESH AIR
°F DEGREES FAHRENHEIT
F FIRE WATER SUPPLY
F
MVD MANUAL VOLUME DAMPER
MVA MEGAVOLT AMPERE
MV MANUAL VENT
MUW MAKE-UP WATER
MUA MAKE-UP AIR
MTL METAL
MTD MOUNTED
MPG MULTI-POINT GROUND
MOD MOTOR OPERATED DAMPER
MM MILLIMETER
MLO MAIN LUGS ONLY
MISC MISCELLANEOUS
MIN MINIMAL, MINUTE, MINIMUM
MIL ST MILITARY STANDARD
MIL THOUSANDTHS OF AN INCH
MH MANHOLE
MG MOTOR GENERATOR
MFR MANUFACTURER
MEMB MEMBRANE
MED MEDIUM
MECH MECHANICAL
MDT MAIN DISTRIBUTION TERMINAL
MDF MEDIUM DENSITY FIBERBOARD
MD MANUAL DAMPER
MCP MOTOR CIRCUIT PROTECTOR
MCM THOUSAND CIRCULAR MILLS
MCC MOTOR CONTROL CENTER
MCB MOLDED CASE BREAKER
MBP MAINTENANCE BYPASS PANEL
MBH THOUSAND BTU/HOUR
MAX MAXIMUM
MAINT MAINTENANCE
MAG MAGNETIC DOOR HOLD OPEN
M
LWT LEAVING WATER TEMPERATURE
LVL LEVEL
LV LOW VOLTAGE
LTG LIGHTING
LT LIQUID TIGHT
LSD LINEAR SLOT DIFFUSER
LS LIGHT STANDARD
LRG LINEAR RETURN GRILLE
LRAG LINEAR RETURN AIR GRILLE
LRA LOCKED ROTOR AMPERE
LP LOW POINT
LOSP LOCAL OPERATING STATUS PANEL
LONG LONGITUDINAL
LLV LONG LEG VERTICAL
LLH LONG LEG HORIZONTAL
LFS LIGHTING FIXTURE SCHEDULE
LF LINEAR FEET
LD LINEAR DIFFUSER
LBS POUNDS
LBR LINEAR BAR RETURN
LBG LINEAR BAR GRILLE
LBD LINEAR BAR DIFFUSER
LAT LEAVING AIR TEMPERATURE
L&S LOUVER AND SCREEN
L
KWH KILOWATT HOUR
KW KILOWATT
KVAR KILOVOLT AMPERES-REACTIVE
KVA KILOVOLT AMPERES
KV KILOVOLT
KCMIL THOUSAND CIRCULAR MILLS
KA KILOAMPERES
K
JT JOINT
JP JOCKEY PUMP
JB JUNCTION BOX
J
GMR
GMR
SUBMITTER'S TITLE APPROVER'S TITLE
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
F
IL
E
D
A T
E
T
IM
E
N
A M
E
DATE
APPROVED
RALEIGH-DURHAM NC
SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALES FOR OTHER SIZES.
WW JOB NUMBER: 220079.00
wileywilson.com
678.320.1888
Atlanta, Georgia 30328-6055
Bldg. C, Ste 515
5901 Peachtree Dunwoody Rd.
Wiley|Wilson
1303936MARCH 2022
(INTERNATIONAL AIRPORT)
ATCT HVAC REPLACEMENT & FIRE ALARM UPGRADE
RALEIGH-DURHAM INTERNATIONAL AIRPORT (RDU)
RDU-D-TOWB-CHECKED
SUBMITTED BY
REVIEWED BY
DRAWN
DESIGNED ISSUED BY
CENTER
ENGINEERING
TERMINAL DRAWING NO
DATE JCN
APPROVED BY
REV
REV DESCRIPTION JCN
DATE
REDLINE
APVD
cknight Stamp
TW TEMPERED WATER
TYP TYPICAL
TVSS TRANSIENT VOLTAGE SURGE SUPPRESSOR (GFM)
TV TELEVISION, TEMPERING VALVE
TTB TELEPHONE TERMINAL BOARD
TT TEMPERATURE TRANSMITTER
T°STAT THERMOSTAT
TSP TOTAL STATIC PRESSURE, TRAP SEAL PRIMER
TS TWO SPEED
TRACO TERMINAL RADAR APPROACH CONTROL BUILDING
TRBL TROUBLE CONDITION
TP TRAP PRIMER, TWISTER PAIR
TOWB ATCT AND ATTACHED BASE BUILDING
TOS,T/S TOP OF STEEL
TOD TOP OF DUCT
TOC TOP OF CONCRETE
THK THICK, THICKNESS
TG TRANSFER GRILLE
TERM TERMINAL
TEMP TEMPERATURE
TELCO TELEPHONE COMPANY
TEL TELEPHONE
TEF TOILET EXHAUST FAN
TD TIME DELAY, TRENCH DRAIN
TC TRIP COIL, TOTAL COOLING, TIME CLOCK
TB TERMINAL BOX, TERMINAL BOARD
T&P TEMPERATURE AND PRESSURE
T&B TOP AND BOTTOM
T TRANSDUCER
T
SYS SYSTEM
SYM SYMMETRICAL
SWSR SIDE WALL SUPPLY REGISTER
SWSI SINGLE WIDTH SINGLE INLET
SWR SIDEWALL REGISTER
SWGR SWITCHGEAR
SWG SIDEWALL GRILLE
SWBD SWITCHBOARD
SW SWITCH
SUSP SUSPENDED
SUBJ SUBJUNCTION
STRUCT STRUCTURAL
STP SHIELDED TWISTED PAIR
STL STEEL
STGP SIGNAL TRANSPORT GROUND PLANE
STD STANDARD
ST SHUNT TRIP
S/S START-STOP
SS STAINLESS STEEL, SANITARY SEWER
SRG SIGNAL REFERENCE GRID
SR SUPPLY REGISTER
SQ.FT. SQUARE FOOT/FEET
SQ SQUARE
SPVR SUPERVISORY CONDITION
SPT STATIC PRESSURE TRANSMITTER
SPST SINGLE POLE SINGLE THROW
SPF STAIRWELL PRESSURIZATION FAN
SPEC SPECIFICATION
SP STATIC PRESSURE(IN W.G.), SINGLE POLE, SUMP PUMP
SOV SHUT-OFF VALVE
NATIONAL ASSOCIATION
SMACNA SHEET METAL AND AIR CONDITIONING CONTRACTORS'
SIM SIMILAR
SHT SHEET
SHLD SHIELDED
SHDWN SHUT DOWN
SGL SINGLE
SG SUPPLY GRILLE
SF SQUARE FEET
SENS SENSIBLE
SECT SECTION
SEC SECONDARY
S.D. SUPPLY DIFFUSER
SD SPLITTER DAMPER STORM DRAIN, SMOKE DETECTOR
SCP SYSTEM CONTROL PANEL, SMOKE CONTROL PANEL
SCND SECONDARY
SCHWS SECONDARY CHILLED WATER SUPPLY
SCHWR SECONDARY CHILLED WATER RETURN
SCHWP SECONDARY CHILLED WATER PUMP
SCHED SCHEDULE
SCC SECURITY CONTROL CENTER
S.C. SOLID CORE
SC SPIN IN COLLAR WITH VOLUME DAMPER, SENSIBLE COOLING
SAN SANITARY
SA SUPPLY AIR
S SOUTH, STAIN COLOR, SANITARY
S
RV RELIEF VALVE
RTU ROOF TOP UNIT
RTN RETURN
RQMTS REQUIREMENTS
RPZ REDUCED PRESSURE ZONE
RPM ROTATIONS PER MINUTE, REVOLUTIONS PER MINUTE
RP BP REDUCED PRESSURE BACKFLOW PREVENTER
RO REVERSE OSMOSIS
RMS ROOT MEAN SQUARE
RML RADAR MICROWAVE LINK
RMH ROOF MOUNTED HOOD
RM ROOM
RL RAIN LEADER
ABBREVIATIONS - SHEET 2
GENERAL
G011
IMPEDANCEZ
Z
WYE DELTADY-
WYEY
Y
TRANSDUCERXDCR
TRANSMITTERXMTR
TRANSFORMERXFMR
TRANSFERXFR
AUXILIARY RELAYX
X
WELDED WIRE FABRICWWF
WATERWTR
WATER TANKWT
WASHDOWN SUPPLY WATERWSW
WATER PRESSURE DROPWPD
WEATHERPROOF NEMA TYPE 3R OR EQUIVALENT, UON
SUBSCRIPT "WP" APPLIED TO ANY SYMBOL INDICATESWP
WIRE MESH SCREENWMS
WATT METERWM
WATER HAMMER ARRESTERWHA
WATER HEATER, WALL HEATER, WALL HYDRANTWH
WATER GAUGEWG
WALL CLEANOUTWCO
WATER COLUMN, WATER CLOSET, WALL COVERINGWC
WET BULBWB
WITHOUTW/O
WITHW/
WEST, WIDTH, WATTW
W
VENT THROUGH ROOFVTR
VESTIBLE PRESSURIZATION FANVPF
VOLTMETERVM
VARIABLE FREQUENCY DRIVEVFD
VESTIBULEVEST
VERTICALVERT
VENTILATIONVENT
VIDEO DISPLAY TERMINALVDT
VOLUME DAMPER - MANUALVD
VINYL COMPOSITE TILEVCT
VACUUM BREAKERVB
VARIABLE AIR VOLUMEVAV
VACUUMVAC
VOLT AMPERE, VOICE ALARMVA
VOLT, VOLTAGE, VENTV
V
UTILITYUTIL
UNINTERUPTIBLE POWER SUPPLYUPS,U
UNIFORM PLUMBING CODEUPC
UNLESS OTHERWISE NOTEDUON
UNLESS NOTED OTHERWISEUNO
UNFUSEDUNF
UNDERWRITER'S LABORATORYUL
UNIT HEATERUH
UNDERGROUND POWERUGP
UNDERGROUNDUG
UNDERCUTUC
UNIFORM BUILDING CODEUBC
U
GMR
GMR
RAB
RGS RIGID GALVANIZED STEEL
RG RETURN GRILLE
RFI RADIO FREQUENCY INTERFERENCE
RF RETURN FAN
REV REVISION
RET RETURN
REQ'D REQUIRED
REINF REINFORCEMENT, REINFORCED
REG REGISTER
REF REFERENCE
RECT RECTIFIER, RECEPTACLE
RECP RECEPTACLE
REC'D RECEIVED
REC RECEPTACLE
REBAR REINFORCING STEEL BAR
RE RESIDENT ENGINEER
RDF RUBBER RAISED DISK FLOOR
RD ROOF DRAIN
RCP REINFORCED CONCRETE PIPE, REFLECTED CEILING PLAN
RB RUBBER BASE
RAR RETURN AIR REGISTER
RAG RETURN AIR GRILLE
RAD RADIUS
RACP REMOTE ACCESS CONTROL PANEL
RA RETURN AIR, REMOTE ANNUNCIATOR
R RED, RISER, RADIATOR, RADIUS, REFRIGERANT
R
QUA QUARTER
Q
PVMT PAVEMENT
PVC POLYVINYL CHLORIDE, POINT OF VERTICAL CURVATURE
PTAC PACKAGED TERMINAL AIR CONDITIONER
PT PRESSURE TRANSMITTER, PRESSURE-TEMPERATURE PORT
PSIG POUNDS PER SQ.IN. GAUGE
PSIA POUNDS PER SQ.IN. ABSOLUTE
PSI POUNDS PER SQ. INCH
PSF POUNDS PER SQ. FOOT
PS PRESSURE SWITCH
PRV PRESSURE REDUCING VALVE
PROP PROPELLER
PRSR PRESSURIZATION
PRMY PRIMARY
PRESS PRESSURE
PREFAB PREFABRICATED
PP POWER POLE, PATCH PANEL
POS POSITIVE, POSITION
P.O.C. POINT OF CONNECTION
PNL PANEL, PANELBOARD
PMB POWER MIXING BOX
PM POWER MANHOLE
PLYWD PLYWOOD
PLCS PLACES
PLBG PLUMBING
PL PLATE
PIU POWER INDUCTION UNIT
PI PRESSURE INDICATOR
PH ELECTRICAL PHASE
PFR PERFORATED FACE RETURN
PFD PERFORATED FACE DIFFUSER
PF POWER FACTOR
PD PRESSURE DROP
PCS POWER CONDITIONING SYSTEM
PCMS POWER CONTROL MONITORING SYSTEM
PCHWS PRIMARY CHILLED WATER SUPPLY
PCHWR PRIMARY CHILLED WATER RETURN
PCF POUNDS PER CUBIC FOOT
PB PULL BOX
PART PARTITION
PAF POWDER ACTUATED FASTENER
PABX PRIVATE AUTOMATIC BRANCH EXCHANGE
P POLE, PAINT, PUMP
P
OZ OUNCES
OVHD OVERHEAD
OSCO OUTSIDE CLEANOUT
OSA OUTSIDE SUPPLY AIR
ORL OVERFLOW ROOF LEADER
ORD OVERFLOW ROOF DRAIN
OPP OPPOSITE
OPNG OPENING
OH OPPOSITE HAND, OVERHEAD
OE OPEN END
ODP OPEN DRIP PROOF
OD OUTSIDE DIAMETER, OVERFLOW DRAIN
OC ON CENTER
OBD OPPOSED BLADE DAMPER
OAF OUTSIDE AIR FAN
OA OUTSIDE AIR
O
NTS NOT TO SCALE
NTE NOT TO EXCEED
NOM NOMINAL
N.O. NORMALLY OPEN
NO NUMBER OF DESIGNATION
NK NECK
NIC NOT IN CONTRACT
NG NATURAL GAS
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NFHB NON-FREEZE HOSE BIB
NEMA NATIONAL ELECTRICAL MANUFACTURERS' ASSOCIATION
NEG NEGATIVE
NEC NATIONAL ELECTRIC CODE
N.C. NORMALLY CLOSED
NC NOISE CRITERIA
NA NOT APPLICABLE
N NORTH, NEUTRAL
N
SUBMITTER'S TITLE APPROVER'S TITLE
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
F
IL
E
D
A T
E
T
IM
E
N
A M
E
DATE
APPROVED
RALEIGH-DURHAM NC
SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALES FOR OTHER SIZES.
WW JOB NUMBER: 220079.00
wileywilson.com
678.320.1888
Atlanta, Georgia 30328-6055
Bldg. C, Ste 515
5901 Peachtree Dunwoody Rd.
Wiley|Wilson
1303936MARCH 2022
(INTERNATIONAL AIRPORT)
ATCT HVAC REPLACEMENT & FIRE ALARM UPGRADE
RALEIGH-DURHAM INTERNATIONAL AIRPORT (RDU)
RDU-D-TOWB-CHECKED
SUBMITTED BY
REVIEWED BY
DRAWN
DESIGNED ISSUED BY
CENTER
ENGINEERING
TERMINAL DRAWING NO
DATE JCN
APPROVED BY
REV
REV DESCRIPTION JCN
DATE
REDLINE
APVD
cknight Stamp
4 0 4 8
1/4" = 1'-0"
SCALE IN FEET
020 20 40
X
X
X
GRAPHIC SCALE
ARCHITECTURAL
GRAPHIC SCALE
ENGINEERING
AXXX
AXXX
GENERAL SYMBOL LEGEND:
SECTION LETTER
A
SECTION IS LOCATED
SHEET NUMBER WHERE
AXXX
DETAIL IS LOCATED
SHEET NUMBER WHERE
DETAIL NUMBER
ELEVATION IS LOCATED
SHEET NUMBER WHERE
ELEVATION NUMBER
* SCALE OR OTHER INFORMATION
AXXX
DETAIL NUMBER
DETAIL TITLE
SECTION CUT
ELEVATION
DETAIL 2
GENERAL NOTES
GENERAL
SYMBOL LEGEND
G015
TITLE OF PLAN, SECTION OR DETAIL
IS LOCATED
PLAN, SECTION OR DETAIL
SHEET NUMBER WHERE
RAB
THE SHEET IS REDUCED IN SIZE.
USING THE APPROPRIATE BAR SCALE WHEN
USED FOR SCALING AT FULL SIZE AND FOR
(22" X 34" DRAWING SHEET SIZE) AND IS
THIS SCALE REFERS TO FULL SIZE DRAWING
VERIFY FIELD CONDITIONS PRIOR TO COMMENCING EACH PORTION OF THE WORK.3.
DO NOT SCALE DRAWINGS.2.
FOR ALL ABBREVIATIONS REFERENCE DRAWINGS G010 & G011.1.
GMR
GMR
1-HR FIRE RATED WALL
2-HR FIRE RATED WALL
SUBMITTER'S TITLE APPROVER'S TITLE
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
F
IL
E
D
A T
E
T
IM
E
N
A M
E
DATE
APPROVED
RALEIGH-DURHAM NC
SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALES FOR OTHER SIZES.
WW JOB NUMBER: 220079.00
wileywilson.com
678.320.1888
Atlanta, Georgia 30328-6055
Bldg. C, Ste 515
5901 Peachtree Dunwoody Rd.
Wiley|Wilson
1303936MARCH 2022
(INTERNATIONAL AIRPORT)
ATCT HVAC REPLACEMENT & FIRE ALARM UPGRADE
RALEIGH-DURHAM INTERNATIONAL AIRPORT (RDU)
RDU-D-TOWB-CHECKED
SUBMITTED BY
REVIEWED BY
DRAWN
DESIGNED ISSUED BY
CENTER
ENGINEERING
TERMINAL DRAWING NO
DATE JCN
APPROVED BY
REV
REV DESCRIPTION JCN
DATE
REDLINE
APVD
cknight Stamp
G040
CONSTRUCTION COORDINATION NOTES
CONSTRUCTION NOTES
CRK
CRK
RAB
DESIGN CRITERIA AND REFERENCES
DEMOLITION NOTES
GENERAL PROJECT DESCRIPTION
BASE BUILDING.
ADMINISTRATIVE BASE BUILDING AND THE REPLACEMENT OF THE FIRE ALARM SYSTEM ON THE ATCT AND
REPLACEMENT OF THE HEATING , VENTILATION AIR CONDITIONING (HVAC) SYSTEM AT THE
IMPROVEMENTS TO ITS HVAC AND FIRE ALARM SYSTEMS. REHABILITATION WORK WILL INCLUDE THE
THE RALEIGH-DURHAM AIRPORT TRAFFIC CONTROL TOWER (RDU) IN RALEIGH, NC IS IN NEED OF MAJOR
ACTIVITY NUMBER ACTIVITY DESCRIPTION
100 APPROVAL OF CONTRACTOR'S SAFETY AND RISK MANAGEMENT PLANS
110 APPROVAL OF CONTRACTOR'S PHASING PLAN
130 SITE MOBILIZATION
140 SELECTIVE DEMOLITION TO PROVIDE ACCESS TO HVAC UNITS AND DUCTWORK
150 REPLACEMENT OF HVAC UNITS
160 REPLACEMENT OF DUCTWORK
170 PROVIDE CONDENSATE DRAINS FOR AHUs
190 PROVIDE NEW CONTROL SYSTEM FOR HVAC
210 REPLACEMENT OF INTERIOR FINISHES: CEILINGS, PAINTING WALLS, AS REQUIRED
220 COMPLETION OF PUNCHLIST ITEMS
DEMOBILIZE
PROJECT CLOSEOUT
PROVIDE ELECTRICAL WORK TO NEW HVAC SYSTEMS
* APPROVAL OF CONTRACTOR'S ACCESS AND STAGING AREA PLANS.
REPLACE FIRE ALARM SYSTEM
POSSIBLE ALSO WITH THE RDU AIRPORT AUTHORITY.
THESE ACTIVITIES WILL NEED COORDINATION WITH FAA AND
APPLICABLE FAA ORDERS AND STANDARDS.-
NATIONAL ELECTRICAL CODE (NEC), 2020.-
INTERNATIONAL PLUMBING CODE (IMC), 2021.-
INTERNATIONAL MECHANICAL CODE (IMC), 2021.-
INTERNATIONAL FIRE CODE (IFC), 2018.-
INTERNATIONAL BUILDING CODE (IBC), 2021.-
WEEKEND SHIFT MAY BE ALLOWED (TO BE COORDINATED WITH COR)
EVENING SHIFT: 9:00 PM - 5:00 AM DAY SHIFT 7:00 AM - 4:00 PM
MIDNIGHT SHIFT: 11:00 PM - 5:00 AM
LIMITATIONS:
CONSTRUCTION ACTIVITY WILL BE LIMITED TO OFF-HOURS WORK TO MINIMIZE RISK TO THE OPERATIONAL FACILITY. THE FOLLOWING ARE WORK HOUR
RISK TO THE OPERATIONAL FACILITY. REFER TO PRELIMINARY PHASING REQUIREMENTS/RESTRICTIONS MATRIX FOR ADDITIONAL INFORMATION. SELECT
ROOMS IS REQUIRED TO BE GROUPED EITHER REQUIRING CONCURRENT WORK OR PRECLUDING CONCURRENT WORK IN THE GROUPED ROOMS, TO MINIMIZE
FRIDAY, 6:00 AM - 6:00 PM). THE OPERATIONS AREA AND ENVIRONMENTAL SUPPORT AREA OPERATE 24 HOURS 7 DAYS PER WEEK. WORK IN SELECT
TRACON IS A 24 HOUR 7 DAY PER WEEK OPERATING FACILITY. THE ADMINISTRATION AREA OPERATES UNDER NORMAL BUSINESS HOURS (MONDAY - 19.
OUTLINED IN SPECIFICATION 01 35 33.
SPECIFIC REGULATIONS TO PROTECT FAA PERSONNEL AND CONTRACTOR'S PERSONNEL FOR THE DURATION OF THE PROJECT. FOLLOW THE PROCEDURES
GENERAL CONTRACTOR SHALL COMPLY WITH FEDERAL REGULATIONS TO LIMIT THE SPREAD OF COVID-19. 2. THE CONTRACTOR SHALL COMPLY WITH FAA 18.
B. CONTRACTOR PERSONNEL SHALL NOT USE TOILET FACILITIES INSIDE FAA BUILDING.
A. CONTRACTOR SHALL PROVIDE TOILET FACILITIES AND WASH STATION WITHIN THE CONSTRUCTION STAGING AREA. COORDINATE SERVICE WITH COR.
CONSTRUCTION TOILET FACILITIES: 17.
FIRE WALL OPENINGS MUST BE REPAIR AND FIRESTOPPED TO MAINTAIN THE FIRE PROTECTION INTEGRITY OF THE WALL. 16.
CONTRACTOR TO REPAIR, PATCH AND PAINT ANY SURFACE DAMAGED DURING CONSTRUCTION.15.
CLARIFY.
THESE DRAWINGS SHALL NOT BE SCALED FOR DIMENSIONS. IF THERE ARE DIMENSIONS DISCREPANCIES OR CONCERNS, CONTACT THE FAA COR TO 14.
THE COST OF ANY CHANGES REQUIRED BY THE CLIENT TO SUITABLY MODIFY SUCH WORK SHALL BE SOLELY THE RESPONSIBILITY OF THE CONTRACTOR.
PRIOR TO THE BEGINNING OF THE AFFECTED WORK. WORK THAT PROCEEDS IN VIOLATION OF THIS PRINCIPLE IS AT THE CONTRACTOR'S OWN RISK, AND
THEREIN, SHALL BE REPORTED TO THE FAA CONTRACTING OFFICERS REPRESENTATIVE (COR) IMMEDIATELY, AND SUITABLE RESOLUTION ESTABLISHED
ANY DISCREPANCIES BETWEEN THE EXISTING CONDITIONS AND THE CONTRACT DOCUMENTS , OR ANY AMBIGUITIES OR INCONSISTENCIES CONTAIN 13.
IMMEDIATELY.
IF AN UNSAFE CONDITION OR LIFE THREATENING HAZARD IS NOTED AT THE SITE, NOTIFY THE FAA CONTRACTING OFFICERS REPRESENTATIVE 12.
MANUFACTURED ITEMS SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.11.
ALL EXTERIOR DIMENSIONS ARE FROM THE EXTERIOR FACE OF WALL.10.
ALL INTERIOR DIMENSIONS ARE FROM THE INTERIOR FACE OF WALL, UNLESS OTHERWISE NOTED.9.
REINSTALL ALL SMOKE/FIRE DETECTORS AS REQUIRED.8.
DO NOT PAINT OVER ANY FIRE LABELS ON WALLS OR DOORS.7.
AVAILABLE SPECIFY WHICH COATINGS ARE NOT AVAILABLE, FOR FAA REFERENCE.
COR) SHALL APPROVE THE SYSTEM TO BE UTILIZED FOR VENTILATION PRIOR TO USE. EXTERIOR PAINT CAN BE LOW VOC. WHEN LOW VOC IN NOT
PAINTING AND OTHER CONSTRUCTION ACTIVITIES THAT HAVE THE POTENTIAL FOR STRONG ODORS. THE CONTRACTING OFFICERS REPRESENTATIVE (FAA
CONTRACTOR SHALL USE NON-VOC PAINTS AND COATINGS AND PROVIDE ADEQUATE MEASURES FOR VENTILATION TO MINIMIZE ODORS DURING INTERIOR 6.
LOCKOUT AND TAG PROCEDURES MUST BE FOLLOWED AT ALL TIMES.5.
TRAFFIC OPERATIONS. SEE SPECIFICATION 02 03 00 FOR MORE INFORMATION.
MAINTAINED IN THE FACILITY. PERSONNEL SHALL NOT BE EXPOSED TO FUMES OF ODORS CAUSED BY THE CONTRACTORS WORK AS THIS MAY IMPACT AIR
CONTRACTOR SHALL VENT ANY FUMES AND ODORS FROM THE CONSTRUCTION ACTIVITIES TO THE EXTERIOR OF THE BUILDING. AIR QUALITY SHALL BE 4.
WEEKLY.
ALL EXTERIOR WORK WILL BE CONDUCTED DURING DAYLIGHT HOURS. ALL WORK WILL BE COORDINATED WITH FAA COR AND AIR TRAFFIC AT LEAST
UNLESS DIRECTED OTHERWISE BY FAA COR, ALL INTERIOR WORK SHALL BE CONDUCTED AT NIGHT AND COORDINATED WITH LOCAL AIR TRAFFIC AND COR. 3.
AUTHORITY PRIOR TO FIELD MOBILIZATION.
AUTHORITY, AND FAA AIR TRAFFIC. THE CONTRACTOR WILL RE -CONFIRM THIS PLAN AND ANY SUGGESTED MODIFICATION WITH FAA AND AIRPORT
CONSTRUCTION CONTRACTOR WILL ABIDE BY THIS PROPOSED PHASING PLAN SINCE THIS PLAN HAS BEEN COORDINATED IN ADVANCE WITH THE AIRPORT
THE CONSTRUCTION SEQUENCE OF OPERATIONS SHALL BE COORDINATED WITH THE CONSTRUCTION SCHEDULE PROVIDED ON THIS SHEET. THE 2.
REQUIREMENTS FOR INDIVIDUAL ROOMS.
OF THE FACILITY. NORMAL HOURS OF OPERATION ARE STATED IN DIVISION 1 OF THE SPECIFICATIONS. SEE DRAWING RDU-D-TOWB-G042 FOR WORK
HOURS. ALL WORK NEEDS TO BE COORDINATED WITH FAA CONTRACTING OFFICERS REPRESENTATIVE TO AVOID DISRUPTION TO THE NORMAL OPERATIONS
THE CONSTRUCTION OF THIS PROJECT MUST NOT INTERFERE WITH OPERATION OF THE AIR TRAFFIC CONTROL FUNCTION DURING NORMAL OPERATING 1.
WORKING DAYS IN ADVANCE OF PERFORMING THE WORK.
DEMOLITION (INSIDE AND OUTSIDE) SHALL BE SCHEDULED, COORDINATED AND APPROVED IN ADVANCE IN WRITING BY COR WITH A MINIMUM OF 7 4.
AFTER NEW CONSTRUCTION IS COMPLETED.
IF A PORTION OF AN EXISTING WALL IS DEMOLISHED OR PATCHED, THE ENTIRE WALL OR CEILING SHALL BE PAINTED 3.
STRUCTURAL INTEGRITY SHALL BE MAINTAINED FOR ALL BUILDING ELEMENTS DURING AND AFTER DEMOLITION.2.
EXISTING APPEARANCE, UNLESS NOTED OTHERWISE.
BY THE CONSTRUCTION TO MAINTAIN THEIR FIXTURES OR BUILDING ASSEMBLIES. REPAIR ALL AREAS AFFECTED
FACILITY TO BE PROTECTED DURING CONSTRUCTION AND FROM DAMAGE TO ANY EXISTING OR ADJACENT FINISHES, MATERIALS, 1.
SUBMITTER'S TITLE APPROVER'S TITLE
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
F
IL
E
D
A T
E
T
IM
E
N
A M
E
DATE
APPROVED
RALEIGH-DURHAM NC
SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALES FOR OTHER SIZES.
WW JOB NUMBER: 220079.00
wileywilson.com
678.320.1888
Atlanta, Georgia 30328-6055
Bldg. C, Ste 515
5901 Peachtree Dunwoody Rd.
Wiley|Wilson
1303936MARCH 2022
(INTERNATIONAL AIRPORT)
ATCT HVAC REPLACEMENT & FIRE ALARM UPGRADE
RALEIGH-DURHAM INTERNATIONAL AIRPORT (RDU)
RDU-D-TOWB-CHECKED
SUBMITTED BY
REVIEWED BY
DRAWN
DESIGNED ISSUED BY
CENTER
ENGINEERING
TERMINAL DRAWING NO
DATE JCN
APPROVED BY
REV
REV DESCRIPTION JCN
DATE
REDLINE
APVD
cknight Stamp
G041
CONSTRUCTION STAGING NOTES
CONSTRUCTION STAGING NOTES
GMR
RAB
DAMAGED BY THE WORK SHALL BE REPLACED WITH SOD OR HYDROSEEDING TO MATCH EXISTING AND TO SATIFFACTION OF COR.
DISTURBED LAWNS AND LANDSCAPING OR GRASSY AREAS SHAL BE RESPOTRED TO ORIGINAL CONDITION BY CONTRACTOR TO THE SATISFACTION OF THE COR. LAWN 2.
REPAIRED PAVED SURFACES.
UPON COMPLETION OF THE WORK, CONTRACTOR SHALL REPAIR PAVED SURFACES AT AFFECTED WORK AREAS TO ORIGINAL CONDITION, INCLUDING STRIPING OF 1.
PARKING LOT, DRIVEWAYS AND LANDSCAPE AREASH.
COR.
FAA EQUIPMENT WILL REMAIN OPERATIONAL DURING THE CONSTRUCTION PROJECT. WORK IN EQUIPMENT ROOMS OR AROUND FAA EQUIPMENT SHALL BE SCHEDULED WITH 6.
NO WELDING SHALL OCCUR INSIDE THE FACILITY OR WELDING EQUIPMENT POWERED BY THE FACILITY ELECTRICAL SYSTEM. 5.
WATER, ASBESTOS, DEBRIS AND DUST.
CONTRACTOR SHALL PROTECT FAA EQUIPMENT BOTH INSIDE AND OUTSIDE THE BUILDING FROM DAMAGE INCLUDING, BUT NOT LIMITED TO DAMAGE CAUSED BY IMPACT, 4.
WELDING EQUIPMENT SHALL NOT BE POWERED BY THE FACILITY ELECTRICAL SYSTEM. WELDING SHALL NOT BE PERMITTED IN FAA OCCUPIED AREA.3.
OFFICERS REPRESENTATIVE A MINIMUM OF 10 WORKING DAYS IN ADVANCE OF THE SHUTDOWN OR CUTOVER.
HOURS. PREPARATORY WORK SHALL BE COMPLETED PRIOR TO SHUTDOWN. CUTOVER WORK SHALL BE SCHEDULED AND COORDINATED WITH THE FAA CONTRACTING
SHUTDOWNS, CUTOVERS AND ANY TEMPORARY PROVISIONS FOR PLUMBING, MECHANICAL AND ELECTRICAL SYSTEMS SHALL BE ACCOMPLISHED AFTER NORMAL OPERATING 2.
OF THE FLYING PUBLIC.
SUCH DAMAGE OR DISRUPTION OF POWER SHOULD OCCUR. THE LOSS OF THESE COMPUTERS AND EQUIPMENT FOR ANY AMOUNT OF TIME WILL JEOPARDIZE THE SAFETY
NEGLIGENCE SUCH AS, BUT NOT LIMITED TO, DISRUPTION OF POWER TO THE UNITS. INFORM THE FAA CONTRACTING OFFICERS REPRESENTATIVE IMMEDIATELY IF
RESPONSIBLE FOR THE CONTINUOUS PROTECTION OF THIS EQUIPMENT FROM PHYSICAL AND ELECTRICAL DAMAGE AS A RESULT OF INCIDENTAL OR ACCIDENTAL
EXISTING FAA AIR TRAFFIC COMPUTERS AND EQUIPMENT SHALL REMAIN OPERATIONAL THROUGHOUT THE DURATION OF THIS CONTRACT. THE CONTRACTOR SHALL BE 1.
G. EQUIPMENT PROTECTION
FAA CONTRACTING OFFICERS REPRESENTATIVE.
CONCRETE SAWING, GRINDING, CORE DRILLING, CONCRETE DEMOLITION AND ANCHOR DRILLING WILL BE ALLOWED ONLY AT PREARRANGED TIMES APPROVED BY THE 2.
CONSTRUCTION IN ADVANCE WITH THE FAA CONTRACTING OFFICERS REPRESENTATIVE.
IN AREAS ADJACENT TO THE AIR TRAFFIC CONTROL FUNCTION MUST BE ACCOMPLISHED AFTER NORMAL OPERATING HOURS. COORDINATE NIGHT WORK AND OVERTIME
THE CONTRACTOR SHALL NOT INTERFERE WITH THE AIR TRAFFIC CONTROL FUNCTION OF THE FACILITY. DEMOLITION NOISE, CONSTRUCTION NOISE AND ALL WORK 1.
F. DEMOLITION AND CONSTRUCTION HOURS
A FIRE OR LIFE SAFETY HAZARD.
REMOVE ALL CONSTRUCTION AND/OR DEMOLITION DEBRIS FROM THE JOB SITE TO MAINTAIN A CLEAN AND SAFE ENVIRONMENT AND TO PREVENT THE POSSIBILITY OF 2.
DUMPSTERS SHALL BE KEPT CLEAN AND FREE OF DEBRIS AND DUST DURING CONSTRUCTION. DEBRIS SHALL BE REMOVED BY THE CONTRACTOR IN A TIMELY MANNER.
ENCLOSED DUMPSTERS FOR DISPOSAL OF CONSTRUCTION DEBRIS SHALL BE PROVIDED BY THE CONTRACTOR WITHIN THE STAGING AREA. THE AREAS AROUND THE 1.
E. CONSTRUCTION DEBRIS
REPRESENTATIVE.
STORED AND PROTECTED. A CONSTRUCTION FENCE SHALL BE PROVIDED AT THE DISCRETION OF AIRPORT AUTHORITY AND THE FAA CONTRACTING OFFICERS
STORAGE OF CONSTRUCTION MATERIALS AND TRAILERS ON THE SITE SHALL BE LIMITED TO THE CONSTRUCTION STAGING AREA. MATERIALS SHALL BE NEATLY 1.
D. CONSTRUCTION MATERIAL STORAGE
EGRESS.
THE BUILDING IS A SECURE AREA, AND CONSTRUCTION PERSONNEL SHALL REMAIN IN THE CONSTRUCTION AREAS. CONTRACTOR SHALL MINIMIZE INGRESS AND 2.
ENTERING AND LEAVING THE SITE.
CONTRACTOR'S PERSONNEL ON SITE. CONTRACTOR VEHICLES SHALL BE IDENTIFIED AS SUCH. EACH CONSTRUCTION EMPLOYEE SHALL CHECK IN AND OUT UPON
FACILITY. TEMPORARY SECURITY BADGES MAY BE ISSUED TO THOSE CONSTRUCTION PERSONNEL. CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF
REQUIRED TO OBTAIN AN FAA CONTRACTOR BADGE PRIOR TO THE START OF WORK. CONTRACTOR TO COORDINATE WITH HIS SUBS AND EMPLOYEES THE ACCESS TO THE
AN ADVANCE LIST OF THE CONTRACTOR'S PERSONNEL SHALL BE PROVIDED TO THE FAA CONTRACTING OFFICERS REPRESENTATIVE. CONTRACTOR SUPERINTENDENT IS 1.
C. FAA SECURITY REQUIREMENTS
STAGING AREA IS VERY LIMITED MUST BE COORDINATED WITH AIRPORT AUTHORITY VIA THE FAA CONTRACTING OFFICERS REPRESENTATIVE.
CONSTRUCTION ACCESS (VEHICLE, PEDESTRIAN AND DELIVERIES), CONTRACTOR'S PARKING, CONSTRUCTION OFFICES AND THE EXTENT/SIZE OF THE CONSTRUCTION 2.
CONTRACTOR SHALL PROVIDE SIGNS AS NECESSARY TO RESERVE AN AREA FOR CONSTRUCTION PARKING ONLY. COORDINATE WITH AIRPORT AUTHORITY.1.
B. CONTRACTOR STAGING AREA AND PARKING
SHIFT CHANGES TO AVOID CONGESTION.
DELIVERIES SHALL BE SCHEDULED 48 HOURS IN ADVANCE WITH THE FAA CONTRACTING OFFICERS REPRESENTATIVE AND AT TIMES OTHER THAN THE FAA EMPLOYEE 1.
A. CONSTRUCTION ACCESS
PARAPHRASE OR SUPPLEMENT DIVISION 1 REQUIREMENTS AND ARE NOT INTENDED TO REPLACE DIVISION 1 REQUIREMENTS.
THE FOLLOWING NOTES REPRESENT MANY OF THE MAJOR REQUIREMENTS STATED IN "DIVISION 1 - GENERAL REQUIREMENTS" OF THE SPECIFICATIONS. THESE NOTES
SUBMITTER'S TITLE APPROVER'S TITLE
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
F
IL
E
D
A T
E
T
IM
E
N
A M
E
DATE
APPROVED
RALEIGH-DURHAM NC
SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALES FOR OTHER SIZES.
WW JOB NUMBER: 220079.00
wileywilson.com
678.320.1888
Atlanta, Georgia 30328-6055
Bldg. C, Ste 515
5901 Peachtree Dunwoody Rd.
Wiley|Wilson
1303936MARCH 2022
(INTERNATIONAL AIRPORT)
ATCT HVAC REPLACEMENT & FIRE ALARM UPGRADE
RALEIGH-DURHAM INTERNATIONAL AIRPORT (RDU)
RDU-D-TOWB-CHECKED
SUBMITTED BY
REVIEWED BY
DRAWN
DESIGNED ISSUED BY
CENTER
ENGINEERING
TERMINAL DRAWING NO
DATE JCN
APPROVED BY
REV
REV DESCRIPTION JCN
DATE
REDLINE
APVD
cknight Stamp
G042
PHASING REQUIREMENTS MATRIX
GMR
GMR
RAB
NOTES
DAYS PRIOR TO WORK. EGRESS FROM THE CAB CAN NEVER BE BLOCKED.
ALL WORK IN THE ATCT MAY HAVE FURTHER WORK LIMITATIONS AND SHALL BE COORDINATED WITH COR 7 4.
CEILINGS PRIOR TO THE COMPLETION OF THE WORK AT EACH GWB CEILING SYSTEM.
COORDINATE WITH COR TEMPORARY PROTECTIVE MEASURES REQUIRED AT OPENINGS/ PENETRATIONS IN GWB 3.
CONSTRUCTION, CLEANING, ETC. TO BRING EACH ROOM BACK TO ITS ORIGINAL CONDITION.
WORK DURING THE HOURS LISTED SHALL INCLUDE ALL CONTRACTOR ACTIVITIES INCLUDING DEMOLITION, 2.
REFER G040 CONSTRUCTION NOTES FOR DEFINITIONS OF WORK HOUR LIMITATIONS.1.
SUBMITTER'S TITLE APPROVER'S TITLE
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
F
IL
E
D
A T
E
T
IM
E
N
A M
E
DATE
APPROVED
RALEIGH-DURHAM NC
SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALES FOR OTHER SIZES.
WW JOB NUMBER: 220079.00
wileywilson.com
678.320.1888
Atlanta, Georgia 30328-6055
Bldg. C, Ste 515
5901 Peachtree Dunwoody Rd.
Wiley|Wilson
1303936MARCH 2022
(INTERNATIONAL AIRPORT)
ATCT HVAC REPLACEMENT & FIRE ALARM UPGRADE
RALEIGH-DURHAM INTERNATIONAL AIRPORT (RDU)
RDU-D-TOWB-CHECKED
SUBMITTED BY
REVIEWED BY
DRAWN
DESIGNED ISSUED BY
CENTER
ENGINEERING
TERMINAL DRAWING NO
DATE JCN
APPROVED BY
REV
REV DESCRIPTION JCN
DATE
REDLINE
APVD
PHASING MATRIX PER ROOM
NUMBER
ROOM
NAME
ROOM
VISITOR AREA
CORRIDOR
A.F. ADMIN AREA
TSS
COPY ROOM
CONF. ROOM
(NOT USED)
TELCO SUP.
ELECTRICAL
AUS
WOMEN'S TOILET
PPS
QUALITY
MECHANICAL ROOM
EG ROOM
JANITOR
UPS
BATTERY RM
NATCA
LOCKERS
BREAKROOM
MEN'S TOILET
132BULK STORAGE
138A
138B
VESTIBULE
QUATS
AR CONF. ROOM
TRAINING
TAPE PLAYBACK
OFFICE
ATMPT
111ENGINEERING
WORKSHOP
ADMIN. OFFICE
LAN
TECH. ROOM
ELECT. EQUIP.
TRACON
EQUIP. ROOM
AREA SUPERVISOR
NOT USED
LIMITATIONS
WORK HOUR
FOR USE BY 6:00 AM)
(CLEANED AND AVAILABLE
NEXT DAY AVAILABILITY
WORK REQUIREMENTS
GROUPED ROOM
NOTES
ADDITIONAL
YES
BE AVAILABLE FOR EGRESS
CORRIDOR 101 AND 117 WILL
EVENING SHIFT
EVENING SHIFT
YES
EVENING SHIFT
EVENING SHIFT
EVENING SHIFT
EVENING SHIFT
EVENING SHIFT
EVENING SHIFT
EVENING SHIFT
EVENING SHIFT
EVENING SHIFT
EVENING SHIFT
EVENING SHIFT
EVENING SHIFT
EVENING SHIFT
EVENING SHIFT
EVENING SHIFT
EVENING SHIFT YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
AVAILABLE AT ALL TIMES
BREAKROOM 163 WILL BE
BE AVAILABLE FOR EGRESS
CORRIDOR 101 AND 117 WILL
AVAILABLE FOR EGRESS
CORRIDOR 153 WILL BE
WILL BE ALWAYS AVAILABLE
RESTROOMS 130, 131 AND 156
NO WORK
NO WORK
NO WORK
NO WORK
NO WORK
NO WORK
NO WORK
NO WORK
NO WORK
NO WORK
NO WORK
NO WORK
NO WORK
NO WORK
NO WORK
NO WORK
NO WORK
NO WORK
NO WORK
NO WORK
NO WORK
NO WORK
NO WORK
NO WORK
NO WORK
NO WORK
NO WORK
NO WORK
NO WORK YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
WILL BE AVAILABLE FOR EGRESS
CORRIDOR 102, 117 AND 133
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
PHASING MATRIX PER ROOM
NUMBER
ROOM
NAME
ROOM
ATM
AMPP
ADMIN. OFFICER
AT ADMIN. AREA
RELO. MOD. FURN.
153A
RELO MOD. FURN. 153B
TRAINING
MEN'S TOILET
F&E/FMP
CORRIDOR
TSS
TSS
SSC MANAGER
VESTIBULE
BREAKROOM ADDITION
LOCKER ADDITION
LIMITATIONS
WORK HOUR
FOR USE BY 6:00 AM)
(CLEANED AND AVAILABLE
NEXT DAY AVAILABILITY
WORK REQUIREMENTS
GROUPED ROOM
NOTES
ADDITIONAL
EVENING SHIFT
EVENING SHIFT
YES
YES
AVAILABLE FOR EGRESS
CORRIDOR 139 WILL BE
NO WORK
NO WORK
NO WORK
NO WORK
NO WORK
NO WORK
NO WORK
NO WORK
NO WORK
NO WORK
NO WORK
NO WORK
NO WORK
NO WORK
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
cknight Stamp
HAZMAT NOTES
ROOM NAME
H001
FLOOR LEVEL
THIS PROJECT
AFFECTED BY
HAZARDOUS MATERIAL (HAZMAT) INFORMATION
GENERAL
SUSPECTED ASBESTOS AND LEAD CONTAINING MATERIAL LOCATION SUMMARY
LEAD CONTAINING COMPONENTS
ASBESTOS MATERIAL (ACM) AND
GMR
GMR
RAB
NOTES
THROUGHOUT FACILITY DOORS (NSTAD; ASSUME ACM)
BASE BUILDING LOBBY (103) FLOOR TILE MASTIC OLD TILES REPLACED 1995, ASSUME MASTIC STILL PRESENT
TELCO A (109) FLOOR TILE MASTIC OLD TILES REPLACED 1995, ASSUME MASTIC STILL PRESENT
WORKSHOP (112) FLOOR TILE MASTIC OLD TILES REPLACED 1995, ASSUME MASTIC STILL PRESENT
BREAKROOM (113) FLOOR TILE MASTIC OLD TILES REPLACED 1995, ASSUME MASTIC STILL PRESENT
BATTERY ROOM (123)
STREAKED FLOOR TILE (FLOOR TILE IS NON-ACM)
MASTIC ASSOCIATED WITH 1FT X 1FT BEIGE
UPS ROOM (125)
STREAKED FLOOR TILE (FLOOR TILE IS NON-ACM)
MASTIC ASSOCIATED WITH 1FT X 1FT BEIGE
GENERATOR ROOM (126)
STREAKED FLOOR TILE (FLOOR TILE IS NON-ACM)
MASTIC ASSOCIATED WITH 1FT X 1FT BEIGE
BREAKROOM (129)
STREAKED FLOOR TILE (FLOOR TILE IS NON-ACM)
MASTIC ASSOCIATED WITH 1FT X 1FT BEIGE
STOVE/OVEN & CABINETS
ONLY PRESENT ON FLOOR AROUND / UNDER AREA OF
STORAGE (132)
STREAKED FLOOR TILE (FLOOR TILE IS NON-ACM)
MASTIC ASSOCIATED WITH 1FT X 1FT BEIGE
CORRIDOR A FLOOR TILE MASTIC OLD TILES REPLACED 1995, ASSUME MASTIC STILL PRESENT
CORRIDOR B FLOOR TILE MASTIC OLD TILES REPLACED 1995, ASSUME MASTIC STILL PRESENT
CORRIDOR C FLOOR TILE MASTIC OLD TILES REPLACED 1995, ASSUME MASTIC STILL PRESENT
JANITOR'S CLOSET
STREAKED FLOOR TILE (FLOOR TILE IS NON-ACM)
MASTIC ASSOCIATED WITH 1FT X 1FT BEIGE
TOWER LINK
STREAKED FLOOR TILE (FLOOR TILE IS NON-ACM)
MASTIC ASSOCIATED WITH 1FT X 1FT BEIGE
INFORMATION SEE SPECIFICATIONS.
CONSISTENT WITH ALL APPLICABLE LAWS AND REQUIREMENTS. FOR MORE
CONTAMINATION OF ENVIRONMENTAL MEDIA AND HANDLED AND DISPOSED OF
CONSTITUENTS, WASTES, SUBSTANCES, OR MATERIALS, ARE MANAGED TO AVOID
INCLUDING THOSE THAT CONSIST OF ASBESTOS, LEAD, OR OTHER HAZARDOUS
THE CONTRACTOR SHALL ENSURE THAT ALL DEMOLITION GENERATED SOLID WASTES, 2.
DIVISION 2, SPECIFICATIONS FOR FUTHER INFORMATION.
SUSPECT MATERIALS THAT MAY BE AFFECTED BY WORK IN THIS PROJECT. REFER TO
CONTRACTOR SHALL HIRE AN FAA APPROVED HAZMAT TESTING AGENCY TO SAMPLE ANY
LOCATIONS AS CONTAINED ASBESTOS PERIODIC SURVEILLANCE ASSESSMENT SHEET.
DRAWING IS A SUMMARY OF SUSPECTED ASBESTOS CONTAINING MATERIAL (ACM)
BUILDING CONTAINS HAZARDOUS MATERIAL (HAZMAT) LOCATIONS. SHOWN ON THIS 1.
YES ACM MAY HAVE BEEN USED IN ORIGINAL CONSTRUCTION
CORRIDORS WALL JOINT COMPOUND YES ACM MAY HAVE BEEN USED IN ORIGINAL CONSTRUCTION
MECHANICAL (122) PIPING INSULATION AND SEALANTS
CORRIDORS ORIGINAL PAINT COAT YES LEAD PAINT MAY HAVE BEEN USED IN ORIGINAL CONSTRUCTION
TRACON ROOF ROOF PENETRATION SEALANT YES
HYGIENIST SERVICES TO OVERSEE REMEDIATION ACTIVITIES.
SPECIFICATIONS PROCEDURES. FAA WILL PROCURE THIRD PARTY
FOR ACM. IF ACM IS FOUND CONTACT FAA COTR AND FOLLOW
TO TEST AREAS WHERE ANY SEALANT OR MASTIC WILL BE IMACTED
ACM MAY HAVE BEEN USED IN ORIGINAL CONSTRUCTION. CONTRACTOR
SUBMITTER'S TITLE APPROVER'S TITLE
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
F
IL
E
D
A T
E
T
IM
E
N
A M
E
DATE
APPROVED
RALEIGH-DURHAM NC
SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALES FOR OTHER SIZES.
WW JOB NUMBER: 220079.00
wileywilson.com
678.320.1888
Atlanta, Georgia 30328-6055
Bldg. C, Ste 515
5901 Peachtree Dunwoody Rd.
Wiley|Wilson
1303936MARCH 2022
(INTERNATIONAL AIRPORT)
ATCT HVAC REPLACEMENT & FIRE ALARM UPGRADE
RALEIGH-DURHAM INTERNATIONAL AIRPORT (RDU)
RDU-D-TOWB-CHECKED
SUBMITTED BY
REVIEWED BY
DRAWN
DESIGNED ISSUED BY
CENTER
ENGINEERING
TERMINAL DRAWING NO
DATE JCN
APPROVED BY
REV
REV DESCRIPTION JCN
DATE
REDLINE
APVD
cknight Stamp
HAZMAT NOTES
(SEE SPECIFICATION FOR ACM REPORT)
H002
FLOOR LEVEL
THIS PROJECT
AFFECTED BY
HAZARDOUS MATERIAL (HAZMAT) INFORMATION
GENERAL
SUSPECTED ASBESTOS AND LEAD CONTAINING MATERIAL LOCATION SUMMARY
LEAD CONTAINING COMPONENTS
ASBESTOS MATERIAL (ACM) AND
INFORMATION SEE SPECIFICATIONS.
CONSISTENT WITH ALL APPLICABLE LAWS AND REQUIREMENTS. FOR MORE
CONTAMINATION OF ENVIRONMENTAL MEDIA AND HANDLED AND DISPOSED OF
CONSTITUENTS, WASTES, SUBSTANCES, OR MATERIALS, ARE MANAGED TO AVOID
INCLUDING THOSE THAT CONSIST OF ASBESTOS, LEAD, OR OTHER HAZARDOUS
THE CONTRACTOR SHALL ENSURE THAT ALL DEMOLITION GENERATED SOLID WASTES, 2.
ASSESSMENT IS ON FILE WITH THE FAA.
CONTAINED ASBESTOS PERIODIC SURVEILLANCE ASSESSMENT SHEET. THE COMPLETE
DRAWING IS A SUMMARY OF ASBESTOS CONTAINING MATERIAL (ACM) LOCATIONS AS
BUILDING CONTAINS HAZARDOUS MATERIAL (HAZMAT) LOCATIONS. SHOWN ON THIS 1.
GMR
GMR
RAB
NOTES
9TH FLOOR TOWER ELEVATOR SHAFT ELEVATOR BRAKE SHOES (NSTAD; ASSUME ACM)
HALL FLOOR TILE MASTIC OLD TILES REPLACED 2000, ASSUME MASTIC STILL PRESENT
STREAKED FLOOR TILE (FLOOR TILE IS NON-ACM)
MASTIC ASSOCIATED WITH 1FT X 1FT BEIGE
STAIR TO CAB
STAIR FLOOR TILE MASTIC OLD TILES REPLACED 2000, ASSUME MASTIC STILL PRESENT
STAIR TREAD MASTIC
CATWALK ROOFING MATERIALS (NSTAD; ASSUME ACM)
CAB
NOT LISTED IN ORIGINAL SURVEY REPORT)
SINK UNDERCOAT (NSTAD; ASSUME ACM -
10TH FLOOR TOWER ROOF NSTAD: ASSUME ACM
TOWER ELEVATOR CAR FLOOR TILE MASTIC OLD TILES REPLACED 2000, ASSUME MASTIC STILL PRESENT
LOBBY STREAKED FLOOR TILE (FLOOR TILE IS NON-ACM)
MASTIC ASSOCIATED WITH 1FT X 1FT BEIGE
ROOF ROOFING MATERIALS (NSTAD; ASSUME ACM)1ST FLOOR TOWER
STAIR
STREAKED FLOOR TILE (FLOOR TILE IS NON-ACM)
MASTIC ASSOCIATED WITH 1FT X 1FT BEIGE
VESTIBULE
STREAKED FLOOR TILE (FLOOR TILE IS NON-ACM)
MASTIC ASSOCIATED WITH 1FT X 1FT BEIGE
2ND FLOOR TOWER ELEVATOR SHAFT INACCESSIBLE; ASSUME ACM
2.5 FLOOR TOWER ELEVATOR SHAFT INACCESSIBLE; ASSUME ACM
3RD FLOOR TOWER ELEVATOR SHAFT INACCESSIBLE; ASSUME ACM
3.5 FLOOR TOWER ELEVATOR SHAFT INACCESSIBLE; ASSUME ACM
4TH FLOOR TOWER
4.5 FLOOR TOWER
5TH FLOOR TOWER
5.5 FLOOR TOWER ELEVATOR SHAFT
ELEVATOR SHAFT
ELEVATOR SHAFT
ELEVATOR SHAFT INACCESSIBLE; ASSUME ACM
INACCESSIBLE; ASSUME ACM
INACCESSIBLE; ASSUME ACM
INACCESSIBLE; ASSUME ACM
6TH FLOOR TOWER
6.5 FLOOR TOWER
ELEVATOR SHAFT
ELEVATOR SHAFT INACCESSIBLE; ASSUME ACM
INACCESSIBLE; ASSUME ACM
7TH FLOOR TOWER HALL FLOOR TILE MASTIC OLD TILES REPLACED 2000, ASSUME MASTIC STILL PRESENT
STAIR FLOOR TILE MASTIC OLD TILES REPLACED 2000, ASSUME MASTIC STILL PRESENT
8TH FLOOR TOWER CABLE CHASE FLOOR TILE MASTIC OLD TILES REPLACED 2000, ASSUME MASTIC STILL PRESENT
HALL FLOOR TILE MASTIC OLD TILES REPLACED 2000, ASSUME MASTIC STILL PRESENT
FLOOR TILE MASTICSTAIR OLD TILES REPLACED 2000, ASSUME MASTIC STILL PRESENT
BE INCLUDED ONTHE NEXT SUBMITTAL
BEING CONDUCTED AND RESULTS WILL
HAZARDOWS MATERIAL TESTING IS
SUBMITTER'S TITLE APPROVER'S TITLE
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
F
IL
E
D
A T
E
T
IM
E
N
A M
E
DATE
APPROVED
RALEIGH-DURHAM NC
SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALES FOR OTHER SIZES.
WW JOB NUMBER: 220079.00
wileywilson.com
678.320.1888
Atlanta, Georgia 30328-6055
Bldg. C, Ste 515
5901 Peachtree Dunwoody Rd.
Wiley|Wilson
1303936MARCH 2022
(INTERNATIONAL AIRPORT)
ATCT HVAC REPLACEMENT & FIRE ALARM UPGRADE
RALEIGH-DURHAM INTERNATIONAL AIRPORT (RDU)
RDU-D-TOWB-CHECKED
SUBMITTED BY
REVIEWED BY
DRAWN
DESIGNED ISSUED BY
CENTER
ENGINEERING
TERMINAL DRAWING NO
DATE JCN
APPROVED BY
REV
REV DESCRIPTION JCN
DATE
REDLINE
APVD
cknight Stamp
FO
TNEMT
R A
P E
D
N
OI
T
AT
RO
PSNART
U N
IT
E
D
STATES OF
AM
ER
I C A
COVER SHEET
G000
APRIL 1, 2022
BASE BUILDING
RALEIGH, NC
RALEIGH-DURHAM INTERNATIONAL AIRPORT
HVAC REPLACEMENT & FIRE ALARM UPGRADE
AIRPORT TRAFFIC CONTROL TOWER
SUBMITTER'S TITLE APPROVER'S TITLE
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
F
IL
E
D
A T
E
T
IM
E
N
A M
E
DATE
APPROVED
RALEIGH-DURHAM NC
SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALES FOR OTHER SIZES.
WW JOB NUMBER: 220079.00
wileywilson.com
678.320.1888
Atlanta, Georgia 30328-6055
Bldg. C, Ste 515
5901 Peachtree Dunwoody Rd.
Wiley|Wilson
1303936MARCH 2022
(INTERNATIONAL AIRPORT)
ATCT HVAC REPLACEMENT & FIRE ALARM UPGRADE
RALEIGH-DURHAM INTERNATIONAL AIRPORT (RDU)
RDU-D-TRACO-CHECKED
SUBMITTED BY
REVIEWED BY
DRAWN
DESIGNED ISSUED BY
CENTER
ENGINEERING
TERMINAL DRAWING NO
DATE JCN
APPROVED BY
REV
REV DESCRIPTION JCN
DATE
REDLINE
APVD
cknight Stamp
SCALE: 1/8" = 1' - 0"D120
1 BASE BUILDING RCP DEMOLITION
BASE BUILDING RCP - DEMOLITION
ARCHITECTURAL
D120
08' 8' 16'
1/8" = 1'-0"
NOTES
COORDINATE REMOVAL/REPLACEMENT WITH COR.7.
CLEAN UP WORK AREA BY THE END OF EACH SHIFT.
DEBRIES FROM CEILING REMOVAL. CONTRACTOR SHALL
CONTRACTOR SHALL PROTECT FURNITURE FROM DUST AND 6.
PERFORM WORK. COORDINATE WITH COR.
CONTRACTOR SHALL MOVE FURNITURE AS NEEDED TO 5.
CEILING REMOVAL LOCATION.
COORDINATE WITH OTHER DISCIPLINES FOR ANY OTHER 4.
REMOVAL OR TO REMAIN.
REFER TO OTHER DISCIPLINES FOR CEILING DEVICES 3.
CONSTRUCTION TO EXISTING CEILING.
CONTRACTOR IS REQUIRED TO REPAIR ANY DAMAGE DURING 2.
ROOM 103, U.N.O.
147, 149, 134, 153 A, 155, 157, 161, PARTIALLY IN
DRAWING IN ROOMS 101, 102, 111, 113, 117, 128, 137,
REMOVE EXISTING 2' X 4' CEILING TILE AS SHOWN ON 1.
AFTER MECHANICAL WORK IS COMPLETED.
STORED IN DRY PLACE TO BE REINSTALLED
EXISTING CEILING TO BE REMOVED AND
EXISTING CEILING TO REMAIN.
REFER TO A120 FOR NEW CEILING LAYOUT.
CEILING TO BE REMOVED AND REPLACED.
LEGEND
CEILING
EXPOSED
CEILING
EXPOSED
TO REMAIN
CEILING
GYPSUM
TO REMAIN
CEILING
GYPSUM
CEILING
EXPOSED
CEILING
EXPOSED
CEILING
EXPOSED
CEILING
EXPOSED
CEILING
EXPOSED
TO REMAIN
CEILING
GYPSUM
TO REMAIN
CEILING
GYPSUM
TO REMAIN
CEILING
GYPSUM
1-HR FIRE RATED WALL
2-HR FIRE RATED WALL
SUBMITTER'S TITLE APPROVER'S TITLE
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
F
IL
E
D
A T
E
T
IM
E
N
A M
E
DATE
APPROVED
RALEIGH-DURHAM NC
SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALES FOR OTHER SIZES.
WW JOB NUMBER: 220079.00
wileywilson.com
678.320.1888
Atlanta, Georgia 30328-6055
Bldg. C, Ste 515
5901 Peachtree Dunwoody Rd.
Wiley|Wilson
1303936MARCH 2022
(INTERNATIONAL AIRPORT)
ATCT HVAC REPLACEMENT & FIRE ALARM UPGRADE
RALEIGH-DURHAM INTERNATIONAL AIRPORT (RDU)
RDU-D-TRACO-CHECKED
SUBMITTED BY
REVIEWED BY
DRAWN
DESIGNED ISSUED BY
CENTER
ENGINEERING
TERMINAL DRAWING NO
DATE JCN
APPROVED BY
REV
REV DESCRIPTION JCN
DATE
REDLINE
APVD
N
130131
138B
138A
107106
153B
153A
150 149 141
TOWER
LINK TO
ROOM SCHEDULE
NO.
RM.
LMS
QUALITY
ATM
153A
WOMEN'S TOILET RELO MOD. FURN.153B
MEN'S TOILET
F&E/FMP
CORRIDOR
TSS
TSS
SSC MANAGER
VESTIBULE
BREAKROOM ADDITION
LOCKER ADDITION
132 BULK STORAGE
138A
138B
NOT USED111 ENGINEERING
RM.
ROOM NAME
NO.
RM.
ROOM NAME
NO.
RM.
ROOM NAME
NO.
RM.
ROOM NAME
NO.
RM.
03/31/2022
T
T
T
ZONE 8
TO
ZONE 7
TO
ZONE 6
TO
ZONE 4
TO
ZONE 3
TO
ZONE 5
TO T
x x
12x88x8
20x1216x1216x7 x x x x x x x
40x1240x1240x12
34x1034x10
T
ZONE 1
TO
26x12
R x
160E
24x1220x12
18x12
16x12 x
16x12
10x10
22x12
24x10
12x4
10x10
8x8
8x8
10x10 x
14x10
10x6 x
TD
26x12
10x810x88x8 x x x x x
20x12
14x12 8x6
8x6
12x6
12x8
26x12
24x10
12x10 30x10 x
12x4E
12x4E 24x14 x x x
24x10 24x10
N
08' 8' 16'
1/8" = 1'-0"
D300
1 BASE BUILDING FLOOR PLAN - HVAC DEMOLITION
SCALE: 1/8" = 1'-0"
BASE BUILDING FLOOR PLAN - HVAC DEMOLITION
MECHANICAL
D300
DEMOLITION NOTES
GENERAL
153B
153A
141 140
138A
137 134
130131
LAN
TECH ROOM115
107106
138B
MJH
CRK
JJS
x
24x12
10x12
VV-4
VV-3
VV-5
S
S
VV-6
VV-1
S
VV-2
x
S
S
ON ROOF
RTU-1
EXISTING
11 ON ROOF
EXISTING RTAC-10 &
T
RTU-2
TO
8x6
18x12
36x12
10x6 x
D302
ON ROOF
EXISTING RTU-2
ON ROOF
EXISTING EF-2
ASSOCIATED DUCTWORK IS TO REMAIN EXCEPT WHERE SHOWN.
REMOVE 6 VARIABLE AIR VOLUME TERMINALS ASSOCIATED WITH RTU-1. 6
REMAIN. SEE DRAWING TRACO-D301 FOR WORK ON ROOF.
ASSOCIATED CONTROLS, WIRING AND SUPPORTS. EXISTING ROOF CURB TO
REMOVE EXISTING ROOFTOP AIR CONDITIONING UNIT INCLUDING ALL 5
MECHANICAL ROOM AND EQUIPMENT ROOM.
SEE DRAWING TRACO-D302 FOR CONTINUATION OF DEMOLITION WORK IN 4
REUSED.
REPAIR WALL TO RESTORE RATING WHERE OPENINGS ARE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .