J-1c Full Size Dwgs.pdf

PDF 19 MB Posted

Attached to
RDU HVAC and Fire Alarm Replacement requirement located in Raleigh, NC.
Solicitation number
697DCK-23-R-00048
Issued by

About this file

This document outlines a federal contract opportunity to replace the HVAC and fire alarm systems at Raleigh-Durham International Airport in Raleigh, North Carolina. The solicitation number is 697DCK-23-R-00048 and is being issued by the Department of Transportation Federal Aviation Administration Southwestern Region. The purpose of the contract is to replace the HVAC and fire alarm at the airport as specified in the attached specifications documents in section J of the solicitation. Interested parties should review the full details of the scope of work and technical requirements in the provided specifications files.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FO

TNEMT

R A

P E

D

N

OI

T

AT

RO

PSNART

U N

IT

E

D

STATES OF

AM

ER

I C A

COVER SHEET

GENERAL

G000

RAB

GMR

CRK

APRIL 1, 2022

RALEIGH, NC

RALEIGH-DURHAM INTERNATIONAL AIRPORT

HVAC REPLACEMENT & FIRE ALARM UPGRADE

AIRPORT TRAFFIC CONTROL TOWER

SUBMITTER'S TITLE APPROVER'S TITLE

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

8 1234567

8 1234567

F

IL

E

D

A T

E

T

IM

E

N

A M

E

DATE

APPROVED

RALEIGH-DURHAM NC

SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALES FOR OTHER SIZES.

WW JOB NUMBER: 220079.00

wileywilson.com

678.320.1888

Atlanta, Georgia 30328-6055

Bldg. C, Ste 515

5901 Peachtree Dunwoody Rd.

Wiley|Wilson

1303936MARCH 2022

(INTERNATIONAL AIRPORT)

ATCT HVAC REPLACEMENT & FIRE ALARM UPGRADE

RALEIGH-DURHAM INTERNATIONAL AIRPORT (RDU)

RDU-D-TOWB-CHECKED

SUBMITTED BY

REVIEWED BY

DRAWN

DESIGNED ISSUED BY

CENTER

ENGINEERING

TERMINAL DRAWING NO

DATE JCN

APPROVED BY

REV

REV DESCRIPTION JCN

DATE

REDLINE

APVD

cknight Stamp cknight Stamp

G001

DRAWING INDEX

TITLEDRAWING NUMBER

TITLEDRAWING NUMBER

RDU-D-TRACO-F120

RDU-D-TRACO-F100

RDU-D-TRACO-F001

RDU-D-TRACO-F000

FIRE PROTECTION

RDU-D-TRACO-E800

RDU-D-TRACO-E600

RDU-D-TRACO-E500

RDU-D-TRACO-E400

RDU-D-TRACO-E120

RDU-D-TRACO-E101

RDU-D-TRACO-E100

RDU-D-TRACO-E000

ELECTRICAL

BASE BUILDING (CONTINUED)

FIRE ALARM LINK PLAN

FIRE ALARM BASE BUILDING FLOOR PLAN

NOTES AND LEGEND

DRAWING INDEX AND CONSTRUCTION STAGING NOTES

ONE LINE DIAGRAM

DETAILS

PANEL SCHEDULES

MECHANICAL ROOM POWER PLAN

BASE BUILDING POWER PLAN

BASE BUILDING ELECTRICAL ROOF PLAN

BASE BUILDING LIGHTING PLAN

LEGEND, SYMBOLS AND NOTES

RDU-D-TRACO-M809

RDU-D-TRACO-M808

RDU-D-TRACO-M807

RDU-D-TRACO-M806

RDU-D-TRACO-M805

RDU-D-TRACO-M804

RDU-D-TRACO-M803

RDU-D-TRACO-M802

RDU-D-TRACO-M801

RDU-D-TRACO-M800

RDU-D-TRACO-M631

RDU-D-TRACO-M630

RDU-D-TRACO-M603

RDU-D-TRACO-M602

RDU-D-TRACO-M601

RDU-D-TRACO-M600

RDU-D-TRACO-M501

RDU-D-TRACO-M500

RDU-D-TRACO-M400

RDU-D-TRACO-M120

RDU-D-TRACO-M100

RDU-D-TRACO-M000

MECHANICAL

RDU-D-TRACO-A660

RDU-D-TRACO-A500

RDU-D-TRACO-A140

RDU-D-TRACO-A120

RDU-D-TRACO-A100

RDU-D-TRACO-A000

ARCHITECTURAL

RDU-D-TRACO-D701

RDU-D-TRACO-D700

RDU-D-TRACO-D502

RDU-D-TRACO-D501

RDU-D-TRACO-D500

RDU-D-TRACO-D302

RDU-D-TRACO-D301

RDU-D-TRACO-D300

RDU-D-TRACO-D120

DEMOLITION

RDU-D-TRACO-G000

BASE BUILDING

RDU-D-TOWB-H002

RDU-D-TOWB-H001

RDU-D-TOWB-G042

RDU-D-TOWB-G041

RDU-D-TOWB-G040

RDU-D-TOWB-G015

RDU-D-TOWB-G011

RDU-D-TOWB-G010

RDU-D-TOWB-G001

RDU-D-TOWB-G000

GENERAL

SEQUENCE OF OPERATION AND SYSTEM POINT LIST

CONTROL SYSTEM EXHAUST FANS & MOTORIZED DAMPERS

SEQUENCE OF OPERATION AND SYSTEM POINT LIST

CONTROL SYSTEM DIAGRAM B-RTU-2

SEQUENCE OF OPERATION AND SYSTEM POINT LIST

CONTROL SYSTEM DIAGRAM B-RTU-1 & TERMINAL UNIT (VAV)

SEQUENCE OF OPERATION AND SYSTEM POINT LIST

CONTROL SYSTEM DIAGRAM B-AHU-2, B-RTU-3A & B-RTU-3B

SEQUENCE OF OPERATION AND SYSTEM POINT LIST

CONTROL SYSTEM DIAGRAM AHU-1, VAV & EXHAUST FANS

SEISMIC DETAILS

SEISMIC DETAILS

HVAC DETAILS

HVAC DETAILS

HVAC DETAILS

HVAC DETAILS

HVAC SCHEDULES

HVAC SCHEDULES

ENLARGED FLOOR PLAN - HVAC

BASE BUILDING ROOF PLAN - HVAC

BASE BUILDING FLOOR PLAN - HVAC

HVAC LEGEND AND GENERAL NOTES

DETAILS

FINISH AND COLOR SCHEDULES

BASE BUILDING ROOF PLAN

BASE BUILDING RCP

BASE BUILDING FLOOR PLAN

LEGEND, SYMBOLS AND GENERAL NOTES

LINK PLAN - FIRE ALARM DEMOLITION

BASE BUILDING FLOOR PLAN - FIRE ALARM DEMOLITION

ENLARGED FLOOR PLAN - ELECTRICAL DEMOLITION

BASE BUILDING ROOF PLAN - ELECTRICAL DEMOLITION

BASE BUILDING FLOOR PLAN - ELECTRICAL DEMOLITION

ENLARGED FLOOR PLAN - HVAC DEMOLITION

BASE BUILDING ROOF PLAN - HVAC DEMOLITION

BASE BUILDING FLOOR PLAN - HVAC DEMOLITION

BASE BUILDING RCP - ARCHITECTURAL DEMOLITION

BASE BUILDING COVER SHEET

HAZARDOUS MATERIAL (HAZMAT) INFORMATION (TOWER)

HAZARDOUS MATERIAL (HAZMAT) INFORMATION (BASE BLDG)

PHASING REQUIREMENTS MATRIX

CONSTRUCTION STAGING NOTES

CONSTRUCTION COORDINATION NOTES

SYMBOL LEGEND

ABBREVIATIONS - SHEET 2

ABBREVIATIONS - SHEET 1

DRAWING INDEX

COVER SHEET

RDU-D-ATCT-F650

RDU-D-ATCT-F600

RDU-D-ATCT-F103

RDU-D-ATCT-F102

RDU-D-ATCT-F101

RDU-D-ATCT-F100

RDU-D-ATCT-F001

FIRE PROTECTION

RDU-D-ATCT-M805

RDU-D-ATCT-M804

RDU-D-ATCT-M803

RDU-D-ATCT-M802

RDU-D-ATCT-M801

RDU-D-ATCT-M800

RDU-D-ATCT-M103

RDU-D-ATCT-M102

RDU-D-ATCT-M101

RDU-D-ATCT-M000

MECHANICAL

RDU-D-ATCT-A200

RDU-D-ATCT-A120

RDU-D-ATCT-A103

RDU-D-ATCT-A102

RDU-D-ATCT-A101

RDU-D-ATCT-A100

RDU-D-ATCT-A000

ARCHITECTURAL

RDU-D-ATCT-D703

RDU-D-ATCT-D702

RDU-D-ATCT-D701

RDU-D-ATCT-D700

DEMOLITION

RDU-D-ATCT-G000

GENERAL

ATCT

SEQUENCE OF OPERATION - FIRE ALARM

RISER DIAGRAM - FIRE ALARM

CAB AND CAB WALKWAY PLAN - FIRE ALARM

SUBJUNCTION LEVEL 1 AND JUNCTION LEVEL - FIRE ALARM

CABLE ACCESS PLAN AND SUBJUNCTION LEVEL 2 - FIRE ALARM

GROUND LEVEL AND SECOND LEVEL PLAN - FIRE ALARM

NOTES AND LEGEND

SEQUENCE OF OPERATION AND SYSTEM POINT LIST

CONTROL SYSTEM DIAGRAM T-AHU-2, T-AHU-3 & T-EF-4

SEQUENCE OF OPERATION AND SYSTEM POINT LIST

CONTROL SYSTEM DIAGRAM T-AHU-1

SEQUENCE OF OPERATION AND SYSTEM POINT LIST

CONTROL SYSTEM DIAGRAM T-AHU-4A AND T-AHU-4B

CAB FLOOR

SUBJUNCTION LEVEL 1 AND JUNCTION LEVEL

GROUND AND SUBJUNCTION 2 PLANS

HVAC LEGEND AND GENERAL NOTES

ELEVATIONS

BASE LEVEL 1 RCP AND ROOF PLAN

CAB FLOOR AND CAB ROOF

SUBJUNCTION LEVEL 1 AND JUNCTION LEVEL

CABLE ACCESS PLAN AND SUBJUNCTION LEVEL 2

BASE LEVEL AND CABLE ACCESS PLAN

LEGEND, SYMBOLS AND GENERAL NOTES

CAB AND CAB WALKWAY PLAN - FIRE ALARM DEMOLITION

SUBJUNCTION LEVEL 1 AND JUNCTION LEVEL - FIRE ALARM DEMOLITION

CABLE ACCESS PLAN AND SUBJUCTION LEVEL 2 - FIRE ALARM DEMOLITION

GROUND LEVEL AND SECOND LEVEL PLAN - FIRE ALARM DEMOLITION

TOWER COVER SHEET

SUBMITTER'S TITLE APPROVER'S TITLE

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

8 1234567

8 1234567

F

IL

E

D

A T

E

T

IM

E

N

A M

E

DATE

APPROVED

RALEIGH-DURHAM NC

SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALES FOR OTHER SIZES.

WW JOB NUMBER: 220079.00

wileywilson.com

678.320.1888

Atlanta, Georgia 30328-6055

Bldg. C, Ste 515

5901 Peachtree Dunwoody Rd.

Wiley|Wilson

1303936MARCH 2022

(INTERNATIONAL AIRPORT)

ATCT HVAC REPLACEMENT & FIRE ALARM UPGRADE

RALEIGH-DURHAM INTERNATIONAL AIRPORT (RDU)

RDU-D-TOWB-CHECKED

SUBMITTED BY

REVIEWED BY

DRAWN

DESIGNED ISSUED BY

CENTER

ENGINEERING

TERMINAL DRAWING NO

DATE JCN

APPROVED BY

REV

REV DESCRIPTION JCN

DATE

REDLINE

APVD

cknight Stamp

ABBREVIATIONS - SHEET 1

G010RAB

COL COLUMN

CO CLEANOUT, CONDUIT ONLY

CMU CONCRETE MASONRY UNIT

CM COMMUNICATION MANHOLE

CLR CLEAR

CLG CEILING

CLF CURRENT LIMITING FUSE

CL CENTERLINE

CKT CIRCUIT

C.I.P. CAST IN PLACE

CWS CHILLED WATER SUPPLY

CWR CHILLED WATER RETURN

CWP CHILLED WATER PUMP

CHWS CHILLED WATER SUPPLY

CHWR CHILLED WATER RETURN

CHW CHILLED WATER

CHKD CHECKERED

CH CHILLER

CFM CUBIC FEET PER MINUTE

CFACC CENTRIFUGAL FAN AIR COOLED CONDENSER

CF CUBIC FOOT/FEET

CAF COMBUSTION AIR FAN

CENTRIF CENTRIFUGAL

CENT CENTRIFUGAL

CD CEILING DIFFUSER, CONDENSATE DRAIN

CCTV CLOSED CIRCUIT TELEVISION

CBCR CURVED BLADE CEILING REG.

CB CIRCUIT BREAKER

CAV CONSTANT AIR VOLUME

CAP CAPACITY

C CONDUIT

C

BTUH BRITISH THERMAL UNIT/HOUR

BTU BRITISH THERMAL UNIT

BSMT BASEMENT

BSDC BARE SOFT DRAWN COPPER

BPU BREAKER PROGRAMMING UNIT

BP BOOSTER PUMP

BOT BOTTOM

BOP BOTTOM OF PIPING

BOF BOTTOM OF FIXTURE

BOD BOTTOM OF DUCT, BACKDRAFT DAMPER

BLK BLACK

BLDG BUILDING

BITS BYPASS ISOLATION TRANSFER SWITCH

BI BACKWARD INCLINED

BFP BACKFLOW PREVENTER

BFC BELOW FINISHED CEILING

BF BELOW FLOOR (PIPE SIZE)

BDD BACKDRAFT DAMPER

BCKP BACKUP

BC BARE COPPER

BBHWH BASEBOARD HOT WATER HEATER

BAT CHGR BATTERY CHARGER

B

AWS AMERICAN WELDING SOCIETY

AWG AMERICAN WIRE GAUGE

AVG AVERAGE

AV AUTOMATIC VENT

AUX AUXILIARY

ATV ATMOSPHERIC VENT

ATS AUTOMATIC TRANSFER SWITCH

ATCT AIRPORT TRAFFIC CONTROL TOWER

ATC AIR TRAFFIC CONTROL

ATC ACOUSTICAL TILE CEILING

ATBM AIRWAY/TERMINAL BUILDING MAINTENANCE FACILITY

AT AMPERE TRIP

ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS

AND AIR CONDITIONING ENGINEERS

ASHRAE AMERICAN SOCIETY OF HEATING, REFRIGERATION

A/S AUDIBLE STROBE

AS AIR SEPARATOR

ARTS AUTOMATED RADAR

ARCH ARCHITECT, ARCHITECTURAL

APPROX APPROXIMATELY

APD AIR PRESSURE DROP

AP ANNUNCIATOR POINT, ACCESS PANEL

AO ANALOG OUTPUT

ANSI AMERICAN NATIONAL STANDARDS INSTITUTE

ANN ANNUNCIATOR

AMM AMMETER

ALUM ALUMINUM

AL-GL ALUMINUM AND GLASS

AL AIRPORT LIGHTING, ALUMINUM

AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION

AIC AMPERE INTERRUPTING CAPACITY

AI ANALOG INPUT

AHU AIR HANDLING UNIT

AH AIR HANDLER

AFR ABOVE FINISHED ROOF

AFG ABOVE FINISHED GRADE

AFF ABOVE FINISHED FLOOR

AF AMPERE FRAME

ADJ ADJUSTABLE

AD ACCESS DOOR, AREA DRAIN

ACT ACOUSTICAL CEILING TILE, ACCESS CONTROL TERMINAL

ACM ASBESTOS CONTAINING MATERIAL

ACI AMERICAN CONCRETE INSTITUTE

ACDFC AIR COOLED DRY FLUID COOLER

ACC AIR COOLED CHILLER

A/C AIR CONDITIONING

AC ALTERNATING CURRENT, ABOVE CEILING

ABG ABOVE FINISHED GRADE

AAV AUTOMATIC AIR VENT

AA AIR COOLED

A AMPERE

A

EXP EXPOSED, EXPANSION

EXIST EXISTING

EXH EXHAUST

EWT ENTERING WATER TEMPERATURE

EWH ELECTRIC WALL HEATER, ELECTRIC WATER HEATER

EWC ELECTRICAL WATER COOLER

EW EACH WAY

EUH ELECTRIC UNIT HEATER

ET EXPANSION TANK

ESP EXTERNAL STATIC PRESSURE

ERMS ENVIRONMENTAL REMOTE MONITORING SYSTEM

ER EXHAUST REGISTER

EQUIP EQUIPMENT

EQ EQUAL

ENT ENTERING

EMT ELECTRICAL METALLIC TUBING

EMS ENERGY MANAGEMENT SYSTEM

EMI ELECTROMAGNETIC INTERFACE

EMERG EMERGENCY

EMCS ENERGY MANAGEMENT AND CONTROL SYSTEM

ELEV, EL ELEVATION, ELEVATOR

ELEC ELECTRIC

EIFS EXTERIOR INSULATION FINISH SYSTEM

EHC ELECTRIC HEATING COIL

EH ELECTRIC HEATER, ELECTRONIC HUMIDIFIER

EMERGENCY GENERATOR

EG, E/G ENGINE GENERATOR, EXHAUST GRILLE

EF EXHAUST FAN

EDH ELECTRIC DUCT HEATER

EDAM ELECTRICAL DATA ACQUISITION AND MONITORING

ECP ENGINE CONTROL PANEL

EAT ENTERING AIR TEMPERATURE

EA EACH, EXHAUST AIR

E EAST

E

DWL DOWEL

DWGS DRAWINGS

DWDI DOUBLE WIDTH DOUBLE INLET

DWBP DOMESTIC WATER BOOSTER PUMP

DTS DOUBLE THROW SWITCH

DT DOUBLE THROW, DIAPHRAM TANK

DSF DESTRATIFICATION FAN

DPT DIFFERENTIAL PRESSURE TRANSMITTER

DPST DOUBLE POLE SINGLE THROW

D PNL DISTRIBUTION PANEL

DPDT DOUBLE POLE DOUBLE THROW

DP DIFFERENTIAL PRESSURE

DO DIGITAL OUTPUT

DN DOWN

DM DEMAND METER

DF DEGREES FAHRENHEIT

DISC DISCONNECT

DIM DIMENSION

DIFF DIFFUSER

DIAG DIAGONAL

DIA DIAMETER

DI DIGITAL INPUT

DHW DOMESTIC HOT WATER

DG DOOR GRILLE

DET DETAIL

DEMO DEMOLITION

DEG DEGREE

DDC DIRECT DIGITAL CONTROL

DC DIRECT CURRENT

DBL DOUBLE

DB DRY BULB, DIRECT BURIAL, DUCTBANK

DAMP DAMPER

D DRAIN

D

CY YD CUBIC YARD

CWV COMBINATION WASTE AND VENT

CWS CONDENSER WATER SUPPLY

CWR CONDENSER WATER RETURN

CWP CONDENSER WATER PUMP, CHILLED WATER PUMP

CW COLD (DOMESTIC) WATER

CVC CENTRAL VACUUM CLEANER

CV CONSTANT VOLUME, CONTROL VALVE

CU FT CUBIC FOOT/FEET

CU CONDENSING UNIT, COPPER

CTL CONTROL

CURRENT TRANSFORMER, CERAMIC TILE

CT COOLING TOWER, CABLE TRAY,

CSF CHEMICAL SHOT FEEDER

CS CONTROL SWITCH

CR CONTROL RELAY

CPU CENTRAL PROCESSING UNIT

CPT CARPET

CPC CRITICAL POWER CENTER

COR CONTRACTING OFFICER'S REPRESENTATIVE

CONTR CONTRACTOR

CONT CONTINUATION

CONN CONNECTION

CONFIG CONFIGURATION

COND CONDENSATE

CONC CONCRETE

COMM COMMUNICATIONS

ISMS INTEGRATED SECURITY MANAGEMENT SYSTEM

INV INVERT

INT INTERIOR

INSUL INSULATED

INDIC INDICATOR

INCL INCLUDE

INCAND INCANDESCENT

IN INCHES

IE INVERT ELEVATION

IC INTERCOMMUNICATION, INTERCOM

I

HZ HERTZ

HX HEAT EXCHANGER

HWUH HOT WATER UNIT HEATER

HWS HOT WATER SUPPLY

HWR HOT WATER RETURN

HWP HOT WATER PUMP

HVAC HEATING, VENTILATION AND AIR CONDITIONING

HU HUMIDIFIER

HTR HEATER

HTG HEATING

HT HEIGHT

HSB HIGH STRENGTH BOLT

HS HIGH STRENGTH

HR HOUR

HPS HIGH PRESSURE SODIUM

HP HORSEPOWER

HORIZ HORIZONTAL

HOA HAND-OFF-AUTOMATIC

H. MET. HOLLOW METAL

HM HOLLOW METAL

HH HAND HOLE

HEX HEXAGONAL

HB HOSE BIBB

HAZMAT HAZARDOUS MATERIALS

H

GYP GYPSUM

GWB GYPSUM WALLBOARD

GUH GAS FIRED UNIT HEATER

GRS GALVANIZED RIGID STEEL

GRN GREEN

GPM GALLONS PER MINUTE

GPH GALLONS PER HOUR

GOVT GOVERNMENT

GND GROUND CONNECTOR

GFM GOVERNMENT FURNISHED MATERIAL

GFE GOVERNMENT FURNISHED EQUIPMENT

GFCI GROUND FAULT CIRCUIT INTERRUPTER

GEN GENERAL, GENERATOR

GALV GALVANIZED

GAL GALLON

GA GAUGE

G GROUND

G

FWD FORWARD, FIRE SPRINKLER WATER DRAIN

FWS FIRE WATER SUPPLY

FW FIRE WATER

FVC FIRE VALVE CABINET

FV FULL VOLTAGE

FTG FOOTING, FITTING

FT FEET

FSS FUSIBLE SAFETY SWITCH

FSD FIRE/SMOKE DAMPER

FS FLOW SWITCH, FLOOR SINK

FPU FIELD PROGRAMMING UNIT

FPM FEET PER MINUTE

FP FIRE PUMP

FOT FIBER OPTIC TERMINAL, FUEL OIL TRANSFER

FOS FUEL OIL SUPPLY

FOR FUEL OIL RETURN

FOG FUEL OIL GAGE

FOD FACE OPERATED DAMPER

FO FIBER OPTIC

FM FACTORY MUTUAL, FORCE MAIN

FLUOR FLUORESCENT

FLS FLOW SWITCH, FIRE AND LIFE SAFETY

FLEX FLEXIBLE

FLR FLOOR

FLA FULL LOAD AMPERES

FIN FINISH

FIG FIGURE

FHV FIRE HOSE VALVE

FHC FIRE HOSE CABINET

FH FIRE HYDRANT

FG FIBERGLASS

FFE FINISHED FLOOR ELEVATION

FF FLY FAN

FEC FIRE EXTINGUISHER CABINET

FE FIRE EXTINGUISHER

FDR FEEDER

FDN FOUNDATION

FDC FIRE DEPARTMENT CONNECTION

FD FLOOR DRAIN, FIRE DAMPER

FCV FLOW CONTROL VALVE

FCU FAN COIL UNIT

FCO FLOOR CLEANOUT

FC FACE OF CURB, FLEXIBLE CONNECTION

FACT FACTORY

FACP FIRE ALARM CONTROL PANEL

FAA FEDERAL AVIATION ADMINISTRATION

FA FIRE ALARM, FREE AREA, FAN COOLED, FRESH AIR

°F DEGREES FAHRENHEIT

F FIRE WATER SUPPLY

F

MVD MANUAL VOLUME DAMPER

MVA MEGAVOLT AMPERE

MV MANUAL VENT

MUW MAKE-UP WATER

MUA MAKE-UP AIR

MTL METAL

MTD MOUNTED

MPG MULTI-POINT GROUND

MOD MOTOR OPERATED DAMPER

MM MILLIMETER

MLO MAIN LUGS ONLY

MISC MISCELLANEOUS

MIN MINIMAL, MINUTE, MINIMUM

MIL ST MILITARY STANDARD

MIL THOUSANDTHS OF AN INCH

MH MANHOLE

MG MOTOR GENERATOR

MFR MANUFACTURER

MEMB MEMBRANE

MED MEDIUM

MECH MECHANICAL

MDT MAIN DISTRIBUTION TERMINAL

MDF MEDIUM DENSITY FIBERBOARD

MD MANUAL DAMPER

MCP MOTOR CIRCUIT PROTECTOR

MCM THOUSAND CIRCULAR MILLS

MCC MOTOR CONTROL CENTER

MCB MOLDED CASE BREAKER

MBP MAINTENANCE BYPASS PANEL

MBH THOUSAND BTU/HOUR

MAX MAXIMUM

MAINT MAINTENANCE

MAG MAGNETIC DOOR HOLD OPEN

M

LWT LEAVING WATER TEMPERATURE

LVL LEVEL

LV LOW VOLTAGE

LTG LIGHTING

LT LIQUID TIGHT

LSD LINEAR SLOT DIFFUSER

LS LIGHT STANDARD

LRG LINEAR RETURN GRILLE

LRAG LINEAR RETURN AIR GRILLE

LRA LOCKED ROTOR AMPERE

LP LOW POINT

LOSP LOCAL OPERATING STATUS PANEL

LONG LONGITUDINAL

LLV LONG LEG VERTICAL

LLH LONG LEG HORIZONTAL

LFS LIGHTING FIXTURE SCHEDULE

LF LINEAR FEET

LD LINEAR DIFFUSER

LBS POUNDS

LBR LINEAR BAR RETURN

LBG LINEAR BAR GRILLE

LBD LINEAR BAR DIFFUSER

LAT LEAVING AIR TEMPERATURE

L&S LOUVER AND SCREEN

L

KWH KILOWATT HOUR

KW KILOWATT

KVAR KILOVOLT AMPERES-REACTIVE

KVA KILOVOLT AMPERES

KV KILOVOLT

KCMIL THOUSAND CIRCULAR MILLS

KA KILOAMPERES

K

JT JOINT

JP JOCKEY PUMP

JB JUNCTION BOX

J

GMR

GMR

SUBMITTER'S TITLE APPROVER'S TITLE

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

8 1234567

8 1234567

F

IL

E

D

A T

E

T

IM

E

N

A M

E

DATE

APPROVED

RALEIGH-DURHAM NC

SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALES FOR OTHER SIZES.

WW JOB NUMBER: 220079.00

wileywilson.com

678.320.1888

Atlanta, Georgia 30328-6055

Bldg. C, Ste 515

5901 Peachtree Dunwoody Rd.

Wiley|Wilson

1303936MARCH 2022

(INTERNATIONAL AIRPORT)

ATCT HVAC REPLACEMENT & FIRE ALARM UPGRADE

RALEIGH-DURHAM INTERNATIONAL AIRPORT (RDU)

RDU-D-TOWB-CHECKED

SUBMITTED BY

REVIEWED BY

DRAWN

DESIGNED ISSUED BY

CENTER

ENGINEERING

TERMINAL DRAWING NO

DATE JCN

APPROVED BY

REV

REV DESCRIPTION JCN

DATE

REDLINE

APVD

cknight Stamp

TW TEMPERED WATER

TYP TYPICAL

TVSS TRANSIENT VOLTAGE SURGE SUPPRESSOR (GFM)

TV TELEVISION, TEMPERING VALVE

TTB TELEPHONE TERMINAL BOARD

TT TEMPERATURE TRANSMITTER

T°STAT THERMOSTAT

TSP TOTAL STATIC PRESSURE, TRAP SEAL PRIMER

TS TWO SPEED

TRACO TERMINAL RADAR APPROACH CONTROL BUILDING

TRBL TROUBLE CONDITION

TP TRAP PRIMER, TWISTER PAIR

TOWB ATCT AND ATTACHED BASE BUILDING

TOS,T/S TOP OF STEEL

TOD TOP OF DUCT

TOC TOP OF CONCRETE

THK THICK, THICKNESS

TG TRANSFER GRILLE

TERM TERMINAL

TEMP TEMPERATURE

TELCO TELEPHONE COMPANY

TEL TELEPHONE

TEF TOILET EXHAUST FAN

TD TIME DELAY, TRENCH DRAIN

TC TRIP COIL, TOTAL COOLING, TIME CLOCK

TB TERMINAL BOX, TERMINAL BOARD

T&P TEMPERATURE AND PRESSURE

T&B TOP AND BOTTOM

T TRANSDUCER

T

SYS SYSTEM

SYM SYMMETRICAL

SWSR SIDE WALL SUPPLY REGISTER

SWSI SINGLE WIDTH SINGLE INLET

SWR SIDEWALL REGISTER

SWGR SWITCHGEAR

SWG SIDEWALL GRILLE

SWBD SWITCHBOARD

SW SWITCH

SUSP SUSPENDED

SUBJ SUBJUNCTION

STRUCT STRUCTURAL

STP SHIELDED TWISTED PAIR

STL STEEL

STGP SIGNAL TRANSPORT GROUND PLANE

STD STANDARD

ST SHUNT TRIP

S/S START-STOP

SS STAINLESS STEEL, SANITARY SEWER

SRG SIGNAL REFERENCE GRID

SR SUPPLY REGISTER

SQ.FT. SQUARE FOOT/FEET

SQ SQUARE

SPVR SUPERVISORY CONDITION

SPT STATIC PRESSURE TRANSMITTER

SPST SINGLE POLE SINGLE THROW

SPF STAIRWELL PRESSURIZATION FAN

SPEC SPECIFICATION

SP STATIC PRESSURE(IN W.G.), SINGLE POLE, SUMP PUMP

SOV SHUT-OFF VALVE

NATIONAL ASSOCIATION

SMACNA SHEET METAL AND AIR CONDITIONING CONTRACTORS'

SIM SIMILAR

SHT SHEET

SHLD SHIELDED

SHDWN SHUT DOWN

SGL SINGLE

SG SUPPLY GRILLE

SF SQUARE FEET

SENS SENSIBLE

SECT SECTION

SEC SECONDARY

S.D. SUPPLY DIFFUSER

SD SPLITTER DAMPER STORM DRAIN, SMOKE DETECTOR

SCP SYSTEM CONTROL PANEL, SMOKE CONTROL PANEL

SCND SECONDARY

SCHWS SECONDARY CHILLED WATER SUPPLY

SCHWR SECONDARY CHILLED WATER RETURN

SCHWP SECONDARY CHILLED WATER PUMP

SCHED SCHEDULE

SCC SECURITY CONTROL CENTER

S.C. SOLID CORE

SC SPIN IN COLLAR WITH VOLUME DAMPER, SENSIBLE COOLING

SAN SANITARY

SA SUPPLY AIR

S SOUTH, STAIN COLOR, SANITARY

S

RV RELIEF VALVE

RTU ROOF TOP UNIT

RTN RETURN

RQMTS REQUIREMENTS

RPZ REDUCED PRESSURE ZONE

RPM ROTATIONS PER MINUTE, REVOLUTIONS PER MINUTE

RP BP REDUCED PRESSURE BACKFLOW PREVENTER

RO REVERSE OSMOSIS

RMS ROOT MEAN SQUARE

RML RADAR MICROWAVE LINK

RMH ROOF MOUNTED HOOD

RM ROOM

RL RAIN LEADER

ABBREVIATIONS - SHEET 2

GENERAL

G011

IMPEDANCEZ

Z

WYE DELTADY-

WYEY

Y

TRANSDUCERXDCR

TRANSMITTERXMTR

TRANSFORMERXFMR

TRANSFERXFR

AUXILIARY RELAYX

X

WELDED WIRE FABRICWWF

WATERWTR

WATER TANKWT

WASHDOWN SUPPLY WATERWSW

WATER PRESSURE DROPWPD

WEATHERPROOF NEMA TYPE 3R OR EQUIVALENT, UON

SUBSCRIPT "WP" APPLIED TO ANY SYMBOL INDICATESWP

WIRE MESH SCREENWMS

WATT METERWM

WATER HAMMER ARRESTERWHA

WATER HEATER, WALL HEATER, WALL HYDRANTWH

WATER GAUGEWG

WALL CLEANOUTWCO

WATER COLUMN, WATER CLOSET, WALL COVERINGWC

WET BULBWB

WITHOUTW/O

WITHW/

WEST, WIDTH, WATTW

W

VENT THROUGH ROOFVTR

VESTIBLE PRESSURIZATION FANVPF

VOLTMETERVM

VARIABLE FREQUENCY DRIVEVFD

VESTIBULEVEST

VERTICALVERT

VENTILATIONVENT

VIDEO DISPLAY TERMINALVDT

VOLUME DAMPER - MANUALVD

VINYL COMPOSITE TILEVCT

VACUUM BREAKERVB

VARIABLE AIR VOLUMEVAV

VACUUMVAC

VOLT AMPERE, VOICE ALARMVA

VOLT, VOLTAGE, VENTV

V

UTILITYUTIL

UNINTERUPTIBLE POWER SUPPLYUPS,U

UNIFORM PLUMBING CODEUPC

UNLESS OTHERWISE NOTEDUON

UNLESS NOTED OTHERWISEUNO

UNFUSEDUNF

UNDERWRITER'S LABORATORYUL

UNIT HEATERUH

UNDERGROUND POWERUGP

UNDERGROUNDUG

UNDERCUTUC

UNIFORM BUILDING CODEUBC

U

GMR

GMR

RAB

RGS RIGID GALVANIZED STEEL

RG RETURN GRILLE

RFI RADIO FREQUENCY INTERFERENCE

RF RETURN FAN

REV REVISION

RET RETURN

REQ'D REQUIRED

REINF REINFORCEMENT, REINFORCED

REG REGISTER

REF REFERENCE

RECT RECTIFIER, RECEPTACLE

RECP RECEPTACLE

REC'D RECEIVED

REC RECEPTACLE

REBAR REINFORCING STEEL BAR

RE RESIDENT ENGINEER

RDF RUBBER RAISED DISK FLOOR

RD ROOF DRAIN

RCP REINFORCED CONCRETE PIPE, REFLECTED CEILING PLAN

RB RUBBER BASE

RAR RETURN AIR REGISTER

RAG RETURN AIR GRILLE

RAD RADIUS

RACP REMOTE ACCESS CONTROL PANEL

RA RETURN AIR, REMOTE ANNUNCIATOR

R RED, RISER, RADIATOR, RADIUS, REFRIGERANT

R

QUA QUARTER

Q

PVMT PAVEMENT

PVC POLYVINYL CHLORIDE, POINT OF VERTICAL CURVATURE

PTAC PACKAGED TERMINAL AIR CONDITIONER

PT PRESSURE TRANSMITTER, PRESSURE-TEMPERATURE PORT

PSIG POUNDS PER SQ.IN. GAUGE

PSIA POUNDS PER SQ.IN. ABSOLUTE

PSI POUNDS PER SQ. INCH

PSF POUNDS PER SQ. FOOT

PS PRESSURE SWITCH

PRV PRESSURE REDUCING VALVE

PROP PROPELLER

PRSR PRESSURIZATION

PRMY PRIMARY

PRESS PRESSURE

PREFAB PREFABRICATED

PP POWER POLE, PATCH PANEL

POS POSITIVE, POSITION

P.O.C. POINT OF CONNECTION

PNL PANEL, PANELBOARD

PMB POWER MIXING BOX

PM POWER MANHOLE

PLYWD PLYWOOD

PLCS PLACES

PLBG PLUMBING

PL PLATE

PIU POWER INDUCTION UNIT

PI PRESSURE INDICATOR

PH ELECTRICAL PHASE

PFR PERFORATED FACE RETURN

PFD PERFORATED FACE DIFFUSER

PF POWER FACTOR

PD PRESSURE DROP

PCS POWER CONDITIONING SYSTEM

PCMS POWER CONTROL MONITORING SYSTEM

PCHWS PRIMARY CHILLED WATER SUPPLY

PCHWR PRIMARY CHILLED WATER RETURN

PCF POUNDS PER CUBIC FOOT

PB PULL BOX

PART PARTITION

PAF POWDER ACTUATED FASTENER

PABX PRIVATE AUTOMATIC BRANCH EXCHANGE

P POLE, PAINT, PUMP

P

OZ OUNCES

OVHD OVERHEAD

OSCO OUTSIDE CLEANOUT

OSA OUTSIDE SUPPLY AIR

ORL OVERFLOW ROOF LEADER

ORD OVERFLOW ROOF DRAIN

OPP OPPOSITE

OPNG OPENING

OH OPPOSITE HAND, OVERHEAD

OE OPEN END

ODP OPEN DRIP PROOF

OD OUTSIDE DIAMETER, OVERFLOW DRAIN

OC ON CENTER

OBD OPPOSED BLADE DAMPER

OAF OUTSIDE AIR FAN

OA OUTSIDE AIR

O

NTS NOT TO SCALE

NTE NOT TO EXCEED

NOM NOMINAL

N.O. NORMALLY OPEN

NO NUMBER OF DESIGNATION

NK NECK

NIC NOT IN CONTRACT

NG NATURAL GAS

NFPA NATIONAL FIRE PROTECTION ASSOCIATION

NFHB NON-FREEZE HOSE BIB

NEMA NATIONAL ELECTRICAL MANUFACTURERS' ASSOCIATION

NEG NEGATIVE

NEC NATIONAL ELECTRIC CODE

N.C. NORMALLY CLOSED

NC NOISE CRITERIA

NA NOT APPLICABLE

N NORTH, NEUTRAL

N

SUBMITTER'S TITLE APPROVER'S TITLE

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

8 1234567

8 1234567

F

IL

E

D

A T

E

T

IM

E

N

A M

E

DATE

APPROVED

RALEIGH-DURHAM NC

SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALES FOR OTHER SIZES.

WW JOB NUMBER: 220079.00

wileywilson.com

678.320.1888

Atlanta, Georgia 30328-6055

Bldg. C, Ste 515

5901 Peachtree Dunwoody Rd.

Wiley|Wilson

1303936MARCH 2022

(INTERNATIONAL AIRPORT)

ATCT HVAC REPLACEMENT & FIRE ALARM UPGRADE

RALEIGH-DURHAM INTERNATIONAL AIRPORT (RDU)

RDU-D-TOWB-CHECKED

SUBMITTED BY

REVIEWED BY

DRAWN

DESIGNED ISSUED BY

CENTER

ENGINEERING

TERMINAL DRAWING NO

DATE JCN

APPROVED BY

REV

REV DESCRIPTION JCN

DATE

REDLINE

APVD

cknight Stamp

4 0 4 8

1/4" = 1'-0"

SCALE IN FEET

020 20 40

X

X

X

GRAPHIC SCALE

ARCHITECTURAL

GRAPHIC SCALE

ENGINEERING

AXXX

AXXX

GENERAL SYMBOL LEGEND:

SECTION LETTER

A

SECTION IS LOCATED

SHEET NUMBER WHERE

AXXX

DETAIL IS LOCATED

SHEET NUMBER WHERE

DETAIL NUMBER

ELEVATION IS LOCATED

SHEET NUMBER WHERE

ELEVATION NUMBER

* SCALE OR OTHER INFORMATION

AXXX

DETAIL NUMBER

DETAIL TITLE

SECTION CUT

ELEVATION

DETAIL 2

GENERAL NOTES

GENERAL

SYMBOL LEGEND

G015

TITLE OF PLAN, SECTION OR DETAIL

IS LOCATED

PLAN, SECTION OR DETAIL

SHEET NUMBER WHERE

RAB

THE SHEET IS REDUCED IN SIZE.

USING THE APPROPRIATE BAR SCALE WHEN

USED FOR SCALING AT FULL SIZE AND FOR

(22" X 34" DRAWING SHEET SIZE) AND IS

THIS SCALE REFERS TO FULL SIZE DRAWING

VERIFY FIELD CONDITIONS PRIOR TO COMMENCING EACH PORTION OF THE WORK.3.

DO NOT SCALE DRAWINGS.2.

FOR ALL ABBREVIATIONS REFERENCE DRAWINGS G010 & G011.1.

GMR

GMR

1-HR FIRE RATED WALL

2-HR FIRE RATED WALL

SUBMITTER'S TITLE APPROVER'S TITLE

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

8 1234567

8 1234567

F

IL

E

D

A T

E

T

IM

E

N

A M

E

DATE

APPROVED

RALEIGH-DURHAM NC

SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALES FOR OTHER SIZES.

WW JOB NUMBER: 220079.00

wileywilson.com

678.320.1888

Atlanta, Georgia 30328-6055

Bldg. C, Ste 515

5901 Peachtree Dunwoody Rd.

Wiley|Wilson

1303936MARCH 2022

(INTERNATIONAL AIRPORT)

ATCT HVAC REPLACEMENT & FIRE ALARM UPGRADE

RALEIGH-DURHAM INTERNATIONAL AIRPORT (RDU)

RDU-D-TOWB-CHECKED

SUBMITTED BY

REVIEWED BY

DRAWN

DESIGNED ISSUED BY

CENTER

ENGINEERING

TERMINAL DRAWING NO

DATE JCN

APPROVED BY

REV

REV DESCRIPTION JCN

DATE

REDLINE

APVD

cknight Stamp

G040

CONSTRUCTION COORDINATION NOTES

CONSTRUCTION NOTES

CRK

CRK

RAB

DESIGN CRITERIA AND REFERENCES

DEMOLITION NOTES

GENERAL PROJECT DESCRIPTION

BASE BUILDING.

ADMINISTRATIVE BASE BUILDING AND THE REPLACEMENT OF THE FIRE ALARM SYSTEM ON THE ATCT AND

REPLACEMENT OF THE HEATING , VENTILATION AIR CONDITIONING (HVAC) SYSTEM AT THE

IMPROVEMENTS TO ITS HVAC AND FIRE ALARM SYSTEMS. REHABILITATION WORK WILL INCLUDE THE

THE RALEIGH-DURHAM AIRPORT TRAFFIC CONTROL TOWER (RDU) IN RALEIGH, NC IS IN NEED OF MAJOR

ACTIVITY NUMBER ACTIVITY DESCRIPTION

100 APPROVAL OF CONTRACTOR'S SAFETY AND RISK MANAGEMENT PLANS

110 APPROVAL OF CONTRACTOR'S PHASING PLAN

130 SITE MOBILIZATION

140 SELECTIVE DEMOLITION TO PROVIDE ACCESS TO HVAC UNITS AND DUCTWORK

150 REPLACEMENT OF HVAC UNITS

160 REPLACEMENT OF DUCTWORK

170 PROVIDE CONDENSATE DRAINS FOR AHUs

190 PROVIDE NEW CONTROL SYSTEM FOR HVAC

210 REPLACEMENT OF INTERIOR FINISHES: CEILINGS, PAINTING WALLS, AS REQUIRED

220 COMPLETION OF PUNCHLIST ITEMS

DEMOBILIZE

PROJECT CLOSEOUT

PROVIDE ELECTRICAL WORK TO NEW HVAC SYSTEMS

* APPROVAL OF CONTRACTOR'S ACCESS AND STAGING AREA PLANS.

REPLACE FIRE ALARM SYSTEM

POSSIBLE ALSO WITH THE RDU AIRPORT AUTHORITY.

THESE ACTIVITIES WILL NEED COORDINATION WITH FAA AND

APPLICABLE FAA ORDERS AND STANDARDS.-

NATIONAL ELECTRICAL CODE (NEC), 2020.-

INTERNATIONAL PLUMBING CODE (IMC), 2021.-

INTERNATIONAL MECHANICAL CODE (IMC), 2021.-

INTERNATIONAL FIRE CODE (IFC), 2018.-

INTERNATIONAL BUILDING CODE (IBC), 2021.-

WEEKEND SHIFT MAY BE ALLOWED (TO BE COORDINATED WITH COR)

EVENING SHIFT: 9:00 PM - 5:00 AM DAY SHIFT 7:00 AM - 4:00 PM

MIDNIGHT SHIFT: 11:00 PM - 5:00 AM

LIMITATIONS:

CONSTRUCTION ACTIVITY WILL BE LIMITED TO OFF-HOURS WORK TO MINIMIZE RISK TO THE OPERATIONAL FACILITY. THE FOLLOWING ARE WORK HOUR

RISK TO THE OPERATIONAL FACILITY. REFER TO PRELIMINARY PHASING REQUIREMENTS/RESTRICTIONS MATRIX FOR ADDITIONAL INFORMATION. SELECT

ROOMS IS REQUIRED TO BE GROUPED EITHER REQUIRING CONCURRENT WORK OR PRECLUDING CONCURRENT WORK IN THE GROUPED ROOMS, TO MINIMIZE

FRIDAY, 6:00 AM - 6:00 PM). THE OPERATIONS AREA AND ENVIRONMENTAL SUPPORT AREA OPERATE 24 HOURS 7 DAYS PER WEEK. WORK IN SELECT

TRACON IS A 24 HOUR 7 DAY PER WEEK OPERATING FACILITY. THE ADMINISTRATION AREA OPERATES UNDER NORMAL BUSINESS HOURS (MONDAY - 19.

OUTLINED IN SPECIFICATION 01 35 33.

SPECIFIC REGULATIONS TO PROTECT FAA PERSONNEL AND CONTRACTOR'S PERSONNEL FOR THE DURATION OF THE PROJECT. FOLLOW THE PROCEDURES

GENERAL CONTRACTOR SHALL COMPLY WITH FEDERAL REGULATIONS TO LIMIT THE SPREAD OF COVID-19. 2. THE CONTRACTOR SHALL COMPLY WITH FAA 18.

B. CONTRACTOR PERSONNEL SHALL NOT USE TOILET FACILITIES INSIDE FAA BUILDING.

A. CONTRACTOR SHALL PROVIDE TOILET FACILITIES AND WASH STATION WITHIN THE CONSTRUCTION STAGING AREA. COORDINATE SERVICE WITH COR.

CONSTRUCTION TOILET FACILITIES: 17.

FIRE WALL OPENINGS MUST BE REPAIR AND FIRESTOPPED TO MAINTAIN THE FIRE PROTECTION INTEGRITY OF THE WALL. 16.

CONTRACTOR TO REPAIR, PATCH AND PAINT ANY SURFACE DAMAGED DURING CONSTRUCTION.15.

CLARIFY.

THESE DRAWINGS SHALL NOT BE SCALED FOR DIMENSIONS. IF THERE ARE DIMENSIONS DISCREPANCIES OR CONCERNS, CONTACT THE FAA COR TO 14.

THE COST OF ANY CHANGES REQUIRED BY THE CLIENT TO SUITABLY MODIFY SUCH WORK SHALL BE SOLELY THE RESPONSIBILITY OF THE CONTRACTOR.

PRIOR TO THE BEGINNING OF THE AFFECTED WORK. WORK THAT PROCEEDS IN VIOLATION OF THIS PRINCIPLE IS AT THE CONTRACTOR'S OWN RISK, AND

THEREIN, SHALL BE REPORTED TO THE FAA CONTRACTING OFFICERS REPRESENTATIVE (COR) IMMEDIATELY, AND SUITABLE RESOLUTION ESTABLISHED

ANY DISCREPANCIES BETWEEN THE EXISTING CONDITIONS AND THE CONTRACT DOCUMENTS , OR ANY AMBIGUITIES OR INCONSISTENCIES CONTAIN 13.

IMMEDIATELY.

IF AN UNSAFE CONDITION OR LIFE THREATENING HAZARD IS NOTED AT THE SITE, NOTIFY THE FAA CONTRACTING OFFICERS REPRESENTATIVE 12.

MANUFACTURED ITEMS SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.11.

ALL EXTERIOR DIMENSIONS ARE FROM THE EXTERIOR FACE OF WALL.10.

ALL INTERIOR DIMENSIONS ARE FROM THE INTERIOR FACE OF WALL, UNLESS OTHERWISE NOTED.9.

REINSTALL ALL SMOKE/FIRE DETECTORS AS REQUIRED.8.

DO NOT PAINT OVER ANY FIRE LABELS ON WALLS OR DOORS.7.

AVAILABLE SPECIFY WHICH COATINGS ARE NOT AVAILABLE, FOR FAA REFERENCE.

COR) SHALL APPROVE THE SYSTEM TO BE UTILIZED FOR VENTILATION PRIOR TO USE. EXTERIOR PAINT CAN BE LOW VOC. WHEN LOW VOC IN NOT

PAINTING AND OTHER CONSTRUCTION ACTIVITIES THAT HAVE THE POTENTIAL FOR STRONG ODORS. THE CONTRACTING OFFICERS REPRESENTATIVE (FAA

CONTRACTOR SHALL USE NON-VOC PAINTS AND COATINGS AND PROVIDE ADEQUATE MEASURES FOR VENTILATION TO MINIMIZE ODORS DURING INTERIOR 6.

LOCKOUT AND TAG PROCEDURES MUST BE FOLLOWED AT ALL TIMES.5.

TRAFFIC OPERATIONS. SEE SPECIFICATION 02 03 00 FOR MORE INFORMATION.

MAINTAINED IN THE FACILITY. PERSONNEL SHALL NOT BE EXPOSED TO FUMES OF ODORS CAUSED BY THE CONTRACTORS WORK AS THIS MAY IMPACT AIR

CONTRACTOR SHALL VENT ANY FUMES AND ODORS FROM THE CONSTRUCTION ACTIVITIES TO THE EXTERIOR OF THE BUILDING. AIR QUALITY SHALL BE 4.

WEEKLY.

ALL EXTERIOR WORK WILL BE CONDUCTED DURING DAYLIGHT HOURS. ALL WORK WILL BE COORDINATED WITH FAA COR AND AIR TRAFFIC AT LEAST

UNLESS DIRECTED OTHERWISE BY FAA COR, ALL INTERIOR WORK SHALL BE CONDUCTED AT NIGHT AND COORDINATED WITH LOCAL AIR TRAFFIC AND COR. 3.

AUTHORITY PRIOR TO FIELD MOBILIZATION.

AUTHORITY, AND FAA AIR TRAFFIC. THE CONTRACTOR WILL RE -CONFIRM THIS PLAN AND ANY SUGGESTED MODIFICATION WITH FAA AND AIRPORT

CONSTRUCTION CONTRACTOR WILL ABIDE BY THIS PROPOSED PHASING PLAN SINCE THIS PLAN HAS BEEN COORDINATED IN ADVANCE WITH THE AIRPORT

THE CONSTRUCTION SEQUENCE OF OPERATIONS SHALL BE COORDINATED WITH THE CONSTRUCTION SCHEDULE PROVIDED ON THIS SHEET. THE 2.

REQUIREMENTS FOR INDIVIDUAL ROOMS.

OF THE FACILITY. NORMAL HOURS OF OPERATION ARE STATED IN DIVISION 1 OF THE SPECIFICATIONS. SEE DRAWING RDU-D-TOWB-G042 FOR WORK

HOURS. ALL WORK NEEDS TO BE COORDINATED WITH FAA CONTRACTING OFFICERS REPRESENTATIVE TO AVOID DISRUPTION TO THE NORMAL OPERATIONS

THE CONSTRUCTION OF THIS PROJECT MUST NOT INTERFERE WITH OPERATION OF THE AIR TRAFFIC CONTROL FUNCTION DURING NORMAL OPERATING 1.

WORKING DAYS IN ADVANCE OF PERFORMING THE WORK.

DEMOLITION (INSIDE AND OUTSIDE) SHALL BE SCHEDULED, COORDINATED AND APPROVED IN ADVANCE IN WRITING BY COR WITH A MINIMUM OF 7 4.

AFTER NEW CONSTRUCTION IS COMPLETED.

IF A PORTION OF AN EXISTING WALL IS DEMOLISHED OR PATCHED, THE ENTIRE WALL OR CEILING SHALL BE PAINTED 3.

STRUCTURAL INTEGRITY SHALL BE MAINTAINED FOR ALL BUILDING ELEMENTS DURING AND AFTER DEMOLITION.2.

EXISTING APPEARANCE, UNLESS NOTED OTHERWISE.

BY THE CONSTRUCTION TO MAINTAIN THEIR FIXTURES OR BUILDING ASSEMBLIES. REPAIR ALL AREAS AFFECTED

FACILITY TO BE PROTECTED DURING CONSTRUCTION AND FROM DAMAGE TO ANY EXISTING OR ADJACENT FINISHES, MATERIALS, 1.

SUBMITTER'S TITLE APPROVER'S TITLE

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

8 1234567

8 1234567

F

IL

E

D

A T

E

T

IM

E

N

A M

E

DATE

APPROVED

RALEIGH-DURHAM NC

SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALES FOR OTHER SIZES.

WW JOB NUMBER: 220079.00

wileywilson.com

678.320.1888

Atlanta, Georgia 30328-6055

Bldg. C, Ste 515

5901 Peachtree Dunwoody Rd.

Wiley|Wilson

1303936MARCH 2022

(INTERNATIONAL AIRPORT)

ATCT HVAC REPLACEMENT & FIRE ALARM UPGRADE

RALEIGH-DURHAM INTERNATIONAL AIRPORT (RDU)

RDU-D-TOWB-CHECKED

SUBMITTED BY

REVIEWED BY

DRAWN

DESIGNED ISSUED BY

CENTER

ENGINEERING

TERMINAL DRAWING NO

DATE JCN

APPROVED BY

REV

REV DESCRIPTION JCN

DATE

REDLINE

APVD

cknight Stamp

G041

CONSTRUCTION STAGING NOTES

CONSTRUCTION STAGING NOTES

GMR

RAB

DAMAGED BY THE WORK SHALL BE REPLACED WITH SOD OR HYDROSEEDING TO MATCH EXISTING AND TO SATIFFACTION OF COR.

DISTURBED LAWNS AND LANDSCAPING OR GRASSY AREAS SHAL BE RESPOTRED TO ORIGINAL CONDITION BY CONTRACTOR TO THE SATISFACTION OF THE COR. LAWN 2.

REPAIRED PAVED SURFACES.

UPON COMPLETION OF THE WORK, CONTRACTOR SHALL REPAIR PAVED SURFACES AT AFFECTED WORK AREAS TO ORIGINAL CONDITION, INCLUDING STRIPING OF 1.

PARKING LOT, DRIVEWAYS AND LANDSCAPE AREASH.

COR.

FAA EQUIPMENT WILL REMAIN OPERATIONAL DURING THE CONSTRUCTION PROJECT. WORK IN EQUIPMENT ROOMS OR AROUND FAA EQUIPMENT SHALL BE SCHEDULED WITH 6.

NO WELDING SHALL OCCUR INSIDE THE FACILITY OR WELDING EQUIPMENT POWERED BY THE FACILITY ELECTRICAL SYSTEM. 5.

WATER, ASBESTOS, DEBRIS AND DUST.

CONTRACTOR SHALL PROTECT FAA EQUIPMENT BOTH INSIDE AND OUTSIDE THE BUILDING FROM DAMAGE INCLUDING, BUT NOT LIMITED TO DAMAGE CAUSED BY IMPACT, 4.

WELDING EQUIPMENT SHALL NOT BE POWERED BY THE FACILITY ELECTRICAL SYSTEM. WELDING SHALL NOT BE PERMITTED IN FAA OCCUPIED AREA.3.

OFFICERS REPRESENTATIVE A MINIMUM OF 10 WORKING DAYS IN ADVANCE OF THE SHUTDOWN OR CUTOVER.

HOURS. PREPARATORY WORK SHALL BE COMPLETED PRIOR TO SHUTDOWN. CUTOVER WORK SHALL BE SCHEDULED AND COORDINATED WITH THE FAA CONTRACTING

SHUTDOWNS, CUTOVERS AND ANY TEMPORARY PROVISIONS FOR PLUMBING, MECHANICAL AND ELECTRICAL SYSTEMS SHALL BE ACCOMPLISHED AFTER NORMAL OPERATING 2.

OF THE FLYING PUBLIC.

SUCH DAMAGE OR DISRUPTION OF POWER SHOULD OCCUR. THE LOSS OF THESE COMPUTERS AND EQUIPMENT FOR ANY AMOUNT OF TIME WILL JEOPARDIZE THE SAFETY

NEGLIGENCE SUCH AS, BUT NOT LIMITED TO, DISRUPTION OF POWER TO THE UNITS. INFORM THE FAA CONTRACTING OFFICERS REPRESENTATIVE IMMEDIATELY IF

RESPONSIBLE FOR THE CONTINUOUS PROTECTION OF THIS EQUIPMENT FROM PHYSICAL AND ELECTRICAL DAMAGE AS A RESULT OF INCIDENTAL OR ACCIDENTAL

EXISTING FAA AIR TRAFFIC COMPUTERS AND EQUIPMENT SHALL REMAIN OPERATIONAL THROUGHOUT THE DURATION OF THIS CONTRACT. THE CONTRACTOR SHALL BE 1.

G. EQUIPMENT PROTECTION

FAA CONTRACTING OFFICERS REPRESENTATIVE.

CONCRETE SAWING, GRINDING, CORE DRILLING, CONCRETE DEMOLITION AND ANCHOR DRILLING WILL BE ALLOWED ONLY AT PREARRANGED TIMES APPROVED BY THE 2.

CONSTRUCTION IN ADVANCE WITH THE FAA CONTRACTING OFFICERS REPRESENTATIVE.

IN AREAS ADJACENT TO THE AIR TRAFFIC CONTROL FUNCTION MUST BE ACCOMPLISHED AFTER NORMAL OPERATING HOURS. COORDINATE NIGHT WORK AND OVERTIME

THE CONTRACTOR SHALL NOT INTERFERE WITH THE AIR TRAFFIC CONTROL FUNCTION OF THE FACILITY. DEMOLITION NOISE, CONSTRUCTION NOISE AND ALL WORK 1.

F. DEMOLITION AND CONSTRUCTION HOURS

A FIRE OR LIFE SAFETY HAZARD.

REMOVE ALL CONSTRUCTION AND/OR DEMOLITION DEBRIS FROM THE JOB SITE TO MAINTAIN A CLEAN AND SAFE ENVIRONMENT AND TO PREVENT THE POSSIBILITY OF 2.

DUMPSTERS SHALL BE KEPT CLEAN AND FREE OF DEBRIS AND DUST DURING CONSTRUCTION. DEBRIS SHALL BE REMOVED BY THE CONTRACTOR IN A TIMELY MANNER.

ENCLOSED DUMPSTERS FOR DISPOSAL OF CONSTRUCTION DEBRIS SHALL BE PROVIDED BY THE CONTRACTOR WITHIN THE STAGING AREA. THE AREAS AROUND THE 1.

E. CONSTRUCTION DEBRIS

REPRESENTATIVE.

STORED AND PROTECTED. A CONSTRUCTION FENCE SHALL BE PROVIDED AT THE DISCRETION OF AIRPORT AUTHORITY AND THE FAA CONTRACTING OFFICERS

STORAGE OF CONSTRUCTION MATERIALS AND TRAILERS ON THE SITE SHALL BE LIMITED TO THE CONSTRUCTION STAGING AREA. MATERIALS SHALL BE NEATLY 1.

D. CONSTRUCTION MATERIAL STORAGE

EGRESS.

THE BUILDING IS A SECURE AREA, AND CONSTRUCTION PERSONNEL SHALL REMAIN IN THE CONSTRUCTION AREAS. CONTRACTOR SHALL MINIMIZE INGRESS AND 2.

ENTERING AND LEAVING THE SITE.

CONTRACTOR'S PERSONNEL ON SITE. CONTRACTOR VEHICLES SHALL BE IDENTIFIED AS SUCH. EACH CONSTRUCTION EMPLOYEE SHALL CHECK IN AND OUT UPON

FACILITY. TEMPORARY SECURITY BADGES MAY BE ISSUED TO THOSE CONSTRUCTION PERSONNEL. CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF

REQUIRED TO OBTAIN AN FAA CONTRACTOR BADGE PRIOR TO THE START OF WORK. CONTRACTOR TO COORDINATE WITH HIS SUBS AND EMPLOYEES THE ACCESS TO THE

AN ADVANCE LIST OF THE CONTRACTOR'S PERSONNEL SHALL BE PROVIDED TO THE FAA CONTRACTING OFFICERS REPRESENTATIVE. CONTRACTOR SUPERINTENDENT IS 1.

C. FAA SECURITY REQUIREMENTS

STAGING AREA IS VERY LIMITED MUST BE COORDINATED WITH AIRPORT AUTHORITY VIA THE FAA CONTRACTING OFFICERS REPRESENTATIVE.

CONSTRUCTION ACCESS (VEHICLE, PEDESTRIAN AND DELIVERIES), CONTRACTOR'S PARKING, CONSTRUCTION OFFICES AND THE EXTENT/SIZE OF THE CONSTRUCTION 2.

CONTRACTOR SHALL PROVIDE SIGNS AS NECESSARY TO RESERVE AN AREA FOR CONSTRUCTION PARKING ONLY. COORDINATE WITH AIRPORT AUTHORITY.1.

B. CONTRACTOR STAGING AREA AND PARKING

SHIFT CHANGES TO AVOID CONGESTION.

DELIVERIES SHALL BE SCHEDULED 48 HOURS IN ADVANCE WITH THE FAA CONTRACTING OFFICERS REPRESENTATIVE AND AT TIMES OTHER THAN THE FAA EMPLOYEE 1.

A. CONSTRUCTION ACCESS

PARAPHRASE OR SUPPLEMENT DIVISION 1 REQUIREMENTS AND ARE NOT INTENDED TO REPLACE DIVISION 1 REQUIREMENTS.

THE FOLLOWING NOTES REPRESENT MANY OF THE MAJOR REQUIREMENTS STATED IN "DIVISION 1 - GENERAL REQUIREMENTS" OF THE SPECIFICATIONS. THESE NOTES

SUBMITTER'S TITLE APPROVER'S TITLE

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

8 1234567

8 1234567

F

IL

E

D

A T

E

T

IM

E

N

A M

E

DATE

APPROVED

RALEIGH-DURHAM NC

SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALES FOR OTHER SIZES.

WW JOB NUMBER: 220079.00

wileywilson.com

678.320.1888

Atlanta, Georgia 30328-6055

Bldg. C, Ste 515

5901 Peachtree Dunwoody Rd.

Wiley|Wilson

1303936MARCH 2022

(INTERNATIONAL AIRPORT)

ATCT HVAC REPLACEMENT & FIRE ALARM UPGRADE

RALEIGH-DURHAM INTERNATIONAL AIRPORT (RDU)

RDU-D-TOWB-CHECKED

SUBMITTED BY

REVIEWED BY

DRAWN

DESIGNED ISSUED BY

CENTER

ENGINEERING

TERMINAL DRAWING NO

DATE JCN

APPROVED BY

REV

REV DESCRIPTION JCN

DATE

REDLINE

APVD

cknight Stamp

G042

PHASING REQUIREMENTS MATRIX

GMR

GMR

RAB

NOTES

DAYS PRIOR TO WORK. EGRESS FROM THE CAB CAN NEVER BE BLOCKED.

ALL WORK IN THE ATCT MAY HAVE FURTHER WORK LIMITATIONS AND SHALL BE COORDINATED WITH COR 7 4.

CEILINGS PRIOR TO THE COMPLETION OF THE WORK AT EACH GWB CEILING SYSTEM.

COORDINATE WITH COR TEMPORARY PROTECTIVE MEASURES REQUIRED AT OPENINGS/ PENETRATIONS IN GWB 3.

CONSTRUCTION, CLEANING, ETC. TO BRING EACH ROOM BACK TO ITS ORIGINAL CONDITION.

WORK DURING THE HOURS LISTED SHALL INCLUDE ALL CONTRACTOR ACTIVITIES INCLUDING DEMOLITION, 2.

REFER G040 CONSTRUCTION NOTES FOR DEFINITIONS OF WORK HOUR LIMITATIONS.1.

SUBMITTER'S TITLE APPROVER'S TITLE

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

8 1234567

8 1234567

F

IL

E

D

A T

E

T

IM

E

N

A M

E

DATE

APPROVED

RALEIGH-DURHAM NC

SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALES FOR OTHER SIZES.

WW JOB NUMBER: 220079.00

wileywilson.com

678.320.1888

Atlanta, Georgia 30328-6055

Bldg. C, Ste 515

5901 Peachtree Dunwoody Rd.

Wiley|Wilson

1303936MARCH 2022

(INTERNATIONAL AIRPORT)

ATCT HVAC REPLACEMENT & FIRE ALARM UPGRADE

RALEIGH-DURHAM INTERNATIONAL AIRPORT (RDU)

RDU-D-TOWB-CHECKED

SUBMITTED BY

REVIEWED BY

DRAWN

DESIGNED ISSUED BY

CENTER

ENGINEERING

TERMINAL DRAWING NO

DATE JCN

APPROVED BY

REV

REV DESCRIPTION JCN

DATE

REDLINE

APVD

PHASING MATRIX PER ROOM

NUMBER

ROOM

NAME

ROOM

VISITOR AREA

CORRIDOR

A.F. ADMIN AREA

TSS

COPY ROOM

CONF. ROOM

(NOT USED)

TELCO SUP.

ELECTRICAL

AUS

WOMEN'S TOILET

PPS

QUALITY

MECHANICAL ROOM

EG ROOM

JANITOR

UPS

BATTERY RM

NATCA

LOCKERS

BREAKROOM

MEN'S TOILET

132BULK STORAGE

138A

138B

VESTIBULE

QUATS

AR CONF. ROOM

TRAINING

TAPE PLAYBACK

OFFICE

ATMPT

111ENGINEERING

WORKSHOP

ADMIN. OFFICE

LAN

TECH. ROOM

ELECT. EQUIP.

TRACON

EQUIP. ROOM

AREA SUPERVISOR

NOT USED

LIMITATIONS

WORK HOUR

FOR USE BY 6:00 AM)

(CLEANED AND AVAILABLE

NEXT DAY AVAILABILITY

WORK REQUIREMENTS

GROUPED ROOM

NOTES

ADDITIONAL

YES

BE AVAILABLE FOR EGRESS

CORRIDOR 101 AND 117 WILL

EVENING SHIFT

EVENING SHIFT

YES

EVENING SHIFT

EVENING SHIFT

EVENING SHIFT

EVENING SHIFT

EVENING SHIFT

EVENING SHIFT

EVENING SHIFT

EVENING SHIFT

EVENING SHIFT

EVENING SHIFT

EVENING SHIFT

EVENING SHIFT

EVENING SHIFT

EVENING SHIFT

EVENING SHIFT

EVENING SHIFT YES

YES

YES

YES

YES

YES

YES

YES

YES

YES

YES

YES

YES

YES

YES

YES

AVAILABLE AT ALL TIMES

BREAKROOM 163 WILL BE

BE AVAILABLE FOR EGRESS

CORRIDOR 101 AND 117 WILL

AVAILABLE FOR EGRESS

CORRIDOR 153 WILL BE

WILL BE ALWAYS AVAILABLE

RESTROOMS 130, 131 AND 156

NO WORK

NO WORK

NO WORK

NO WORK

NO WORK

NO WORK

NO WORK

NO WORK

NO WORK

NO WORK

NO WORK

NO WORK

NO WORK

NO WORK

NO WORK

NO WORK

NO WORK

NO WORK

NO WORK

NO WORK

NO WORK

NO WORK

NO WORK

NO WORK

NO WORK

NO WORK

NO WORK

NO WORK

NO WORK YES

YES

YES

YES

YES

YES

YES

YES

YES

YES

YES

YES

YES

YES

YES

YES

YES

YES

YES

YES

YES

YES

YES

YES

YES

YES

YES

YES

YES

WILL BE AVAILABLE FOR EGRESS

CORRIDOR 102, 117 AND 133

NONE

NONE

NONE

NONE

NONE

NONE

NONE

NONE

NONE

NONE

NONE

NONE

NONE

NONE

NONE

NONE

NONE

NONE

NONE

NONE

NONE

NONE

NONE

NONE

NONE

NONE

NONE

NONE

NONE

NONE

NONE

NONE

NONE

NONE

NONE

NONE

NONE

NONE

NONE

NONE

NONE

PHASING MATRIX PER ROOM

NUMBER

ROOM

NAME

ROOM

ATM

AMPP

ADMIN. OFFICER

AT ADMIN. AREA

RELO. MOD. FURN.

153A

RELO MOD. FURN. 153B

TRAINING

MEN'S TOILET

F&E/FMP

CORRIDOR

TSS

TSS

SSC MANAGER

VESTIBULE

BREAKROOM ADDITION

LOCKER ADDITION

LIMITATIONS

WORK HOUR

FOR USE BY 6:00 AM)

(CLEANED AND AVAILABLE

NEXT DAY AVAILABILITY

WORK REQUIREMENTS

GROUPED ROOM

NOTES

ADDITIONAL

EVENING SHIFT

EVENING SHIFT

YES

YES

AVAILABLE FOR EGRESS

CORRIDOR 139 WILL BE

NO WORK

NO WORK

NO WORK

NO WORK

NO WORK

NO WORK

NO WORK

NO WORK

NO WORK

NO WORK

NO WORK

NO WORK

NO WORK

NO WORK

YES

YES

YES

YES

YES

YES

YES

YES

YES

YES

YES

YES

YES

YES

NONE

NONE

NONE

NONE

NONE

NONE

NONE

NONE

NONE

NONE

NONE

NONE

NONE

NONE

NONE

cknight Stamp

HAZMAT NOTES

ROOM NAME

H001

FLOOR LEVEL

THIS PROJECT

AFFECTED BY

HAZARDOUS MATERIAL (HAZMAT) INFORMATION

GENERAL

SUSPECTED ASBESTOS AND LEAD CONTAINING MATERIAL LOCATION SUMMARY

LEAD CONTAINING COMPONENTS

ASBESTOS MATERIAL (ACM) AND

GMR

GMR

RAB

NOTES

THROUGHOUT FACILITY DOORS (NSTAD; ASSUME ACM)

BASE BUILDING LOBBY (103) FLOOR TILE MASTIC OLD TILES REPLACED 1995, ASSUME MASTIC STILL PRESENT

TELCO A (109) FLOOR TILE MASTIC OLD TILES REPLACED 1995, ASSUME MASTIC STILL PRESENT

WORKSHOP (112) FLOOR TILE MASTIC OLD TILES REPLACED 1995, ASSUME MASTIC STILL PRESENT

BREAKROOM (113) FLOOR TILE MASTIC OLD TILES REPLACED 1995, ASSUME MASTIC STILL PRESENT

BATTERY ROOM (123)

STREAKED FLOOR TILE (FLOOR TILE IS NON-ACM)

MASTIC ASSOCIATED WITH 1FT X 1FT BEIGE

UPS ROOM (125)

STREAKED FLOOR TILE (FLOOR TILE IS NON-ACM)

MASTIC ASSOCIATED WITH 1FT X 1FT BEIGE

GENERATOR ROOM (126)

STREAKED FLOOR TILE (FLOOR TILE IS NON-ACM)

MASTIC ASSOCIATED WITH 1FT X 1FT BEIGE

BREAKROOM (129)

STREAKED FLOOR TILE (FLOOR TILE IS NON-ACM)

MASTIC ASSOCIATED WITH 1FT X 1FT BEIGE

STOVE/OVEN & CABINETS

ONLY PRESENT ON FLOOR AROUND / UNDER AREA OF

STORAGE (132)

STREAKED FLOOR TILE (FLOOR TILE IS NON-ACM)

MASTIC ASSOCIATED WITH 1FT X 1FT BEIGE

CORRIDOR A FLOOR TILE MASTIC OLD TILES REPLACED 1995, ASSUME MASTIC STILL PRESENT

CORRIDOR B FLOOR TILE MASTIC OLD TILES REPLACED 1995, ASSUME MASTIC STILL PRESENT

CORRIDOR C FLOOR TILE MASTIC OLD TILES REPLACED 1995, ASSUME MASTIC STILL PRESENT

JANITOR'S CLOSET

STREAKED FLOOR TILE (FLOOR TILE IS NON-ACM)

MASTIC ASSOCIATED WITH 1FT X 1FT BEIGE

TOWER LINK

STREAKED FLOOR TILE (FLOOR TILE IS NON-ACM)

MASTIC ASSOCIATED WITH 1FT X 1FT BEIGE

INFORMATION SEE SPECIFICATIONS.

CONSISTENT WITH ALL APPLICABLE LAWS AND REQUIREMENTS. FOR MORE

CONTAMINATION OF ENVIRONMENTAL MEDIA AND HANDLED AND DISPOSED OF

CONSTITUENTS, WASTES, SUBSTANCES, OR MATERIALS, ARE MANAGED TO AVOID

INCLUDING THOSE THAT CONSIST OF ASBESTOS, LEAD, OR OTHER HAZARDOUS

THE CONTRACTOR SHALL ENSURE THAT ALL DEMOLITION GENERATED SOLID WASTES, 2.

DIVISION 2, SPECIFICATIONS FOR FUTHER INFORMATION.

SUSPECT MATERIALS THAT MAY BE AFFECTED BY WORK IN THIS PROJECT. REFER TO

CONTRACTOR SHALL HIRE AN FAA APPROVED HAZMAT TESTING AGENCY TO SAMPLE ANY

LOCATIONS AS CONTAINED ASBESTOS PERIODIC SURVEILLANCE ASSESSMENT SHEET.

DRAWING IS A SUMMARY OF SUSPECTED ASBESTOS CONTAINING MATERIAL (ACM)

BUILDING CONTAINS HAZARDOUS MATERIAL (HAZMAT) LOCATIONS. SHOWN ON THIS 1.

YES ACM MAY HAVE BEEN USED IN ORIGINAL CONSTRUCTION

CORRIDORS WALL JOINT COMPOUND YES ACM MAY HAVE BEEN USED IN ORIGINAL CONSTRUCTION

MECHANICAL (122) PIPING INSULATION AND SEALANTS

CORRIDORS ORIGINAL PAINT COAT YES LEAD PAINT MAY HAVE BEEN USED IN ORIGINAL CONSTRUCTION

TRACON ROOF ROOF PENETRATION SEALANT YES

HYGIENIST SERVICES TO OVERSEE REMEDIATION ACTIVITIES.

SPECIFICATIONS PROCEDURES. FAA WILL PROCURE THIRD PARTY

FOR ACM. IF ACM IS FOUND CONTACT FAA COTR AND FOLLOW

TO TEST AREAS WHERE ANY SEALANT OR MASTIC WILL BE IMACTED

ACM MAY HAVE BEEN USED IN ORIGINAL CONSTRUCTION. CONTRACTOR

SUBMITTER'S TITLE APPROVER'S TITLE

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

8 1234567

8 1234567

F

IL

E

D

A T

E

T

IM

E

N

A M

E

DATE

APPROVED

RALEIGH-DURHAM NC

SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALES FOR OTHER SIZES.

WW JOB NUMBER: 220079.00

wileywilson.com

678.320.1888

Atlanta, Georgia 30328-6055

Bldg. C, Ste 515

5901 Peachtree Dunwoody Rd.

Wiley|Wilson

1303936MARCH 2022

(INTERNATIONAL AIRPORT)

ATCT HVAC REPLACEMENT & FIRE ALARM UPGRADE

RALEIGH-DURHAM INTERNATIONAL AIRPORT (RDU)

RDU-D-TOWB-CHECKED

SUBMITTED BY

REVIEWED BY

DRAWN

DESIGNED ISSUED BY

CENTER

ENGINEERING

TERMINAL DRAWING NO

DATE JCN

APPROVED BY

REV

REV DESCRIPTION JCN

DATE

REDLINE

APVD

cknight Stamp

HAZMAT NOTES

(SEE SPECIFICATION FOR ACM REPORT)

H002

FLOOR LEVEL

THIS PROJECT

AFFECTED BY

HAZARDOUS MATERIAL (HAZMAT) INFORMATION

GENERAL

SUSPECTED ASBESTOS AND LEAD CONTAINING MATERIAL LOCATION SUMMARY

LEAD CONTAINING COMPONENTS

ASBESTOS MATERIAL (ACM) AND

INFORMATION SEE SPECIFICATIONS.

CONSISTENT WITH ALL APPLICABLE LAWS AND REQUIREMENTS. FOR MORE

CONTAMINATION OF ENVIRONMENTAL MEDIA AND HANDLED AND DISPOSED OF

CONSTITUENTS, WASTES, SUBSTANCES, OR MATERIALS, ARE MANAGED TO AVOID

INCLUDING THOSE THAT CONSIST OF ASBESTOS, LEAD, OR OTHER HAZARDOUS

THE CONTRACTOR SHALL ENSURE THAT ALL DEMOLITION GENERATED SOLID WASTES, 2.

ASSESSMENT IS ON FILE WITH THE FAA.

CONTAINED ASBESTOS PERIODIC SURVEILLANCE ASSESSMENT SHEET. THE COMPLETE

DRAWING IS A SUMMARY OF ASBESTOS CONTAINING MATERIAL (ACM) LOCATIONS AS

BUILDING CONTAINS HAZARDOUS MATERIAL (HAZMAT) LOCATIONS. SHOWN ON THIS 1.

GMR

GMR

RAB

NOTES

9TH FLOOR TOWER ELEVATOR SHAFT ELEVATOR BRAKE SHOES (NSTAD; ASSUME ACM)

HALL FLOOR TILE MASTIC OLD TILES REPLACED 2000, ASSUME MASTIC STILL PRESENT

STREAKED FLOOR TILE (FLOOR TILE IS NON-ACM)

MASTIC ASSOCIATED WITH 1FT X 1FT BEIGE

STAIR TO CAB

STAIR FLOOR TILE MASTIC OLD TILES REPLACED 2000, ASSUME MASTIC STILL PRESENT

STAIR TREAD MASTIC

CATWALK ROOFING MATERIALS (NSTAD; ASSUME ACM)

CAB

NOT LISTED IN ORIGINAL SURVEY REPORT)

SINK UNDERCOAT (NSTAD; ASSUME ACM -

10TH FLOOR TOWER ROOF NSTAD: ASSUME ACM

TOWER ELEVATOR CAR FLOOR TILE MASTIC OLD TILES REPLACED 2000, ASSUME MASTIC STILL PRESENT

LOBBY STREAKED FLOOR TILE (FLOOR TILE IS NON-ACM)

MASTIC ASSOCIATED WITH 1FT X 1FT BEIGE

ROOF ROOFING MATERIALS (NSTAD; ASSUME ACM)1ST FLOOR TOWER

STAIR

STREAKED FLOOR TILE (FLOOR TILE IS NON-ACM)

MASTIC ASSOCIATED WITH 1FT X 1FT BEIGE

VESTIBULE

STREAKED FLOOR TILE (FLOOR TILE IS NON-ACM)

MASTIC ASSOCIATED WITH 1FT X 1FT BEIGE

2ND FLOOR TOWER ELEVATOR SHAFT INACCESSIBLE; ASSUME ACM

2.5 FLOOR TOWER ELEVATOR SHAFT INACCESSIBLE; ASSUME ACM

3RD FLOOR TOWER ELEVATOR SHAFT INACCESSIBLE; ASSUME ACM

3.5 FLOOR TOWER ELEVATOR SHAFT INACCESSIBLE; ASSUME ACM

4TH FLOOR TOWER

4.5 FLOOR TOWER

5TH FLOOR TOWER

5.5 FLOOR TOWER ELEVATOR SHAFT

ELEVATOR SHAFT

ELEVATOR SHAFT

ELEVATOR SHAFT INACCESSIBLE; ASSUME ACM

INACCESSIBLE; ASSUME ACM

INACCESSIBLE; ASSUME ACM

INACCESSIBLE; ASSUME ACM

6TH FLOOR TOWER

6.5 FLOOR TOWER

ELEVATOR SHAFT

ELEVATOR SHAFT INACCESSIBLE; ASSUME ACM

INACCESSIBLE; ASSUME ACM

7TH FLOOR TOWER HALL FLOOR TILE MASTIC OLD TILES REPLACED 2000, ASSUME MASTIC STILL PRESENT

STAIR FLOOR TILE MASTIC OLD TILES REPLACED 2000, ASSUME MASTIC STILL PRESENT

8TH FLOOR TOWER CABLE CHASE FLOOR TILE MASTIC OLD TILES REPLACED 2000, ASSUME MASTIC STILL PRESENT

HALL FLOOR TILE MASTIC OLD TILES REPLACED 2000, ASSUME MASTIC STILL PRESENT

FLOOR TILE MASTICSTAIR OLD TILES REPLACED 2000, ASSUME MASTIC STILL PRESENT

BE INCLUDED ONTHE NEXT SUBMITTAL

BEING CONDUCTED AND RESULTS WILL

HAZARDOWS MATERIAL TESTING IS

SUBMITTER'S TITLE APPROVER'S TITLE

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

8 1234567

8 1234567

F

IL

E

D

A T

E

T

IM

E

N

A M

E

DATE

APPROVED

RALEIGH-DURHAM NC

SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALES FOR OTHER SIZES.

WW JOB NUMBER: 220079.00

wileywilson.com

678.320.1888

Atlanta, Georgia 30328-6055

Bldg. C, Ste 515

5901 Peachtree Dunwoody Rd.

Wiley|Wilson

1303936MARCH 2022

(INTERNATIONAL AIRPORT)

ATCT HVAC REPLACEMENT & FIRE ALARM UPGRADE

RALEIGH-DURHAM INTERNATIONAL AIRPORT (RDU)

RDU-D-TOWB-CHECKED

SUBMITTED BY

REVIEWED BY

DRAWN

DESIGNED ISSUED BY

CENTER

ENGINEERING

TERMINAL DRAWING NO

DATE JCN

APPROVED BY

REV

REV DESCRIPTION JCN

DATE

REDLINE

APVD

cknight Stamp

FO

TNEMT

R A

P E

D

N

OI

T

AT

RO

PSNART

U N

IT

E

D

STATES OF

AM

ER

I C A

COVER SHEET

G000

APRIL 1, 2022

BASE BUILDING

RALEIGH, NC

RALEIGH-DURHAM INTERNATIONAL AIRPORT

HVAC REPLACEMENT & FIRE ALARM UPGRADE

AIRPORT TRAFFIC CONTROL TOWER

SUBMITTER'S TITLE APPROVER'S TITLE

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

8 1234567

8 1234567

F

IL

E

D

A T

E

T

IM

E

N

A M

E

DATE

APPROVED

RALEIGH-DURHAM NC

SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALES FOR OTHER SIZES.

WW JOB NUMBER: 220079.00

wileywilson.com

678.320.1888

Atlanta, Georgia 30328-6055

Bldg. C, Ste 515

5901 Peachtree Dunwoody Rd.

Wiley|Wilson

1303936MARCH 2022

(INTERNATIONAL AIRPORT)

ATCT HVAC REPLACEMENT & FIRE ALARM UPGRADE

RALEIGH-DURHAM INTERNATIONAL AIRPORT (RDU)

RDU-D-TRACO-CHECKED

SUBMITTED BY

REVIEWED BY

DRAWN

DESIGNED ISSUED BY

CENTER

ENGINEERING

TERMINAL DRAWING NO

DATE JCN

APPROVED BY

REV

REV DESCRIPTION JCN

DATE

REDLINE

APVD

cknight Stamp

SCALE: 1/8" = 1' - 0"D120

1 BASE BUILDING RCP DEMOLITION

BASE BUILDING RCP - DEMOLITION

ARCHITECTURAL

D120

08' 8' 16'

1/8" = 1'-0"

NOTES

COORDINATE REMOVAL/REPLACEMENT WITH COR.7.

CLEAN UP WORK AREA BY THE END OF EACH SHIFT.

DEBRIES FROM CEILING REMOVAL. CONTRACTOR SHALL

CONTRACTOR SHALL PROTECT FURNITURE FROM DUST AND 6.

PERFORM WORK. COORDINATE WITH COR.

CONTRACTOR SHALL MOVE FURNITURE AS NEEDED TO 5.

CEILING REMOVAL LOCATION.

COORDINATE WITH OTHER DISCIPLINES FOR ANY OTHER 4.

REMOVAL OR TO REMAIN.

REFER TO OTHER DISCIPLINES FOR CEILING DEVICES 3.

CONSTRUCTION TO EXISTING CEILING.

CONTRACTOR IS REQUIRED TO REPAIR ANY DAMAGE DURING 2.

ROOM 103, U.N.O.

147, 149, 134, 153 A, 155, 157, 161, PARTIALLY IN

DRAWING IN ROOMS 101, 102, 111, 113, 117, 128, 137,

REMOVE EXISTING 2' X 4' CEILING TILE AS SHOWN ON 1.

AFTER MECHANICAL WORK IS COMPLETED.

STORED IN DRY PLACE TO BE REINSTALLED

EXISTING CEILING TO BE REMOVED AND

EXISTING CEILING TO REMAIN.

REFER TO A120 FOR NEW CEILING LAYOUT.

CEILING TO BE REMOVED AND REPLACED.

LEGEND

CEILING

EXPOSED

CEILING

EXPOSED

TO REMAIN

CEILING

GYPSUM

TO REMAIN

CEILING

GYPSUM

CEILING

EXPOSED

CEILING

EXPOSED

CEILING

EXPOSED

CEILING

EXPOSED

CEILING

EXPOSED

TO REMAIN

CEILING

GYPSUM

TO REMAIN

CEILING

GYPSUM

TO REMAIN

CEILING

GYPSUM

1-HR FIRE RATED WALL

2-HR FIRE RATED WALL

SUBMITTER'S TITLE APPROVER'S TITLE

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

H

G

F

E

D

C

B

A

H

G

F

E

D

C

B

A

8 1234567

8 1234567

F

IL

E

D

A T

E

T

IM

E

N

A M

E

DATE

APPROVED

RALEIGH-DURHAM NC

SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALES FOR OTHER SIZES.

WW JOB NUMBER: 220079.00

wileywilson.com

678.320.1888

Atlanta, Georgia 30328-6055

Bldg. C, Ste 515

5901 Peachtree Dunwoody Rd.

Wiley|Wilson

1303936MARCH 2022

(INTERNATIONAL AIRPORT)

ATCT HVAC REPLACEMENT & FIRE ALARM UPGRADE

RALEIGH-DURHAM INTERNATIONAL AIRPORT (RDU)

RDU-D-TRACO-CHECKED

SUBMITTED BY

REVIEWED BY

DRAWN

DESIGNED ISSUED BY

CENTER

ENGINEERING

TERMINAL DRAWING NO

DATE JCN

APPROVED BY

REV

REV DESCRIPTION JCN

DATE

REDLINE

APVD

N

130131

138B

138A

107106

153B

153A

150 149 141

TOWER

LINK TO

ROOM SCHEDULE

NO.

RM.

LMS

QUALITY

ATM

153A

WOMEN'S TOILET RELO MOD. FURN.153B

MEN'S TOILET

F&E/FMP

CORRIDOR

TSS

TSS

SSC MANAGER

VESTIBULE

BREAKROOM ADDITION

LOCKER ADDITION

132 BULK STORAGE

138A

138B

NOT USED111 ENGINEERING

RM.

ROOM NAME

NO.

RM.

ROOM NAME

NO.

RM.

ROOM NAME

NO.

RM.

ROOM NAME

NO.

RM.

03/31/2022

T

T

T

ZONE 8

TO

ZONE 7

TO

ZONE 6

TO

ZONE 4

TO

ZONE 3

TO

ZONE 5

TO T

x x

12x88x8

20x1216x1216x7 x x x x x x x

40x1240x1240x12

34x1034x10

T

ZONE 1

TO

26x12

R x

160E

24x1220x12

18x12

16x12 x

16x12

10x10

22x12

24x10

12x4

10x10

8x8

8x8

10x10 x

14x10

10x6 x

TD

26x12

10x810x88x8 x x x x x

20x12

14x12 8x6

8x6

12x6

12x8

26x12

24x10

12x10 30x10 x

12x4E

12x4E 24x14 x x x

24x10 24x10

N

08' 8' 16'

1/8" = 1'-0"

D300

1 BASE BUILDING FLOOR PLAN - HVAC DEMOLITION

SCALE: 1/8" = 1'-0"

BASE BUILDING FLOOR PLAN - HVAC DEMOLITION

MECHANICAL

D300

DEMOLITION NOTES

GENERAL

153B

153A

141 140

138A

137 134

130131

LAN

TECH ROOM115

107106

138B

MJH

CRK

JJS

x

24x12

10x12

VV-4

VV-3

VV-5

S

S

VV-6

VV-1

S

VV-2

x

S

S

ON ROOF

RTU-1

EXISTING

11 ON ROOF

EXISTING RTAC-10 &

T

RTU-2

TO

8x6

18x12

36x12

10x6 x

D302

ON ROOF

EXISTING RTU-2

ON ROOF

EXISTING EF-2

ASSOCIATED DUCTWORK IS TO REMAIN EXCEPT WHERE SHOWN.

REMOVE 6 VARIABLE AIR VOLUME TERMINALS ASSOCIATED WITH RTU-1. 6

REMAIN. SEE DRAWING TRACO-D301 FOR WORK ON ROOF.

ASSOCIATED CONTROLS, WIRING AND SUPPORTS. EXISTING ROOF CURB TO

REMOVE EXISTING ROOFTOP AIR CONDITIONING UNIT INCLUDING ALL 5

MECHANICAL ROOM AND EQUIPMENT ROOM.

SEE DRAWING TRACO-D302 FOR CONTINUATION OF DEMOLITION WORK IN 4

REUSED.

REPAIR WALL TO RESTORE RATING WHERE OPENINGS ARE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .