J-1A Drawings.pdf

PDF 10 MB Posted

Attached to
Major Improvement Project at Fort Lauderdale International ATCT
Solicitation number
697DCK-20-R-00248
Issued by

About this file

This solicitation requests proposals for a major improvement project at the Fort Lauderdale International Airport Air Traffic Control Tower facility. Offerors must be registered in the System for Award Management and submit proposals in accordance with the solicitation instructions. A virtual site visit will be held on July 15, 2020, with questions due by July 20th and proposals due August 3rd. The project involves the Federal Aviation Administration facility located at Fort Lauderdale International Airport.

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FO

TNEMT

R A

P E

D

N

OI

T

AT

RO

PSNART

U N

IT

E

D

STATES OF

AM

ER

I C A

COVER SHEET

GENERAL

G000

JANUARY 31, 2020

FT. LAUDERDALE, FL.

FORT LAUDERDALE INTERNATIONAL

MAJOR IMPROVEMENTS

AIRPORT TRAFFIC CONTROL TOWER

CRK

RAB

CRK

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

DESCRIPTION

DATE

APPROVED

PAGE OF

REVIEWED BY

SUBMITTED BY APPROVED BY

ISSUED BY DATE

DRAWING NO REV

DESIGNED

DRAWN

CHECKED

REV JCN

DATE

REDLINE

APVD

JCN

wileywilson.com

678.320.1888

Atlanta, Georgia 30328-6055

Bldg. C, Ste 515

5901 Peachtree Dunwoody Rd.

Wiley|Wilson

SUBMITTER'S TITLE - CIVIL ENGINEER APPROVER'S TITLE - MANAGER

SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALES FOR OTHER SIZES.

FT LAUDERDALE (INTERNATIONAL) FL

FLL-D-TOWB-

1508912

CENTER

ENGINEERING

ATLANTA TERMINAL

WW JOB NUMBER: 219075.00

MAJOR IMPROVEMENTS

FORT LAUDERDALE AIRPORT TRAFFIC CONTROL TOWER

JAN 31, 2020

cknight Stamp

G001

TITLEDRAWING NUMBER

CRK

RAB

GENERAL

BASE BUILDING - DRAWING INDEX

FLL-D-TOWB-H001

FLL-D-TOWB-G040

FLL-D-TOWB-G015

FLL-D-TOWB-G011

FLL-D-TOWB-G010

FLL-D-TOWB-G002

FLL-D-TOWB-G001

FLL-D-TOWB-G000

HAZARDOUS MATERIALS

CONSTRUCTION COORDINATION NOTES

SYMBOL LEGEND

ABBREVIATIONS - SHEET 2

ABBREVIATIONS - SHEET 1

ATCT - DRAWING INDEX

BASE BUILDING - DRAWING INDEX

COVER SHEET

GENERAL

BASE BUILDING (TRACON)

FLL-D-TRACO-G000

DEMOLITION

ARCHITECTURAL

MECHANICAL

PLUMBING

ELECTRICAL

FIRE PROTECTION

GENERATOR BUILDING PLAN

BASE BUILDING AND LINK PLAN

FLL-D-TRACO-F102

FLL-D-TRACO-F101

FLL-D-TRACO-A610

FLL-D-TRACO-A505

FLL-D-TRACO-A500

FLL-D-TRACO-A410

FLL-D-TRACO-A401

FLL-D-TRACO-A400

FLL-D-TRACO-A140

FLL-D-TRACO-A100

FLL-D-TRACO-A000

ROOF DETAILS

DOOR TYPES, SCHEDULE AND DETAILS

FINISH AND COLOR SCHEDULES

SCREENED-IN PORCH

RESTROOM ACCESSORIES

RESTROOM DEMOLITION AND NEW WORK

BASE BUILDING ROOF PLAN

BASE BUILDING FLOOR PLAN

LEGEND, SYMBOLS AND GENERAL NOTES

FLL-D-TRACO-P400

FLL-D-TRACO-P100

FLL-D-TRACO-P050

FLL-D-TRACO-P000

DETAILS

DETAILS

PANEL SCHEDULES

PANEL SCHEDULES

PANEL SCHEDULES

BASE BUILDING ROOF LIGHTNING PROTECTION PLAN

BASE BUILDING POWER PLAN

GENERATOR BUILDING PLAN

ELECTRICAL SITE PLAN

GENERAL NOTES

LEGEND AND SYMBOLS

FLL-D-TRACO-E601

FLL-D-TRACO-E600

FLL-D-TRACO-E502

FLL-D-TRACO-E501

FLL-D-TRACO-E500

FLL-D-TRACO-E160

FLL-D-TRACO-E120

FLL-D-TRACO-E060

FLL-D-TRACO-E050

FLL-D-TRACO-E001

FLL-D-TRACO-E000

FLL-D-TRACO-D501

FLL-D-TRACO-D500

FLL-D-TRACO-D401

FLL-D-TRACO-D400

FLL-D-TRACO-D301

FLL-D-TRACO-D300

FLL-D-TRACO-D140

FLL-D-TRACO-D100

FLL-D-TRACO-D000

FLL-D-TRACO-M802

FLL-D-TRACO-M801

FLL-D-TRACO-M800

FLL-D-TRACO-M602

FLL-D-TRACO-M601

FLL-D-TRACO-M600

FLL-D-TRACO-M500

FLL-D-TRACO-M420

FLL-D-TRACO-M400

FLL-D-TRACO-M100

FLL-D-TRACO-M000

SEQUENCE OF OPERATION AND SYSTEM POINT SYSTEM

CONTROL SYSTEM DIAGRAM FCU-1 AND FCU-2

CONTROL SYSTEM DIAGRAM AHU-1, VAV & EXHAUST FANS

HVAC DETAILS

HVAC DETAILS

HVAC DETAILS

HVAC SCHEDULES

ENLARGED MECHANICAL ROOM & SECTION

ENLARGED RESTROOM HVAC PLAN

BASE BUILDING FLOOR PLAN - HVAC

HVAC LEGEND AND GENERAL NOTES

ENLARGED RESTROOM NEW WORK AND SCHEDULE

BASE BUILDING FLOOR PLAN - NEW WORK

PLUMBING SITE PLAN

SYMBOLS AND GENERAL NOTES

ELECTRICAL - BASE BUILDING ROOF PLAN DEMOLITION

ELECTRICAL - BASE BUILDING FLOOR PLAN DEMOLITION

PLUMBING - ENLARGED RESTROOM DEMOLITION PLAN

PLUMBING - BASE BUILDING FLOOR PLAN - DEMOLITION

MECHANICAL - MECHANICAL ROOM BASE BUILDING PLAN - DEMOLITION

MECHANICAL - BASE BUILDING FLOOR PLAN - DEMOLITION

ARCHITECTURAL - BASE BUILDING ROOF PLAN DEMOLITION

ARCHITECTURAL - BASE BUILDING FLOOR PLAN DEMOLITION

PLUMBING - SITE PLAN - DEMOLITION

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

DESCRIPTION

DATE

APPROVED

PAGE OF

REVIEWED BY

SUBMITTED BY APPROVED BY

ISSUED BY DATE

DRAWING NO REV

DESIGNED

DRAWN

CHECKED

REV JCN

DATE

REDLINE

APVD

JCN

wileywilson.com

678.320.1888

Atlanta, Georgia 30328-6055

Bldg. C, Ste 515

5901 Peachtree Dunwoody Rd.

Wiley|Wilson

SUBMITTER'S TITLE - CIVIL ENGINEER APPROVER'S TITLE - MANAGER

SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALES FOR OTHER SIZES.

FT LAUDERDALE (INTERNATIONAL) FL

FLL-D-TOWB-

1508912

CENTER

ENGINEERING

ATLANTA TERMINAL

WW JOB NUMBER: 219075.00

MAJOR IMPROVEMENTS

FORT LAUDERDALE AIRPORT TRAFFIC CONTROL TOWER

JAN 31, 2020

G002

RAB

DRAWING NUMBER TITLE

ATCT

FLL-D-ATCT-G000

DEMOLITION

ARCHITECTURAL

MECHANICAL

ELECTRICAL

FIRE PROTECTION

ATCT - DRAWING INDEX

GENERAL

FLL-D-ATCT-A611

FLL-D-ATCT-A610

FLL-D-ATCT-A505

FLL-D-ATCT-A500

FLL-D-ATCT-A121

FLL-D-ATCT-A103

FLL-D-ATCT-A102

FLL-D-ATCT-A101

FLL-D-ATCT-A100

FLL-D-ATCT-A000

FLL-D-ATCT-F501

FLL-D-ATCT-F103

FLL-D-ATCT-F102

FLL-D-ATCT-F101

DETAILS

SUBJUNCTION LEVEL 1 AND JUNCTION LEVEL PLANS

CABLE ACCESS (TYPICAL) AND SUBJUNCTION LEVEL 2 PLANS

GROUND LEVEL AND CABLE ACCESS LEVEL 1 PLANS

FLL-D-ATCT-D501

FLL-D-ATCT-D500

FLL-D-ATCT-D400

FLL-D-ATCT-D301

FLL-D-ATCT-D300

FLL-D-ATCT-D103

FLL-D-ATCT-D102

FLL-D-ATCT-D101

FLL-D-ATCT-D100

PANEL SCHEDULES

PANEL SCHEDULES

CAB LEVEL ROOF PLAN - LIGHNING PROTECTION

SUBJUNCTION LEVEL 1 AND JUCTION LEVEL - NEW WORK

SUBJUNCTION LEVEL 2 POWER PLAN - NEW WORK

GROUND LEVEL POWER PLAN - NEW WORK

FLL-D-ATCT-E501

FLL-D-ATCT-E500

FLL-D-ATCT-E160

FLL-D-ATCT-E122

FLL-D-ATCT-E121

FLL-D-ATCT-E120

PLUMBING

FLL-D-ATCT-P400

CONTROL SYSTEM DIAGRAM FOR FCU-T2 AND FCU-T3

SEQUENCE OF OPERATION AND SYSTEM POINT SYSTEM

CONTROL SYSTEM DIAGRAM FOR AHUs-T1/T1B, T4/T4B

HVAC SCHEDULES

SUBJUNCTION LEVEL 1 AND JUNCTION LEVEL - HVAC

GROUND LEVEL AND SUBJUNCTION LEVEL 2 - HVAC

FLL-D-ATCT-M802

FLL-D-ATCT-M801

FLL-D-ATCT-M800

FLL-D-ATCT-M500

FLL-D-ATCT-M101

FLL-D-ATCT-M100

GROUND LEVEL PLAN - NEW WORK

ELECTRICAL - SUBJUNCTION LEVEL 1 AND JUNCTION LEVEL DEMOLITION

ELECTRICAL - GROUND LEVEL AND SUBJUNCTION LEVEL 2 DEMOLITION

PLUMBING - GROUND LEVEL PLAN - DEMOLITION

MECHANICAL - SUBJUNCTION LEVEL 1 AND JUNCTION LEVEL DEMOLITION

MECHANICAL - GROUND LEVEL AND SUBJUNCTION LEVEL 2 DEMOLITION

ARCHITECTURAL - CAB FLOOR AND ROOF PLANS DEMOLITION

ARCHITECTURAL - SUBJUNCTION LEVEL 1 AND JUNCTION LEVEL DEMOLITION

ARCHITECTURAL - CABLE ACCESS PLAN AND SUBJUNCTION LEVEL 2 DEMOLITION

ARCHITECTURAL - GROUND LEVEL AND SECOND LEVEL DEMOLITION

CATWALK HATCH AND CAB DETAILS

CATWALK AND CAB ROOF DETAILS

DOOR TYPES, SCHEDULE AND DETAILS

FINISH SCHEDULE AND COLOR SELECTIONS

CABLE ACCESS 7TH LEVEL - RCP

CAB LEVEL FLOOR AND ROOF PLANS

SUBJUNCTION LEVEL 1 AND JUNCTION LEVEL

CABLE ACCESS PLAN AND SUBJUNCTION LEVEL 2

GROUND LEVEL AND SECOND LEVEL PLAN

LEGEND, SYMBOLS AND GENERAL NOTES

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

DESCRIPTION

DATE

APPROVED

PAGE OF

REVIEWED BY

SUBMITTED BY APPROVED BY

ISSUED BY DATE

DRAWING NO REV

DESIGNED

DRAWN

CHECKED

REV JCN

DATE

REDLINE

APVD

JCN

wileywilson.com

678.320.1888

Atlanta, Georgia 30328-6055

Bldg. C, Ste 515

5901 Peachtree Dunwoody Rd.

Wiley|Wilson

SUBMITTER'S TITLE - CIVIL ENGINEER APPROVER'S TITLE - MANAGER

SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALES FOR OTHER SIZES.

FT LAUDERDALE (INTERNATIONAL) FL

FLL-D-TOWB-

1508912

CENTER

ENGINEERING

ATLANTA TERMINAL

WW JOB NUMBER: 219075.00

MAJOR IMPROVEMENTS

FORT LAUDERDALE AIRPORT TRAFFIC CONTROL TOWER

JAN 31, 2020

ABBREVIATIONS - SHEET 1

G010

COL COLUMN

CO CLEANOUT, CONDUIT ONLY

CMU CONCRETE MASONRY UNIT

CM COMMUNICATION MANHOLE

CLR CLEAR

CLG CEILING

CLF CURRENT LIMITING FUSE

CL CENTERLINE

CKT CIRCUIT

C.I.P. CAST IN PLACE

CWS CHILLED WATER SUPPLY

CWR CHILLED WATER RETURN

CWP CHILLED WATER PUMP

CHWS CHILLED WATER SUPPLY

CHWR CHILLED WATER RETURN

CHW CHILLED WATER

CHKD CHECKERED

CH CHILLER

CFM CUBIC FEET PER MINUTE

CFACC CENTRIFUGAL FAN AIR COOLED CONDENSER

CF CUBIC FOOT/FEET

CAF COMBUSTION AIR FAN

CENTRIF CENTRIFUGAL

CENT CENTRIFUGAL

CD CEILING DIFFUSER, CONDENSATE DRAIN

CCTV CLOSED CIRCUIT TELEVISION

CBCR CURVED BLADE CEILING REG.

CB CIRCUIT BREAKER

CAV CONSTANT AIR VOLUME

CAP CAPACITY

C CONDUIT

C

BTUH BRITISH THERMAL UNIT/HOUR

BTU BRITISH THERMAL UNIT

BSMT BASEMENT

BSDC BARE SOFT DRAWN COPPER

BPU BREAKER PROGRAMMING UNIT

BP BOOSTER PUMP

BOT BOTTOM

BOP BOTTOM OF PIPING

BOF BOTTOM OF FIXTURE

BOD BOTTOM OF DUCT, BACKDRAFT DAMPER

BLK BLACK

BLDG BUILDING

BITS BYPASS ISOLATION TRANSFER SWITCH

BI BACKWARD INCLINED

BFP BACKFLOW PREVENTER

BFC BELOW FINISHED CEILING

BF BELOW FLOOR (PIPE SIZE)

BDD BACKDRAFT DAMPER

BCKP BACKUP

BC BARE COPPER

BBHWH BASEBOARD HOT WATER HEATER

BAT CHGR BATTERY CHARGER

B

AWS AMERICAN WELDING SOCIETY

AWG AMERICAN WIRE GAUGE

AVG AVERAGE

AV AUTOMATIC VENT

AUX AUXILIARY

ATV ATMOSPHERIC VENT

ATS AUTOMATIC TRANSFER SWITCH

ATCT AIRPORT TRAFFIC CONTROL TOWER

ATC AIR TRAFFIC CONTROL

ATC ACOUSTICAL TILE CEILING

ATBM AIRWAY/TERMINAL BUILDING MAINTENANCE FACILITY

AT AMPERE TRIP

ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS

AND AIR CONDITIONING ENGINEERS

ASHRAE AMERICAN SOCIETY OF HEATING, REFRIGERATION

A/S AUDIBLE STROBE

AS AIR SEPARATOR

ARTS AUTOMATED RADAR

ARCH ARCHITECT, ARCHITECTURAL

APPROX APPROXIMATELY

APD AIR PRESSURE DROP

AP ANNUNCIATOR POINT, ACCESS PANEL

AO ANALOG OUTPUT

ANSI AMERICAN NATIONAL STANDARDS INSTITUTE

ANN ANNUNCIATOR

AMM AMMETER

ALUM ALUMINUM

AL-GL ALUMINUM AND GLASS

AL AIRPORT LIGHTING, ALUMINUM

AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION

AIC AMPERE INTERRUPTING CAPACITY

AI ANALOG INPUT

AHU AIR HANDLING UNIT

AH AIR HANDLER

AFR ABOVE FINISHED ROOF

AFG ABOVE FINISHED GRADE

AFF ABOVE FINISHED FLOOR

AF AMPERE FRAME

ADJ ADJUSTABLE

AD ACCESS DOOR, AREA DRAIN

ACT ACOUSTICAL CEILING TILE, ACCESS CONTROL TERMINAL

ACM ASBESTOS CONTAINING MATERIAL

ACI AMERICAN CONCRETE INSTITUTE

ACDFC AIR COOLED DRY FLUID COOLER

ACC AIR COOLED CHILLER

A/C AIR CONDITIONING

AC ALTERNATING CURRENT, ABOVE CEILING

ABG ABOVE FINISHED GRADE

AAV AUTOMATIC AIR VENT

AA AIR COOLED

A AMPERE

A

EXP EXPOSED, EXPANSION

EXIST EXISTING

EXH EXHAUST

EWT ENTERING WATER TEMPERATURE

EWH ELECTRIC WALL HEATER, ELECTRIC WATER HEATER

EWC ELECTRICAL WATER COOLER

EW EACH WAY

EUH ELECTRIC UNIT HEATER

ET EXPANSION TANK

ESP EXTERNAL STATIC PRESSURE

ERMS ENVIRONMENTAL REMOTE MONITORING SYSTEM

ER EXHAUST REGISTER

EQUIP EQUIPMENT

EQ EQUAL

ENT ENTERING

EMT ELECTRICAL METALLIC TUBING

EMS ENERGY MANAGEMENT SYSTEM

EMI ELECTROMAGNETIC INTERFACE

EMERG EMERGENCY

EMCS ENERGY MANAGEMENT AND CONTROL SYSTEM

ELEV, EL ELEVATION, ELEVATOR

ELEC ELECTRIC

EIFS EXTERIOR INSULATION FINISH SYSTEM

EHC ELECTRIC HEATING COIL

EH ELECTRIC HEATER, ELECTRONIC HUMIDIFIER

EMERGENCY GENERATOR

EG, E/G ENGINE GENERATOR, EXHAUST GRILLE

EF EXHAUST FAN

EDH ELECTRIC DUCT HEATER

EDAM ELECTRICAL DATA ACQUISITION AND MONITORING

ECP ENGINE CONTROL PANEL

EAT ENTERING AIR TEMPERATURE

EA EACH, EXHAUST AIR

E EAST

E

DWL DOWEL

DWGS DRAWINGS

DWDI DOUBLE WIDTH DOUBLE INLET

DWBP DOMESTIC WATER BOOSTER PUMP

DTS DOUBLE THROW SWITCH

DT DOUBLE THROW, DIAPHRAM TANK

DSF DESTRATIFICATION FAN

DPT DIFFERENTIAL PRESSURE TRANSMITTER

DPST DOUBLE POLE SINGLE THROW

D PNL DISTRIBUTION PANEL

DPDT DOUBLE POLE DOUBLE THROW

DP DIFFERENTIAL PRESSURE

DO DIGITAL OUTPUT

DN DOWN

DM DEMAND METER

DF DEGREES FAHRENHEIT

DISC DISCONNECT

DIM DIMENSION

DIFF DIFFUSER

DIAG DIAGONAL

DIA DIAMETER

DI DIGITAL INPUT

DHW DOMESTIC HOT WATER

DG DOOR GRILLE

DET DETAIL

DEMO DEMOLITION

DEG DEGREE

DDC DIRECT DIGITAL CONTROL

DC DIRECT CURRENT

DBL DOUBLE

DB DRY BULB, DIRECT BURIAL, DUCTBANK

DAMP DAMPER

D DRAIN

D

CY YD CUBIC YARD

CWV COMBINATION WASTE AND VENT

CWS CONDENSER WATER SUPPLY

CWR CONDENSER WATER RETURN

CWP CONDENSER WATER PUMP, CHILLED WATER PUMP

CW COLD (DOMESTIC) WATER

CVC CENTRAL VACUUM CLEANER

CV CONSTANT VOLUME, CONTROL VALVE

CU FT CUBIC FOOT/FEET

CU CONDENSING UNIT, COPPER

CTL CONTROL

CURRENT TRANSFORMER, CERAMIC TILE

CT COOLING TOWER, CABLE TRAY,

CSF CHEMICAL SHOT FEEDER

CS CONTROL SWITCH

CR CONTROL RELAY

CPU CENTRAL PROCESSING UNIT

CPT CARPET

CPC CRITICAL POWER CENTER

COR CONTRACTING OFFICER'S REPRESENTATIVE

CONTR CONTRACTOR

CONT CONTINUATION

CONN CONNECTION

CONFIG CONFIGURATION

COND CONDENSATE

CONC CONCRETE

COMM COMMUNICATIONS

ISMS INTEGRATED SECURITY MANAGEMENT SYSTEM

INV INVERT

INT INTERIOR

INSUL INSULATED

INDIC INDICATOR

INCL INCLUDE

INCAND INCANDESCENT

IN INCHES

IE INVERT ELEVATION

IC INTERCOMMUNICATION, INTERCOM

I

HZ HERTZ

HX HEAT EXCHANGER

HWUH HOT WATER UNIT HEATER

HWS HOT WATER SUPPLY

HWR HOT WATER RETURN

HWP HOT WATER PUMP

HVAC HEATING, VENTILATION AND AIR CONDITIONING

HU HUMIDIFIER

HTR HEATER

HTG HEATING

HT HEIGHT

HSB HIGH STRENGTH BOLT

HS HIGH STRENGTH

HR HOUR

HPS HIGH PRESSURE SODIUM

HP HORSEPOWER

HORIZ HORIZONTAL

HOA HAND-OFF-AUTOMATIC

H. MET. HOLLOW METAL

HM HOLLOW METAL

HH HAND HOLE

HEX HEXAGONAL

HB HOSE BIBB

HAZMAT HAZARDOUS MATERIALS

H

GYP GYPSUM

GWB GYPSUM WALLBOARD

GUH GAS FIRED UNIT HEATER

GRS GALVANIZED RIGID STEEL

GRN GREEN

GPM GALLONS PER MINUTE

GPH GALLONS PER HOUR

GOVT GOVERNMENT

GND GROUND CONNECTOR

GFM GOVERNMENT FURNISHED MATERIAL

GFE GOVERNMENT FURNISHED EQUIPMENT

GFCI GROUND FAULT CIRCUIT INTERRUPTER

GEN GENERAL, GENERATOR

GALV GALVANIZED

GAL GALLON

GA GAUGE

G GROUND

G

FWD FORWARD, FIRE SPRINKLER WATER DRAIN

FWS FIRE WATER SUPPLY

FW FIRE WATER

FVC FIRE VALVE CABINET

FV FULL VOLTAGE

FTG FOOTING, FITTING

FT FEET

FSS FUSIBLE SAFETY SWITCH

FSD FIRE/SMOKE DAMPER

FS FLOW SWITCH, FLOOR SINK

FPU FIELD PROGRAMMING UNIT

FPM FEET PER MINUTE

FP FIRE PUMP

FOT FIBER OPTIC TERMINAL, FUEL OIL TRANSFER

FOS FUEL OIL SUPPLY

FOR FUEL OIL RETURN

FOG FUEL OIL GAGE

FOD FACE OPERATED DAMPER

FO FIBER OPTIC

FM FACTORY MUTUAL, FORCE MAIN

FLUOR FLUORESCENT

FLS FLOW SWITCH, FIRE AND LIFE SAFETY

FLEX FLEXIBLE

FLR FLOOR

FLA FULL LOAD AMPERES

FIN FINISH

FIG FIGURE

FHV FIRE HOSE VALVE

FHC FIRE HOSE CABINET

FH FIRE HYDRANT

FG FIBERGLASS

FFE FINISHED FLOOR ELEVATION

FF FLY FAN

FEC FIRE EXTINGUISHER CABINET

FE FIRE EXTINGUISHER

FDR FEEDER

FDN FOUNDATION

FDC FIRE DEPARTMENT CONNECTION

FD FLOOR DRAIN, FIRE DAMPER

FCV FLOW CONTROL VALVE

FCU FAN COIL UNIT

FCO FLOOR CLEANOUT

FC FACE OF CURB, FLEXIBLE CONNECTION

FACT FACTORY

FACP FIRE ALARM CONTROL PANEL

FAA FEDERAL AVIATION ADMINISTRATION

FA FIRE ALARM, FREE AREA, FAN COOLED, FRESH AIR

°F DEGREES FAHRENHEIT

F FIRE WATER SUPPLY

F

MVD MANUAL VOLUME DAMPER

MVA MEGAVOLT AMPERE

MV MANUAL VENT

MUW MAKE-UP WATER

MUA MAKE-UP AIR

MTL METAL

MTD MOUNTED

MPG MULTI-POINT GROUND

MOD MOTOR OPERATED DAMPER

MM MILLIMETER

MLO MAIN LUGS ONLY

MISC MISCELLANEOUS

MIN MINIMAL, MINUTE, MINIMUM

MIL ST MILITARY STANDARD

MIL THOUSANDTHS OF AN INCH

MH MANHOLE

MG MOTOR GENERATOR

MFR MANUFACTURER

MEMB MEMBRANE

MED MEDIUM

MECH MECHANICAL

MDT MAIN DISTRIBUTION TERMINAL

MDF MEDIUM DENSITY FIBERBOARD

MD MANUAL DAMPER

MCP MOTOR CIRCUIT PROTECTOR

MCM THOUSAND CIRCULAR MILLS

MCC MOTOR CONTROL CENTER

MCB MOLDED CASE BREAKER

MBP MAINTENANCE BYPASS PANEL

MBH THOUSAND BTU/HOUR

MAX MAXIMUM

MAINT MAINTENANCE

MAG MAGNETIC DOOR HOLD OPEN

M

LWT LEAVING WATER TEMPERATURE

LVL LEVEL

LV LOW VOLTAGE

LTG LIGHTING

LT LIQUID TIGHT

LSD LINEAR SLOT DIFFUSER

LS LIGHT STANDARD

LRG LINEAR RETURN GRILLE

LRAG LINEAR RETURN AIR GRILLE

LRA LOCKED ROTOR AMPERE

LP LOW POINT

LOSP LOCAL OPERATING STATUS PANEL

LONG LONGITUDINAL

LLV LONG LEG VERTICAL

LLH LONG LEG HORIZONTAL

LFS LIGHTING FIXTURE SCHEDULE

LF LINEAR FEET

LD LINEAR DIFFUSER

LBS POUNDS

LBR LINEAR BAR RETURN

LBG LINEAR BAR GRILLE

LBD LINEAR BAR DIFFUSER

LAT LEAVING AIR TEMPERATURE

L&S LOUVER AND SCREEN

L

KWH KILOWATT HOUR

KW KILOWATT

KVAR KILOVOLT AMPERES-REACTIVE

KVA KILOVOLT AMPERES

KV KILOVOLT

KCMIL THOUSAND CIRCULAR MILLS

KA KILOAMPERES

K

JT JOINT

JP JOCKEY PUMP

JB JUNCTION BOX

J

CRK

CRK

RAB

GENERAL

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

DESCRIPTION

DATE

APPROVED

PAGE OF

REVIEWED BY

SUBMITTED BY APPROVED BY

ISSUED BY DATE

DRAWING NO REV

DESIGNED

DRAWN

CHECKED

REV JCN

DATE

REDLINE

APVD

JCN

wileywilson.com

678.320.1888

Atlanta, Georgia 30328-6055

Bldg. C, Ste 515

5901 Peachtree Dunwoody Rd.

Wiley|Wilson

SUBMITTER'S TITLE - CIVIL ENGINEER APPROVER'S TITLE - MANAGER

SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALES FOR OTHER SIZES.

FT LAUDERDALE (INTERNATIONAL) FL

FLL-D-TOWB-

1508912

CENTER

ENGINEERING

ATLANTA TERMINAL

WW JOB NUMBER: 219075.00

MAJOR IMPROVEMENTS

FORT LAUDERDALE AIRPORT TRAFFIC CONTROL TOWER

JAN 31, 2020

ABBREVIATIONS - SHEET 2

G011

RGS RIGID GALVANIZED STEEL

RG RETURN GRILLE

RFI RADIO FREQUENCY INTERFERENCE

RF RETURN FAN

REV REVISION

RET RETURN

REQ'D REQUIRED

REINF REINFORCEMENT, REINFORCED

REG REGISTER

REF REFERENCE

RECT RECTIFIER, RECEPTACLE

RECP RECEPTACLE

REC'D RECEIVED

REC RECEPTACLE

REBAR REINFORCING STEEL BAR

RE RESIDENT ENGINEER

RDF RUBBER RAISED DISK FLOOR

RD ROOF DRAIN

RCP REINFORCED CONCRETE PIPE, REFLECTED CEILING PLAN

RB RUBBER BASE

RAR RETURN AIR REGISTER

RAG RETURN AIR GRILLE

RAD RADIUS

RACP REMOTE ACCESS CONTROL PANEL

RA RETURN AIR, REMOTE ANNUNCIATOR

R RED, RISER, RADIATOR, RADIUS, REFRIGERANT

R

QUA QUARTER

Q

PVMT PAVEMENT

PVC POLYVINYL CHLORIDE, POINT OF VERTICAL CURVATURE

PTAC PACKAGED TERMINAL AIR CONDITIONER

PT PRESSURE TRANSMITTER, PRESSURE-TEMPERATURE PORT

PSIG POUNDS PER SQ.IN. GAUGE

PSIA POUNDS PER SQ.IN. ABSOLUTE

PSI POUNDS PER SQ. INCH

PSF POUNDS PER SQ. FOOT

PS PRESSURE SWITCH

PRV PRESSURE REDUCING VALVE

PROP PROPELLER

PRSR PRESSURIZATION

PRMY PRIMARY

PRESS PRESSURE

PREFAB PREFABRICATED

PP POWER POLE, PATCH PANEL

POS POSITIVE, POSITION

P.O.C. POINT OF CONNECTION

PNL PANEL, PANELBOARD

PMB POWER MIXING BOX

PM POWER MANHOLE

PLYWD PLYWOOD

PLCS PLACES

PLBG PLUMBING

PL PLATE

PIU POWER INDUCTION UNIT

PI PRESSURE INDICATOR

PH ELECTRICAL PHASE

PFR PERFORATED FACE RETURN

PFD PERFORATED FACE DIFFUSER

PF POWER FACTOR

PD PRESSURE DROP

PCS POWER CONDITIONING SYSTEM

PCMS POWER CONTROL MONITORING SYSTEM

PCHWS PRIMARY CHILLED WATER SUPPLY

PCHWR PRIMARY CHILLED WATER RETURN

PCF POUNDS PER CUBIC FOOT

PB PULL BOX

PART PARTITION

PABX PRIVATE AUTOMATIC BRANCH EXCHANGE

P POLE, PAINT, PUMP

P

OZ OUNCES

OVHD OVERHEAD

OSCO OUTSIDE CLEANOUT

OSA OUTSIDE SUPPLY AIR

ORL OVERFLOW ROOF LEADER

ORD OVERFLOW ROOF DRAIN

OPP OPPOSITE

OPNG OPENING

OH OPPOSITE HAND, OVERHEAD

OE OPEN END

ODP OPEN DRIP PROOF

OD OUTSIDE DIAMETER, OVERFLOW DRAIN

OC ON CENTER

OBD OPPOSED BLADE DAMPER

OAF OUTSIDE AIR FAN

OA OUTSIDE AIR

O

NTS NOT TO SCALE

NTE NOT TO EXCEED

NOM NOMINAL

N.O. NORMALLY OPEN

NO NUMBER OF DESIGNATION

NK NECK

NIC NOT IN CONTRACT

NG NATURAL GAS

NFPA NATIONAL FIRE PROTECTION ASSOCIATION

NFHB NON-FREEZE HOSE BIB

NEMA NATIONAL ELECTRICAL MANUFACTURERS' ASSOCIATION

NEG NEGATIVE

NEC NATIONAL ELECTRIC CODE

N.C. NORMALLY CLOSED

NC NOISE CRITERIA

NA NOT APPLICABLE

N NORTH, NEUTRAL

N

IMPEDANCEZ

Z

WYE DELTADY-

WYEY

Y

TRANSDUCERXDCR

TRANSMITTERXMTR

TRANSFORMERXFMR

TRANSFERXFR

AUXILIARY RELAYX

X

WELDED WIRE FABRICWWF

WATERWTR

WATER TANKWT

WASHDOWN SUPPLY WATERWSW

WATER PRESSURE DROPWPD

WEATHERPROOF NEMA TYPE 3R OR EQUIVALENT, UON

SUBSCRIPT "WP" APPLIED TO ANY SYMBOL INDICATESWP

WIRE MESH SCREENWMS

WATT METERWM

WATER HAMMER ARRESTERWHA

WATER HEATER, WALL HEATER, WALL HYDRANTWH

WATER GAUGEWG

WALL CLEANOUTWCO

WATER COLUMN, WATER CLOSET, WALL COVERINGWC

WET BULBWB

WITHOUTW/O

WITHW/

WEST, WIDTH, WATTW

W

VENT THROUGH ROOFVTR

VESTIBLE PRESSURIZATION FANVPF

VOLTMETERVM

VARIABLE FREQUENCY DRIVEVFD

VESTIBULEVEST

VERTICALVERT

VENTILATIONVENT

VIDEO DISPLAY TERMINALVDT

VOLUME DAMPER - MANUALVD

VINYL COMPOSITE TILEVCT

VACUUM BREAKERVB

VARIABLE AIR VOLUMEVAV

VACUUMVAC

VOLT AMPERE, VOICE ALARMVA

VOLT, VOLTAGE, VENTV

V

UTILITYUTIL

UNINTERUPTIBLE POWER SUPPLYUPS,U

UNIFORM PLUMBING CODEUPC

UNLESS OTHERWISE NOTEDUON

UNLESS NOTED OTHERWISEUNO

UNFUSEDUNF

UNDERWRITER'S LABORATORYUL

UNIT HEATERUH

UNDERGROUND POWERUGP

UNDERGROUNDUG

UNDERCUTUC

UNIFORM BUILDING CODEUBC

U

GMR

RAB

CRK

GENERAL

TW TEMPERED WATER

TYP TYPICAL

TVSS TRANSIENT VOLTAGE SURGE SUPPRESSOR (GFM)

TV TELEVISION, TEMPERING VALVE

TTB TELEPHONE TERMINAL BOARD

TT TEMPERATURE TRANSMITTER

T°STAT THERMOSTAT

TSP TOTAL STATIC PRESSURE, TRAP SEAL PRIMER

TS TWO SPEED

TRACO TERMINAL RADAR APPROACH CONTROL BUILDING

TRBL TROUBLE CONDITION

TP TRAP PRIMER, TWISTER PAIR

TOWB ATCT AND ATTACHED BASE BUILDING

TOS,T/S TOP OF STEEL

TOD TOP OF DUCT

TOC TOP OF CONCRETE

THK THICK, THICKNESS

TG TRANSFER GRILLE

TERM TERMINAL

TEMP TEMPERATURE

TELCO TELEPHONE COMPANY

TEL TELEPHONE

TEF TOILET EXHAUST FAN

TD TIME DELAY, TRENCH DRAIN

TC TRIP COIL, TOTAL COOLING, TIME CLOCK

TB TERMINAL BOX, TERMINAL BOARD

T&P TEMPERATURE AND PRESSURE

T&B TOP AND BOTTOM

T TRANSDUCER

T

SYS SYSTEM

SYM SYMMETRICAL

SWSR SIDE WALL SUPPLY REGISTER

SWSI SINGLE WIDTH SINGLE INLET

SWR SIDEWALL REGISTER

SWGR SWITCHGEAR

SWG SIDEWALL GRILLE

SWBD SWITCHBOARD

SW SWITCH

SUSP SUSPENDED

SUBJ SUBJUNCTION

STRUCT STRUCTURAL

STP SHIELDED TWISTED PAIR

STL STEEL

STGP SIGNAL TRANSPORT GROUND PLANE

STD STANDARD

ST SHUNT TRIP

S/S START-STOP

SS STAINLESS STEEL

SRG SIGNAL REFERENCE GRID

SR SUPPLY REGISTER

SQ.FT. SQUARE FOOT/FEET

SQ SQUARE

SPVR SUPERVISORY CONDITION

SPT STATIC PRESSURE TRANSMITTER

SPST SINGLE POLE SINGLE THROW

SPF STAIRWELL PRESSURIZATION FAN

SPEC SPECIFICATION

SP STATIC PRESSURE(IN W.G.), SINGLE POLE, SUMP PUMP

SOV SHUT-OFF VALVE

NATIONAL ASSOCIATION

SMACNA SHEET METAL AND AIR CONDITIONING CONTRACTORS'

SIM SIMILAR

SHT SHEET

SHLD SHIELDED

SHDWN SHUT DOWN

SGL SINGLE

SG SUPPLY GRILLE

SF SQUARE FEET

SENS SENSIBLE

SECT SECTION

SEC SECONDARY

S.D. SUPPLY DIFFUSER

SD SPLITTER DAMPER STORM DRAIN, SMOKE DETECTOR

SCP SYSTEM CONTROL PANEL, SMOKE CONTROL PANEL

SCND SECONDARY

SCHWS SECONDARY CHILLED WATER SUPPLY

SCHWR SECONDARY CHILLED WATER RETURN

SCHWP SECONDARY CHILLED WATER PUMP

SCHED SCHEDULE

SCC SECURITY CONTROL CENTER

S.C. SOLID CORE

SC SPIN IN COLLAR WITH VOLUME DAMPER, SENSIBLE COOLING

SAN SANITARY

SA SUPPLY AIR

S SOUTH, STAIN COLOR, SANITARY

S

RV RELIEF VALVE

RTU ROOF TOP UNIT

RTN RETURN

RQMTS REQUIREMENTS

RPZ REDUCED PRESSURE ZONE

RPM ROTATIONS PER MINUTE, REVOLUTIONS PER MINUTE

RP BP REDUCED PRESSURE BACKFLOW PREVENTER

RO REVERSE OSMOSIS

RMS ROOT MEAN SQUARE

RML RADAR MICROWAVE LINK

RMH ROOF MOUNTED HOOD

RM ROOM

RL RAIN LEADER

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

DESCRIPTION

DATE

APPROVED

PAGE OF

REVIEWED BY

SUBMITTED BY APPROVED BY

ISSUED BY DATE

DRAWING NO REV

DESIGNED

DRAWN

CHECKED

REV JCN

DATE

REDLINE

APVD

JCN

wileywilson.com

678.320.1888

Atlanta, Georgia 30328-6055

Bldg. C, Ste 515

5901 Peachtree Dunwoody Rd.

Wiley|Wilson

SUBMITTER'S TITLE - CIVIL ENGINEER APPROVER'S TITLE - MANAGER

SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALES FOR OTHER SIZES.

FT LAUDERDALE (INTERNATIONAL) FL

FLL-D-TOWB-

1508912

CENTER

ENGINEERING

ATLANTA TERMINAL

WW JOB NUMBER: 219075.00

MAJOR IMPROVEMENTS

FORT LAUDERDALE AIRPORT TRAFFIC CONTROL TOWER

JAN 31, 2020

4 0 4 8

1/4" = 1'-0"

SCALE IN FEET

020 20 40

X

X

X

GRAPHIC SCALE

ARCHITECTURAL

GRAPHIC SCALE

ENGINEERING

AXXX

AXXX

GENERAL SYMBOL LEGEND:

SECTION LETTER

A

SECTION IS LOCATED

SHEET NUMBER WHERE

AXXX

DETAIL IS LOCATED

SHEET NUMBER WHERE

DETAIL NUMBER

ELEVATION IS LOCATED

SHEET NUMBER WHERE

ELEVATION NUMBER

* SCALE OR OTHER INFORMATION

AXXX

DETAIL NUMBER

DETAIL TITLE

SECTION CUT

ELEVATION

DETAIL 2

GENERAL NOTES

GENERAL

SYMBOL LEGEND

G015

TITLE OF PLAN, SECTION OR DETAIL

RAB

THE SHEET IS REDUCED IN SIZE.

USING THE APPROPRIATE BAR SCALE WHEN

USED FOR SCALING AT FULL SIZE AND FOR

(22" X 34" DRAWING SHEET SIZE) AND IS

THIS SCALE REFERS TO FULL SIZE DRAWING

VERIFY FIELD CONDITIONS PRIOR TO COMMENCING EACH PORTION OF THE WORK.3.

DO NOT SCALE DRAWINGS.2.

FOR ALL ABBREVIATIONS REFERENCE DRAWINGS G010 & G011.1.

IS LOCATED

PLAN, SECTION OR DETAIL

SHEET NUMBER WHERE

CRK

CRK

B-5 ROOM TAG

X-1 DOOR TAG

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

DESCRIPTION

DATE

APPROVED

PAGE OF

WW JOB NUMBER: 219075.00 FLL-D-ATCT-

REVIEWED BY

SUBMITTED BY APPROVED BY

ISSUED BY DATE

DRAWING NO REV

DESIGNED

DRAWN

CHECKED

REV JCN

DATE

REDLINE

APVD

JCN

1508912

FL

wileywilson.com

678.320.1888

Atlanta, Georgia 30328-6055

Bldg. C, Ste 515

5901 Peachtree Dunwoody Rd.

Wiley|Wilson

SUBMITTER'S TITLE - CIVIL ENGINEER APPROVER'S TITLE - MANAGER

SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALES FOR OTHER SIZES.

CENTER

ENGINEERING

ATLANTA TERMINAL

FT LAUDERDALE (INTERNATIONAL)

MAJOR IMPROVEMENTS

FORT LAUDERDALE AIRPORT TRAFFIC CONTROL TOWER

JAN 31, 2020

G040

CONSTRUCTION STAGING NOTES

CONSTRUCTION COORDINATION NOTES

CONSTRUCTION NOTES

CRK

CRK

WELDING EQUIPMENT SHALL NOT BE POWERED BY THE FACILITY ELECTRICAL SYSTEM. WELDING SHALL NOT BE PERMITTED IN FAA OCCUPIED AREA.3.

OFFICERS REPRESENTATIVE A MINIMUM OF 10 WORKING DAYS IN ADVANCE OF THE SHUTDOWN OR CUTOVER.

HOURS. PREPARATORY WORK SHALL BE COMPLETED PRIOR TO SHUTDOWN. CUTOVER WORK SHALL BE SCHEDULED AND COORDINATED WITH THE FAA CONTRACTING

SHUTDOWNS, CUTOVERS AND ANY TEMPORARY PROVISIONS FOR PLUMBING, MECHANICAL AND ELECTRICAL SYSTEMS SHALL BE ACCOMPLISHED AFTER NORMAL OPERATING 2.

OF THE FLYING PUBLIC. SEE SPECIAL NOTES ON SHEET M000 FOR ADDITIONAL REQUIREMENTS.

SUCH DAMAGE OR DISRUPTION OF POWER SHOULD OCCUR. THE LOSS OF THESE COMPUTERS AND EQUIPMENT FOR ANY AMOUNT OF TIME WILL JEOPARDIZE THE SAFETY

NEGLIGENCE SUCH AS, BUT NOT LIMITED TO, DISRUPTION OF POWER TO THE UNITS. INFORM THE FAA CONTRACTING OFFICERS REPRESENTATIVE IMMEDIATELY IF

RESPONSIBLE FOR THE CONTINUOUS PROTECTION OF THIS EQUIPMENT FROM PHYSICAL AND ELECTRICAL DAMAGE AS A RESULT OF INCIDENTAL OR ACCIDENTAL

EXISTING FAA AIR TRAFFIC COMPUTERS AND EQUIPMENT SHALL REMAIN OPERATIONAL THROUGHOUT THE DURATION OF THIS CONTRACT. THE CONTRACTOR SHALL BE 1.

G. EQUIPMENT PROTECTION

FAA CONTRACTING OFFICERS REPRESENTATIVE.

CONCRETE SAWING, GRINDING, CORE DRILLING, CONCRETE DEMOLITION AND ANCHOR DRILLING WILL BE ALLOWED ONLY AT PREARRANGED TIMES APPROVED BY THE 3.

SEE CONSTRUCTION SEQUENCE NOTES FOR FURTHER INFORMATION.2.

CONSTRUCTION IN ADVANCE WITH THE FAA CONTRACTING OFFICERS REPRESENTATIVE.

IN AREAS ADJACENT TO THE AIR TRAFFIC CONTROL FUNCTION MUST BE ACCOMPLISHED AFTER NORMAL OPERATING HOURS. COORDINATE NIGHT WORK AND OVERTIME

THE CONTRACTOR SHALL NOT INTERFERE WITH THE AIR TRAFFIC CONTROL FUNCTION OF THE FACILITY. DEMOLITION NOISE, CONSTRUCTION NOISE AND ALL WORK 1.

F. DEMOLITION AND CONSTRUCTION HOURS

A FIRE OR LIFE SAFETY HAZARD.

REMOVE ALL CONSTRUCTION AND/OR DEMOLITION DEBRIS FROM THE JOB SITE TO MAINTAIN A CLEAN AND SAFE ENVIRONMENT AND TO PREVENT THE POSSIBILITY OF 2.

DUMPSTERS SHALL BE KEPT CLEAN AND FREE OF DEBRIS AND DUST DURING CONSTRUCTION. DEBRIS SHALL BE REMOVED BY THE CONTRACTOR IN A TIMELY MANNER.

ENCLOSED DUMPSTERS FOR DISPOSAL OF CONSTRUCTION DEBRIS SHALL BE PROVIDED BY THE CONTRACTOR WITHIN THE STAGING AREA. THE AREAS AROUND THE 1.

E. CONSTRUCTION DEBRIS

UNDERGROUND UTILITIES MAY RUN THROUGH THE STAGING AREA AND ELSEWHERE.

SHALL NOT PERFORM ANY DIGGING WITHOUT PERMISSION FROM THE FAA CONTRACTING OFFICERS REPRESENTATIVE. BURIED CABLES AND OTHER EXISTING

STORED AND PROTECTED. A CONSTRUCTION FENCE SHALL BE PROVIDED AT THE DISCRETION OF THE FAA CONTRACTING OFFICERS REPRESENTATIVE. CONTRACTOR

STORAGE OF CONSTRUCTION MATERIALS AND TRAILERS ON THE SITE SHALL BE LIMITED TO THE CONSTRUCTION STAGING AREA. MATERIALS SHALL BE NEATLY 1.

D. CONSTRUCTION MATERIAL STORAGE

EGRESS.

THE BUILDING IS A SECURE AREA, AND CONSTRUCTION PERSONNEL SHALL REMAIN IN THE CONSTRUCTION AREAS. CONTRACTOR SHALL MINIMIZE INGRESS AND 2.

BE IDENTIFIED AS SUCH. EACH CONSTRUCTION EMPLOYEE SHALL CHECK IN AND OUT UPON ENTERING AND LEAVING THE SITE.

THOSE CONSTRUCTION PERSONNEL. CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF CONTRACTOR'S PERSONNEL ON SITE. CONTRACTOR VEHICLES SHALL

PERIMETER GATE. CONTRACTOR TO COORDINATE WITH HIS SUBS AND EMPLOYEES THE ACCESS TO THE FACILITY. TEMPORARY SECURITY BADGES MAY BE ISSUED TO

REQUIRED TO OBTAIN AN FAA CONTRACTOR BADGE PRIOR TO THE START OF WORK. A FACILITY ACCESS CARD WILL BE ISSUED AND WILL ALLOW ACCESS TO THE

AN ADVANCE LIST OF THE CONTRACTOR'S PERSONNEL SHALL BE PROVIDED TO THE FAA CONTRACTING OFFICERS REPRESENTATIVE. CONTRACTOR SUPERINTENDENT IS 1.

C. FAA SECURITY REQUIREMENTS

SIGNS AS NECESSARY TO RESERVE AN AREA FOR CONSTRUCTION PARKING ONLY.

CONTRACTOR'S STAGING AND PERSONNEL PARKING IS LIMITED AND SHALL BE DETERMINED AT THE PRECONSTRUCTION CONFERENCE. CONTRACTOR SHALL PROVIDE 1.

B. CONTRACTOR STAGING AREA AND PARKING

SHIFT CHANGES TO AVOID CONGESTION.

DELIVERIES SHALL BE SCHEDULED 48 HOURS IN ADVANCE WITH THE FAA CONTRACTING OFFICERS REPRESENTATIVE AND AT TIMES OTHER THAN THE FAA EMPLOYEE 1.

A. CONSTRUCTION ACCESS

STAGING AREA MUST BE COORDINATED WITH SITE PERSONNEL VIA THE FAA CONTRACTING OFFICERS REPRESENTATIVE.

CONSTRUCTION ACCESS (VEHICLE, PEDESTRIAN AND DELIVERIES), CONTRACTOR'S PARKING, CONSTRUCTION OFFICES AND THE EXTENT/SIZE OF THE CONSTRUCTION

PARAPHRASE OR SUPPLEMENT DIVISION 1 REQUIREMENTS AND ARE NOT INTENDED TO REPLACE DIVISION 1 REQUIREMENTS.

THE FOLLOWING NOTES REPRESENT MANY OF THE MAJOR REQUIREMENTS STATED IN "DIVISION 1 - GENERAL REQUIREMENTS" OF THE SPECIFICATIONS. THESE NOTES

DESIGN CRITERIA AND REFERENCES

CLARIFY.

THESE DRAWINGS SHALL NOT BE SCALED FOR DIMENSIONS. IF THERE ARE DIMENSIONS DISCREPANCIES OR CONCERNS, CONTACT THE FAA COR TO 15.

THE COST OF ANY CHANGES REQUIRED BY THE CLIENT TO SUITABLY MODIFY SUCH WORK SHALL BE SOLELY THE RESPONSIBILITY OF THE CONTRACTOR.

PRIOR TO THE BEGGINING OF THE AFFECTED WORK. WORK THAT PROCEEDS IN VIOLATION OF THIS PRINCIPLE IS AT THE CONTRACTOR'S OWN RISK, AND

THEREIN, SHALL BE REPORTED TO THE FAA CONTRACTING OFFICERS REPRESENTATIVE (COR) IMMEDIATELY, AND SUITABLE RESOLUTION ESTABLISHED

ANY DISCREPANCIES BETWEEN THE EXISTING CONDITIONS AND THE CONTRACT DOCUMENTS , OR ANY AMBIGUITIES OR INCONSISTENCIES CONTAIN 14.

IMMEDIATELY.

IF AN UNSAFE CONDITION OR LIFE THREATENING HAZARD IS NOTED AT THE SITE, NOTIFY THE FAA CONTRACTING OFFICERS REPRESENTATIVE 13.

MANUFACTURED ITEMS SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.12.

ALL EXTERIOR DIMENSIONS ARE FROM THE EXTERIOR FACE OF WALL.11.

ALL INTERIOR DIMENSIONS ARE FROM THE FACE OF STUD OF MASONRY STRUCTURE, UNLESS OTHERWISE NOTED.10.

REINSTALL ALL SMOKE/FIRE DETECTORS AS REQUIRED.9.

DO NOT PAINT OVER ANY FIRE DOOR LABEL.8.

REPRESENTATIVE SHALL APPROVE THE SYSTEM TO BE UTILIZED FOR VENTILATION PRIOR TO USE.

PAINTING, CURING OF FRP RESINS AND OTHER CONSTRUCTION ACTIVITIES THAT HAVE THE POTENTIAL FOR STRONG ODORS. THE CONTRACTING OFFICERS

CONTRACTOR SHALL USE VERY LOW VOC PAINTS AND COATINGS AND PROVIDE ADEQUATE MEASURES FOR VENTILATION TO MINIMIZE ODORS DURING 7.

RELOCATED BY THE CONTRACTOR. COORDINATE WITH CONTRACTING OFFICERS REPRESENTATIVE.

IF NECESSARY ALL ELECTRONIC EQUIPMENT CIRCUITS SHALL BE RELOCATED BY THE FAA. ALL OTHER BUILDING SYSTEMS CIRCUITS SHALL BE 6.

LOCKOUT AND TAG PROCEDURES MUST BE FOLLOWED AT ALL TIMES.5.

DISRUPTION TO THE NORMAL OPERATIONS OF THE FACILITY. NORMAL HOURS OF OPERATION ARE STATED IN DIVISION 1 OF THE SPECIFICATIONS.

FACILITY DURING NORMAL OPERATING HOURS. ALL WORK NEEDS TO BE COORDINATED WITH FAA CONTRACTING OFFICERS REPRESENTATIVE TO AVOID

THE CONSTRUCTION OF THIS PROJECT MUST NOT INTERFERE WITH OPERATION OF THE AIR TRAFFIC CONTROL FUNCTION OR ACCESS AND EGRESS TO THE 4.

AREA DURING ALL GENERAL CONSTRUCTION SEQUENCES.

CONSTRUCTION NOISE, DUST AND DEBRIS MUST NOT INTERFERE WITH OPERATION OF ATCT FACILITY. MAINTAIN HEPA FILTRATION OF CONSTRUCTION 3.

SIGNIFICANT AMOUNTS OF WORK MUST BE COMPLETED AFTER NORMAL OPERATING HOURS. 2.

NOTICE TO PROCEED IS ISSUED. SCHEDULE SHALL OUTLINE ALL PHASES OF THE WORK AND THEIR IMPACT ON THE OPERATION OF THE FACILITY.

PLAN AND PROVIDE A COMPLETE AND COMPREHENSIVE SCHEDULE TO THE CONTRACTING OFFICERS REPRESENTATIVE FOR REVIEW AND APPROVAL BEFORE A

FAA WILL COORDINATE PHASING PLAN WITH FACILITY TO MINIMIZE THE DISRUPTION OF OPERATIONS. THE CONTRACTOR SHALL USE THIS PHASING 1.

DEMOLITION NOTES

AFTER NEW CONSTRUCTION IS COMPLETED.

IF A PORTION OF AN EXISTING WALL IS DEMOLISHED OR PATCHED, THE ENTIRE WALL OR CEILING SHALL BE PAINTED 3.

STRUCTURAL INTEGRITY SHALL BE MAINTAINED FOR ALL BUILDING ELEMENTS DURING AND AFTER DEMOLITION.2.

EXISTING APPEARANCE, UNLESS NOTED OTHERWISE.

BY THE CONSTRUCTION TO MAINTAIN THEIR FIXTURES OR BUILDING ASSEMBLIES. REPAIR ALL AREAS AFFECTED

FACILITY TO BE PROTECTED DURING CONSTRUCTION AND FROM DAMAGE TO ANY EXISTING OR ADJACENT FINISHES, MATERIALS, 1.

APPLICABLE FAA ORDERS AND STANDARDS.-

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) 780, STANDARD FOR THE INSTALLATION OF LIGHT PROTECTION SYSTEMS, 2015.-

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) 110, STANDARD FOR EMERGENCY AND STANDBY POWER SYSTEMS, 2016-

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) 101, LIFE SAFETY CODE, 2015-

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) 92, STANDARD FOR SMOKE CONTROL SYSTEMS, 2015.-

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) 90A, STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATION SYSTEMS, 2015.-

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) 75, STANDARD FOR THE PROTECTION OF INFORMATION TECHNOLOGY EQUIPMENT, 2013.-

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) 72, NATIONAL FIE ALARM AND SIGNALING CODE, 2016.-

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) 70, NATIONAL ELECTRICAL CODE, 2017.-

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) 20, STANDARD FOR THE INSTALLATION STATIONARY PUMPS FOR FIRE PROTECTION, 2016.-

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) 13, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS, 2016.-

NATIONAL ELECTRICAL CODE (NEC), 2017.-

INTERNATIONAL PLUMBING CODE (IPC), 2015.-

INTERNATIONAL MECHANICAL CODE (IMC), 2015.-

INTERNATIONAL FIRE CODE (IFC), 2015.-

INTERNATIONAL BUILDING CODE (IBC), 2015.-

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

DESCRIPTION

DATE

APPROVED

PAGE OF

WW JOB NUMBER: 219075.00 FLL-D-ATCT-

REVIEWED BY

SUBMITTED BY APPROVED BY

ISSUED BY DATE

DRAWING NO REV

DESIGNED

DRAWN

CHECKED

REV JCN

DATE

REDLINE

APVD

JCN

1508912

FL

wileywilson.com

678.320.1888

Atlanta, Georgia 30328-6055

Bldg. C, Ste 515

5901 Peachtree Dunwoody Rd.

Wiley|Wilson

SUBMITTER'S TITLE - CIVIL ENGINEER APPROVER'S TITLE - MANAGER

SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALES FOR OTHER SIZES.

CENTER

ENGINEERING

ATLANTA TERMINAL

FT LAUDERDALE (INTERNATIONAL)

MAJOR IMPROVEMENTS

FORT LAUDERDALE AIRPORT TRAFFIC CONTROL TOWER

JAN 31, 2020

H001

THE PROJECT

AFFECTED BY

(SEE SPECIFICATIONS FOR ACM REPORT)

SUSPECTED ASBESTOS MATERIAL LOCATION SUMMARY

(ACM)

ASBESTOS MATERIAL

HAZARDOUS MATERIALS

GENERAL

HAZMAT NOTES

REQUIREMENTS.

MEDIA AND HANDLED AND DISPOSED OF CONSISTENT WITH ALL APPLICABLE LAWS AND

SUBSTANCES, OR MATERIALS, ARE MANAGED TO AVOID CONTAMINATION OF ENVIRONMENTAL

THOSE THAT CONSIST OF ASBESTOS, LEAD, OR OTHER HAZARDOUS CONSTITUENTS, WASTES,

4. THE CONTRACTOR SHALL ENSURE THAT ALL DEMOLITION GENERATED SOLID WASTES, INCLUDING

PAINT. REFER TO FAA STANDARD SPECIFICATIONS.

3. PAINTED AREAS SUCH AS THE STAIR HANDRAILS ARE ASSUMED TO CONTAIN LEAD-BASED

TO APPROPRIATE SECTIONS OF FAA STANDARD SPECIFICATIONS.

2. IT IS THE INTENT OF THIS DRAWING FOR ALL EXISTING ACM TO BE REMOVED. REFER

IS LISTED.

THE COMPLETE REPORT IS ON FILE WITH THE FAA. PROVIDE TEST WHERE ASSUMED ACM

A SUMMARY OF THIS REPORT IS INCLUDED AS AN APPENDIX TO THE SPECIFICATIONS.

SHOWN IN THE REPORT PREPARED BY RESEARCH MANAGEMENT CONSULTANTS, INC.

IS A SUMMARY OF ASBESTOS CONTAINING MATERIAL (ACM) AND IT'S LOCATION AS

1. BUILDING CONTAINS HAZARDOUS MATERIAL (HAZMAT). THE TABLE ON THIS DRAWING ROOM NAME

STAIRS

10TH FLOOR (JUNCTION LEVEL),

CORRIDOR

10TH FLOOR (JUNCTION LEVEL),

EQUIPM ROOM

10TH FLOOR (JUNCTION LEVEL),

ATCT

TELCO

EQUIPMENT ROOM

TELCO

CONFERENCE ROOM

AF STORAGE

AF STORAGE, EAST WALL

BASE BUILDING

6" BEIGE BASE BOARD TAN MASTIC

12"X12" PEACH VINYL FLOOR TILE TAN MASTIC

YELLOW MASTIC

TAN MASTIC

12"X12" WHITE VINYL FLOOR TILE

4" BROWN VINYL BASEBOARD

WITH SPOTS AND BLACK MASTIC

12"X 12"WHITE VINYL FLOOR TILE

BLACK MASTIC

OFF WHITE FLOOR TILE

BLACK MASTIC

WITH SPOTS AND BLACK MASTIC

12"X 12"WHITE VINYL FLOOR TILE

2" BLACK VINYL BASE BOARD YELLOW MASTIC

WITH JOINT COMPOUND

INTERIOR PERIMETER DRYWALL

WHITE JOINT COMPOUND

YELLOW MASTICTILE GREY SPOTS

12"X 12" WHITE VINYL FLOOR

STRIKES AND MASTIC

BLACK VINYL FLOOR TILE WITH

YELLOW MASTIC

TEM - SAMPLE NOT ANALYZED

TEM - SAMPLE NOT ANALYZED

ASSUME ACM

TEM - SAMPLE NOT ANALYZED

TEM - SAMPLE NOT ANALYZED

TEM - SAMPLE NOT ANALYZED

TEM - SAMPLE NOT ANALYZED

ASSUME ACM

TEM - SAMPLE NOT ANALYZED

TEM - SAMPLE NOT ANALYZED

YES

YES

YES

RESULTS

GMR

GMR

RAB

NO

NO

NO

NO

NO

NO

NO

NO

YES

YES

YES

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

DESCRIPTION

DATE

APPROVED

PAGE OF

REVIEWED BY

SUBMITTED BY APPROVED BY

ISSUED BY DATE

DRAWING NO REV

DESIGNED

DRAWN

CHECKED

REV JCN

DATE

REDLINE

APVD

JCN

wileywilson.com

678.320.1888

Atlanta, Georgia 30328-6055

Bldg. C, Ste 515

5901 Peachtree Dunwoody Rd.

Wiley|Wilson

SUBMITTER'S TITLE - CIVIL ENGINEER APPROVER'S TITLE - MANAGER

SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALES FOR OTHER SIZES.

FT LAUDERDALE (INTERNATIONAL) FL

FLL-D-TOWB-

1508912

CENTER

ENGINEERING

ATLANTA TERMINAL

WW JOB NUMBER: 219075.00

MAJOR IMPROVEMENTS

FORT LAUDERDALE AIRPORT TRAFFIC CONTROL TOWER

JAN 31, 2020

CRK

CRK

G000

(TRAC0)

TRACON BASE BUILDING

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

DESCRIPTION

DATE

APPROVED

PAGE OF

WW JOB NUMBER: 219075.00 FLL-D-TRACO-

REVIEWED BY

SUBMITTED BY APPROVED BY

ISSUED BY DATE

DRAWING NO REV

DESIGNED

DRAWN

CHECKED

REV JCN

DATE

REDLINE

APVD

JCN

1508912

FL

wileywilson.com

678.320.1888

Atlanta, Georgia 30328-6055

Bldg. C, Ste 515

5901 Peachtree Dunwoody Rd.

Wiley|Wilson

SUBMITTER'S TITLE - CIVIL ENGINEER APPROVER'S TITLE - MANAGER

SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALES FOR OTHER SIZES.

CENTER

ENGINEERING

ATLANTA TERMINAL

FT LAUDERDALE (INTERNATIONAL)

MAJOR IMPROVEMENTS

FORT LAUDERDALE AIRPORT TRAFFIC CONTROL TOWER

JAN 31, 2020

020' 20' 40'

1" = 20' - 0" D000

CRK

JJS

NOTES

SITE PLAN - DEMOLITION

PLUMBING

SCALE: 1" = 20'-0" D000

1 PLUMBING SITE PLAN - DEMOLITION

GENERAL NOTES

EX. 4" SAN

WORK WITH COTR.

THIS AREA MUST BE PERFORMED WHEN TOWER IS UNOCCUPIED. COORDINATE

THIS CONCRETE PATH IS MAIN EGRESS TO BUILDING. ANY WORK ON 2

FROM PLANS DATED 08/04/1987. SEE ATCT-D400 FOR CONTINUATION.

TO 8" LINE. APPROXIMATE LOCATION OF EXISTING 8" PIPE IS SHOWN

REPLACE EXISTING 4" SANITARY SEWER FOR ENTIRE LENGTH OF RUN1

WORK SHALL NOT COMMENCE UNTIL NEW PIPE HAS BEEN INSTALLED.

PIPE SHOWN ALSO SERVES EXISTING RESTROOM AT TOP OF ATCT. DEMOLITIONB.

TOWB-G011 FOR ABBREVIATIONS.

SEE TRACO-P000 FOR GENERAL NOTES AND SYMBOLS. SEE TOWB-G010 AND A.

OF 8" SAN

LOCATION

APPROXIMATE

JJS

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

DESCRIPTION

DATE

APPROVED

PAGE OF

WW JOB NUMBER: 219075.00 FLL-D-TRACO-

REVIEWED BY

SUBMITTED BY APPROVED BY

ISSUED BY DATE

DRAWING NO REV

DESIGNED

DRAWN

CHECKED

REV JCN

DATE

REDLINE

APVD

JCN

1508912

FL

wileywilson.com

678.320.1888

Atlanta, Georgia 30328-6055

Bldg. C, Ste 515

5901 Peachtree Dunwoody Rd.

Wiley|Wilson

SUBMITTER'S TITLE - CIVIL ENGINEER APPROVER'S TITLE - MANAGER

SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALES FOR OTHER SIZES.

N

CENTER

ENGINEERING

ATLANTA TERMINAL

FT LAUDERDALE (INTERNATIONAL)

MAJOR IMPROVEMENTS

FORT LAUDERDALE AIRPORT TRAFFIC CONTROL TOWER

JAN 31, 2020

BASE BUILDING

ATCT

ROOM

GENERATOR

ENGINE

ROOM

BREAK

D300

SCALE: 3/16" = 1' - 0"D300

1 BASE BUILDING HVAC FLOOR PLAN - DEMOLITION

10x6

OA DUCT

24X12

CFM

CFM

6"

26x20

26x22 6x6

CFM

10x6

14x8

CFM

CFM

CFM

CFM

3/16" = 1'-0"

04' 4' 8' 12'

8x6

V A

V

O

VAV-2

V

2 5"Ø

Ø

8"Ø

6x6

CFM

10"Ø x

TO VAV-3

VAV-3

CFM

10x10

CFM

8x8 6"Ø

CFM

CFM

V x x

18x8

8x6 x

VAV-7

10"Ø

Ø x

26x8VAV-8

FCU-1 & 2

12"Ø

12x12 x

16x8

16x8 x x

(TYP OF 4)

650 CFM

16x8

16x8

24x16

FCU-2 FCU-1

C

U

150 CFM

8x6

8x8

12x6

TO VAV-5AHU-1

x

VAV-5

5"Ø

VAV-6 10x8

VAV-6

TO

x

(TYP 0F 4)

100 CFM

CFM

Ø6x6

Ø

6x6

8x6 x

CFM

Ø 6x6

80 CFM

TO VAV-4

6x8 x

10x10

VAV-4

5"Ø x

14x8 x

8x6 6"Ø

M M

BASE BUILDING FLOOR PLAN - DEMOLITION

MECHANICAL

T

T

T

T

T

T

T

T

M M

M T

M

M

S D

CO2

P

Ø

VAV-1

12"Ø

OA DUCT

16X12

RA DUCT

14x40

HP-2

HP-1

CU-1

NOTES

GENERAL NOTES

CFM

CFM

CRKCRK

JJS

JJS

4 4

D301

CFM

CFM

116 117/

107 106

MECHANICAL ROOM

COORDINATOR

NAV/COMM

C O

R R I

D O

R

CONFERENCE ROOM

AF STORAGE

VEST.

AF SSC

SECRETARY

AT MANAGER

AT DEPUTY

VESTIBULE

EPDS

CORRIDORCORRIDOR

CORRIDOR

ADMIN. STOR.

AF/AT

ASST. AT

LOCKER ROOM

BREAK ROOM

ROOM

MEN'S

CORRIDOR

ROOM

WOMENS

JANITOR

CORRIDOR

LINK

TELCO

SCREENED PORCH

TRAINING/STOR.

STORAGE

CFM

CFM

ROOM

EQUIPMENT

CFM

ROOM

PLAYBACK

COORDINATOR

RADAR

6"

OWNER SHALL HAVE FIRST RIGHT TO ALL EQUIPMENT THAT IS REMOVED.G.

CONTRACTORS.

RATING AND SHALL BE COORDINATED WITH THE FIRE ALARM AND ELECTRICAL

THIS WORK, THE REMOVED DAMPER SHALL BE REPLACED WITH THE SAME TYPE,

WHERE FIRE OR FIRE/SMOKE DAMPERS ARE REMOVED IN CONJUNCTION WITH F.

NOTES.

SEE DRAWING TRACO-M000 FOR HVAC LEGEND, GENERAL NOTES AND SPECIAL E.

MINIMIZE DOWNTIME OF THE HVAC SYSTEM.

CONTROL INSTALLATION PRIOR TO PERFORMING ANY WORK AND SHALL

CONTRACTOR SHALL REVIEW THE EXISTING CONTROL DRAWINGS AND ACTUAL D.

THERMOSTATS AND ALL ASSOCIATED CONTROL COMPONENTS.

INCLUDING OPERATOR WORKSTATION, CONTROL PANELS, CONTROL WIRING,

CONTRACTOR SHALL COMPLETELY REMOVE THE EXISTING HVAC CONTROL SYSTEM C.

EXISTING WORK SHOWN LIGHT SOLID LINE WITHOUT HATCHING SHALL REMAIN.B.

NEW AIR DEVICES TO AIR FLOW INDICATED.

AFTER CONSTRUCTION. THE SYSTEM SHALL BE REBALANCED ALL EXISTING AND

SUBMITTED TO THE FAA CONTRACTING OFFICER REPRESENTATIVE FOR REVIEW,

COMPLETION OF THE MECHANICAL WORK. THE ACTUAL AIR FLOW SHALL BE

RESULTS SHALL BE RETAINED AND USED TO RESTORE THE SYSTEM AT THE

BUILDING, PRIOR TO CONSTRUCTION START OR ANY HVAC DEMOLITION WORK,

AND RECORD THE ACTUAL AIR FLOW ON EXISTING AIR OUTLETS IN BASE

DRAWINGS. THE APPROVED TAB CONTRACTOR SHALL PERFORM AIR FLOW TEST

AIR FLOW SHOWN ON EXISTING SUPPLY AIR OUTLETS ARE FROM AS-BUILT A.

10 FSD9 M

UP TO EXISTING EF-2, EF-2 TO BE REMOVED.10

REMOVE EXISTING FIRE-SMOKE DAMPER (TYP 2).9

REMOVE EXISTING DDC CONTROL PANEL.8

REMOVE TAP AND MVD. PATCH AND SEAL DUCTWORK AIRTIGHT.7

EXISTING MAKE-UP AIR DUCT FOR TOILETS.6

REMOVE EXISTING THERMOSTAT.5

REMOVE EXISTING CONTROL DAMPERS AND ACTUATORS.4

AIR HANDLING UNIT AHU-1 REPLACED IN INITIAL PHASE OF RENOVATION.3

REMOVE VAV BOXES (VAV-1 THRU VAV-8) AND FD WHERE APLICABLE.2

PHASE OF RENOVATION.

CONDENSING UNIT (CU-1) AND ASSOCIATED LINESET REPLACED IN INTIAL 1

FSD

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

DESCRIPTION

DATE

APPROVED

PAGE OF

WW JOB NUMBER: 219075.00 FLL-D-TRACO-

REVIEWED BY

SUBMITTED BY APPROVED BY

ISSUED BY DATE

DRAWING NO REV

DESIGNED

DRAWN

CHECKED

REV JCN

DATE

REDLINE

APVD

JCN

1508912

FL

wileywilson.com

678.320.1888

Atlanta, Georgia 30328-6055

Bldg. C, Ste 515

5901 Peachtree Dunwoody Rd.

Wiley|Wilson

SUBMITTER'S TITLE - CIVIL ENGINEER APPROVER'S TITLE - MANAGER

SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALES FOR OTHER SIZES.

N

CENTER

ENGINEERING

ATLANTA TERMINAL

FT LAUDERDALE (INTERNATIONAL)

MAJOR IMPROVEMENTS

FORT LAUDERDALE AIRPORT TRAFFIC CONTROL TOWER

JAN 31, 2020

CORRIDOR

SE

E

TOWER

DWG'

S.

MAT

CHL

IN

E

D301

NOTES

SA DUCT

14X18 LINED

SEGMENT

SUPPLY FAN

AHU-1

SEGMENT

VERTICAL COIL

MIXING BOX SEGMENT

COMBINATION FILTER AND

CONNECTION (TYP.)

FLEXIBLE DUCT

FINISHED FLOOR

OA DUCT

16X12 LINED

RA DUCT

40X14 LINED

A.F.F.

CEILING 8'-0"

SA DUCT

18X14 LINED

TRANSITION

SD

SD

FD

ROOF

M

MECHANICAL ROOM BASE BUILDING PLAN - DEMOLITION

MECHANICAL

SCALE: 3/8" = 1'-0"D301

1 MECHANICAL ROOM BASE BUILDING PLAN - DEMOLITION

MOTORIZED DAMPER

CRK

JJS

JJS

3/8" = 1'-0"

02' 2' 4' 6'

REMOVE EXISTING SMOKE DETECTORS.3

EXISTING MOTORIZED DAMPER TO REMAIN.2

EXISTING AHU-1 REPLACED IN INITIAL PHASE OF RENOVATION.1

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

DESCRIPTION

DATE

APPROVED

PAGE OF

WW JOB NUMBER: 219075.00 FLL-D-TRACO-

REVIEWED BY

SUBMITTED BY APPROVED BY

ISSUED BY DATE

DRAWING NO REV

DESIGNED

DRAWN

CHECKED

REV JCN

DATE

REDLINE

APVD

JCN

1508912

FL

wileywilson.com

678.320.1888

Atlanta, Georgia 30328-6055

Bldg. C, Ste 515

5901 Peachtree Dunwoody Rd.

Wiley|Wilson

SUBMITTER'S TITLE - CIVIL ENGINEER APPROVER'S TITLE - MANAGER

SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALES FOR OTHER SIZES.

CENTER

ENGINEERING

ATLANTA TERMINAL

FT LAUDERDALE (INTERNATIONAL)

MAJOR IMPROVEMENTS

FORT LAUDERDALE AIRPORT TRAFFIC CONTROL TOWER

JAN 31, 2020

D400 3/16" = 1'-0"

04' 4' 8' 12'

JJS

CRK

JJS

BASE BUILDING FLOOR PLAN - DEMOLITION

PLUMBING

SCALE: 3/16" = 1' - 0"D400

1 BASE BUILDING FLOOR PLAN - DEMOLITION

D401

MECHANICAL ROOM

COORDINATOR

NAV/COMM

CORRIDOR

VEST.

AF STORAGE

CONFERENCE ROOM

EQUIPMENT ROOM

STORAGE

TELCO

SCREENED PORCH

LINK

JANITOR

CORRIDOR

RADAR COORDINATOR

AF SSC

SECRETARY

ADMIN OFFICE

QUIET ROOM

102ROOM

CBI/PLAYBACK

TRAINING/STOR.

AT MANAGER

AT DEPUTY

EPDS

CORRIDOR

CORRIDORCORRIDOR

VESTIBULE

LOCKER ROOM

ROOM

MEN'S

BREAK ROOM

CORRIDOR

ROOM

WOMENS

CO

CO

3" RD

3" UP TO

3" RD

CO

3" RD

S D

CO

3" RD

FOR CONTINUATION

SEE DWG. ATCT-D400

NOTES

GENERAL NOTES

1 1

REMOVED AND REPLACED FOR WORK.

TRACO-P100 FOR MORE INFORMATION. CEILING TILES WILL NEED TO BE

REMOVE EXISTING ROOF DRAINS AND REPLACE WITH 4" ROOF DRAINS. SEE 1

4" SD (AC)

4" SD (AC)

6" SD (BF)

3" SD (AC)

BY START OF ATCT OPERATIONS.

WORK NEEDS TO BE COMPLETED AND BUILDING PUT BACK TO WORKING ORDER

ALL WORK IN THIS AREA SHALL BE COMPLETED AFTER HOURS. ALL PHASED C.

DEVIATE SIGNIFICANTLY FROM CONTRACT DOCUMENTS.

CONTRACTOR SHALL NOTIFY ENGINEER IN WRITING IF SITE CONDITIONS B.

TOWB-G010 AND TOWB-G011 FOR ABBREVIATIONS.

SEE DRAWING TRACO-P000 FOR PLUMBING GENERAL NOTES AND SYMBOLS. SEE A.

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

DESCRIPTION

DATE

APPROVED

PAGE OF

WW JOB NUMBER: 219075.00 FLL-D-TRACO-

REVIEWED BY

SUBMITTED BY APPROVED BY

ISSUED BY DATE

DRAWING NO REV

DESIGNED

DRAWN

CHECKED

REV JCN

DATE

REDLINE

APVD

JCN

1508912

FL

wileywilson.com

678.320.1888

Atlanta, Georgia 30328-6055

Bldg. C, Ste 515

5901 Peachtree Dunwoody Rd.

Wiley|Wilson

SUBMITTER'S TITLE - CIVIL ENGINEER APPROVER'S TITLE - MANAGER

SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALES FOR OTHER SIZES.

N

CENTER

ENGINEERING

ATLANTA TERMINAL

FT LAUDERDALE (INTERNATIONAL)

MAJOR IMPROVEMENTS

FORT LAUDERDALE AIRPORT TRAFFIC CONTROL TOWER

JAN 31, 2020

A B C

CORRIDOR

SE

E

TOWER

DWG'

S.

MAT

CHL

IN

E

ROOM

MEN'S

NOTES

D401 3/8" = 1'-0"

02' 2' 4' 6'

ROOM

MEN'S

ENLARGED RESTROOM DEMOLITION PLAN

PLUMBING

FD

FD

2" VENT

EXISTING

4" VTR

CO

CO

GENERAL NOTES

SCALE: 3/8" = 1' - 0"D401

1 SANITARY DEMOLITION PLAN

ENLARGED RESTROOM

SCALE: 3/8" = 1' - 0"D401

2 DOMESTIC DEMOLITION PLAN

ENLARGED RESTROOM

1" HW

2" CW

H

3/4" CW

1 1/4" CW

ROOM

WOMENS

ROOM

WOMENS

CORRIDOR

CORRIDOR

EX. EWC-1

EX. UR-1

4" S

EXISTING

4 4

EX. L-12

2 EX. L-1

4 4

EX. L-1

EX. EWC-1

EWC-1

EX.

EX. L-1

L-1

EX.

EX. WC-1 EX. WC-1

EX. EWC-1

EX. WC-1 EX. WC-1

EX. WC-1 EX. WC-1

EX. L-1

EX. WC-1 EX.WC-1

JJS

CRK

TOWB-G011 FOR ABBREVIATIONS.

SEE TRACO-P000 FOR GENERAL NOTES AND SYMBOLS. SEE TOWB-G010 AND B.

EXISTING WORK SHOWN LIGHT SOLID LINE WITHOUT HATCHING SHALL REMAIN.A.

EX. UR-1

EX. UR-1A

EX. UR-1A

REMOVE BACK-TO-BACK WATER CLOSET CARRIER.6

FINISH IN THIS AREA TO BE DEMOLISHED.5

ASSOCIATED ACCESSORIES.

REMOVE EXISTING WATER CLOSET, FLUSH VALVE, SUPPORTS AND ALL 4

ASSOCIATED ACCESSORIES.

REMOVE EXISTING LAVATORY URINAL FLUSH VALVES, SUPPORTS, AND ALL 3

ACCESSORIES.

REMOVE EXISTING LAVATORY SUPPLY LINES, AND ALL ASSOCIATED 2

FLOOR DRAIN IN IT'S ENTIRETY WITH THE EXCEPTION OF THE P-TRAP.

REMOVE EXISTING FLOOR DRAIN AND ALL ASSOCIATED ACCESSORIES. REPLACE 1

6 6

JJS

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

DESCRIPTION

DATE

APPROVED

PAGE OF

WW JOB NUMBER: 219075.00 FLL-D-TRACO-

REVIEWED BY

SUBMITTED BY APPROVED BY

ISSUED BY DATE

DRAWING NO REV

DESIGNED

DRAWN

CHECKED

REV JCN

DATE

REDLINE

APVD

JCN

1508912

FL

wileywilson.com

678.320.1888

Atlanta, Georgia 30328-6055

Bldg. C, Ste 515

5901 Peachtree Dunwoody Rd.

Wiley|Wilson

SUBMITTER'S TITLE - CIVIL ENGINEER APPROVER'S TITLE - MANAGER

SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALES FOR OTHER SIZES.

N

CENTER

ENGINEERING

ATLANTA TERMINAL

FT LAUDERDALE (INTERNATIONAL)

MAJOR IMPROVEMENTS

FORT LAUDERDALE AIRPORT TRAFFIC CONTROL TOWER

JAN 31, 2020

D500 3/16" = 1'-0"

04' 4' 8' 12'

BASE BUILDING FLOOR PLAN - DEMOLITION

ELECTRICAL

CU-1

GENERAL NOTES

CRKCRK

JMC

SCALE: 3/16" = 1' - 0"D500

1 BASE BUILDING FLOOR PLAN - DEMOLITION

F A

C P

HP-1

HP-2

KEY NOTES

VAV-1

VAV-2

VAV-7

VAV-3

2 VAV-4

VAV-8 2

VAV-6 2

VAV-52

2 2

MAK

AHU-1

PANEL #9

EXISTING

FCU-2 FCU-1

MECHANICAL ROOM

AF STORAGE

VEST.

C O

R R I

D O

R

CONFERENCE ROOM

116 117/

COORDINATOR

RADAR

COORDINATOR

NAV/COMM

ROOM

EQUIPMENT

STORAGE

TELCO

AF SSC

TRAINING/STOR.

ROOM

PLAYBACK

JANITOR

CORRIDOR

CORRIDOR

CORRIDOR

ADMIN. STOR.

AF/AT

SECRETARY

AT MANAGER

AT DEPUTY

EPDS

VESTIBULE

LOCKER ROOM

ROOM

MEN'S

BREAK ROOM

ROOM

WOMENS

CORRIDOR

ASST. AT

EXISTING NPA

ELPA

EXISTING

SECT 1,2

EXISTING NLPA

SCREENED PORCH

NPA-25,27

NLPA-42,44

NPA-6,8

NPA-10,12

NPA-13,15

NLPA-45,47

NPA-26,28,30

SHALL FIELD VERIFY ALL EXISTING CIRCUITS PRIOR TO DEMOLITION.

ALL CIRCUIT NUMBERS ARE BASED ON AS-BUILT DRAWINGS. CONTRACTOR D.

ROOF. REMOVE ALL ELECTRICAL CONDUCTORS AND CONDUIT BACK TO PANEL.

SEE DRAWING TRACO-D501 FOR ELECTRICAL DEMOLITION REQUIRED ON THE C.

GENERAL NOTES AND SPECIAL NOTES.

SEE DRAWING TRACO-E000 AND TRACO-E001 FOR ELECTRICAL LEGEND, B.

EXISTING WORK SHOWN LIGHT SOLID LINE WITHOUT HATCHING SHALL REMAIN.A.

NPA-19,

PANEL #10

EXISTING

S

S

FSD M

MECHANICAL. REMOVE CIRCUIT BACK TO SOURCE.

EXISTING DDC CONTROL PANEL TO BE REPLACED. COORDINATE WITH 5

SHALL REMAIN FOR CONNECTION OF NEW DEVICES.

ELECTRICAL DEVICES WITHIN SPACE. CIRCUITS SERVED BY PANEL NLPA

RESTROOM TO BE RENOVATED. REMOVE ALL EXISTING LIGHT FIXTURES AND 4

SHALL BE CORRECTED BY THE CONTRACTOR AT NO ADDITIONAL COST.

CONDITIONS. ANY DAMAGE WHILE IN STORAGE OR DURING REINSTALLATION

CONTRACTOR SHALL DOCUMENT EXISTING CONDITIONS AND REINSTALL IN SAME

REMOVE AND SALVAGE EXISTING CEILING FANS AND LIGHT FIXTURES. 3

REMAIN FOR REUSE.

SWITCH AND REMOVE CONDUCTORS BACK TO PANEL. CONDUIT PATHWAY TO

EXISTING MECHANICAL EQUIPMENT TO BE REPLACED. REMOVE DISCONNECT 2

WITH MECHANICAL.

SERVED BY PANEL #9 TO BE REPLACED, WIRING TO REMAIN. COORDINATE

DISCONNECT CIRCUIT WIRING TO FIRE SMOKE DAMPERS 1 & 2. DAMPER 1

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

DESCRIPTION

DATE

APPROVED

PAGE OF

WW JOB NUMBER: 219075.00 FLL-D-TRACO-

REVIEWED BY

SUBMITTED BY APPROVED BY

ISSUED BY DATE

DRAWING NO REV

DESIGNED

DRAWN

CHECKED

REV JCN

DATE

REDLINE

APVD

JCN

1508912

FL

wileywilson.com

678.320.1888

Atlanta, Georgia 30328-6055

Bldg. C, Ste 515

5901 Peachtree Dunwoody Rd.

Wiley|Wilson

SUBMITTER'S TITLE - CIVIL ENGINEER APPROVER'S TITLE - MANAGER

SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALES FOR OTHER SIZES.

N

CENTER

ENGINEERING

ATLANTA TERMINAL

FT LAUDERDALE (INTERNATIONAL)

MAJOR IMPROVEMENTS

FORT LAUDERDALE AIRPORT TRAFFIC CONTROL TOWER

JAN 31, 2020

CORRIDOR

SE

E

TOWER

DWG'

S.

MAT

CHL

IN

E

SCALE: 3/16" = 1' - 0"D501

1 BASE BUILDING ROOF PLAN DEMOLITION

D501 3/16" = 1'-0"

04' 4' 8' 12'

BRP

CRK

MAK

BASE BUILDING ROOF PLAN DEMOLITION

ELECTRICAL

GENERAL NOTES

KEY NOTES

SHALL FIELD VERIFY ALL EXISTING CIRCUITS PRIOR TO DEMOLITION.

ALL CIRCUIT NUMBERS ARE BASED ON AS-BUILT DRAWINGS. CONTRACTOR D.

PANEL.

GROUND FLOOR. REMOVE ALL ELECTRICAL CONDUCTORS AND CONDUIT BACK TO

SEE DRAWING TRACO-D500 FOR ELECTRICAL DEMOLITION REQUIRED ON THE C.

GENERAL NOTES AND SPECIAL NOTES.

SEE DRAWING TRACO-E000 AND TRACO-E001 FOR ELECTRICAL LEGEND, B.

EXISTING WORK SHOWN LIGHT SOLID LINE WITHOUT HATCHING SHALL REMAIN.A.

REPLACED. REFER TO NEW WORK SHEET E-160 FROM MORE INFORMATION.

ENTIRE LIGHTNING PROTECTION SYSTEM CONDUCTORS AND HARDWARE TO BE 3

NEW FIXTURES

AND CONDUIT SERVED FROM PANEL NLPA SHALL REMAIN FOR CONNECTION OF

EXISTING LIGHT FIXTURES TO BE REPLACED. EXISTING LIGHTING CIRCUIT 2

EXHAUST FAN

CONDUIT SERVED FROM PANEL NPA SHALL REMAIN FOR CONNECTION OF NEW

EXISTING EXHAUST FAN EF-2 TO BE REPLACED. EXISTING CIRCUIT AND 1

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

DESCRIPTION

DATE

APPROVED

PAGE OF

WW JOB NUMBER: 219075.00 FLL-D-TRACO-

REVIEWED BY

SUBMITTED BY APPROVED BY

ISSUED BY DATE

DRAWING NO REV

DESIGNED

DRAWN

CHECKED

REV JCN

DATE

REDLINE

APVD

JCN

1508912

FL

wileywilson.com

678.320.1888

Atlanta, Georgia 30328-6055

Bldg. C, Ste 515

5901 Peachtree Dunwoody Rd.

Wiley|Wilson

SUBMITTER'S TITLE - CIVIL ENGINEER APPROVER'S TITLE - MANAGER

SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALES FOR OTHER SIZES.

N

CENTER

ENGINEERING

ATLANTA TERMINAL

FT LAUDERDALE (INTERNATIONAL)

MAJOR IMPROVEMENTS

FORT LAUDERDALE AIRPORT TRAFFIC CONTROL TOWER

JAN 31, 2020

BA C

TANK VTR

FUEL OIL

4" VTR

DOOR TYPES, SCHEDULE AND DETAILS

ARCHITECTURAL

A505

H E I

G H

T

T H I

C K

M A

T E

R I

A L

F I

N I

S H

T Y

P E

DOOR SCHEDULE HARDWARE SCHEDULE

W I

D T

H

SECURITY DOOR MATRIX

DOOR SCHEDULE

D O

L

O S

E R

W E

A T

H E

R I

P

L O

K

P E

E X

T E

D

A N

A M

E

I N

S T

A

O R

R E

M O

I

D

I N

S T

A

O R

G R

A D

E

B

R E

P A I

N G

T A

L

R E

A D

E R

E L

E C

T R

O N

R D

M A

G N

E T

N T

A C

T

E L

E C

T R

O N

R I

K E

E M

E R

G E

N

G N

N

G N

SCHEDULE

FRAME

T Y