697DCK-20-R-00248 Amendment 0005.pdf

PDF 162 KB Posted

Attached to
Major Improvement Project at Fort Lauderdale International ATCT
Solicitation number
697DCK-20-R-00248
Issued by

About this file

This document includes an amendment to a solicitation and the related federal contract opportunity. The amendment revises the requirements for key personnel on a major improvement project for the Fort Lauderdale International Airport Air Traffic Control Tower facility. The project requires a Project Manager with a bachelor's degree in engineering or technical degree and five years of relevant experience. A Project Superintendent and Safety Manager are also required, each with minimum five years of experience on similar sized projects. The amendment allows the Safety Manager and Project Superintendent roles to be dual-hatted by one individual. The opportunity is available through the Federal Aviation Administration for the improvement project at the specified location. Proposals were due by August 3, 2020 for consideration of award. Interested offerors must be registered in the System for Award Management database.

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

5. PROJECT NO. (If applicable)2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ.NO.

PAGE OF PAGES

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6)

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

Items 8 and 15, and returning is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required.)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO THE AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14.

E. IMPORTANT: Contractor is not, is required to sign this document and return

ORDER NO. IN ITEM 10A.

1 3

0005 08/21/2020

FEDERAL AVIATION ADMINISTRATION

AAQ-500 - REGIONAL ACQUISITIONS

10101 HILLWOOD PARKWAY

FORT WORTH TX 76177-1524

AAQ520FTW-AFN

x

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

separate letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By ___________ 1 x x

697DCK-20-R-00248

1 copies to the issuing office.

06/26/2020

(x)

Solicitation 697DCK-20-R-00248 Amendment 0005 is hereby executed to revise Section L.6

VOLUME II: FACTOR 4 - MANAGEMENT APPROACH

All other terms and conditions of this solicitation remain unchanged.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. CONTRACT AUTHORITY 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Katherine Fogle

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

FIRST: Section L.6 Volume II: Factor 4 - Management Approach is hereby revised as follows:

FROM: L.6 VOLUME II: FACTOR 4 - MANAGEMENT APPROACH

Offeror must provide a description of their management approach, specifically addressing the following:

1. Key Personnel:

The Offeror must identify all key personnel along with each member’s contribution to the project.

The offeror must describe the capabilities, certifications and skills of each member. The offeror must, at a minimum meet the requirements and submit resumes for the Key Personnel listed below.

a. Project Manager with a minimum of a Bachelor of Science (BS) degree in Civil, Mechanical, or Electrical Engineering from an accredited institution of higher learning, or a technical degree, and five (5) years of experience with planning, scheduling, budgeting, and implementation on projects similar in scope and size.

b. Project Superintendent with a minimum of five (5) years of experience in coordinating subcontractors on projects similar in size and scope.

c. Safety Manager with minimum (5) years’ experience in providing safety oversight, training, and management on construction projects of similar size and scope.

Offeror must provide written acknowledgement of the requirement to maintain a physical presence of a Safety Manager and Project Superintendent at the project site any time work is taking place.

TO: L.6 VOLUME II: FACTOR 4 - MANAGEMENT APPROACH

Offeror must provide a description of their management approach, specifically addressing the following:

1. Key Personnel:

The Offeror must identify all key personnel along with each member’s contribution to the project.

The offeror must describe the capabilities, certifications and skills of each member. The offeror must, at a minimum meet the requirements and submit resumes for the Key Personnel listed below.

a. Project Manager with a minimum of a Bachelor of Science (BS) degree in Civil, Mechanical, or Electrical Engineering from an accredited institution of higher learning, or a technical degree, and five (5) years of experience with planning, scheduling, budgeting, and implementation on projects similar in scope and size.

b. Project Superintendent with a minimum of five (5) years of experience in coordinating subcontractors on projects similar in size and scope.

c. Safety Manager with minimum (5) years’ experience in providing safety oversight, training, and management on construction projects of similar size and scope.

Offeror must provide written acknowledgment of the requirement to maintain a physical presence of a Safety Manager and Project Superintendent at the project site any time work is taking place.

The Safety Manager and Project Superintendent may be separate individuals or dual-hatted.

SECOND: All other terms and conditions remain unchanged.