Attachment J-1A Revised Drawings.pdf

PDF 978 KB Posted

Attached to
Major Improvement Project at Fort Lauderdale International ATCT
Solicitation number
697DCK-20-R-00248
Issued by

About this file

This solicitation requests proposals for a major improvement project at the Fort Lauderdale International Airport Air Traffic Control Tower facility. Offerors must have a current SAM registration and submit proposals by August 3, 2020 at 5:00 PM EST in accordance with the solicitation instructions. A virtual site visit will be held on July 15, 2020 at 2:00 PM EST. Questions are due by July 20, 2020 at 5:00 PM EST. The selected contractor will be responsible for renovations and upgrades to the air traffic control tower facility. The Federal Aviation Administration will evaluate proposals and award a contract for this requirement.

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

SCALE: 1/4" = 1' - 0"A100

1 GROUND LEVEL FLOOR PLAN

SCALE: 1/4" = 1' - 0" A100

2 SECOND LEVEL FLOOR PLAN

04' 4' 8'

1/4" = 1'-0"

GROUND AND SECOND FLOOR PLAN

ARCHITECTURAL

A100

SCHEDULE AND COLOR SELECTION

REFER TO A500 FOR FINISH

PROVIDE AND INSTALL NEW VCT.

SCHEDULE AND COLOR SELECTION

REFER TO A500 FOR FINISH

PROVIDE AND INSTALL NEW VCT.

NO WORK TO BE DONE IN THIS LEVEL

N

GMR

NXE

C-2

C-3

C-4B-4

R.D.

F.D.

MORE INFORMATION

AND PLUMBING DRAWINGS FOR

REFER TO DETAIL 10/A610

PROVIDE NEW FLOOR DRAIN

SMOOTH FINISH.

AFTER PLUMBING WORK HAS BEEN COMPLETED, REPAIR CONCRETE SLAB TO A 1.

NOTES

AND LOCATION

REPLACEMENT WORK

TO P400 FOR PIPE

SEE NOTE 1. REFER

FIELD VERIFY

DRAWIGNS

TO FIRE PROTECTION

STANDPIPE, REFER

PROVIDE NEW DRY

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

DESCRIPTION

DATE

APPROVED

PAGE OF

WW JOB NUMBER: 219075.00 FLL-D-ATCT-

REVIEWED BY

SUBMITTED BY APPROVED BY

ISSUED BY DATE

DRAWING NO REV

DESIGNED

DRAWN

CHECKED

REV JCN

REDLINE

APVD

JCN

1508912

FL

wileywilson.com

678.320.1888

Atlanta, Georgia 30328-6055

Bldg. C, Ste 515

5901 Peachtree Dunwoody Rd.

Wiley|Wilson

SUBMITTER'S TITLE - CIVIL ENGINEER APPROVER'S TITLE - MANAGER

SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALES FOR OTHER SIZES.

CENTER

ENGINEERING

ATLANTA TERMINAL

FT LAUDERDALE (INTERNATIONAL)

MAJOR IMPROVEMENTS

FORT LAUDERDALE AIRPORT TRAFFIC CONTROL TOWER

JAN 31, 2020

2.5

D

B-3

CABLE CHASE

B-2

B-2

B-1

ELEVATOR

B-6

VESTIBULE

B-4

STAIRS

U P

B-5

LOBBY

S E E

B A S E

B U I L D I

G

M A T C H L I

E

2.5

C-3

C-2

C-1

ELEVATOR

C-5

C-4

PLATFORM

E

B A S E

B U I L D I

T C H L I

1 08/05/2020 ISSUE FOR CONSTRUCTION

DOOR TYPES, SCHEDULE AND DETAILS

A505

H

IG

T

IC

K

R

IA

L

F

IN

IS

Y

DOOR SCHEDULE HARDWARE SCHEDULE

W

ID

SECURITY DOOR MATRIX

DOOR SCHEDULE

O

C

IP

X

V

-1

B

IR

IK

IT

SCHEDULE

FRAME

FUNCTION DESCRIPTION

INSIDE LEVEROUTSIDE LEVER

LOCKED BY LOCKED BYUNLOCKED BY UNLOCKED BY

DESG.

DOOR HARDWARE DESCRIPTION

TURNING THE INSIDE LEVER, OR CANNOT BE LOCKED ALWAYS UNLOCKED

ROTATING THE OUTSIDE LEVER

CANNOT BE LOCKED ALWAYS UNLOCKEDP PASSAGE

DOOR

WIDTH

FLUSH

NOT TO SCALEA505

2" 2"

HOLLOW METAL

DOOR AND FRAME TYPE

3'-0" 7'-0" 1 3/4" PAINTSTL A STL PAINT1

PB-4

DC-2

DC-3

1.5

012" 6"9" 3"

3"=1'-0"

LOCATION

C-4 - - - - -

- - - - -YES -

OR ROTATING THE INSIDE LEVER

TURNING THE KEY IN THE OUTSIDE LEVER, ALWAYS FIXED CANNOT BE UNLOCKED CANNOT BE LOCKED ALWAYS UNLOCKEDD STOREROOM

SJ1-2

J-1

GROUND

SECOND

SUBJUNCTION

JUNCTION

LEVEL/FLOOR

3'-0" 7'-0" 1 3/4" PAINTSTL A STL PAINT1 1.5

3'-0" 7'-0" 1 3/4" PAINTSTL A STL PAINT1 1.5

SIGN

IM

YES

SCALE: 3" = 1'-0"

EXTERIOR THRESHOLD

INT.

EXT.

TO PEMKO 216DV

SWEEP EQ.

TO PEMKO 255X226_FGT

IN SEALANT BED EQ.

METAL THRESHOLD

/2

/2

DOOR HEAD

JAMB DET.

5 3/4"

5 3/4"

CONC. WALL

PRECAST

SOLID

GROUT

CONC. WALL

PRECAST

CAULK

SOLID

GROUT

FIELD VERIFY

DOOR LOCATION

ELEVATOR MACHINE

1 1

A611

WHEN OPEN

70° MIN

HATCH COVER

REQUIRED FOR

CLEARANCE AS

7"

COVER

ONE EACH SIDE

AND OPERATING ARMS,

AUTOMATIC HOLD-OPEN

CURB

EXTERIOR HANDLE

ROOF HATCH DOOR

PRE-FINISHED HATCH

RAILING SYSTEM WITH

SEALANT

FLASHING MEMBRANE, LAP OVER

SINGLE PLY MEMBRANE

ADHERED HEAVY-DUTY

WALK MAT W/ TERM. BAR

SINGLE PLY MEMBRANE

ROOF OVER RIGID

INSULATION

COVER BOARD

(R30)

RIGID INSULATION

CONCRETE SLAB

TOP ROOF SLAB

CAB ROOF

T.O.S.

TOP HATCH CURB

1 ROOF HATCH CURB DETAILS

NOT TO SCALE

HANDLE

INTERIOR

PULL HANDLE

8" TYPICAL

BY HATCH

DIMENSION ALLOWED

MINIMIZE TO SMALLEST

SIDE OF HATCH

WITH CAP AT EACH

GALVANIZED TUBE

2 1/2 x 1 1/2 x 1/4"

AFTER FABRICATION

HOT DIP GALVANIZED

(3) 5/8" BOLTS MINIMUM

ANGLES TO HATCH CURBS WITH

ATTACH HOT DIP GALVANIZED

SIDE OF HATCH

L 3 x 3 x 1/3 AT EACH

ELEVATION

ELEVATION AS HATCH

SINGLE RUNG AT SAME

HATCH

ROOF

2 GRAB BARS ATTACHED TO HATCH FRAME

NOT TO SCALE

NOT TO SCALEA611

COUNTERBALANCED HATCH COVER AT ROOF

2. GRAB BAR NOT SHOWN FOR CLARITY.

1. HATCH WIDTH 24" MIN FROM FACE - FACE OF OPERATING ARMS.

CATWALK HATCH AND CAB DETAILS

ARCHITECTURE

NEW FLASHING

PROVIDE AND INSTALL

SEALANT WITH BACKER ROD

PROVIDE AND INSTALL NEW

METAL PANEL INSTALLATION

REUSED AFTER NEW INSULATED

BE REMOVED AND STORED TO BE

EXISTING ALUMINUM SYSTEM TO

METAL PANEL DETAIL

SCALE: 3" = 1' - 0"

PANEL INSTALLATION

INSULATED METAL

REPAINTED AFTER NEW

TO BE REUSED AND

REMOVED AND STORED

SYSTEM TO BE

EXISTING ALUMINUM

SEALANT

INSTALL NEW

PROVIDE AND

BE FIELD VERIFIED

PANELS DIMENSION TO

INSULATED METAL

NEW 2" PREFINISHED

PROVIDE AND INSTALL

MIAMI-DADE COUNTY BUILDING CODE COMPLIANCE OFFICE.

CODE. PROVIDE EVIDENCE OF PRODUCT CURRENT OF

VELOCITY HURRICANE ZONE OF THE FLORIDA BUILDING

TO CENTRIA, DESIGNED TO COMPLY WITH THE HIGH

PROVIDE INSULATED METAL PANELS (R-20 MIN.), EQUAL 3.

SPECIFICATIONS.

SUB-CONTRACTOR, AS PER THE REQUIREMENTS OF THE

CONNECTIONS AND ATTACHMENT FURNISHED BY A SINGLE

PANEL SYSTEM, INCLUDING FULLY ENGINEERED

CONTRACTOR TO PROVIDE A COMPLETE INSULATED METAL

ONLY. THE INTENT OF THIS DRAWING IS FOR THE

INSULATED METAL PANEL DETAIL SHOWN IS DIAGRAMMATIC 2.

EXISTING CONDITIONS ARE NOT DEPICTED IN DRAWINGS.

CONTRACTOR SHALL COORDINATE WITH FAA COR IF 1.

INSULATED METAL PANEL NOTES

EXISTING GLAZING

EXISTING

EXISTING

R30 MIN. TYP

ROOF MEMBRANE

FLASHING SEE 1/A611

HINGE

CANT STRIP

SEE 1/A611

FLASHING

HATCH CURB

INSULATED

ABBREVIATIONS - SHEET 1

G010

COL COLUMN

CO CLEANOUT, CONDUIT ONLY

CMU CONCRETE MASONRY UNIT

CM COMMUNICATION MANHOLE

CLR CLEAR

CLG CEILING

CLF CURRENT LIMITING FUSE

CL CENTERLINE

CKT CIRCUIT

C.I.P. CAST IN PLACE

CWS CHILLED WATER SUPPLY

CWR CHILLED WATER RETURN

CWP CHILLED WATER PUMP

CHWS CHILLED WATER SUPPLY

CHWR CHILLED WATER RETURN

CHW CHILLED WATER

CHKD CHECKERED

CH CHILLER

CFM CUBIC FEET PER MINUTE

CFACC CENTRIFUGAL FAN AIR COOLED CONDENSER

CF CUBIC FOOT/FEET

CAF COMBUSTION AIR FAN

CENTRIF CENTRIFUGAL

CENT CENTRIFUGAL

CD CEILING DIFFUSER, CONDENSATE DRAIN

CCTV CLOSED CIRCUIT TELEVISION

CBCR CURVED BLADE CEILING REG.

CB CIRCUIT BREAKER

CAV CONSTANT AIR VOLUME

CAP CAPACITY

C CONDUIT

BTUH BRITISH THERMAL UNIT/HOUR

BTU BRITISH THERMAL UNIT

BSMT BASEMENT

BSDC BARE SOFT DRAWN COPPER

BPU BREAKER PROGRAMMING UNIT

BP BOOSTER PUMP

BOT BOTTOM

BOP BOTTOM OF PIPING

BOF BOTTOM OF FIXTURE

BOD BOTTOM OF DUCT, BACKDRAFT DAMPER

BLK BLACK

BLDG BUILDING

BITS BYPASS ISOLATION TRANSFER SWITCH

BI BACKWARD INCLINED

BFP BACKFLOW PREVENTER

BFC BELOW FINISHED CEILING

BF BELOW FLOOR (PIPE SIZE)

BDD BACKDRAFT DAMPER

BCKP BACKUP

BC BARE COPPER

BBHWH BASEBOARD HOT WATER HEATER

BAT CHGR BATTERY CHARGER

AWS AMERICAN WELDING SOCIETY

AWG AMERICAN WIRE GAUGE

AVG AVERAGE

AV AUTOMATIC VENT

AUX AUXILIARY

ATV ATMOSPHERIC VENT

ATS AUTOMATIC TRANSFER SWITCH

ATCT AIRPORT TRAFFIC CONTROL TOWER

ATC AIR TRAFFIC CONTROL

ATC ACOUSTICAL TILE CEILING

ATBM AIRWAY/TERMINAL BUILDING MAINTENANCE FACILITY

AT AMPERE TRIP

ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS

AND AIR CONDITIONING ENGINEERS

ASHRAE AMERICAN SOCIETY OF HEATING, REFRIGERATION

A/S AUDIBLE STROBE

AS AIR SEPARATOR

ARTS AUTOMATED RADAR

ARCH ARCHITECT, ARCHITECTURAL

APPROX APPROXIMATELY

APD AIR PRESSURE DROP

AP ANNUNCIATOR POINT, ACCESS PANEL

AO ANALOG OUTPUT

ANSI AMERICAN NATIONAL STANDARDS INSTITUTE

ANN ANNUNCIATOR

AMM AMMETER

ALUM ALUMINUM

AL-GL ALUMINUM AND GLASS

AL AIRPORT LIGHTING, ALUMINUM

AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION

AIC AMPERE INTERRUPTING CAPACITY

AI ANALOG INPUT

AHU AIR HANDLING UNIT

AH AIR HANDLER

AFR ABOVE FINISHED ROOF

AFG ABOVE FINISHED GRADE

AFF ABOVE FINISHED FLOOR

AF AMPERE FRAME

ADJ ADJUSTABLE

AD ACCESS DOOR, AREA DRAIN

ACT ACOUSTICAL CEILING TILE, ACCESS CONTROL TERMINAL

ACM ASBESTOS CONTAINING MATERIAL

ACI AMERICAN CONCRETE INSTITUTE

ACDFC AIR COOLED DRY FLUID COOLER

ACC AIR COOLED CHILLER

A/C AIR CONDITIONING

AC ALTERNATING CURRENT, ABOVE CEILING

ABG ABOVE FINISHED GRADE

AAV AUTOMATIC AIR VENT

AA AIR COOLED

A AMPERE

EXP EXPOSED, EXPANSION

EXIST EXISTING

EXH EXHAUST

EWT ENTERING WATER TEMPERATURE

EWH ELECTRIC WALL HEATER, ELECTRIC WATER HEATER

EWC ELECTRICAL WATER COOLER

EW EACH WAY

EUH ELECTRIC UNIT HEATER

ET EXPANSION TANK

ESP EXTERNAL STATIC PRESSURE

ERMS ENVIRONMENTAL REMOTE MONITORING SYSTEM

ER EXHAUST REGISTER

EQUIP EQUIPMENT

EQ EQUAL

ENT ENTERING

EMT ELECTRICAL METALLIC TUBING

EMS ENERGY MANAGEMENT SYSTEM

EMI ELECTROMAGNETIC INTERFACE

EMERG EMERGENCY

EMCS ENERGY MANAGEMENT AND CONTROL SYSTEM

ELEV, EL ELEVATION, ELEVATOR

ELEC ELECTRIC

EIFS EXTERIOR INSULATION FINISH SYSTEM

EHC ELECTRIC HEATING COIL

EH ELECTRIC HEATER, ELECTRONIC HUMIDIFIER

EMERGENCY GENERATOR

EG, E/G ENGINE GENERATOR, EXHAUST GRILLE

EF EXHAUST FAN

EES EARTH ELECTRODE SYSTEM

EDH ELECTRIC DUCT HEATER

EDAM ELECTRICAL DATA ACQUISITION AND MONITORING

ECP ENGINE CONTROL PANEL

EAT ENTERING AIR TEMPERATURE

EA EACH, EXHAUST AIR

E EAST

DWL DOWEL

DWGS DRAWINGS

DWDI DOUBLE WIDTH DOUBLE INLET

DWBP DOMESTIC WATER BOOSTER PUMP

DTS DOUBLE THROW SWITCH

DT DOUBLE THROW, DIAPHRAM TANK

DSF DESTRATIFICATION FAN

DPT DIFFERENTIAL PRESSURE TRANSMITTER

DPST DOUBLE POLE SINGLE THROW

D PNL DISTRIBUTION PANEL

DPDT DOUBLE POLE DOUBLE THROW

DP DIFFERENTIAL PRESSURE

DO DIGITAL OUTPUT

DN DOWN

DM DEMAND METER

DF DEGREES FAHRENHEIT

DISC DISCONNECT

DIM DIMENSION

DIFF DIFFUSER

DIAG DIAGONAL

DIA DIAMETER

DI DIGITAL INPUT

DHW DOMESTIC HOT WATER

DG DOOR GRILLE

DET DETAIL

DEMO DEMOLITION

DEG DEGREE

DDC DIRECT DIGITAL CONTROL

DC DIRECT CURRENT

DBL DOUBLE

DB DRY BULB, DIRECT BURIAL, DUCTBANK

DAMP DAMPER

D DRAIN

CY YD CUBIC YARD

CWV COMBINATION WASTE AND VENT

CWS CONDENSER WATER SUPPLY

CWR CONDENSER WATER RETURN

CWP CONDENSER WATER PUMP, CHILLED WATER PUMP

CW COLD (DOMESTIC) WATER

CVC CENTRAL VACUUM CLEANER

CV CONSTANT VOLUME, CONTROL VALVE

CU FT CUBIC FOOT/FEET

CU CONDENSING UNIT, COPPER

CTL CONTROL

CURRENT TRANSFORMER, CERAMIC TILE

CT COOLING TOWER, CABLE TRAY,

CSF CHEMICAL SHOT FEEDER

CS CONTROL SWITCH

CR CONTROL RELAY

CPU CENTRAL PROCESSING UNIT

CPT CARPET

CPC CRITICAL POWER CENTER

COR CONTRACTING OFFICER'S REPRESENTATIVE

CONTR CONTRACTOR

CONT CONTINUATION

CONN CONNECTION

CONFIG CONFIGURATION

COND CONDENSATE

CONC CONCRETE

COMM COMMUNICATIONS

ISMS INTEGRATED SECURITY MANAGEMENT SYSTEM

INV INVERT

INT INTERIOR

INSUL INSULATED

INDIC INDICATOR

INCL INCLUDE

INCAND INCANDESCENT

IN INCHES

IE INVERT ELEVATION

IC INTERCOMMUNICATION, INTERCOM

I

HZ HERTZ

HX HEAT EXCHANGER

HWUH HOT WATER UNIT HEATER

HWS HOT WATER SUPPLY

HWR HOT WATER RETURN

HWP HOT WATER PUMP

HVAC HEATING, VENTILATION AND AIR CONDITIONING

HU HUMIDIFIER

HTR HEATER

HTG HEATING

HT HEIGHT

HSB HIGH STRENGTH BOLT

HS HIGH STRENGTH

HR HOUR

HPS HIGH PRESSURE SODIUM

HP HORSEPOWER

HORIZ HORIZONTAL

HOA HAND-OFF-AUTOMATIC

H. MET. HOLLOW METAL

HM HOLLOW METAL

HH HAND HOLE

HEX HEXAGONAL

HB HOSE BIBB

HAZMAT HAZARDOUS MATERIALS

GYP GYPSUM

GWB GYPSUM WALLBOARD

GUH GAS FIRED UNIT HEATER

GRS GALVANIZED RIGID STEEL

GRN GREEN

GPM GALLONS PER MINUTE

GPH GALLONS PER HOUR

GOVT GOVERNMENT

GND GROUND CONNECTOR

GFM GOVERNMENT FURNISHED MATERIAL

GFE GOVERNMENT FURNISHED EQUIPMENT

GFCI GROUND FAULT CIRCUIT INTERRUPTER

GEN GENERAL, GENERATOR

GALV GALVANIZED

GAL GALLON

GA GAUGE

G GROUND

FWD FORWARD, FIRE SPRINKLER WATER DRAIN

FWS FIRE WATER SUPPLY

FW FIRE WATER

FVC FIRE VALVE CABINET

FV FULL VOLTAGE

FTG FOOTING, FITTING

FT FEET

FSS FUSIBLE SAFETY SWITCH

FSD FIRE/SMOKE DAMPER

FS FLOW SWITCH, FLOOR SINK

FPU FIELD PROGRAMMING UNIT

FPM FEET PER MINUTE

FP FIRE PUMP

FOT FIBER OPTIC TERMINAL, FUEL OIL TRANSFER

FOS FUEL OIL SUPPLY

FOR FUEL OIL RETURN

FOG FUEL OIL GAGE

FOD FACE OPERATED DAMPER

FO FIBER OPTIC

FM FACTORY MUTUAL, FORCE MAIN

FLUOR FLUORESCENT

FLS FLOW SWITCH, FIRE AND LIFE SAFETY

FLEX FLEXIBLE

FLR FLOOR

FLA FULL LOAD AMPERES

FIN FINISH

FIG FIGURE

FHV FIRE HOSE VALVE

FHC FIRE HOSE CABINET

FH FIRE HYDRANT

FG FIBERGLASS

FFE FINISHED FLOOR ELEVATION

FF FLY FAN

FEC FIRE EXTINGUISHER CABINET

FE FIRE EXTINGUISHER

FDR FEEDER

FDN FOUNDATION

FDC FIRE DEPARTMENT CONNECTION

FD FLOOR DRAIN, FIRE DAMPER

FCV FLOW CONTROL VALVE

FCU FAN COIL UNIT

FCO FLOOR CLEANOUT

FC FACE OF CURB, FLEXIBLE CONNECTION

FACT FACTORY

FACP FIRE ALARM CONTROL PANEL

FAA FEDERAL AVIATION ADMINISTRATION

FA FIRE ALARM, FREE AREA, FAN COOLED, FRESH AIR

°F DEGREES FAHRENHEIT

F FIRE WATER SUPPLY

MVD MANUAL VOLUME DAMPER

MVA MEGAVOLT AMPERE

MV MANUAL VENT

MUW MAKE-UP WATER

MUA MAKE-UP AIR

MTL METAL

MTD MOUNTED

MPG MULTI-POINT GROUND

MOD MOTOR OPERATED DAMPER

MM MILLIMETER

MLO MAIN LUGS ONLY

MISC MISCELLANEOUS

MIN MINIMAL, MINUTE, MINIMUM

MIL ST MILITARY STANDARD

MIL THOUSANDTHS OF AN INCH

MH MANHOLE

MG MOTOR GENERATOR

MFR MANUFACTURER

MEMB MEMBRANE

MED MEDIUM

MECH MECHANICAL

MDT MAIN DISTRIBUTION TERMINAL

MDF MEDIUM DENSITY FIBERBOARD

MD MANUAL DAMPER

MCP MOTOR CIRCUIT PROTECTOR

MCM THOUSAND CIRCULAR MILLS

MCC MOTOR CONTROL CENTER

MCB MOLDED CASE BREAKER

MBP MAINTENANCE BYPASS PANEL

MBH THOUSAND BTU/HOUR

MAX MAXIMUM

MAINT MAINTENANCE

MAG MAGNETIC DOOR HOLD OPEN

LWT LEAVING WATER TEMPERATURE

LVL LEVEL

LV LOW VOLTAGE

LTG LIGHTING

LT LIQUID TIGHT

LSD LINEAR SLOT DIFFUSER

LS LIGHT STANDARD

LRG LINEAR RETURN GRILLE

LRAG LINEAR RETURN AIR GRILLE

LRA LOCKED ROTOR AMPERE

LP LOW POINT

LOSP LOCAL OPERATING STATUS PANEL

LONG LONGITUDINAL

LLV LONG LEG VERTICAL

LLH LONG LEG HORIZONTAL

LFS LIGHTING FIXTURE SCHEDULE

LF LINEAR FEET

LD LINEAR DIFFUSER

LBS POUNDS

LBR LINEAR BAR RETURN

LBG LINEAR BAR GRILLE

LBD LINEAR BAR DIFFUSER

LAT LEAVING AIR TEMPERATURE

L&S LOUVER AND SCREEN

KWH KILOWATT HOUR

KW KILOWATT

KVAR KILOVOLT AMPERES-REACTIVE

KVA KILOVOLT AMPERES

KV KILOVOLT

KCMIL THOUSAND CIRCULAR MILLS

KA KILOAMPERES

JT JOINT

JP JOCKEY PUMP

JB JUNCTION BOX

J

CRK

RAB

GENERAL

FT LAUDERDALE (INTERNATIONAL) FL

FLL-D-TOWB-

WW JOB NUMBER: 219075.00

4 0 4 8

1/4" = 1'-0"

SCALE IN FEET

020 20 40

GRAPHIC SCALE

GRAPHIC SCALE

AXXX

GENERAL SYMBOL LEGEND:

SECTION LETTER

SECTION IS LOCATED

SHEET NUMBER WHERE

DETAIL IS LOCATED

DETAIL NUMBER

ELEVATION IS LOCATED

ELEVATION NUMBER

* SCALE OR OTHER INFORMATION

DETAIL NUMBER

DETAIL TITLE

SECTION CUT

ELEVATION

DETAIL 2

GENERAL NOTES

SYMBOL LEGEND

G015

TITLE OF PLAN, SECTION OR DETAIL

THE SHEET IS REDUCED IN SIZE.

USING THE APPROPRIATE BAR SCALE WHEN

USED FOR SCALING AT FULL SIZE AND FOR

(22" X 34" DRAWING SHEET SIZE) AND IS

THIS SCALE REFERS TO FULL SIZE DRAWING

VERIFY FIELD CONDITIONS PRIOR TO COMMENCING EACH PORTION OF THE WORK.3.

DO NOT SCALE DRAWINGS.2.

FOR ALL ABBREVIATIONS REFERENCE DRAWINGS G010 & G011.1.

IS LOCATED

PLAN, SECTION OR DETAIL

B-5 ROOM TAG

X-1 DOOR TAG

1 1

G040

CONSTRUCTION STAGING NOTES

CONSTRUCTION COORDINATION NOTES

CONSTRUCTION NOTES

AND 2 SINKS. BOTH UNITS TO BE CONDITIONED.

PROVIDE TEMPORARY RESTROOM TRAILERS FOR FAA PERSONNEL, WOMEN UNIT TO INCLUDE 2 STALLS AND 2 SINKS, MEN UNIT TO INCLUDE 2 STALLS, 2 URINALS 2.

REFER TO SPECIFICATIONS, SECTION 01 50 00 FOR TEMPORARY FACILITES.1.

H. TEMPORARY FACILITIES

WELDING EQUIPMENT SHALL NOT BE POWERED BY THE FACILITY ELECTRICAL SYSTEM. WELDING SHALL NOT BE PERMITTED IN FAA OCCUPIED AREA.3.

OFFICERS REPRESENTATIVE A MINIMUM OF 10 WORKING DAYS IN ADVANCE OF THE SHUTDOWN OR CUTOVER.

HOURS. PREPARATORY WORK SHALL BE COMPLETED PRIOR TO SHUTDOWN. CUTOVER WORK SHALL BE SCHEDULED AND COORDINATED WITH THE FAA CONTRACTING

SHUTDOWNS, CUTOVERS AND ANY TEMPORARY PROVISIONS FOR PLUMBING, MECHANICAL AND ELECTRICAL SYSTEMS SHALL BE ACCOMPLISHED AFTER NORMAL OPERATING 2.

OF THE FLYING PUBLIC. SEE SPECIAL NOTES ON SHEET M000 FOR ADDITIONAL REQUIREMENTS.

SUCH DAMAGE OR DISRUPTION OF POWER SHOULD OCCUR. THE LOSS OF THESE COMPUTERS AND EQUIPMENT FOR ANY AMOUNT OF TIME WILL JEOPARDIZE THE SAFETY

NEGLIGENCE SUCH AS, BUT NOT LIMITED TO, DISRUPTION OF POWER TO THE UNITS. INFORM THE FAA CONTRACTING OFFICERS REPRESENTATIVE IMMEDIATELY IF

RESPONSIBLE FOR THE CONTINUOUS PROTECTION OF THIS EQUIPMENT FROM PHYSICAL AND ELECTRICAL DAMAGE AS A RESULT OF INCIDENTAL OR ACCIDENTAL

EXISTING FAA AIR TRAFFIC COMPUTERS AND EQUIPMENT SHALL REMAIN OPERATIONAL THROUGHOUT THE DURATION OF THIS CONTRACT. THE CONTRACTOR SHALL BE 1.

G. EQUIPMENT PROTECTION

FAA CONTRACTING OFFICERS REPRESENTATIVE.

CONCRETE SAWING, GRINDING, CORE DRILLING, CONCRETE DEMOLITION AND ANCHOR DRILLING WILL BE ALLOWED ONLY AT PREARRANGED TIMES APPROVED BY THE 3.

SEE CONSTRUCTION SEQUENCE NOTES FOR FURTHER INFORMATION.2.

CONSTRUCTION IN ADVANCE WITH THE FAA CONTRACTING OFFICERS REPRESENTATIVE.

IN AREAS ADJACENT TO THE AIR TRAFFIC CONTROL FUNCTION MUST BE ACCOMPLISHED AFTER NORMAL OPERATING HOURS. COORDINATE NIGHT WORK AND OVERTIME

THE CONTRACTOR SHALL NOT INTERFERE WITH THE AIR TRAFFIC CONTROL FUNCTION OF THE FACILITY. DEMOLITION NOISE, CONSTRUCTION NOISE AND ALL WORK 1.

F. DEMOLITION AND CONSTRUCTION HOURS

A FIRE OR LIFE SAFETY HAZARD.

REMOVE ALL CONSTRUCTION AND/OR DEMOLITION DEBRIS FROM THE JOB SITE TO MAINTAIN A CLEAN AND SAFE ENVIRONMENT AND TO PREVENT THE POSSIBILITY OF 2.

DUMPSTERS SHALL BE KEPT CLEAN AND FREE OF DEBRIS AND DUST DURING CONSTRUCTION. DEBRIS SHALL BE REMOVED BY THE CONTRACTOR IN A TIMELY MANNER.

ENCLOSED DUMPSTERS FOR DISPOSAL OF CONSTRUCTION DEBRIS SHALL BE PROVIDED BY THE CONTRACTOR WITHIN THE STAGING AREA. THE AREAS AROUND THE 1.

E. CONSTRUCTION DEBRIS

UNDERGROUND UTILITIES MAY RUN THROUGH THE STAGING AREA AND ELSEWHERE.

SHALL NOT PERFORM ANY DIGGING WITHOUT PERMISSION FROM THE FAA CONTRACTING OFFICERS REPRESENTATIVE. BURIED CABLES AND OTHER EXISTING

STORED AND PROTECTED. A CONSTRUCTION FENCE SHALL BE PROVIDED AT THE DISCRETION OF THE FAA CONTRACTING OFFICERS REPRESENTATIVE. CONTRACTOR

STORAGE OF CONSTRUCTION MATERIALS AND TRAILERS ON THE SITE SHALL BE LIMITED TO THE CONSTRUCTION STAGING AREA. MATERIALS SHALL BE NEATLY 1.

D. CONSTRUCTION MATERIAL STORAGE

EGRESS.

THE BUILDING IS A SECURE AREA, AND CONSTRUCTION PERSONNEL SHALL REMAIN IN THE CONSTRUCTION AREAS. CONTRACTOR SHALL MINIMIZE INGRESS AND 2.

BE IDENTIFIED AS SUCH. EACH CONSTRUCTION EMPLOYEE SHALL CHECK IN AND OUT UPON ENTERING AND LEAVING THE SITE.

THOSE CONSTRUCTION PERSONNEL. CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF CONTRACTOR'S PERSONNEL ON SITE. CONTRACTOR VEHICLES SHALL

PERIMETER GATE. CONTRACTOR TO COORDINATE WITH HIS SUBS AND EMPLOYEES THE ACCESS TO THE FACILITY. TEMPORARY SECURITY BADGES MAY BE ISSUED TO

REQUIRED TO OBTAIN AN FAA CONTRACTOR BADGE PRIOR TO THE START OF WORK. A FACILITY ACCESS CARD WILL BE ISSUED AND WILL ALLOW ACCESS TO THE

AN ADVANCE LIST OF THE CONTRACTOR'S PERSONNEL SHALL BE PROVIDED TO THE FAA CONTRACTING OFFICERS REPRESENTATIVE. CONTRACTOR SUPERINTENDENT IS 1.

C. FAA SECURITY REQUIREMENTS

SIGNS AS NECESSARY TO RESERVE AN AREA FOR CONSTRUCTION PARKING ONLY.

CONTRACTOR'S STAGING AND PERSONNEL PARKING IS LIMITED AND SHALL BE DETERMINED AT THE PRECONSTRUCTION CONFERENCE. CONTRACTOR SHALL PROVIDE 1.

B. CONTRACTOR STAGING AREA AND PARKING

SHIFT CHANGES TO AVOID CONGESTION.

DELIVERIES SHALL BE SCHEDULED 48 HOURS IN ADVANCE WITH THE FAA CONTRACTING OFFICERS REPRESENTATIVE AND AT TIMES OTHER THAN THE FAA EMPLOYEE 1.

A. CONSTRUCTION ACCESS

STAGING AREA MUST BE COORDINATED WITH SITE PERSONNEL VIA THE FAA CONTRACTING OFFICERS REPRESENTATIVE.

CONSTRUCTION ACCESS (VEHICLE, PEDESTRIAN AND DELIVERIES), CONTRACTOR'S PARKING, CONSTRUCTION OFFICES AND THE EXTENT/SIZE OF THE CONSTRUCTION

PARAPHRASE OR SUPPLEMENT DIVISION 1 REQUIREMENTS AND ARE NOT INTENDED TO REPLACE DIVISION 1 REQUIREMENTS.

THE FOLLOWING NOTES REPRESENT MANY OF THE MAJOR REQUIREMENTS STATED IN "DIVISION 1 - GENERAL REQUIREMENTS" OF THE SPECIFICATIONS. THESE NOTES

DESIGN CRITERIA AND REFERENCES

CLARIFY.

THESE DRAWINGS SHALL NOT BE SCALED FOR DIMENSIONS. IF THERE ARE DIMENSIONS DISCREPANCIES OR CONCERNS, CONTACT THE FAA COR TO 15.

THE COST OF ANY CHANGES REQUIRED BY THE CLIENT TO SUITABLY MODIFY SUCH WORK SHALL BE SOLELY THE RESPONSIBILITY OF THE CONTRACTOR.

PRIOR TO THE BEGGINING OF THE AFFECTED WORK. WORK THAT PROCEEDS IN VIOLATION OF THIS PRINCIPLE IS AT THE CONTRACTOR'S OWN RISK, AND

THEREIN, SHALL BE REPORTED TO THE FAA CONTRACTING OFFICERS REPRESENTATIVE (COR) IMMEDIATELY, AND SUITABLE RESOLUTION ESTABLISHED

ANY DISCREPANCIES BETWEEN THE EXISTING CONDITIONS AND THE CONTRACT DOCUMENTS , OR ANY AMBIGUITIES OR INCONSISTENCIES CONTAIN 14.

IMMEDIATELY.

IF AN UNSAFE CONDITION OR LIFE THREATENING HAZARD IS NOTED AT THE SITE, NOTIFY THE FAA CONTRACTING OFFICERS REPRESENTATIVE 13.

MANUFACTURED ITEMS SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.12.

ALL EXTERIOR DIMENSIONS ARE FROM THE EXTERIOR FACE OF WALL.11.

ALL INTERIOR DIMENSIONS ARE FROM THE FACE OF STUD OF MASONRY STRUCTURE, UNLESS OTHERWISE NOTED.10.

REINSTALL ALL SMOKE/FIRE DETECTORS AS REQUIRED.9.

DO NOT PAINT OVER ANY FIRE DOOR LABEL.8.

REPRESENTATIVE SHALL APPROVE THE SYSTEM TO BE UTILIZED FOR VENTILATION PRIOR TO USE.

PAINTING, CURING OF FRP RESINS AND OTHER CONSTRUCTION ACTIVITIES THAT HAVE THE POTENTIAL FOR STRONG ODORS. THE CONTRACTING OFFICERS

CONTRACTOR SHALL USE VERY LOW VOC PAINTS AND COATINGS AND PROVIDE ADEQUATE MEASURES FOR VENTILATION TO MINIMIZE ODORS DURING 7.

RELOCATED BY THE CONTRACTOR. COORDINATE WITH CONTRACTING OFFICERS REPRESENTATIVE.

IF NECESSARY ALL ELECTRONIC EQUIPMENT CIRCUITS SHALL BE RELOCATED BY THE FAA. ALL OTHER BUILDING SYSTEMS CIRCUITS SHALL BE 6.

LOCKOUT AND TAG PROCEDURES MUST BE FOLLOWED AT ALL TIMES.5.

DISRUPTION TO THE NORMAL OPERATIONS OF THE FACILITY. NORMAL HOURS OF OPERATION ARE STATED IN DIVISION 1 OF THE SPECIFICATIONS.

FACILITY DURING NORMAL OPERATING HOURS. ALL WORK NEEDS TO BE COORDINATED WITH FAA CONTRACTING OFFICERS REPRESENTATIVE TO AVOID

THE CONSTRUCTION OF THIS PROJECT MUST NOT INTERFERE WITH OPERATION OF THE AIR TRAFFIC CONTROL FUNCTION OR ACCESS AND EGRESS TO THE 4.

AREA DURING ALL GENERAL CONSTRUCTION SEQUENCES.

CONSTRUCTION NOISE, DUST AND DEBRIS MUST NOT INTERFERE WITH OPERATION OF ATCT FACILITY. MAINTAIN HEPA FILTRATION OF CONSTRUCTION 3.

SIGNIFICANT AMOUNTS OF WORK MUST BE COMPLETED AFTER NORMAL OPERATING HOURS. 2.

NOTICE TO PROCEED IS ISSUED. SCHEDULE SHALL OUTLINE ALL PHASES OF THE WORK AND THEIR IMPACT ON THE OPERATION OF THE FACILITY.

PLAN AND PROVIDE A COMPLETE AND COMPREHENSIVE SCHEDULE TO THE CONTRACTING OFFICERS REPRESENTATIVE FOR REVIEW AND APPROVAL BEFORE A

FAA WILL COORDINATE PHASING PLAN WITH FACILITY TO MINIMIZE THE DISRUPTION OF OPERATIONS. THE CONTRACTOR SHALL USE THIS PHASING 1.

DEMOLITION NOTES

AFTER NEW CONSTRUCTION IS COMPLETED.

IF A PORTION OF AN EXISTING WALL IS DEMOLISHED OR PATCHED, THE ENTIRE WALL OR CEILING SHALL BE PAINTED 3.

STRUCTURAL INTEGRITY SHALL BE MAINTAINED FOR ALL BUILDING ELEMENTS DURING AND AFTER DEMOLITION.2.

EXISTING APPEARANCE, UNLESS NOTED OTHERWISE.

BY THE CONSTRUCTION TO MAINTAIN THEIR FIXTURES OR BUILDING ASSEMBLIES. REPAIR ALL AREAS AFFECTED

FACILITY TO BE PROTECTED DURING CONSTRUCTION AND FROM DAMAGE TO ANY EXISTING OR ADJACENT FINISHES, MATERIALS, 1.

APPLICABLE FAA ORDERS AND STANDARDS.-

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) 780, STANDARD FOR THE INSTALLATION OF LIGHT PROTECTION SYSTEMS, 2015.-

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) 110, STANDARD FOR EMERGENCY AND STANDBY POWER SYSTEMS, 2016-

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) 101, LIFE SAFETY CODE, 2015-

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) 92, STANDARD FOR SMOKE CONTROL SYSTEMS, 2015.-

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) 90A, STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATION SYSTEMS, 2015.-

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) 75, STANDARD FOR THE PROTECTION OF INFORMATION TECHNOLOGY EQUIPMENT, 2013.-

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) 72, NATIONAL FIE ALARM AND SIGNALING CODE, 2016.-

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) 70, NATIONAL ELECTRICAL CODE, 2017.-

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) 20, STANDARD FOR THE INSTALLATION STATIONARY PUMPS FOR FIRE PROTECTION, 2016.-

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) 13, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS, 2016.-

NATIONAL ELECTRICAL CODE (NEC), 2017.-

INTERNATIONAL PLUMBING CODE (IPC), 2015.-

INTERNATIONAL MECHANICAL CODE (IMC), 2015.-

INTERNATIONAL FIRE CODE (IFC), 2015.-

INTERNATIONAL BUILDING CODE (IBC), 2015.-

H001

THE PROJECT

AFFECTED BY

(SEE SPECIFICATIONS FOR ACM REPORT)

SUSPECTED ASBESTOS MATERIAL LOCATION SUMMARY

(ACM)

ASBESTOS MATERIAL

HAZARDOUS MATERIALS

HAZMAT NOTES

REQUIREMENTS.

MEDIA AND HANDLED AND DISPOSED OF CONSISTENT WITH ALL APPLICABLE LAWS AND

SUBSTANCES, OR MATERIALS, ARE MANAGED TO AVOID CONTAMINATION OF ENVIRONMENTAL

THOSE THAT CONSIST OF ASBESTOS, LEAD, OR OTHER HAZARDOUS CONSTITUENTS, WASTES,

4. THE CONTRACTOR SHALL ENSURE THAT ALL DEMOLITION GENERATED SOLID WASTES, INCLUDING

PAINT. REFER TO FAA STANDARD SPECIFICATIONS.

3. PAINTED AREAS SUCH AS THE STAIR HANDRAILS ARE ASSUMED TO CONTAIN LEAD-BASED

FAA STANDARD SPECIFICATIONS.

THAT ARE BEING DISTRURBED BY THIS PROJECT. REFER TO APPROPRIATE SECTIONS OF

2. IT IS THE INTENT OF THIS DRAWING TO REMOVE THE ASBESTOS CONTAINING MATERIAL

IS LISTED.

THE COMPLETE REPORT IS ON FILE WITH THE FAA. PROVIDE TEST WHERE ASSUMED ACM

A SUMMARY OF THIS REPORT IS INCLUDED AS AN APPENDIX TO THE SPECIFICATIONS.

SHOWN IN THE REPORT PREPARED BY RESEARCH MANAGEMENT CONSULTANTS, INC.

IS A SUMMARY OF ASBESTOS CONTAINING MATERIAL (ACM) AND IT'S LOCATION AS

1. BUILDING CONTAINS HAZARDOUS MATERIAL (HAZMAT). THE TABLE ON THIS DRAWING ROOM NAME

10TH FLOOR (JUNCTION LEVEL),

CORRIDOR

EQUIPM ROOM

ATCT

TELCO

EQUIPMENT ROOM

TELCO

CONFERENCE ROOM

AF STORAGE

AF STORAGE, EAST WALL

BASE BUILDING

6" BEIGE BASE BOARD TAN MASTIC

12"X12" PEACH VINYL FLOOR TILE TAN MASTIC

YELLOW MASTIC

TAN MASTIC

12"X12" WHITE VINYL FLOOR TILE

4" BROWN VINYL BASEBOARD

WITH SPOTS AND BLACK MASTIC

12"X 12"WHITE VINYL FLOOR TILE

BLACK MASTIC

OFF WHITE FLOOR TILE

BLACK MASTIC

WITH SPOTS AND BLACK MASTIC

12"X 12"WHITE VINYL FLOOR TILE

2" BLACK VINYL BASE BOARD YELLOW MASTIC

WITH JOINT COMPOUND

INTERIOR PERIMETER DRYWALL

WHITE JOINT COMPOUND

YELLOW MASTICTILE GREY SPOTS

12"X 12" WHITE VINYL FLOOR

STRIKES AND MASTIC

BLACK VINYL FLOOR TILE WITH

YELLOW MASTIC

TEM - SAMPLE NOT ANALYZED

NEGATIVE

RESULTS

NO

ROOM

WOMENS

MEN'S

ACCESSIBLE

128A

5'-0"

13'-3"

6'-11" 1'-4"

SCALE: 3/8" = 1' - 0"A400

1 RESTROOM DEMO PLAN

SCALE: 3/8" = 1' - 0 "A400

2 RESTROOM NEW WORK PLAN

DEMOLITION KEYNOTES

REMOVE EXISTING DOOR

REMOVE EXISTING TOILET PARTITIONS

REMOVE EXISTING WATERCLOSETS

REMOVE EXISTING URINALS

REMOVE EXISTING LAVATORY AND COUNTER TOP

REMOVE EXISTING CERAMIC TILE

4 4

4 4

ELECTRICAL.

PATCH AND PAINT CEILING, INSTALL NEW LIGHT FIXTURES, REFER TO

EXISTING CEILING TO REMAIN, EXISTING LIGHT FIXTURES TO BE REMOVED. 7.

PROVIDE NEW TOILET PARTITIONS. REFER TO A500 FOR MORE INFORMATION.6.

128 AND 128A.

PROVIDE NEW GYPSUM BOARD CEILING AND CEILING FIXTURES IN ROOMS 5.

PROVIDE NEW DOORS. REFER TO DOOR SCHEDULE.4.

PROVIDE NEW FLOOR AND WALL CERAMIC TILE. REFER TO FINISH SCHEDULE.3.

PROVIDE NEW ACCESSORIES, REFER TO TOILET ACCESSORIES SCHEDULE.2.

PROVIDE NEW BATHROOM FIXTURES. REFER TO PLUMBING DRAWINGS.1.

TOILET TISSUE DISPENSER

SOAP DISPENSER

MIRROR 18" X 30"

SEAT COVER DISPENSER

KEY DESCRIPTION

SURFACE MOUNTED

RECESSED MOUNTED

AND WASTE RECEPTACLE

PAPER TOWEL DISPENSER

SANITARY NAPKIN DISPOSAL

TOILET ACCESSORIES SCHEDULE

EQUAL TO MOUNTING TYPE

BOBRICK B-3699

BOBRICK B-2111

BOBRICK B-165 1830

BOBRICK B-301

BOBRICK B-6806 SERIES

SANITARY NAPKIN VENDOR

BOBRICK B-254

GRAB BARS 1-1/2" X 42"H

BOBRICK B-686

BOBRICK B-2706

A A

A A B

GG

JJ

RESTROOM DEMOLITION AND NEW WORK

ARCHITECTURE

A400

3/8" = 1'-0"

02' 2' 4' 6'

BOBRICK B-212COAT HOOKJ SURFACE MOUNTED

BOBRICK B-6806 SERIESGRAB BARS 1-1/2" X 36"

½

4'-3"

COORDINATE WITH NEW CONSTRUCTION

FOR NEW PLUMBING INSTALLATION.

REMOVE PORTIONS OF EXISTING WALL

ACCESSIBLE

SEE NOTE 7

SEE NOTE 5.

SCALE: 3/8" = 1' - 0 "A400

3 RESTROOM NEW RCP

SEE NOTE 6

REFER TO PLUMBING

(1 TO BE ADA)

TOILET FIXTURES.

INSTALL 2 NEW

TO PLUMBING

BE ADA). REFER

URINALS. (1 TO

PROVIDE 2 NEW

A401

SELECTION

FINISH AND COLOR

REFER TO A550 FOR

COUNTERTOP SSM-1.

ADA SINK

PROVIDE NEW

INSTALL NEW SINK

TOILET FIXTURE

TOILET FIXTURE

PROVIDE AND INSTALL NEW

REFER TO A500 FOR FINISH AND COLOR SCHEDULES

PATCH AND REPAIR WALL AFTER PLUMBING REPAIRS HAVE BEEN COMPLETED

AND COLOR SCHEDULES

SEE A500 FOR FINISH

PROVIDE NEW WALL

WW JOB NUMBER: 219075.00 FLL-D-TRACO-

DOOR TYPES, SCHEDULE AND DETAILS

FUNCTION DESCRIPTION

INSIDE LEVEROUTSIDE LEVER

LOCKED BY LOCKED BYUNLOCKED BY UNLOCKED BY

DESG.

DOOR HARDWARE DESCRIPTION

TURNING THE INSIDE LEVER, OR CANNOT BE LOCKED ALWAYS UNLOCKED

ROTATING THE OUTSIDE LEVER

CANNOT BE LOCKED ALWAYS UNLOCKEDP PASSAGE

FLUSH

NOT TO SCALEA505

2" 2"

HOLLOW METAL

DOOR AND FRAME TYPE

THE INSIDE PUSH BUTTON IS OUT

ROTATING THE OUTSIDE LEVER ONLY WHEN

ROTATING THE INSIDE LEVER, OR

PUSHING THE INSIDE BUTTON

CLOSING THE DOOR

ROTATING INSIDE LEVER, OR

ROTATING THE OUTSIDE SLOTTED BUTTON, OR

CANNOT BE LOCKED ALWAYS UNLOCKEDL PRIVACY

MFR. STD

MFR. STD

3 5/8" MET.

STUDS AT

1'-4" O.C.

3 5/8" 5/8"

BOARD

5/8" GYP.

1/2"

CER. TILE

FIBER BOARD

1/2" CEMENT

.F

.F

3 5/8"

H. MET.

3 5/8" MET.

STUDS AT

1'-4" O.C.

5/8"1/2"

FIBER BOARD

RATED CEMENT

1/2" FIRE

CER. TILE

4 3/4"

DOOR HEAD

A505 SCALE: 3" = 1'-0"

JAMB DET.

VCT

SILL

MARBLE

TILE

CERAMIC

4 SILL DETAIL

OR ROTATING THE INSIDE LEVER

TURNING THE KEY IN THE OUTSIDE LEVER, ALWAYS FIXED CANNOT BE UNLOCKED CANNOT BE LOCKED ALWAYS UNLOCKEDD STOREROOM

SCHEDULE

DOOR SCHEDULE HARDWARE SCHEDULE

ID

SECURITY DOOR MATRIX

DOOR SCHEDULE

V

-1

IK

LOCATION

DOOR # DOOR LOCATION AND NUMBER

SIGN

IM

STORAGE ROOM

E/G BUILDING

E/G BUILDING

3'-0"

3'-0"

7'-0"

7'-0"

1 3/4"

1 3/4"

STL

PAINT

A 1

A 1

3'-0" 7'-0" 1 3/4" PAINTSTL A STL PAINT1 LWOMEN'S ROOM 45

3'-0" 7'-0" 1 3/4" PAINTSTL A STL PAINT1 LACCESSIBLE ROOM 45

3'-0" 7'-0" 1 3/4" PAINTSTL A STL PAINT1 PMEN'S ROOM 45

REFER TRACO-F102 FOR DOOR LOCATION

REFER TRACO-F102 FOR DOOR LOCATION

COMMENTS

BASE BUILDING

EG02A

EG02B

E/G BULDING

GYPSUM BOARD

5/8" FIRE CODE

R1

TYPICAL PARTITION

1/2"

4 5/8"

5/8" GYP.

CEILING

SCHEDULED FINISH

(MIN. 20 GA.)

AT 1'-4" O.C.,

3 5/8" METAL STUDS

CERAMIC TILE

THIN SET

W/ 1-1/2" FLANGE

MIN. 20 GA.

METAL STUD TRACK

TILE BACKER

RATED CEMENT

1/2" FIRE

MINERAL WOOL

STRUCTURE

DECKING OR

UNDERSIDE OF

FIRE RATING:

STC RATING:

PLAN KEY

NONE

FIRE RATED TOILET PARTITION

3 5/8" 1/2"

SCALE:

DESIGN:

TEST NO.:

1 HOUR

UL U433

SCHEDULED BASE

FLOOR SLAB

FLOOR TILE

GYP. BOARD

5/8" FIRE CODE

SEALANT TO PROVIDE A 1HR RATED SEPARATION.

NOTE: WALL TO BE SEALED (TOP AND BOTTOM) WITH FIRE RATED

BOTH SIDES

FIRESTOP SEALANT ON

UL DESIGN: HW-D-0034

HEAD OF WALL

SEALANT, BOTH SIDES

SMOKE AND ACOUSTICAL

EXISTING PIPING TO BE REMOVED

SYMBOLS AND GENERAL NOTES

PLUMBING

P000

LEGEND

PLUMBING GENERAL NOTES

EXISTING PIPING AS SHOWN

HEAVY LINE

NEW WORK AS SHOWN

UNION

FLOW SWITCH

PIPING AND EXISTING PIPING

CONNECTING POINT BETWEEN NEW

EXISTING PIPING TO BE REMOVED

EXISTING PIPING TO REMAIN AND

INTERFACING POINT BETWEEN

RISE IN PIPING

DROP IN PIPING

LIGHT DASHED

PRESSURE GAUGE

DOMESTIC COLD WATER PIPING

JJS

DOMESTIC HOT WATER PIPING

SANITARY VENT PIPING

SANITARY SEWER PIPING

STORM SEWER PIPING

IN ACCORDANCE WITH SPECIFICATIONS.

TEST DRINKING WATER AFTER COMPLETION OF PLUMBING WORK 11.

DRAIN PIPING IN CEILINGS PER SPECIFICATIONS.

PROVIDE INSULATION FOR ALL DOMESTIC PIPING AND STORM 10.

DATA EQUIPMENT, OR ELECTRICAL PANELS.

DO NOT ROUTE PIPING ABOVE ELECTRICAL, COMMUNICATIONS,9.

LOCATIONS WHERE POSSIBILITY OF BACK-SIPHONAGE EXISTS.

PROVIDE APPROPRIATE BACKFLOW PREVENTING DEVICE IN8.

316.

OTHER DEVICE SHALL BE STAINLESS STEEL AISI 304 OR AISI

INSTALL ANY EXTERIOR EQUIPMENT, PIPE, CONDUIT, OR

STRUTS, ANCHOR BOLTS, ANGLES, ETC., USED TO SUPPORT OR

ALL HARDWARE, INCLUDING CLAMPS, BOLTS, NUTS, WASHERS,7.

AT 1/8" PER FOOT IN DIRECTION OF FLOW.

LESS THAN OR EQUAL TO 6" IN SIZE, SLOPE PIPING

FLOW, FOR DRAINAGE PIPING AT LEAST 3" IN SIZE AND

PIPING AT MINIMUM 1/4" PER FOOT IN DIRECTION OF

FOR DRAINAGE PIPING SMALLER THAN 3", SLOPE DRAINAGE6.

STRUCTURE.

ADDITIONAL EXPENSE TO THE GOVERNMENT. DO NOT CUT

TRANSITIONS TO COORDINATE WITH OTHER TRADES WITHOUT

STRUCTURAL, AND FIRE PROTECTION. MAKE OFFSETS AND

COORDINATE PIPING WITH DUCTWORK, ELECTRICAL,5.

OF EQUIPMENT.

WITH ELECTRICAL CONTRACT DOCUMENTS PRIOR TO INSTALLATION

ORDERING. PROVIDE WRITTEN VERIFICATION OF COORDINATION

EQUIPMENT WITH ELECTRICAL CONTRACT DOCUMENTS PRIOR TO

COORDINATE THE VOLTAGE AND PHASE OF EACH PIECE OF4.

PRIOR TO ANY PROCUREMENT, FABRICATION, OR INSTALLATION.

ACCESS, EGRESS, MAINTENANCE, AND REQUIRED CODE CLEARANCES

PROVIDED FOR REVIEW AND APPROVAL SHOWING SPACE FOR

MANUFACTURER EQUIPMENT AVAILABLE. SHOP DRAWINGS SHALL BE

EQUIPMENT SIZES SHOWN ARE BASED UPON TYPICAL3.

BE UNUSABLE UNDER THOSE CIRCUMSTANCES.

FABRICATION, OR MATERIAL/EQUIPMENT PURCHASE WHICH WOULD

FOR RESOLUTION BEFORE PROCEEDING WITH ANY CONSTRUCTION,

ATTENTION OF THE FAA CONTRACTING OFFICER REPRESENTATIVE

DRAWINGS. ANY SUCH DEVIATIONS SHALL BE BROUGHT TO THE

CONDITIONS WHICH DIFFER FROM THOSE SHOWN ON THESE

OF MATERIALS AND ASSEMBLIES. THERE MAY EXIST FIELD

VERIFY ALL DIMENSIONS PRIOR TO FABRICATION OR PURCHASE

FOR MANY OF THESE DRAWINGS. THE CONTRACTOR SHALL FIELD

FACILITY, AND PREVIOUS RECORD DRAWINGS FORM THE BASIS

THIS PROJECT IS A RENOVATION OF AN EXISTING2.

ORDERING OR INSTALLING ANY MATERIALS OR EQUIPMENT.

MATERIALS, AND TEMPERATURE AND PRESSURE RATINGS BEFORE

DRAWINGS. THE CONTRACTOR SHALL VERIFY ALL SIZES,

COORDINATE BETWEEN ALL TRADES PRIOR TO SUBMITTING SHOP

CAREFULLY REVIEW ALL THE CONTRACT DOCUMENTS AND

APPURTENANCES, AND CONTROLS. THE CONTRACTOR SHALL

SYSTEM BE PROVIDED WITH ALL NECESSARY EQUIPMENT,

FOR LOCATIONS). IT IS INTENDED THAT A COMPLETE PLUMBING

INTENDED TO SHOW ALL POSSIBLE CONDITIONS (DO NOT SCALE

THESE DRAWINGS ARE SCHEMATIC IN NATURE AND ARE NOT1.

D Plumb

FLL-D-TRACO-P000

File details come from the government source that posted it. Updated .