This document is a Preliminary Review of Proposed Action for a demolition project at the Naval Support Facility (NSF) Dahlgren in Virginia. The project includes demolishing six buildings: 116A Storage, 217 BOQ, 312 RDT&E Storage, 360 Screen Tower, 1312 Kennel, and 2014 Press Box/Score Board. The contractor will be responsible for removing the entire buildings, structures, and associated foundations and utilities. Hazardous materials such as lead and asbestos must be disposed of properly. The work is expected to take place from April to December 2024 and be completed during normal working hours. Several environmental and safety requirements are outlined, including bat and osprey surveys, lead and asbestos abatement procedures, and explosive safety precautions. The project falls under several NEPA categorical exclusions.
The related federal contract opportunity is an Invitation for Bid (IFB) for the FY24 Demolition Contract for the multiple buildings at NSF Dahlgren. The solicitation number is N4008024B5092 and it is being issued by the Department of the Navy Naval Facilities Engineering Command.
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Preliminary Review of Proposed Action NSASP Comprehensive Work Approval Planning (CWAP) - NSF Dahlgren
2/29/2012 Revision
Name of Applicant: James M. Johnson
Project Name: FY24 Facilities Demolition
Work Request / Service Ticket Number(s): 1799880
Phone Ext: 540-653-0218
Application Date: 12/27/2023
Contract Number:
Anticipated Dates of Work: Start: 4/1/2024 Completion: 12/1/2024
Outstanding Conditions for Obtaining a Final CWAP Approval
Tracking Number: 24-517P
Email: james.m.johnson941.civ@us.navy.mil
Organization Submitting Application: NAVFAC
Building Number(s): 116A, 217, 312, 360, 1312, 2014
Organization Funding Proposed Action: CNIC
1.All buildings scheduled for demolition shall be inspected by the NRM prior to beginning activities for the presence of bat colonies or hibernating bats (depending on the time of year). During the active colony season (01 March – 31 August), bat colonies shall not be removed/excluded without approval from Virginia Department of Wildlife Resources (VDWR) and work shall be conducted by a licensed nuisance wildlife control cooperator that is specifically authorized to conduct bat work. Demolition of buildings between 01 September and 28 February will require an inspection by the NRM to ensure hibernating bats are not present. A supplemental bat box of appropriate size shall be erected in close proximity to any building that is determined to be a bat roosting site and is scheduled for demolition prior to the beginning of demolition.
2.There is an osprey nest that is rebuilt and used each year at building 220 which is adjacent to building 217. If the nest is deemed active and
Natural Resources/Species Protection Conditions
Technical POC from Funding Org:
POC Phone Ext:
POC Email:
Conditions Identified for Work Execution (Continued on Pages 2 and 3)
Section A. Customer Information
Section B. Site Issues
Brenda Bottorf
540-842-5527 brendamarie.j.bottorf.civ@us.navy.mil
Cultural Resources - Buildings 312 and 360 are both historic and contributing elements of the Mainside Historic District. A Memorandum of Agreement has been developed to mitigate the adverse effects associated with their demolition that will require certain stipulations related to the demolitions. This MOA will need to be executed prior to the demolition of these two specific buildings. Coordinate with the Cultural Resources Program Manager prior to any work commencing on B. 312 or B. 360. Ground disturbance related to the demolitions should not impact cultural resources since the areas around the buildings are already heavily disturbed by construction and infrastructure. If suspected artifacts are discovered, stop work and contact the Cultural Resources Program Manager at 540-850-0698.
Checked Issues must be reviewed by the appropriate Resource Manager.
Work Restriction Area Review Date Work Restriction Area Review Date
Installation Restoration (IR) Site
Worker Safety
Surface Water/Wetlands/Floodplain
Eagle Nest Buffer
Archeological Area
Historic Building or District
Earth Disturbance
Stormwater Management
Air Emissions
Waste (Hazard and Non-Hazard)
Buried Utilities
Explosives Safety
Other Pipe Work
No Work Restriction Areas
1/10/2024
1/8/2024
Other Work Restriction Area 1/10/2024
Natural Resources/Species Protection 1/10/2024
Munitions Response (MRP) Site
Project Cost:
IMIG/RMIG Review Required?
Greater than $500,000
Yes NoReal Estate Package Required? Yes No
Fire Safety
Signature of Environmental Division Director or Designee:
1/17/2024IRT Review Date:
NOTE: This Preliminary Review of Proposed Action identifies those conditions that must be satisfied in order for the project to be granted a Final Work Approval Permit. This document does not authorize the customer to proceed with project execution (e.g., construction or demolition activities). Prior to project execution, the customer must apply for and obtain a Final Work Approval Permit. The Final Work Approval Permit will evaluate the final project design, ensure that all conditions of the Preliminary Review of Proposed Action have been met, and allow the customer to proceed with project execution.
Signature of Facilities Management Division Director or Designee:
2/29/2012 Revision contains eggs or young, then demolition of 217 would need to occur after the osprey nesting season to avoid impacting the nest efforts. If demo is slated to occur during the nesting season, then the nest can be removed as often as needed as long as there are no eggs and young present.
3.There has been historical evidence that ospreys nest on building 360 (Screen Tower) and similar time of year restrictions would need to be adhered to if a nest is established prior to demolition.
- Seed and straw disturbed areas. Seed mix shall not contain sericea lespedeza or Kentucky 31.
- If erosion control matting is needed, the use of 100% biodegradable material such as jute matting is required (non-biodegradable synthetic fiber erosion control matting is not permitted).
Earth Disturbance Conditions
[To be determined by review team.]
Stormwater Management Conditions
[To be determined by review team.]
Archeological Area Conditions
[To be determined by review team.]
Historic Building/District Conditions
Worker Safety Lead and Asbestos Contamination:
- Lead and asbestos surveys must be performed on the work area prior to start of work.
Asbestos surveys shall be performed by certified EPA AHERA Inspectors and lead surveys shall be performed by certified Lead Inspectors or Risk Assessors. Digital copies of laboratory analysis (asbestos/lead) from samples shall be forwarded to the NAVFAC South Potomac Lead Based Paint and Asbestos Program Manager (Paul Wenninger ), Dahlgren Environmental POC (Brendon Harp), and Safety Specialist (Jim Cole).
If lead and/or asbestos-containing materials are identified the following conditions apply:
- Federal and State requirements for proper management of asbestos for demolition and disposal, included in (VSWMR) 9VAC20-81-620, and the National Emission Standard for Hazardous Air Pollutants (NESHAP) regulations, 40 CFR Part 61 Subpart M, contain standards for managing asbestos-containing waste materials (ACM). Requirements include: completion of proper surveys prior to work, development of proper work plans, notifications to regulators, implementation of proper controls and worker protection, proper supervisor and work licensing, waste disposal, and record keeping.
- A digital copy of the work plan for asbestos abatement/removal shall be submitted to the NAVFAC South Potomac Lead Based Paint and Asbestos Program Manager (Attn: Paul Wenninger, paul.s.wenninger.civ@us.nay.mil, 301-885-6963), Safety Specialist (Attn: Jim Cole), and Dahlgren Environmental POC (Attn: Brendon Harp) for review and acceptance. NAVFAC South Potomac Lead Based Paint and Asbestos Program Manager will review reports, submit comments (if any), and provide final acceptance.
Upon acceptance of the work plan, contractor shall develop appropriate regulatory notifications. Submit a minimum of 15 working days prior to intended activity. Notification to VDEQ will be required if greater than 10 square feet (or 20 linear feet) of asbestos will be disturbed. Appropriate notification to both VDEQ and EPA shall be made if greater than 160 square feet, 260 linear feet or 35 cubic feet of asbestos will be disturbed.
- Contractor must notify the NAVFAC South Potomac Lead Based Paint and Asbestos Program Manager (Paul Wenninger ) and Dahlgren Environmental POC (Brendon Harp, 202-718-0655) prior to contacting or notifying VDEQ or EPA of any abatement activity.
- Records for the asbestos project must be maintained by the NAVFAC South Potomac Lead Based Paint and Asbestos Program Manager (Paul Wenninger ) for at least 6 years. Records must include the location and description of the project, the estimated amount of asbestos removed, start/completion dates, summary procedures used to comply with regulations, and disposal manifest with name/address of disposal site.
- Contractor must follow the Unified Facilities Guide Specifications, 02 82 16. 0020,“Engineering Control of Asbestos Containing Materials.”
Contractor's worker safety plan for asbestos abatement must be submitted to the NAVFAC South Potomac Lead Based Paint and Asbestos Program Manager (Attn: Paul Wenninger ) and Dahlgren Environmental POC (Attn: Brendon Harp, 202-718-0655) prior to project execution.
- Contractor must follow the Unified Facilities Guide Specifications, 02 83 13.0020 "Lead In Construction." Contractor’s worker safety plans for lead abatement must be submitted to the NAVFAC South Potomac Lead Based Paint and Asbestos Program Manager (Paul Wenninger ) prior to project execution.
- A digital final copy of the contractor's final lead and asbestos clearance and analysis report must be provided to the Supervisor of the Industrial Hygiene Office (Attn: Kenneth D. Waits, kenneth.d.waits4.civ@mail.mil, 301-744-4855) for review and records maintenance.
Waste (Hazard and Non-Hazard) Conditions
- Metal should be recovered from demolition for recycling to the maximum extent possible. Any recyclable metal with lead paint does not require removal of that lead paint prior to recycling. The lead paint may remain on the metal parts (stairs, window/door frames, metal siding, crane components, structural supports, etc.). Some of the remaining building materials contain lead. The entire waste stream for the demolition project will require TCLP testing for lead. If the entire waste stream TCLP's positive for lead, review the lead survey and remove all highly leachable lead components from the waste stream, then retest. Consult the NSF Dahlgren Environmental Office (Brendon Harp, 202-718-0655) for guidance.
Waste (Hazard and Non-Hazard) Conditions
- Bldg. 102 shall be downloaded of all explosives while facilities 312 and 360 are being demoed.
- All ammunition and explosives shall remain at rest inside of Magazine Area 2 while facility 1312 is being demoed.
- A UXO surface sweep shall be conducted by EOD or a Certified UXO Technician prior to the demolition of facility 360 (Main Range Tower) to ensure the area of work is clear of UXO/MEC.
- To avoid concurrent explosive operations, all work shall be coordinated and scheduled with Range Control (x540-653-8791) at least 5 days in advance. POC for scheduling is Michael White.
- There shall not be any ammunition/exploisve testing conducted on Main Range while facilities 312 and 360 are being demoed.
- Onsite Construction Workers shall contact Range Control (x540-653-8791) daily prior to the start of work to ensure explosive operations are not being conducted in the areas of facilities 312, 360, and 1312.
- Onsite Construction Workers shall adhere to range barricades and postings at all times, and shall only gain permission from Range Control prior to entering an area that has been barricaded.
- The likelihood of encountering UXO/MEC in the area of facilities 1312, 217, 2014, and 116A is very low. In the unlikely event a suspect explosive item is found, contact Range Control @540-653-8791 or Dispatch @ 540-653-8291/8095 for EOD support.
- If MEC is found for any of the facilities being demoed, then work will not recommence until follow-up actions by the NSWCDD/NSASP ESO have taken place.
- See attached ESR MEMO for any additional Explosive Safety comments/requirements.
Explosives Safety Conditions
2/29/2012 Revision
- Contractor must coordinate storage of any generated hazardous waste with the NSF Dahlgren Environmental Office. Offsite shipments of any hazardous waste remain the responsibility of the contractor and may only be signed by a government employee specifically authorized by the Installation Commanding Officer, coordinated by the NSF Dahlgren Environmental Office. Brendon Harp will be the primary point of contact for government signature of the asbestos shipping documents, please coordinate with Mr. Harp prior to the shipment date to arrange specifics.
Air
- For any project involving demolition and/or renovation activities, 40 CFR 61, Subpart M must be complied with to ensure asbestos does not become airborne.
Lead CWAP Language Worker Safety Lead Contamination:
- Lead surveys must be performed on the work area prior to start of work.
Lead surveys shall be performed by certified Lead Inspectors or Risk Assessors. Digital copies of laboratory analysis from samples shall be forwarded to the NAVFAC South Potomac Lead Based Paint and Asbestos Program Manager (Paul Wenninger), Dahlgren Environmental POC (Brendon Harp, 202-718-0655), and Safety Specialist (Jim Cole, 540-653-3281). If lead is identified the following conditions apply:
- Contractor must notify the NAVFAC South Potomac Lead Based Paint and Asbestos Program Manager (Paul Wenninger) and Dahlgren Environmental POC (Brendon Harp, 202-718-0655) prior to contacting or notifying VDEQ or EPA of any abatement activity.
- Contractor must follow the Unified Facilities Guide Specifications, 02 83 13.0020 "Lead In Construction." Contractor’s worker safety plans for lead abatement must be submitted to the NAVFAC South Potomac Lead Based Paint and Asbestos Program Manager (Paul Wenninger) prior to project execution.
- A digital final copy of the contractor's final lead clearance and analysis report must be provided to the Supervisor of the Industrial Hygiene Office (Attn: Kenneth D. Waits, kenneth.d.waits4.civ@mail.mil, 301-744-4855) for review and records maintenance.
Contact the GIS Analyst upon project completion so that the Navy's GIS geodatabase can be updated (ie. buildings, structures, utilities, etc) Note:
GIS Analyst position is currently vacant, Interim POC: Rob Hupp, 201-757-4863
Other Work Restrictions
- Utility Location Required - No later than 5 business days prior to project execution, project manager must submit a request to Miss Utility for phone line location and submit a utility location request to the service desk (540-653-8230) for Mark Shelton (540-653-2766) to perform base utility location.
- PDS & TPDS Required - If site markings are purple, no excavation without prior notification from NSWCDD 1041 (540-653-3142/6309).
Buried Utilities Conditions
2/29/2012 Revision
Involve operational changes that result in new waste, discharges, or emissions (e.g., air, water, solid waste, hazardous waste)?
Yes No
Involve other materials that require special handling and/or present physical or health hazards (e.g. toxic, flammable, corrosive, explosive)?
Yes No
Involve non-routine repairs, maintenance, or renovations to the interior of a building? Yes No
Involve outdoor or exterior work?
Mold
Require earthwork (digging or fill)? Yes No
Generate construction and demolition debris? Yes No
Involve contact with or handling of asbestos? Yes No
Involve contact with or handling of lead-based paint?
Generate waste other than construction or demolition debris (e.g., concrete wash-down water, decontamination wash-down water, removed soil, storage tanks, waste oil or fuel)?
Yes No
Add new impervious or semi-pervious surface (e.g., pavement, concrete, gravel) or repair/resurface existing roads and parking areas?
Yes No
Involve removing, breaking, or opening any piping, tubing, or hoses? Yes No
Demo of connecting utilities.
Project Description:
This scope of work includes the following: Demolish six buildings: 116A Storage; Building 217 BOQ; 312 RDT&E Storage; 360 Screen Tower;
1312 Kennel; and 2014 Press Box/ Score Board – Fire. The contractor will be responsible for removing entire buildings, structures, and associated foundations and surrounding utilities. There are expected hazardous material present such as lead and asbestos which shall be disposed of in accordance with all associated laws and regulations. Dust control will be required as necessary.
The work does not require Virginia Department of Environmental Quality review and approval for storm water management and erosion & sediment control. The contractor is expected to use heavy equipment and delivery trucks as part of this project. Hauling of demolished material on and off the project site and base is expected.
Work Schedule Restrictions: Work will need to be coordinated with NSWC for any impact to the buildings and surrounding areas. Work is expected to be completed during normal working hours with no weekend work needed.
Will this project:
Location Description:
See attached layouts.
Section C. Project Details
Yes No
Yes No
Unconfirmed
Unconfirmed
Involve placement of trailers, relocatable structures, or temporary structures? Yes No
Install new utilities or infrastructure (e.g., conduits, poles, fences, signs)? Yes No
Yes NoInvolve new outdoor testing or training operations?
Yes NoAdd more than 200 square feet of new impervious surface?
Yes NoInvolve any exposure to explosives operations or explosives storage locations?
Yes NoInvolve relocation of personnel?
Construct any new buildings or structures? Yes No
Demolish any existing buildings or structures? Yes No
116A, 217, 312, 360, 1312, 2014
2/29/2012 Revision
Section D. Interdisciplinary Review Team (IRT) Contact Information Joseph Trocchio Environmental Program Site Manager joseph.r.trocchio.civ@us.nav 202-718-0654 Bldg. 182
Chris Goddard Tank Management christopher.j.goddard 2.civ@ 240-298-4376 Bldg. 182
Jim Cole NAVFACWASH South Potomac Safety james.a.cole9.civ@us.navy. 540-653-3281 Bldg. 182
Thomas Valentour Air Program Manager thomas.m.valentour.civ@us. 540-842-1062 Bldg. 182
Marissa Fabey MWR Program Director marissa.g.fabey.naf@us.nav 540-284-4982 Bldg. 101
Brad Hatch NEPA Program Manager, Cultural Resource danny.b.hatch.civ@us.navy. 540-850-0698 Bldg. 182
Jordan Brobst Industrial Hygienist jordan.j.brobst.civ@health.mil 301-744-2624 Bldg. 1895 IH
Thomas Preston NSWC Explosive Safety Officer thomas.e.preston5.civ@us.n 540-653-4296 Bldg. 189
Michael Simulcik NSWC Safety and Environmental michael.j.simulcik.civ@us.na 540-653-3698 Bldg. 189
Travis Wray IR and MRP Sites travis.w.wray.civ@us.navy.mi 540-846-9946 Bldg. 182
Kevin Burgess Utilities Management kevin.d.burgess.civ@us.navy 540-653-7518 Bldg. 120M
Andrew Knott Range Safety Director andrew.t.knott2.civ@us.navy. 540-653-7460 Bldg. 152
Monte Loving PWD Constructability and Design arthur.v.loving.civ@us.navy. 202-894-3823 Bldg. 182
Brent O'Neil NDW Fire Protection brent.m.oneil.civ@us.navy.mi 540-653-1496 Bldg. 411
Thomas Gallagher NSWC Radiation Safety Director thomas.m.gallagher3.civ@us 540-653-8919 Bldg. 189
Elizabeth Shelby Facilities Planning elizabeth.shelby.civ@us.navy 202-769-8893 Bldg. 182
Travis Wray Natural Resources; Wetlands travis.w.wray.civ@us.navy.mi 540-846-9946 Bldg. 182
Brendon Harp Hazardous Materials and Hazardous Waste brendon.b.harp.civ@us.navy. 202-718-0655 Bldg. 182
Raymond Blake NSASP Explosive Safety Officer raymond.l.blake2.civ@us.nav 202-285-3828 Bldg. 101
Anthony Chinyere Asset Management Branch Head anthony.u.chinyere.civ@us.n 202-744-1525 Bldg. 182
Tiffany Bayliss-Overto NSASP Security tiffany.a.bayliss-overton.civ@ 301-744-1111 Bldg. D327 IH
James Stevens Electromagnetic Effects Chief Engineer james.c.stevens44.civ@us.n 540-653-0721 Bldg. 150
James R. Johnson NSASP Safety Officer james.r.johnson.civ@us.navy 540-653-6551 Bldg. 453
Michele Curtis NSWC EMCON Manager michele.f.curtis2.civ@us.nav 540-834-6745 Bldg. 189
Ashleigh Benson Stormwater Program Manager ashleigh.n.benson2.civ@us.n 540-842-0275 Bldg. 182
Vacant NSASP Energy Manager 540-653-8522 Bldg. 182
Adrian Mood Drinking Water/Sanitary Wastewater adrian.k.mood.civ@us.navy. 540-295-7146 Bldg. 182
Jake Walker High Power Microwave Branch Head jacob.w.walker.civ@us.navy. 540-653-8116 Bldg. 189
Vacant NSASP GIS Analyst 301-744-4135 Bldg. 503 IH
Ryan Hower Requirements Branch Head ryan.m.hower.civ@us.navy.m 540-653-7225 Bldg. 182
Kevin Burgess EICM Supervisor kevin.d.burgess.civ@us.navy 540-653-7518 Bldg. 120M
LT Curtis Weis Facilities Engineering & Acquisition Division curtis.t.weis.mil@us.navy.mil 540-653-8671 Bldg. 182
Monte Loving Acting. Project Management & Engineering arthur.v.loving.civ@us.navy. 202-894-3823 Bldg. 182
Christopher Doan N6 - Communications christopher.doan.civ@us.nav 540-376-2259 Bldg. 196 WNY
Brad Baumgardner N6 - Communications brad.w.baumgardner.civ@us. 540-653-6632 Bldg. 246
James Gilleland N6 - Communications james.a.gilleland.civ@us.nav 202-271-3662 Bldg. 196 WNY
Paul Wenninger NSASP Asbestos Program Manager paul.s.wenninger.civ@us.nav 540-842-3275 Bldg. 503 IH
Susan Williams Facilities Management Division Director susan.v.williams8.civ@us.na 202-905-9953 Bldg. 182
Brian Washburn NSASP Installation Security Director brian.c.washburn.civ@us.nav 540-653-6010 Bldg. 101
Michael Shea NSWC Installation Spectrum Manager (ISM) ichael.l.shea2.civ@us.navy. 540-653-6187 Bldg. 1700T
Rufino Adorno-Avila NSWC Alternate ISM/RADHAZ rufino.adornoavila.civ@us.na 540-653-6919 Bldg. 1700T
Record of NEPA Analysis
Project Title: FY24 Facilities Demolition Tracking Number: 24-517P
Work Request Number: 1799880Building Number(s): 116A, 217, 312, 360, 1312, 2014
NEPA Review:
No significant impacts to resources have been identified. All necessary work restrictions have been incorporated to the satisfaction of the appropriate Subject Matter Experts. The proposed action fits into one of the NEPA work categories below. All NEPA requirements have been met and the project falls under one or more of the CATEXs listed in the Work Categories Section. If this document accompanies a Final Work Approval Permit, work may start as long as all non-NEPA requirements have been addressed. If this document accompanies a Preliminary Review of Proposed Action, the customer must obtain a Final Work Approval Permit prior to starting work. ALL WORK MUST BE PERFORMED IN ACCORDANCE WITH THE CONDITIONS LISTED ON THE FINAL WORK APPROVAL PERMIT.
Based on the Preliminary Review of Proposed Action, this project does not appear to have any significant impacts to resources. However, further review and/or scope refinement is necessary to ensure that all NEPA requirements identified in the Preliminary Review have been met and to confirm that the final scope does not have any significant impacts to resources. The customer must obtain a Final Work Approval Permit prior to starting work.
Work Category:
Non-Construction Related Waste Generation and Disposal Method:
(4) Exterior Repairs (Surfaces) - Repairs, maintenance and renovation of roads, parking lots, sidewalks and improved/semi-improved grounds where the existing dimensions and contours remain the same. Routine repairs and maintenance of groundcover such as maintained lawn, seasonally mowed field or landscaping. (CX's (2), (8) and (35))
(3) Exterior Repairs (Structures) and New Construction - Repairs, maintenance and renovation of the exterior to non-historical structures or repairs and maintenance to historic structures that complies with the Secretary of Interior's Standards for the Treatment of Historic Properties.
Addition of small new equipment pads in support of existing infrastructure. Only minor changes to the exterior dimensions of the structure or its support structures such as sidewalks, ramps, equipment pads and awnings not exceeding 200 square feet of new impervious surface. Does not involve any new process air emissions, or non-sanitary water discharges. Utility related air emissions are addressed in a RONA and a permit to construct is not required. All wastes have been identified and will be disposed of in compliance with all applicable regulations. (CX's (2), (8), (23), (34) and (35))
(2) Exterior Repairs (Existing equipment and Utilities) - Repairs, maintenance and renovation of existing outside equipment. (CX's (2),(8),(15) and (36))
(1) Interior Work - Facility repairs, maintenance, and renovation;including equipment installation, repairs, maintenance, and removal; that is confined to the interior of existing structures. Does not involve any new process air emissions, or non-sanitary water discharges. Utility related air emissions are addressed in a RONA and a permit to construct is not required. All wastes have been identified and will be disposed of in compliance with all applicable regulations. (CX's (2), (8), (15), (17), (23), (35), (36), (37) and (41))
CATEX Applies:
CATEX Applicability Pending:
CATEX Does Not Apply:
Work Category Comments:
Project falls under CATEX 34: Demolition, disposal, or improvements involving buildings or structures when done in accordance with applicable regulations including those regulations applying to removal of asbestos, PCBs, and other hazardous materials;
(5) Other - Projects that fall within the scope of a CATEX, but which do not clearly fall within the Work Categories listed above. See Work Category Comments, below, or the attached report-style Record of CATEX (as applicable) for specific, applicable CATEXs.
Name of Applicant: James M. Johnson
Phone Ext: 540-653-0218
Email: james.m.johnson941.civ@us.navy.mil
Organization Submitting Application: NAVFAC
Technical POC from Funding Org:
POC Phone Ext:
POC Email:
Organization Funding Proposed Action: CNIC
Brenda Bottorf
540-842-5527 brendamarie.j.bottorf.civ@us.navy.mil
Potential impacts to resources have been identified. Work restrictions have not been satisfactorily addressed and/or none of the NEPA work categories below apply. An Environmental Assessment (EA) or Environmental Impact Statement (EIS) is required.
Work may not start until a Finding of No Significant Impact (for an EA) or a Record of Decision (for an EIS) has been completed and a Final Work Approval Permit has been issued.
Signature of Environmental Division Director or Designee:
Explosives Safety Requirements Memo NSF Dahlgren
To: NSWCDD ESO NSASP ESO
Subject: Explosives Safety Requirements for Project – 24-517 – FY24 Facilities Demolition
Prepared: 5 Jan 24
Ref: NAVSEA OP5, Vol. 1, Eighth Revision, Sec 8-1.2.1.b
(a) The proposed action will:
This scope of work includes the following: Demolish six buildings: 116A Storage; Building 217 BOQ; 312 RDT&E Storage; 360 Screen Tower; 1312 Kennel; and 2014 Press Box/ Score Board – Fire. The contractor will be responsible for removing entire buildings, structures, and associated foundations and surrounding utilities. There are expected hazardous material present such as lead and asbestos which shall be disposed of in accordance with all associated laws and regulations.
The work does not require Virginia Department of Environmental Quality review and approval for storm water management and erosion & sediment control. The contractor is expected to use heavy equipment and delivery trucks as part of this project. Hauling of demolished material on and off the project site and base is expected.
Work Schedule Restrictions: Work will need to be coordinated with NSWC for any impact to the buildings and surrounding areas.
Work is expected to be completed during normal working hours with no weekend work needed.
(b) An explosive site approval is not required for this proposed action because one or more of the following conditions apply:
Routine maintenance or repair work that is performed on a regular basis where workers are only present for a short time.
All explosives will be downloaded from the following buildings:
Bldg. 102 shall be downloaded of all explosives while facilities 312 and 360 are being demoed.
Amplifications & additional requirements are as follows:
All ammunition and explosives shall remain at rest inside of Magazine Area 2 while facility 1312 is being demoed.
(c) The project falls under OP5: 8-1.2.1.b. Explosive safety site approval is not normally required in the following instances:
Note: Good judgment must be used to determine when explosive safety site approval is necessary. Any situation that is questionable to the originating activity or a reviewing agent shall be forwarded to the next review level for further clarification.
(3) Maintenance and repair projects (other than routine) located outside the K18 intraline distance from any potential explosion site (PES), provided there is no increase in the number of personnel exposed to an explosives hazard after project completion.
Examples include road repairs and repaving; railroad track and bridge repairs; utilities repairs/replacement; roof repairs/replacement, etc.
(d ) If hot work is to be conducted in an explosives area the following conditions apply:
A hot work permit must be obtained from the NSF Dahlgren Fire Marshall and be in compliance with OP-5 Sec 4-1.15.
(e) The proposed action is on an RDT&E Range one or more of the following conditions apply.
(1) Controlled by an NSWCDD approved SOP if applicable.
A UXO sweep conducted by EOD or Certified UXO Technician.
Amplifications & additional requirements are as follows:
-A UXO surface sweep shall be conducted by EOD or a Certified UXO Technician prior to the demolition of facility 360 (Main Range Tower) to ensure the area of work is clear of UXO/MEC.
-To avoid concurrent explosive operations, all work shall be coordinated and scheduled with Range Control (x3-8791) at least 5 days in advance. POC for scheduling is Michael White.
-There shall not be any ammunition/exploisve testing conducted on Main Range while facilities 312 and 360 are being demoed.
-Onsite Construction Workers shall contact Range Control (x3-8791) daily prior to the start of work to ensure explosive operations are not being conducted in the areas of facilities 312, 360, and 1312.
D
D D
D D
D D
D D
D D
D
D
D D
D D
D D
D
DD
ROADS
1312 AUTUMN LANE
0 90 180 27045
Feet
Building
Canopy / Pavilion
Slab / Loading Dock
Other Structure
Paved Road
Unpaved Road
Sidewalk
Recreation Area
Open Storage
D Fence
ESQD Arcs
ILD
K18
IBD
110%
HPRF
Ranges
Eagle Protection Areas
Archaeological Sites
Wetlands
Surface Water
Stormwater Outfalls
Storm Sewer Inlets
1% - 100 Year
0.2% - 500 Year
Land Use Controls
NOTE: While performing work, if any underground utilities or item(s) are detected and are not shown on this plan, please detail an approximate location and give description of item(s) to the NAVFAC FMD GIS Analyst.
FOR OFFICIAL USE ONLY
Building Demo
1:1,000
NSF Dahlgren Work Approval Layout
24-517 Layout 1
FACILITY ID
INSTALLATION UIC
SPECIAL AREA
PROPERTY RECORD NO
MANPOWER BSO
COMMAND CLAIMANT RPA TYPE CODE
RPA NAME
12 DEC 2023
FACILITY NUMBER
REPORT DATE
NFA100000599783
N61151
200466
1312KENNEL
Building
NSA SOUTH POTOMAC
CNI
N00052 CNI B
CITY
COUNTRY
STATE
COUNTY
REGION
MAP GRID
DISPOSAL COMPLETION DATE
DISPOSAL METHOD CODE
DISPOSAL CONTRACT NO
CONSOLIDATED PROPERTY NO
DISPOSALLOCATION
USA
N00171 NDW
UNITED STATES
VIRGINIA
KING GEORGE
DAHLGREN
ACQ CONTRACT NO
ACQUISITION DATE
GOVERNMENT COST
ESTATE CODE
LAND CCN
ACQUISITION
UNKNOWN
01 NOV 1969
$ 27,535.15
13 OTHER MIL
WIDTH
HEIGHT
AREA
FLOOR ABOVE GROUND QUANTITY
LENGTH
MEASUREMENTS
6.00
8.00
144.00
24.00
SF
CONSTRUCTION TYPE
FACILITY BUILT DATE
CONSTRUCTION
PERM
01 JUL 1969
PERMANENT FACILITY
1.83
2.44
13.38
7.32
M2
MAINTENANCE
PREPONDERANT USER N61151 NSA SOUTH POTOMAC
PREDOMINANT CAT CODE 73076 MWD KENNEL
MNT FUND SOURCE CODE A O&M, N
MNT RESPONSIBILITY UIC N61151 NSA SOUTH POTOMAC
CURRENT PRV
PRV AT EOY
CLASS
AREA UM
ENGLISH METRIC
$ 103,576
$ 103,576
PROPERTY RECORD2
G9
PRIME FAC CODE 1445 WORKING ANIMAL SUPPORT BUILDING
FAMILY HOUSING INDICATOR N
109673REAL PROPERTY UNIQUE ID
OPERATIONAL STATUS CLSD
STREET ADDRESS
EXCESS DECLARATION DATE
SURPLUS DETERMINATION DATE
INTEREST TYPE
18226 AUTUMN LN
FEE
FLOOR BELOW GROUND QUANTITY 0
U.S. Government owned property
HISTORIC STATUS CODE
MDI
NEV
CONDITION RATING
CONFIGURATION RATING
DATE
DATE
DATE
08 MAR 2018
03 MAR 2015
Closed
Not yet Evaluated
HISTORIC STATUS DATE
READINESS FACTORS
ASSET EVALUATION DATE 15 OCT 2021
STREET TYPE CODE LN
STREET DIRECTION CODE
FINANCIAL REPORTING ORG 06 NAVY ACTIVE
DISPOSAL PROGRAMMED FY
18SUH2274345413
BU
MGRS LOCATION
MGRS LOCATION METHOD
0 04 JUL 2018FACILITY CONDITION INDEX DATE
07 OCT 2022
JEFF SOWELL
Y
Y
Y
Y
FIAR E AND C
VERIFICATION DATE
VERIFIED BY
DISPOSAL REASON
REMARKS
INVENTORY REQUIRED ASSET EXISTS
TAGGED DE VALIDATED
NSA SOUTH POTOMACNEIGHBORHOOD NAME
01 JAN 1991COST ID 1 PLACED IN SERVICE DATE
RPA NAME
12 DEC 2023
FACILITY NUMBER
REPORT DATE
1312KENNEL
UTILIZATION
CLASS
USER ACTIVITY N61151
FAC USE CCN 73076 MWD KENNEL
NSA SOUTH POTOMAC
KENNELFACILITY USE
PRIMARY UM
DOD UM
DOD FAC
SF
SF
1445SET BACK VALUE
MAX VALUE
3,800.00
23,000.00
ADEQUATE
SUBSTANDARD
INADEQUATE 144.00 13.38
AREA OTHER ALTERNATE
English Metric English Metric English Metric
144.00
SF M2
13.38TOTAL
UNIT OF MEASURE
ASSET EVAL COMPLETED 8 FEB 2013
AE COMPLETED 10/8/14
OPERATIONAL STATUS OF THE FACILITY SHOULD HAVE BEEN CHANGED TO NONFUNCTIONAL. FACILITY IS
ABANDONED.
McKinney Act Exemption 7JUN2019 attached
AE UPDATED - PLANNED FOR DEMOLITION
22 MAR 2013
03 MAR 2015
15 JUN 2015
10 JUN 2019
22 NOV 2021
NOTES
PROPERTY RECORD2
DOCUMENTS
FP
FP
FP
FP
FP
FP
FP
FP
DAHLGREN SPACE PLAN BLDG 1312.PDF
DAHLGREN SPACE PLAN BLDG
1312_01_FP(2).DWG
DAHLGREN SPACE PLAN BLDG
1312(2).PDF
DAHLGREN SPACE PLAN BLDG
1312_01_FP.DWG
DAHLGREN SPACE PLAN BLDG 1312.PDF
DAHLGREN SPACE PLAN BLDG
1312_01_FP(2).DWG
DAHLGREN SPACE PLAN BLDG
1312(2).PDF
DAHLGREN SPACE PLAN BLDG
1312_01_FP.DWG
FILE NAME DESCRIPTION
UTILIZATION ID 1
DEFICIENCIES
CONFIGURATION
DOCUMENT UPLOAD DATE
28-MAR-22
28-MAR-22
28-MAR-22
28-MAR-22
25-MAR-22
25-MAR-22
25-MAR-22
25-MAR-22
SUSTAINMENT FUND SOURCE
SUSTAINMENT ORGANIZATION
OPERATIONAL FUND SOURCE
OPERATIONAL FUNDING ORG
Operation and Maintenance, Navy
NAVY ACTIVE
Operation and Maintenance, Navy
NAVY ACTIVE
X2
Y4
Z5
CONFIGURATION CODE DEFINITION
INADEQUATE
INADEQUATE
INADEQUATE
FUNCTIONAL OR SPACE CRITERIA - BUILDING INTERIOR CONFIGURATION
LOCATION OR SITING CRITERIA - EXPLOSIVE SAFETY CLEARANCE
INADEQUATE CAPACITY/COVERAGE - FACILITY COMPONENTS
DESCRIPTION
DESCRIPTION
DESCRIPTION
FUNCTIONAL OR SPACE CRITERIA - BUILDING INTERIOR CONFIGURATION
LOCATION OR SITING CRITERIA - EXPLOSIVE SAFETY DISTANCE
INADEQUATE CAPACITY/ COVERAGE - FACILITY COMPONENTS
ASSET EVALUATION DATE 15 OCT 2021
SIZE CERT CODE A
https://nfads.navfac.navy.mil/app/document/download/1434739 https://nfads.navfac.navy.mil/app/document/download/1435652 https://nfads.navfac.navy.mil/app/document/download/1435618 https://nfads.navfac.navy.mil/app/document/download/1434732 https://nfads.navfac.navy.mil/app/document/download/1435625 https://nfads.navfac.navy.mil/app/document/download/1435646 https://nfads.navfac.navy.mil/app/document/download/1434760 https://nfads.navfac.navy.mil/app/document/download/1434766
12 DEC 2023
FACILITY NUMBER
REPORT DATE
1312KENNEL
CLASS PROPERTY RECORD2
DOCUMENTS
AE FY22
Profile Photo
7JUN2019
OPERATIONAL STATUS CODE CHANGES 6/15/15
OPERATIONAL STATUS CODE EMAIL 6/15/15
1312 AE 10/8/14
1312 PHOTO
B1312_AE_2022.pdf
N61151-1312-Profile.jpg
McKinney Exemption 1312.pdf
Copy of Oper Status Code Changes.xlsx
Operational Staus Code Changes EMAIL.pdf
B1312_AE.xlsx
1312.JPG
FILE NAME DESCRIPTION DOCUMENT UPLOAD DATE
22-NOV-21
19-MAR-21
10-JUN-19
15-JUN-15
15-JUN-15
03-MAR-15
16-JUL-09
ASSET EVALUATION DATE 15 OCT 2021
https://nfads.navfac.navy.mil/app/document/download/484926 https://nfads.navfac.navy.mil/app/document/download/983474 https://nfads.navfac.navy.mil/app/document/download/505380 https://nfads.navfac.navy.mil/app/document/download/1291008 https://nfads.navfac.navy.mil/app/document/download/1391376 https://nfads.navfac.navy.mil/app/document/download/505378 https://nfads.navfac.navy.mil/app/document/download/51527
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
PARKAR
PARKAR
ROADS
933OS
PARKAR
ROADS
PARKAR
PARKAR
ROADS
PARKAR
PARKAR
ROADS
ROADS
PARKAR
PARKAR
PARKAR
SUB4BL
H O
LD
E
N R
O A
D
FUZE ROAD
0 90 180 27045
Feet
Building
Canopy / Pavilion
Slab / Loading Dock
Other Structure
Paved Road
Unpaved Road
Sidewalk
Recreation Area
Open Storage
D Fence
ESQD Arcs
ILD
K18
IBD
110%
HPRF
Ranges
Eagle Protection Areas
Archaeological Sites
Wetlands
Surface Water
Stormwater Outfalls
Storm Sewer Inlets
1% - 100 Year
0.2% - 500 Year
Land Use Controls
NOTE: While performing work, if any underground utilities or item(s) are detected and are not shown on this plan, please detail an approximate location and give description of item(s) to the NAVFAC FMD GIS Analyst.
FOR OFFICIAL USE ONLY
Building Demo
1:1,000
NSF Dahlgren Work Approval Layout
Layout 2
INSTALLATION UIC
SPECIAL AREA
PROPERTY RECORD NO
MANPOWER BSO
COMMAND CLAIMANT RPA TYPE CODE
RPA NAME
12 DEC 2023
FACILITY NUMBER
REPORT DATE
NFA100000595965
N61151
200169
312RDT&E STORAGE
Building
NSA SOUTH POTOMAC
NSEASYSCOM
N00052 CNI B
CITY
COUNTRY
STATE
COUNTY
REGION
MAP GRID
DISPOSAL COMPLETION DATE
DISPOSAL METHOD CODE
DISPOSAL CONTRACT NO
CONSOLIDATED PROPERTY NO
DISPOSALLOCATION
USA
N00171 NDW
UNITED STATES
VIRGINIA
KING GEORGE
DAHLGREN
ACQ CONTRACT NO
ACQUISITION DATE
GOVERNMENT COST
ESTATE CODE
LAND CCN
ACQUISITION
UNKNOWN
01 JUN 1943
$ 66,810.28
13 OTHER MIL
WIDTH
HEIGHT
AREA
FLOOR ABOVE GROUND QUANTITY
LENGTH
MEASUREMENTS
21.00
13.00
814.00
38.75
SF
CONSTRUCTION TYPE
FACILITY BUILT DATE
CONSTRUCTION
SEMI
01 JUL 1943
SEMI-PERMANENT FACILITY
6.40
3.96
75.62
11.81
M2
MAINTENANCE
PREPONDERANT USER N00178 NAVSURFWARCENDIV D VA NWCF
PREDOMINANT CAT CODE 31915 RDT&E STORAGE
MNT FUND SOURCE CODE K NWCF
MNT RESPONSIBILITY UIC N00178 NAVSURFWARCENDIV D VA NWCF
CURRENT PRV
PRV AT EOY
CLASS
AREA UM
ENGLISH METRIC
$ 251,313
$ 251,313
PROPERTY RECORD2
H14
PRIME FAC CODE 3191 MISCELLANEOUS ITEM AND EQUIPMENT
FAMILY HOUSING INDICATOR N
111457REAL PROPERTY UNIQUE ID
OPERATIONAL STATUS NONF
STREET ADDRESS
EXCESS DECLARATION DATE
SURPLUS DETERMINATION DATE
INTEREST TYPE
18286 HOLDEN RD
FEE
FLOOR BELOW GROUND QUANTITY 0
U.S. Government owned property
HISTORIC STATUS CODE
MDI
ELPA
CONDITION RATING
CONFIGURATION RATING
DATE
DATE
DATE
20 OCT 2023
13 JUN 2009
Non-functional
Eligible for the purposes of a Program Alternative
HISTORIC STATUS DATE 22 SEP 2008
READINESS FACTORS
ASSET EVALUATION DATE 27 APR 2018
STREET TYPE CODE RD
STREET DIRECTION CODE
FINANCIAL REPORTING ORG 06 NAVY ACTIVE
DISPOSAL PROGRAMMED FY
18SUH2276743960
BU
MGRS LOCATION
MGRS LOCATION METHOD
80 20 OCT 2023FACILITY CONDITION INDEX DATE
12 OCT 2022
JEFF SOWELL
Y
N
Y
Y
FIAR E AND C
VERIFICATION DATE
VERIFIED BY
DISPOSAL REASON
REMARKS
INVENTORY REQUIRED ASSET EXISTS
TAGGED DE VALIDATED
12 DEC 2023
FACILITY NUMBER
REPORT DATE
312RDT&E STORAGE
UTILIZATION
CLASS
USER ACTIVITY N00178
FAC USE CCN 31915 RDT&E STORAGE
NAVSURFWARCENDIV D VA NWCF
RDT&E STORAGE LABFACILITY USE
PRIMARY UM
DOD UM
DOD FAC
SF
SF
3191SET BACK VALUE
MAX VALUE
10,000.00
170,000.00
ADEQUATE
SUBSTANDARD
INADEQUATE 814.00 75.62
AREA OTHER ALTERNATE
English Metric English Metric English Metric
814.00
SF M2
75.62TOTAL
UNIT OF MEASURE
ASSET EVAL COMPLETED 10JUN2014
AE COMPLETED 10/16/15
ASSET EVALUATION 27 APR 2018 RECEIVED FOR UPLOAD 5 JUNE 2018
27 AUG 2014
01 DEC 2015
06 JUN 2018
NOTES
PROPERTY RECORD2
DOCUMENTS
Profile Photo
AE 27 APR 2018
312 AE 10/16/15
AE COMPLETED 10JUN2014
312 PHOTO
N61151-312-Profile.jpg
312 AE Package.pdf
B312_AE.xlsx
B312_AE.xlsx
312.JPG
FILE NAME DESCRIPTION
UTILIZATION ID 1
DEFICIENCIES
CONFIGURATION
DOCUMENT UPLOAD DATE
19-MAR-21
06-JUN-18
01-DEC-15
27-AUG-14
12-JUN-09
SUSTAINMENT FUND SOURCE
SUSTAINMENT ORGANIZATION
OPERATIONAL FUND SOURCE
OPERATIONAL FUNDING ORG
Department of Defense Working Capital Funds
NAVY ACTIVE
Department of Defense Working Capital Funds
NAVY ACTIVE
X3
Z4
Z5
CONFIGURATION CODE DEFINITION
INADEQUATE
INADEQUATE
INADEQUATE
FUNCTIONAL OR SPACE CRITERIA - BUILDING OR STRUCTURE
INADEQUATE CAPACITY/COVERAGE - STRUCTURAL/FOUNDATIONS
INADEQUATE CAPACITY/COVERAGE - FACILITY COMPONENTS
DESCRIPTION
DESCRIPTION
DESCRIPTION
FUNCTIONAL OR SPACE CRITERIA - BUILDING OR STRUCTURE
INADEQUATE CAPACITY/ COVERAGE - STRUCTURAL/FOUNDATIONS
INADEQUATE CAPACITY/ COVERAGE - FACILITY COMPONENTS
ASSET EVALUATION DATE 27 APR 2018
SIZE CERT CODE A
https://nfads.navfac.navy.mil/app/document/download/1291149 https://nfads.navfac.navy.mil/app/document/download/48079 https://nfads.navfac.navy.mil/app/document/download/537492 https://nfads.navfac.navy.mil/app/document/download/820374 https://nfads.navfac.navy.mil/app/document/download/456197
12 DEC 2023
FACILITY NUMBER
REPORT DATE
312RDT&E STORAGE
CLASS PROPERTY RECORD2
ASSET EVALUATION DATE 27 APR 2018
D
D
D
D
D
D
D
PARKAR
ROADS
ROADS
ROADSH
ROADS
PARKAR
PARKAR
222C
W E
L S
H R
O A
D
0 130 260 39065
Feet
Building
Canopy / Pavilion
Slab / Loading Dock
Other Structure
Paved Road
Unpaved Road
Sidewalk
Recreation Area
Open Storage
D Fence
ESQD Arcs
ILD
K18
IBD
110%
HPRF
Ranges
Eagle Protection Areas
Archaeological Sites
Wetlands
Surface Water
Stormwater Outfalls
Storm Sewer Inlets
1% - 100 Year
0.2% - 500 Year
Land Use Controls
NOTE: While performing work, if any underground utilities or item(s) are detected and are not shown on this plan, please detail an approximate location and give description of item(s) to the NAVFAC FMD GIS Analyst.
FOR OFFICIAL USE ONLY
Building Demo
1:1,500
NSF Dahlgren Work Approval Layout
Layout 3
INSTALLATION UIC
SPECIAL AREA
PROPERTY RECORD NO
MANPOWER BSO
COMMAND CLAIMANT RPA TYPE CODE
RPA NAME
12 DEC 2023
FACILITY NUMBER
REPORT DATE
NFA100000596081
N61151
200177
217BOQ
Building
NSA SOUTH POTOMAC
CNI
N00052 CNI B
CITY
COUNTRY
STATE
COUNTY
REGION
MAP GRID
DISPOSAL COMPLETION DATE
DISPOSAL METHOD CODE
DISPOSAL CONTRACT NO
CONSOLIDATED PROPERTY NO
DISPOSALLOCATION
USA
N00171 NDW
UNITED STATES
VIRGINIA
KING GEORGE
DAHLGREN
DEMO Demolition
ACQ CONTRACT NO
ACQUISITION DATE
GOVERNMENT COST
ESTATE CODE
LAND CCN
ACQUISITION
NOY4134
01 JUN 1942
$ 1,702,603.15
13 OTHER MIL
WIDTH
HEIGHT
AREA
FLOOR ABOVE GROUND QUANTITY
LENGTH
MEASUREMENTS
139.00
31.00
19,932.00
181.00
SF
CONSTRUCTION TYPE
FACILITY BUILT DATE
CONSTRUCTION
SEMI
01 JUL 1942
SEMI-PERMANENT FACILITY
42.37
9.45
1,851.74
55.17
M2
MAINTENANCE
PREPONDERANT USER N61151 NSA SOUTH POTOMAC
PREDOMINANT CAT CODE 74094 TDY OFFICIAL LODGING
MNT FUND SOURCE CODE A O&M, N
MNT RESPONSIBILITY UIC N61151 NSA SOUTH POTOMAC
CURRENT PRV
PRV AT EOY
CLASS
AREA UM
ENGLISH METRIC
$ 10,193,064
$ 10,193,064
PROPERTY RECORD2
E15
PRIME FAC CODE 7441 TRANSIENT LODGING
FAMILY HOUSING INDICATOR N
111387REAL PROPERTY UNIQUE ID
OPERATIONAL STATUS EXCS
STREET ADDRESS
EXCESS DECLARATION DATE
SURPLUS DETERMINATION DATE
07 JUN 2019
INTEREST TYPE
6314 WELSH RD
FEE
FLOOR BELOW GROUND QUANTITY 0
U.S. Government owned property
HISTORIC STATUS CODE
MDI
NCE
CONDITION RATING
CONFIGURATION RATING
DATE
DATE
DATE
20 OCT 2023
17 DEC 2014
Excess - Property not required to meet the ag
Non-Contributing Element of NHL/NRL/NRE District.
HISTORIC STATUS DATE 22 SEP 2008
READINESS FACTORS
ASSET EVALUATION DATE 15 OCT 2021
STREET TYPE CODE RD
STREET DIRECTION CODE
FINANCIAL REPORTING ORG 06 NAVY ACTIVE
2020DISPOSAL PROGRAMMED FY
18SUH2197643572
BU
MGRS LOCATION
MGRS LOCATION METHOD
89 20 OCT 2023FACILITY CONDITION INDEX DATE
05 OCT 2022
JEFF SOWELL
Y
Y
Y
Y
FIAR E AND C
VERIFICATION DATE
VERIFIED BY
DISPOSAL REASON
REMARKS
INVENTORY REQUIRED ASSET EXISTS
TAGGED DE VALIDATED
23 OCT 1979COST ID 1 PLACED IN SERVICE DATE
12 DEC 2023
FACILITY NUMBER
REPORT DATE
217BOQ
UTILIZATION
CLASS
USER ACTIVITY N61151
FAC USE CCN 74094 TDY OFFICIAL LODGING
NSA SOUTH POTOMAC
BOQ TRANSIENT W3-W5&03&UPFACILITY USE
PRIMARY UM
DOD UM
DOD FAC
SF
SF
7441SET BACK VALUE
MAX VALUE
23,000.00
152,000.00
ADEQUATE
SUBSTANDARD
INADEQUATE 19,932.00 1,851.74 29.00 29.00
AREA OTHER ALTERNATE
English Metric English Metric English Metric
19,932.00
SF M2
1,851.74 29.00
PN PN
29.00TOTAL
UNIT OF MEASURE
PROPERTY RECORD2
UTILIZATION ID 4
DEFICIENCIES
CONFIGURATION
SUSTAINMENT FUND SOURCE
SUSTAINMENT ORGANIZATION
OPERATIONAL FUND SOURCE
OPERATIONAL FUNDING ORG
Operation and Maintenance, Navy
NAVY ACTIVE
Operation and Maintenance, Navy
NAVY ACTIVE
W1
W5
W6
W7
W9
X2
X3
Z5
CONFIGURATION CODE DEFINITION
INADEQUATE
INADEQUATE
INADEQUATE
INADEQUATE
INADEQUATE
INADEQUATE
INADEQUATE
INADEQUATE
CODE COMPLIANCE - OSHA
CODE COMPLIANCE - FIRE CODES
CODE COMPLIANCE - ENVIRONMENTAL HAZARD
CODE COMPLIANCE - ATFP
CODE COMPLIANCE - BUILDING CODE
FUNCTIONAL OR SPACE CRITERIA - BUILDING INTERIOR CONFIGURATION
FUNCTIONAL OR SPACE CRITERIA - BUILDING OR STRUCTURE
INADEQUATE CAPACITY/COVERAGE - FACILITY COMPONENTS
DESCRIPTION
DESCRIPTION
DESCRIPTION
DESCRIPTION
DESCRIPTION
DESCRIPTION
DESCRIPTION
DESCRIPTION
OSHA - DOES NOT MEET OSHA CODES FOR OCCUPANCY.
FIRE CODES - FACILITY DOES NOT MEET CURRENT FIRE CODES FOR COVERAGE
ENVIRONMENTAL HAZARDS - INTERIOR OF BUILDING WOULD REQUIRE EXTENSIVE MOLD REMEDIATION TO BE HABITABLE AGAIN
ATFP - DOES NOT MEET ATFP SETBACKS FROM ROAD OR PARKING LOT
BUILDING CODE - DOES NOT MEET CODE FOR ACCESS, EMERGENCY EGGRESS, MOLD OR STRUCTURE
INTERIOR CONFIGURATION - DOES NOT MEET MARKET STANDARDS FOR BOQ
BUILDING OR STRUCTURE - BUILDING HAS BEEN VACANT FOR NEARLY 4 YEARS. STRUCTURE HAS SIGNIFICANTLY DEGRADED
DUE TO LACK OF USE
FACILITY COMPONENTS - INTERIOR OF FACILITY HAS HAD LIMITED MAINTENANCE DUE TO INACTIVITY.
ASSET EVALUATION DATE 15 OCT 2021
SIZE CERT CODE A
12 DEC 2023
FACILITY NUMBER
REPORT DATE
217BOQ
CLASS
ONYX AE COMPLETED 5AUG2009
ASSET EVAL COMPLETED 16DEC2014
FACILITY OPERATIONAL STATUS IS NONFUNCTIONAL. AE SHOWED THE FACILITY AS VACANT AND UNUSABLE.
McKinney Act Exemption 7JUN2019 attached
ASSET IS RECOMMENDED FOR DEMOLITION; SHPO EXEMPTED.
AE UPDATED - PLANNED FOR DEMOLITION
28 AUG 2009
17 DEC 2014
15 JUN 2015
10 JUN 2019
30 AUG 2019
22 NOV 2021
NOTES
PROPERTY RECORD2
DOCUMENTS
FP
FP
FP
FP
FP
FP
FP
FP
FP
AE FY22
Profile Photo
7JUN2019
OPERATIONAL STATUS CODE EMAIL 6/15/15
OPERATIONAL STATUS CODE CHANGES 6/15/15
217 AE 16DEC2014
217 PHOTO
DAHLGREN SPACE PLAN BLDG 217.PDF
DAHLGREN SPACE PLAN BLDG
217_02_FP.DWG
DAHLGREN SPACE PLAN BLDG
217_01_FP.DWG
DAHLGREN SPACE PLAN BLDG 217.PDF
DAHLGREN SPACE PLAN BLDG
217_02_FP.DWG
DAHLGREN SPACE PLAN BLDG
217_01_FP.DWG
DAHLGREN SPACE PLAN BLDG 217.PDF
DAHLGREN SPACE PLAN BLDG
217_02_FP.DWG
DAHLGREN SPACE PLAN BLDG
217_01_FP.DWG
B217_AE_2022.pdf
N61151-217-Profile.jpg
McKinney Exemption 217.pdf
Operational Staus Code Changes EMAIL.pdf
Copy of Oper Status Code Changes.xlsx
AE Worksheet - Bldg 217.xlsx
217.JPG
FILE NAME DESCRIPTION DOCUMENT UPLOAD DATE
28-MAR-22
28-MAR-22
28-MAR-22
28-MAR-22
28-MAR-22
28-MAR-22
28-MAR-22
28-MAR-22
28-MAR-22
22-NOV-21
19-MAR-21
10-JUN-19
15-JUN-15
15-JUN-15
17-DEC-14
12-JUN-09
FACILITY COMPONENTS - INTERIOR OF FACILITY HAS HAD LIMITED MAINTENANCE DUE TO INACTIVITY.
ASSET EVALUATION DATE 15 OCT 2021
https://nfads.navfac.navy.mil/app/document/download/505378 https://nfads.navfac.navy.mil/app/document/download/1435883 https://nfads.navfac.navy.mil/app/document/download/1435786 https://nfads.navfac.navy.mil/app/document/download/48020 https://nfads.navfac.navy.mil/app/document/download/505377 https://nfads.navfac.navy.mil/app/document/download/1435872 https://nfads.navfac.navy.mil/app/document/download/1435861 https://nfads.navfac.navy.mil/app/document/download/1435839 https://nfads.navfac.navy.mil/app/document/download/474589 https://nfads.navfac.navy.mil/app/document/download/1435817 https://nfads.navfac.navy.mil/app/document/download/1435798 https://nfads.navfac.navy.mil/app/document/download/1391250 https://nfads.navfac.navy.mil/app/document/download/1435828 https://nfads.navfac.navy.mil/app/document/download/983429 https://nfads.navfac.navy.mil/app/document/download/1291209 https://nfads.navfac.navy.mil/app/document/download/1435775
D D D D D D D
D
D D
D
D
D
D
D
D
D
D
D
D
DDDDDD
D
D D
D D
D D D
PARKAR
PARKAR
ROADS ROADS
PARKAR
DAL000025
DAL000028DAL000026
G R
E E
N S
L A
D E
R O
A D
0 90 180 27045
Feet
Building
Canopy / Pavilion
Slab / Loading Dock
Other Structure
Paved Road
Unpaved Road
Sidewalk
Recreation Area
Open Storage
D Fence
ESQD Arcs
ILD
K18
IBD
110%
HPRF
Ranges
Eagle Protection Areas
Archaeological Sites
Wetlands
Surface Water
Stormwater Outfalls
Storm Sewer Inlets
1% - 100 Year
0.2% - 500 Year
Land Use Controls
NOTE: While performing work, if any underground utilities or item(s) are detected and are not shown on this plan, please detail an approximate location and give description of item(s) to the NAVFAC FMD GIS Analyst.
FOR OFFICIAL USE ONLY
Building Demo
1:1,000
NSF Dahlgren Work Approval Layout
Layout 4
INSTALLATION UIC
SPECIAL AREA
PROPERTY RECORD NO
MANPOWER BSO
COMMAND CLAIMANT RPA TYPE CODE
RPA NAME
12 DEC 2023
FACILITY NUMBER
REPORT DATE
NFA100000601351
N61151
200580
2014PRESS BOX/SCORE BOARD -FIRE
Structure
NSA SOUTH POTOMAC
CNI
N00052 CNI S
CITY
COUNTRY
STATE
COUNTY
REGION
MAP GRID
DISPOSAL COMPLETION DATE
DISPOSAL METHOD CODE
DISPOSAL CONTRACT NO
CONSOLIDATED PROPERTY NO
DISPOSALLOCATION
USA
N00171 NDW
UNITED STATES
VIRGINIA
KING GEORGE
DAHLGREN
ACQ CONTRACT NO
ACQUISITION DATE
GOVERNMENT COST
ESTATE CODE
LAND CCN
ACQUISITION
3C77XWM01
28 APR 1993
$ 9,855.39
13 OTHER MIL
WIDTH
HEIGHT
AREA
FLOOR ABOVE GROUND QUANTITY
LENGTH
MEASUREMENTS
12.00
20.00
192.00
16.00
SF
CONSTRUCTION TYPE
FACILITY BUILT DATE
CONSTRUCTION
SEMI
01 JUL 1993
SEMI-PERMANENT FACILITY
3.66
6.10
17.84
4.88
M2
MAINTENANCE
PREPONDERANT USER N61151 NSA SOUTH POTOMAC
PREDOMINANT CAT CODE 74078 RECREATION PAVILION
MNT FUND SOURCE CODE A O&M, N
MNT RESPONSIBILITY UIC N61151 NSA SOUTH POTOMAC
CURRENT PRV
PRV AT EOY
CLASS
AREA UM
ENGLISH METRIC
$ 36,007
$ 36,007
PROPERTY RECORD2
E14
PRIME FAC CODE 7531 PAVILION
FAMILY HOUSING INDICATOR N
111374REAL PROPERTY UNIQUE ID
OPERATIONAL STATUS NONF
STREET ADDRESS
EXCESS DECLARATION DATE
SURPLUS DETERMINATION DATE
INTEREST TYPE
6121 GREENSLADE RD
FEE
FLOOR BELOW GROUND QUANTITY 0
U.S. Government owned property
HISTORIC STATUS CODE
MDI
NEV
CONDITION RATING
CONFIGURATION RATING
DATE
DATE
DATE
01 OCT 2012
13 SEP 2017
10 MAR 2015
Non-functional
Not yet Evaluated
HISTORIC STATUS DATE
READINESS FACTORS
ASSET EVALUATION DATE 15 OCT 2021
STREET TYPE CODE RD
STREET DIRECTION CODE
FINANCIAL REPORTING ORG 06 NAVY ACTIVE
DISPOSAL PROGRAMMED FY
18SUH2202544071
BU
MGRS LOCATION
MGRS LOCATION METHOD
100 27 MAR 2019FACILITY CONDITION INDEX DATE
05 OCT 2022
JEFF SOWELL
Y
Y
Y
Y
FIAR E AND C
VERIFICATION DATE
VERIFIED BY
DISPOSAL REASON
REMARKS
INVENTORY REQUIRED ASSET EXISTS
TAGGED DE VALIDATED
09 SEP 1993COST ID 1 PLACED IN SERVICE DATE
12 DEC 2023
FACILITY NUMBER
REPORT DATE
2014PRESS BOX/SCORE BOARD -FIRE
UTILIZATION
CLASS
USER ACTIVITY N61151
FAC USE CCN 74078 RECREATION PAVILION
NSA SOUTH POTOMAC
RECREATION PAVILLIONFACILITY USE
PRIMARY UM
DOD UM
DOD FAC
SF
SF
7531SET BACK VALUE
MAX VALUE
790.00
45,000.00
ADEQUATE
SUBSTANDARD
INADEQUATE
192.00 17.84
AREA OTHER ALTERNATE
English Metric English Metric English Metric
192.00
SF M2
17.84TOTAL
UNIT OF MEASURE
RPAO VERIFIED
AE COMPLETED 9/17/14
ASSET EVALUATION COMPLETED 06NOV2017
McKinney Act Exemption 7JUN2019 attached
AE UPDATED
26 SEP 2009
10 MAR 2015
21 DEC 2017
10 JUN 2019
22 NOV 2021
NOTES
PROPERTY RECORD2
DOCUMENTS
AE FY22
Profile Photo
7JUN2019
06NOV2017 AE UPLOAD
2014 AE 9/17/14
2014 AE
2014 PHOTO
B2014_AE_2022.pdf
N61151-2014-Profile.jpg
McKinney Exemption 2014.pdf
2014 AE Packet.pdf
B2014_AE.xlsx
2014.pdf
2014.JPG
FILE NAME DESCRIPTION
UTILIZATION ID 1
DEFICIENCIES
CONFIGURATION
DOCUMENT UPLOAD DATE
22-NOV-21
19-MAR-21
10-JUN-19
21-DEC-17
10-MAR-15
04-NOV-09
17-JUL-09
SUSTAINMENT FUND SOURCE
SUSTAINMENT ORGANIZATION
OPERATIONAL FUND SOURCE
OPERATIONAL FUNDING ORG
Operation and Maintenance, Navy
NAVY ACTIVE
Operation and Maintenance, Navy
NAVY ACTIVE
Z5
CONFIGURATION CODE DEFINITION
2SUBSTANDARD INADEQUATE CAPACITY/COVERAGE - FACILITY COMPONENTS
DESCRIPTION
FAC…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .