This is a Contract Guard Inspection Report template for evaluating security guard performance and contract compliance.
The form is designed to document inspections of security guards across multiple posts including Site Commander, Operational Supervisor, Battery Park Screeners, MIO, Secondary Screening, Liberty State Park Screeners, Post 4, Command Center, and Project Manager positions. Inspectors evaluate five primary performance criteria: post staffing requirements, guard alertness, uniform compliance and appearance, adequate performance of post duties, and timely and accurate preparation of required logs, reports, and timesheets. Each criterion is assessed across all designated posts using checkpoint boxes. The form also includes a miscellaneous section addressing three additional contract requirements: property accounting and documentation, procedures for documenting faulty equipment events, and current personnel file maintenance. All miscellaneous items use yes/no response options. The report requires inspection begin and end times, contractor name, contract number, and inspection report number. Comments are only required for items marked "N" (No). The form concludes with signature lines for both the supervisory inspector and the Contracting Officer's Technical Representative (COTR), along with a legend defining response codes: Y (Yes), N (No), N/I (Not Inspected), and N/A (Not Applicable).
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment J-12
SECURITY GUARDS
CONTRACT GUARD INSPECTION REPORT
DATE: INSPECTION TIMES
BEGIN: END:
CONTRACTOR:
CONTRACT #:
INSPECTION REPORT #
INSTRUCTIONS: Check the appropriate block. Make comments only on the items checked "N".
P O S T I N S P E C T E D SC=Site Commander OS=Operational Supervisor BP=Battery Park Screeners MIO=MIO SC=Secondary Screening
LSP=Liberty State Park Screeners P4=Post 4 CC=Command Center PM=Project Manager
S C
O
B P
M
IO
L
M
1. Was post staffed as required?
2. Was Security Guard alert?
3. Was Security guard in full uniform and did he/she present a neat appearance?
4. Was Security Guard observed, adequately performing post duties?
5. Were all required logs/reports/timesheets prepared and forwarded timely/accurate?
MISCELLANEOUS CONTRACT REQUIREMENTS/INSPECTION
YES NO
1. Is all property accounted for and use documented?
2. Are procedures for documentation of events (faulty equipment) being followed?
3. Are Personnel Files up to date?
COMMENTS:
Supervisory Signature & Date:
COTR’s Signature & Date:
LEGEND: Y = Yes N = No N/I = Not Inspected N/A= Not Applicable