This scope of work and solicitation require fire system testing and inspection services at the Salt Lake City Air Route Traffic Control Center facilities. Services include quarterly, semi-annual, and annual inspections of sprinkler systems, fire alarms, detectors, backflows, hydrants, and other equipment in accordance with NFPA standards. Technicians must hold certifications for Viking, Siemens, and other manufacturer's equipment. The period of performance is one base year from July 2024 to July 2025. The procurement will utilize small business set asides and be tiered based on SBA size standards and availability of competition. The solicitation requests pricing and staffing plans with responses due by the dates outlined in the procurement schedule.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Vendor Questions and Answers.docx | DOCX document | |
| 697DCK-24-R-00230 amendment 0002.pdf | ||
| Procurement Schedule updated 3-27-24.docx | DOCX document | |
| 697DCK-24-R-00230 amendment 0001.pdf | ||
| J-4 Contractor Staffing Access Questionnaire.docx | DOCX document | |
| 697DCK-24-R-00230.pdf | ||
| J-2 WD 2015-5489 rev 22 12-26-23 Salt Lake and Tooele cty.pdf | ||
| J-3 Customer Satisfaction Survey.pdf | ||
| Procurement Schedule.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
FIRE SYSTEM TESTING & INSPECTION PROGRAM
The purpose of this scope of work is to obtain fire system testing and inspection at the following facilities:
Salt Lake City Air Route Traffic Control Center (ARTCC) 2150 W 700 N Salt Lake City, UT 84116
The Fire System Testing and Inspection Program includes all of the detection and suppression systems located at the ARTCC. The facilities on this compound include the following:
1. Building 1 ARTCC
2. Building 2 National Enterprise Management Center (NEMC)
3. Interim Support Building (ISB)
4. Power Services Building (PS)
5. Child Care Center (CCF)
All inspections will be coordinated by the contractor, through the Contracting Officer’s Representative (COR) to align with the dates set by the FAA Periodic Maintenance schedule. The actual testing will take place after 4:00 PM Monday through Thursday.
Contractor is required to have the appropriate number of employees and equipment necessary to perform these inspections in a timely, professional manner. A written inspection report is required to be submitted to the COR within fourteen (14) days after the inspection. Inspection Report format must be approved by the COR prior to the first submission.
There are eleven (11) Viking Fire Cycle III systems currently in operation. It is mandatory the technicians performing inspection services, upgrading and/or repair work on these systems are Viking Fire Cycle III certified. The Contractor must submit a list of all technicians, with their certification credentials, who will work on this project prior to the starting work.
The main fire alarm panel is a Siemens, XLS FireFinder panel. It is mandatory that those technicians performing inspection services, programming, upgrading or repairing the main fire panel must be Siemens certified. The Contractor must submit a list of all technicians, with their certification credentials, who will work on this project prior to the starting work.
There is a Siemens Danger Management System installed and integrated with the Siemens XLS FireFinder System. The Contractor must submit a list of all technicians, with their certification credentials, who will work on this project prior to the starting work.
All testing and inspection services must be provided in accordance with
1. National Fire Protection Association (NFPA) codes, regulations, rules, directives or suggestions.
2. All relevant State and Local fire protection requirements, codes, regulations, directives or suggestions.
3. All Federal Aviation Administration (FAA) Orders, 6930.1B and 6470.5A.
4. National Electric Code (NEC), codes, regulations, rules, directives or suggestions.
5. All manufacturer’s certification requirements for work on their particular systems and equipment. If there are any conflicts in the various codes, the most stringent requirement will prevail.
As a MINIMUM the following will be required:
A. Sprinkler Systems
1. Quarterly
• Test operation of all flow indicator valves; control valves, butterfly valves, OS&Y valves, check valves, post indicator valves, tamper switches for proper operation and reporting to the main fire alarm panel.
Contractor will notify the FAA of any needed repairs or replacement parts discovered during the inspection.
• Ensure that all monitored valves alarm and reset as per the system design and manufacturer’s specifications.
• Check all pressure gauges – air and water. Test for high or low pressure alarms. Record pressure gauge readings. Contractor will notify the FAA of any needed repairs or replacement parts discovered during the inspection.
• Inspect all fire department connections
• Test all pre-action systems interlocks. Ensure devices alarm and reset as per manufacturer’s design and specification. Contractor will notify the FAA of any repairs or replacement parts discovered during the inspection.
• Drain all systems thoroughly after testing is completed.
2. Semi Annual
• Provide all of the inspections services as required for a quarterly inspection.
• Test the exterior and interior audible and visual signals.
• Flow the inspector’s test connection.
• Inspect and test the LOW/HIGH air pressure switch
• Inspect and test the water pressure switch.
• Inspect the gauge-supervised air.
• Ensure the hydraulic name plates are securely attached to the risers and are legible.
• Inspect and check the detector-fixed temperature/rate of rise resistors.
• Test the tamper switches. Ensure tamper switches restore only in the normal position.
• Test all of the pre action systems interlocks. Ensure there are no trim leaks, electrical components are intact and in service, test the priming water level.
3. Annually
• Provide all of the inspection services as outlined in the Quarterly and Semi
Annual inspections.
• Test operation of dry pipe valves In Accordance With (IAW) NFPA 25.
“Dry” trip may be done annually if “Wet” trip is done every three (3) years.
• Inspect the interior of each dry pipe and pre-action valve. Examine, clean and make any necessary repair to the valve. The cost of the valve repair is the responsibility of the FAA.
• Inspect all fire department connections IAW NFPS 25.
• Check all gauges with an inspector’s gauge IAW NFPA 25.
• Test all outside or open sprinkler equipment IAW NPA 25.
• Visually inspect all sprinkler pipe hangers and seismic sway bracing.
• Check to ensure a stock of required spare sprinkler parts are available and match the existing building systems.
• Test water flow rates through main test drain valve IAW NFPA 25.
Record pressure on FAA Form 6000-8 for both valves fully open and fully closed.
• Drain all low point drains in dry pipe and pre-action systems if necessary.
• Test automatic air pressure maintenance devices.
• Inquiry will be made to determine if a possible source of obstruction to the sprinkler piping has been introduced, if so, an obstruction prevention investigation must be undertaken IAW NFPA 25.
FIRE PROTECTION WATER BACKFLOW PREVENTION ASSEMBLIES
1. Annually
• Conduct a forward flow test at a test point downstream from the backflow preventer.
• Conduct a backflow performance test as required by the local authority having jurisdiction.
• Replace all fusible links; including fusible links on fire actuated damper assemblies and automatic sprinkler heads.
OTHER FIRE APPRARATUS AND FIRE PREVENTION EQUIPMENT
A. Fire Hydrants
1. Annually
• Inspect hydrant, lubricate, paint and replace all worn, damaged and missing parts.
• Check for availability of proper tools and equipment for proper hydrant maintenance.
• Test hydrant barrel drain and shutoff valve. Open and allow hydrant to flow for 15 to 20 seconds. Close valve and check that water drains from the hydrant barrel within 60 seconds.
• Flow test the fire hydrant, measure and record the water flow.
• Check condition of hydrant operating nut.
• Check for worn or stripped nozzle threads.
• Ensure all nozzle caps can be easily removed.
FIRE DEPARTMENT CONNECTIONS
1. Annually
• Ensure each connection is visible and accessible.
• Inspect couplings and swivels to ensure they are undamaged and rotate smoothly.
• Inspect all plugs, caps and gaskets.
• Ensure all identification signs are in place and are visible.
• Inspect check valve to ensure there is no leaking.
• Inspect automatic drain valve to ensure proper placement and operation.
FIRE ALARM AND DETECTION SYSTEMS
1. Quarterly
• Ensure alarms are operational and monitored at the main fire alarm control panel as each fire suppression system is tested i.e. flow switches, tamper switches, etc. This task can be accomplished by testing 10% of the field devices and testing all of the flow, tamper, Post Indicator Valves.
• Ensure all alarms are returned to normal as each system is returned to normal i.e. flow switch is returned to normal once the water flow has stopped.
2. Semi Annual
• Ensure all alarms are operational and monitored at the main fire alarm control panel as each fire suppression system is tested i.e. flow switches, tamper switches, etc. 10% of all field devices will be tested.
• Ensure all alarms are returned to normal as each system is returned to normal i.e. flow switch is returned to normal once the water flow has stopped.
3. Annually
• Test to confirm that all alarm, trouble and supervisory signals are properly being sent to the local fire alarm panel and being sent and received at the supervising central alarm station.
• Test and verify each fire alarm circuit, including signaling, notification appliance and indicating device circuits for ground faults and open circuits.
• Test the power supply to the alarm panel for proper supervision, including loss of AC power and transfer to battery back-up power.
• Conduct a voltage test of the batteries in the fire alarm panel.
• Conduct the specified battery tests as directed by NFPA 72.
• Conduct a functional heat test on all heat detectors. Exception: Non-restorable heat detectors that are less than 15 years old should not be tested with a heat source. Ensure that the heat detector returns back to normal once the heat source has been removed.
• Conduct a functional test on all smoke detectors for both alarm and trouble. Verify that all signals are received at the local fire alarm control panel. Ensure that the smoke detector returns back to normal once the smoke source has been removed.
• Test all manual fire alarm pull stations.
• Test all audible devices. Record the sound pressure level during the testing.
• Test all visual devices. Ensure that occupancy changes have not obstructed the ability for occupants to see the visual device.
• Visually inspect and clean all air duct detectors. Ensure proper receipt of trouble and alarm notification at the local fir e alarm panel.
• Verify the activated duct detector triggers the sequence of operations for each protected piece of equipment that will shut down the operation of the affected equipment.
• Test other detection devices such as air sampling, flame and projected beam detectors IAW NFPA 72.
• Test all interlocking devices to the fire alarm system.
• Test the Digital Alarm Communicator Transmitter (DACT) by testing for line seizure while initiating an alarm signal while using the primary line for a telephone call. Transmission to the central station via the DACT must be within 90 seconds.
• Test the primary and secondary lines from the DACT to ensure proper supervision. Trouble transmission to the supervising central station should occur within four (4) minutes.
AIR SAMPLING SMOKE DETECTION
1. Annually
• Conduct a thirty (30) minute discharge test on system batteries.
• Conduct a functional test (smoke test) from the last port on each tube.
• Conduct a manometer test at each port (minimum 25 Pa).
• Conduct a flow test on each port using a manometer.
| A. Dry Chemical Extinguishers |
| B. Sprinkler Systems |
| 2. Semi Annual |
| 3. Annually |
| FIRE PROTECTION WATER BACKFLOW PREVENTION ASSEMBLIES |
| 1. Annually |
| OTHER FIRE APPRARATUS AND FIRE PREVENTION EQUIPMENT |
| A. Fire Hydrants |
| FIRE DEPARTMENT CONNECTIONS |
| 1. Annually |
| FIRE ALARM AND DETECTION SYSTEMS |
| 1. Quarterly |
| 2. Semi Annual |
| 3. Annually |
| AIR SAMPLING SMOKE DETECTION |
| 1. Annually |