J-1 Material Submittal.pdf

PDF 750 KB Posted

Attached to
B2619 Dorm Construction Renovations
Solicitation number
FA448425R0003
Issued by

About this file

This document is a submittal register for a federal contract opportunity for the renovation of dormitories at Joint Base McGuire-Dix-Lakehurst in New Jersey. The work includes demolition, construction, and renovation of 63 bedrooms and 24,530 square feet, with tasks such as relocating hot water and installing new HVAC systems, refurbishing bathrooms and bedrooms, upgrading fire alarms, and removing hazardous materials. It is an 8(a) competitive set-aside requirement for the Department of the Air Force's Air Mobility Command. The solicitation number is FA448425R0003, and the work includes a single bid option covering the entire dorm renovation. The submittal register provides a detailed list of the various submittals required throughout the project, including product data, shop drawings, test reports, certificates, and operation and maintenance data.

View the file

Other files

Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 76 PAGES

B2619 2621 JBMDL Dorm Renovation

01 33 00 SD-01 Preconstruction Submittals

1.8 GSubmittal Register

01 33 29 SD-01 Preconstruction Submittals

1.4.1 GSustainability Action Plan

SD-11 Closeout Submittals

1.5.3.2 GFinal High Performance and

Sustainable Building Checklist

1.5.3.2 GFinal Sustainability eNotebook

1.5.3.2 GAmended Final Sustainability

eNotebook

1.5.3.2 GAmended Final High

Performance and Sustainable

Building Checklist

01 35 26 SD-01 Preconstruction Submittals

1.7 GAccident Prevention Plan (APP)

1.7.1 GAPP - Construction

SD-06 Test Reports

1.4Monthly Exposure Reports

1.12Notifications and Reports

1.12.2 GAccident Reports

1.12.3LHE Inspection Reports

SD-07 Certificates

1.6.1.5Crane Operators/Riggers

1.7.3.2 GStandard Lift Plan

1.7.3.3 GCritical Lift Plan

1.8Activity Hazard Analysis (AHA)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 76 PAGES

01 35 26 1.9.1Confined Space Entry Permit

1.9.1Hot Work Permit

1.14License Certificates

1.14.1 GRadiography Operation Planning

Work Sheet

1.14.1 GPortable Gauge Operations

Planning Worksheet

01 45 00 SD-01 Preconstruction Submittals

1.5.2 GContractor Quality Control (CQC)

Plan

SD-06 Test Reports

1.12.3Verification Statement

SD-07 Certificates

1.6.5.1 GCertificate Of Readiness

01 57 19 SD-01 Preconstruction Submittals

1.6.1Preconstruction Survey

1.6.2 GRegulatory Notifications

1.6.4 GEnvironmental Manager

Qualifications

1.6.5 GEmployee Training Records

1.7 GEnvironmental Protection Plan

1.7.6.2 GDirt and Dust Control Plan

1.10 GSolid Waste Management Permit

3.12.2 GSpill Prevention Control And

Countermeasure (SPCC) Plan

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 76 PAGES

01 57 19 1.10.1 GMonthly Solid Waste Disposal

Report

3.1.1.1Inspection Reports

3.4.1.1.2Laboratory Analysis

SD-07 Certificates

1.4.1.2 GECATTS Certificate Of

Completion

1.6.5 GEmployee Training Records

SD-11 Closeout Submittals

1.5.1.2.1 GRefuse and Recycle Quantity

Form

1.6.2 GRegulatory Notifications

1.6.5 GAssembled Employee Training

Records

1.10 GSolid Waste Management Permit

3.4.1 GWaste Determination

Documentation

3.4.2.1 GProject Solid Waste Disposal

Documentation Report

3.4.2.1 GSales Documentation

3.4.2.1Contractor Certification

3.4.3.1 GHazardous Waste/Debris

Management

3.4.3.6 GDisposal Documentation for

Hazardous and Regulated Waste

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 76 PAGES

01 57 19 3.5.1 GContractor Hazardous Material

Inventory Log

01 74 19 SD-01 Preconstruction Submittals

1.7 GConstruction Waste Management

Plan

SD-06 Test Reports

1.9.2Quarterly Reports

1.9.3Annual Report

SD-11 Closeout Submittals

1.10 SFinal Construction Waste

Diversion Report

01 78 00 SD-03 Product Data

1.8.1Warranty Management Plan

1.8.5Warranty Tags

1.6Spare Parts Data

SD-08 Manufacturer’s Instructions

1.8.1Instructions

SD-10 Operation and Maintenance

Data

3.7 GOperation and Maintenance

Manuals

SD-11 Closeout Submittals

3.1 GAs-Built Drawings

3.3 GRecord Drawings

2.2 GRecord Model

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 76 PAGES

01 78 00 3.6As-Built Record of Equipment and Materials

1.8.1Warranted Equipment and

Materials

3.4 GFinal Approved Shop Drawings

3.5 GConstruction Contract

Specifications

2.3 GCertification of EPA Designated

Items

2.4 GCertification Of USDA Designated

Items

3.9.1 GInterim DD FORM 1354

3.9.2 GHigh Performance and

Sustainable Building (HPSB)

Checklist

3.9.2List Of Installed Building

Equipment Items For DD Form

01 78 23 SD-10 Operation and Maintenance

Data

1.4 GFacility Data Workbook

3.1.1 GTraining Plan

3.1.3 GTraining Outline

3.1.2 GTraining Content

3.2.1 GOperation And Maintenance

Manual, Progress Submittal

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 76 PAGES

01 78 23 3.2.2 GOperation And Maintenance

Manual, Prefinal Submittal

3.2.3 GOperation And Maintenance

Manual, Final Submittal

SD-11 Closeout Submittals

3.1.4 GTraining Video Recording

3.1.6 GValidation of Training Completion

3.1.1 GTraining Plan

1.6.6.7 GRecord Drawings And Utility

Systems

01 91 00.15 SD-06 Test Reports

3.6 GCompleted Construction

Observation Checklists

3.1 GDesign Review Report

3.5 GInterim Construction Phase

Commissioning Plan

3.5 GFinal Construction Phase

Commissioning Plan

1.12 GIssues Log

SD-07 Certificates

1.9 GCommissioning Firm

SD-10 Operation and Maintenance

Data

3.10 GMaintenance and Service Life

Plan

3.9 GSystems Manual

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 76 PAGES

01 91 00.15 SD-11 Closeout Submittals

3.11 GFinal Commissioning Report

3.11 SFinal Commissioning Report

(eNotebook)

02 41 00 SD-01 Preconstruction Submittals

1.2.2 GDemolition Plan

1.2.2 GDeconstruction Plan

1.10Existing Conditions

SD-07 Certificates

1.7 GNotification

SD-11 Closeout Submittals

3.3.4Receipts

02 81 00 SD-03 Product Data

2.1.1Packaging Notifications

3.1 GHazardous Waste Management

Plan

3.2 GOnsite Hazardous Waste

Management

3.3Notices of Non-Compliance and

Notices of Violation

SD-06 Test Reports

3.7 GRecordkeeping

3.7 GException Report

3.8Spill Response

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 76 PAGES

02 81 00 1.4.1 GTransportation and Disposal

Coordinator

1.4.2 GTraining

1.4.3Certification

3.3.3 GShipping Documents and

Packagings Certification

3.3.4Security Plan

3.3.5Certificates of Disposal

3.6Waste Minimization

02 82 00 SD-03 Product Data

1.2.2 GAmended Water

1.3.9 GSafety Data Sheets (SDS) for All

Materials

2.1 GEncapsulants

3.1.2.1 GRespirators

3.1.7 GLocal Exhaust Equipment

3.1.7 GPressure Differential Automatic

Recording Instrument

3.1.8 GVacuums

SD-06 Test Reports

1.5.5 GAir Sampling Results

1.5.6 GPressure Differential Recordings

for Local Exhaust System

3.2.12.2 GEncapsulation Test Patches

3.2.13.5 GClearance Sampling

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 76 PAGES

02 82 00 3.3.3.2 GAsbestos Disposal Quantity

Report

SD-07 Certificates

1.3.4 GEmployee Training

1.3.5 GNotifications

1.3.7 GRespiratory Protection Program

1.3.10 GAsbestos Hazard Abatement Plan

1.3.11 GTesting Laboratory

1.3.12 GLandfill Approval

1.3.12 GDelivery Tickets

1.3.12 GWaste Shipment Records

1.3.13 GTransporter Certification

1.3.14 GMedical Certification

1.5.1 GPrivate Qualified Person

Documentation

1.5.2 GDesignated Competent Person

1.5.3 GWorker's License

1.5.4 GContractor's License

1.5.9 GFederal, State or Local Citations

on Previous Projects

2.1 GEncapsulants

3.1 GEquipment Used to Contain

Airborne Asbestos Fibers

3.1.3.3 GWater Filtration Equipment

3.1.8 GVacuums

3.1.8 GVentilation Systems

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 76 PAGES

02 82 00 SD-11 Closeout Submittals

1.3.5 GPermits and Licenses

1.3.5 GNotifications

1.3.7.1 GRespirator Program Records

1.5.7 GProtective Clothing

Decontamination Quality Control

Records

1.5.8 GProtective Clothing

Decontamination Facility

Notification

1.7.1 GRental Equipment

02 83 00 SD-01 Preconstruction Submittals

1.5.1.1 GCompetent Person

1.5.1.2 GTraining Certification

1.5.2.3 GOccupational and Environmental

Assessment Data Report

1.5.2.4 GMedical Examinations

1.5.2.8 GLead, Cadmium, Chromium

Waste Management Plan

1.5.4 GLicenses, Permits and

Notifications

1.5.2.2 GLead, Cadmium, Chromium

Compliance Plan

3.1.1.6 GLead, Cadmium, Chromium

Compliance Plan

3.4.1.1 GInitial Sample Results

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 76 PAGES

02 83 00 3.5.2.1 GWritten Evidence of TSD

Approval

SD-03 Product Data

1.6.1 GRespirators

1.6.4 GVacuum Filters

1.6.7 GNegative Air Pressure System

2.1 GMaterials and Equipment

2.1.1 GExpendable Supplies

3.1.1.5 GLocal Exhaust Equipment

3.1.1.5 GPressure Differential Automatic

Recording Instrument

3.1.1.6 GPressure Differential Log

SD-06 Test Reports

1.3.3 GSampling and Analysis

1.5.2.3 GOccupational and Environmental

Assessment Data Report

1.5.2.3 GSampling Results

1.5.3 GPressure Differential Recordings

For Local Exhaust System

SD-07 Certificates

1.5.1.3 GTesting Laboratory

3.5.1.1 GClearance Certification

SD-11 Closeout Submittals

3.5.2.1 GHazardous Waste Manifest

3.5.2.1 GTurn-In Documents or Weight

Tickets

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 76 PAGES

02 84 16 SD-07 Certificates

1.8.1 GQualifications of CIH

1.8.1 GTraining Certification

1.8.2 GPCB and Lamp Removal Work

Plan

1.8.3 GPCB and Lamp Disposal Plan

SD-11 Closeout Submittals

3.5.2 GTransporter Certification

3.2.4Certification of Decontamination

3.5.2.1Certificate of Disposal and/or recycling

3.5.3.2DD Form 1348-1

3.3.1Testing Results

02 85 00 SD-01 Preconstruction Submittals

1.2.26 GVentilation System Mold

Remediator Qualifications

1.4.1.1 GPreliminary Visual Assessment

Report

1.4.1.2 GMicrobial Remediation Plan

1.4.1.3 GRespiratory Protection Program

1.4.1.4Worker Records

1.4.1.5 GCertified Industrial Hygienist

(CIH)/Industrial Hygienist (IH)

Qualifications

1.4.1.6 GMicrobial Remediation Supervisor

Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 76 PAGES

02 85 00 SD-03 Product Data

1.2.11 GDisinfectants or Biocide

Sanitizing Solutions

1.2.14 GFungicidal Agents, (EPA)

1.2.21 GPersonal Protective Equipment

(PPE)

1.2.24Pressure Differential Measuring

Instrument

2.2 GSafety Data Sheets (SDS) for All

Materials

3.1.4Dehumidifiers

3.1.5Air Filtration Units

SD-06 Test Reports

1.4.3 GIH Daily Reports

SD-11 Closeout Submittals

1.4.4 GSubmittals at Completion of

Remediation Work

03 01 30.71 SD-05 Design Data

1.4.1.1Job Mix Formula

SD-06 Test Reports

2.1.2Aggregate

2.1.1.1Epoxy Resin Binder

2.1.1.2Epoxy Grout

SD-07 Certificates

2.1.1.1Epoxy Resin Binder

2.1.1.2Epoxy Grout

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 76 PAGES

03 01 30.71 SD-08 Manufacturer’s Instructions

2.1.1Epoxy

03 01 30.72 SD-02 Shop Drawings

2.1.2 GShop Drawings

SD-03 Product Data

2.1.1 GProduct Data

SD-05 Design Data

2.1.2 GDesign Calculations

SD-06 Test Reports

2.1.1 GCurrent ICC Evaluation Service

Report

SD-07 Certificates

2.1 GComposite System

Manufacturer's Training Certificate for Installation

SD-08 Manufacturer’s Instructions

2.1.1 GSafety Data

03 30 53 SD-02 Shop Drawings

1.5 GInstallation Drawings

SD-03 Product Data

2.2.3.1Air-Entraining Admixture

2.2.3.2Water-Reducing or Retarding

Admixture

2.2.9Curing Materials

2.2.6Joint Sealants - Field Molded

Sealants

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 76 PAGES

03 30 53 2.4.1Waterstops

2.4.2Chemical Floor Hardener

3.1.3.3Batching and Mixing Equipment

3.2Conveying and Placing Concrete

2.2.7Formwork

2.3 GMix Design Data

2.3Ready-Mix Concrete

2.4.3Curing Compound

2.2.5Mechanical Reinforcing Bar

Connectors

SD-06 Test Reports

2.2.2Aggregates

2.1.3 GConcrete Mixture Proportions

3.3.3.2Measurement of Floor Tolerances

3.9.3 GCompressive Strength Testing

3.9.3 GSlump

3.9.3Air Content

2.2.4Water

SD-07 Certificates

2.2.1Cementitious Materials

1.5.1CPG for recycled materials or appropriate Waiver Form

2.2.2Aggregates

2.3Delivery Tickets

SD-08 Manufacturer’s Instructions

2.4.2Chemical Floor Hardener

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 76 PAGES

03 30 53 2.4.3Curing Compound

05 12 00 SD-01 Preconstruction Submittals

1.3.1.1 GErection and Erection Bracing

Drawings

SD-02 Shop Drawings

1.3.2 GFabrication Drawings

SD-03 Product Data

2.6.2Shop Primer

2.4.1Welding Electrodes and Rods

2.4.2Non-Shrink Grout

2.3.3Tension Control Bolts

2.2.1 SRecycled Content for Structural

Steel

2.2.2 SRecycled Content for Structural

Steel Tubing

2.2.3 SRecycled Content for Steel Pipe

SD-05 Design Data

1.3.3 GDesign Calculations for Steel

Connections

SD-06 Test Reports

2.6.2Class B Coating

2.3Bolts, Nuts, and Washers

3.7.1.2Weld Inspection Reports

3.7.2.1Bolt Testing Reports

SD-07 Certificates

2.2Steel

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 76 PAGES

05 12 00 2.3Bolts, Nuts, and Washers

2.5Galvanizing

1.3.4.1Welding Procedures and

Qualifications

2.4.1Welding Electrodes and Rods

3.7.1.1Certified Welding Inspector

3.7.1.2NDT Technician

3.4Welding Procedure Specifications

(WPS)

05 40 00 SD-02 Shop Drawings

1.6.1 GFraming Components

SD-03 Product Data

2.1Studs, Joists

2.1 SRecycled Content of Steel

Products

SD-05 Design Data

1.6.2 GMetal Framing Calculations

SD-07 Certificates

1.4Load-Bearing Cold-Formed Metal

Framing

3.1.1Welds

05 51 33 SD-02 Shop Drawings

2.3Ladders

SD-03 Product Data

2.3Ladders

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 76 PAGES

05 51 33 1.3Fabricator Certification for Ladder

Assembly

05 52 00 SD-02 Shop Drawings

1.2.1 GFabrication Drawings

1.5.1 GFabrication Drawings

3.2 GIron and Steel Hardware

3.2 GSteel Shapes, Plates, Bars and

Strips

SD-03 Product Data

2.2.5 GSteel Railings and Handrails

1.2.1 GAnchorage and Fastening

Systems

SD-05 Design Data

1.5.2 GDesign Calculations For Steel

Connections

SD-06 Test Reports

1.4.1 GWelding Inspections

2.3 GMill Test Reports

SD-07 Certificates

1.4.2 GWelder Qualification

SD-08 Manufacturer’s Instructions

3.2Installation Instructions

06 10 00 SD-02 Shop Drawings

1.9.1 GFabricated Structural Members

1.9.2 GModifications of Structural

Members

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 76 PAGES

06 10 00 2.2.1 GNailing Strips

SD-03 Product Data

2.3Underlayment

1.8Fire-retardant Treatment

2.4.3Adhesives

SD-05 Design Data

1.9.2 GModifications of Structural

Members

SD-07 Certificates

2.1.1 SCertified Sustainably Harvested

Virgin Lumber

2.1.2 SCertified Sustainably Harvested

Natural-decay and Insect-resistant

Wood

1.7Preservative Treatment

2.4.3 SIndoor Air Quality for Aerosol

Adhesives

2.4.3 SIndoor Air Quality for Non-aerosol

Adhesives

06 41 16.00 10 SD-02 Shop Drawings

1.5.2Shop Drawings

2.8Shop Drawings

3.1Installation

SD-03 Product Data

2.1Wood Materials

2.8.7.3Finish Schedule

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 76 PAGES

06 41 16.00 10 1.5.3Certification

SD-04 Samples

2.3Plastic Laminates

2.5Cabinet Hardware

SD-07 Certificates

1.5Quality Assurance

3.1Laminate Clad Casework

06 61 16 SD-02 Shop Drawings

1.4.2 GDetail Fabrication Drawings

3.1 GInstallation

SD-03 Product Data

2.1.1 GSolid Polymer

2.2.2 SIndoor air quality for solid surface

seam and sealant products

SD-04 Samples

2.1 GMaterial

2.3.5 GCounter Tops

SD-06 Test Reports

2.1.1Test Report Results

SD-07 Certificates

1.4.1Qualifications

2.1.1 SIndoor Air Quality for solid

surface fabrication products

SD-10 Operation and Maintenance

Data

2.1.1 GSolid Polymer

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 76 PAGES

07 84 00 SD-02 Shop Drawings

2.1 GFirestopping System

SD-03 Product Data

2.2 GFirestopping Materials

SD-06 Test Reports

3.3 GInspection

SD-07 Certificates

1.5.2Inspector Qualifications

2.2Firestopping Materials

1.5.1 GInstaller Qualifications

07 92 00 SD-03 Product Data

2.1 GSealants

2.2 GPrimers

2.3 GBond Breakers

2.4 GBackstops

2.5 GCaulking

2.6 GCleaning Solvents

3.1 GField Adhesion

SD-07 Certificates

2.1.1 SIndoor Air Quality For Interior

Sealants

2.1.3 SIndoor Air Quality For Interior

Floor Joint Sealants

2.5 SIndoor Air Quality For Interior

Caulking

08 11 13 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 76 PAGES

08 11 13 2.1 GDoors

2.1 GDoors

2.3 GFrames

2.3 GFrames

SD-03 Product Data

2.1 GDoors

2.3 GFrames

SD-04 Samples

2.6.1 GFactory-applied Enamel Finish

08 14 00 SD-02 Shop Drawings

2.1 GDoors

SD-03 Product Data

2.1 GDoors

2.1.1.1 SRecycled Content for Door Cores

2.2.7Water-resistant Sealer

1.5Warranty

2.1.2 GSound Transmission Class

Rating

2.1.3 GFire Resistance Rating

SD-04 Samples

2.1Doors

SD-06 Test Reports

2.3Cycle-Slam

2.3Hinge Loading Resistance

SD-07 Certificates

1.3.1Certificates of Grade

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 76 PAGES

08 14 00 2.1.1 SCertified Sustainably Harvested

Flush Wood Doors

2.1.1.1 SIndoor Air Quality for

Particleboard and Agrifiber Door

Cores

SD-11 Closeout Submittals

1.5Warranty

08 31 00 SD-02 Shop Drawings

1.3 GAccess Doors And Panels

SD-03 Product Data

1.3 GAccess Doors And Panels

1.3.2 GHardware

2.2.6 GAccessories

2.1 SRecycled Content

SD-04 Samples

2.5 GFinishes

SD-06 Test Reports

1.3.1 GFire-rating(s) of Assemblies

1.3.1 GAcoustical Ratings of Assemblies

08 71 00 SD-02 Shop Drawings

1.3 GManufacturer's Detail Drawings

1.3 GVerification of Existing Conditions

1.5 GHardware Schedule

2.3.6 GKeying System

SD-03 Product Data

2.3 GHardware Items

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 76 PAGES

08 71 00 SD-08 Manufacturer’s Instructions

3.1Installation

SD-10 Operation and Maintenance

Data

1.5 GHardware Schedule

SD-11 Closeout Submittals

1.6.1Key Bitting

08 87 23.13 SD-03 Product Data

2.2Fragment Retention Film

3.3Cleaning

SD-04 Samples

2.2 GFragment Retention Film

SD-06 Test Reports

2.2Fragment Retention Film

SD-07 Certificates

2.2Fragment Retention Film

09 22 00 SD-02 Shop Drawings

2.1 GMetal Support Systems

SD-03 Product Data

2.1Metal Support Systems

2.1 SRecycled Content for Metal

Support Systems

09 29 00 SD-03 Product Data

2.1.4Cementitious Backer Units

2.1.2Water-Resistant Gypsum Backing

Board

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 76 PAGES

09 29 00 2.1.8Accessories

2.1.1Gypsum Board

2.1.1 SRecycled Content for Gypsum

Board

2.1.1 SRecycled Content for Paper

Facing and Gypsum Cores

2.1.5 SVOC Content of Joint Compound

SD-07 Certificates

2.1 GAsbestos Free Materials

2.1.1 SIndoor Air Quality for Gypsum

Board

2.1.7 SIndoor Air Quality for Non-aerosol

Adhesives

2.1.7 SIndoor Air Quality for Aerosol

Adhesives

09 30 10 SD-02 Shop Drawings

3.2 GDetail Drawings

SD-03 Product Data

2.1.1 GPorcelain Tile

2.1.1 SRecycled Content for Porcelain

Tile

2.1 GTransition Strips

2.6.1 GTransition Strips

2.2 GSetting-Bed

2.4 GMortar, Grout, and Adhesive

2.2.6Reinforcing Wire Fabric

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 76 PAGES

09 30 10 2.7 GWaterproof Membrane

2.8 GCrack Isolation Membrane

SD-04 Samples

2.1 GTile

2.1 GAccessories

2.1 GTransition Strips

2.6.1 GTransition Strips

2.4.4 GGrout

SD-07 Certificates

2.4.9 SIndoor Air Quality for Sealants

1.3.2Water Absorption Rates

SD-08 Manufacturer’s Instructions

3.8Manufacturer's Approved

Cleaning Instructions

SD-10 Operation and Maintenance

Data

2.1.1 GPorcelain Tile

2.1 GTransition Strips

2.6.1 GTransition Strips

09 51 00 SD-02 Shop Drawings

2.1Drawings

SD-03 Product Data

2.1.1Acoustical Ceiling Systems

2.1.1Fire Resistive Ceilings

2.2.1.1 SRecycled Content for Type IV

Ceiling Tiles

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 76 PAGES

09 51 00 2.1.2Acoustical Performance

SD-04 Samples

2.2Acoustical Units

SD-06 Test Reports

2.1.1Fire Resistive Ceilings

SD-07 Certificates

2.2.1.1 SIndoor Air Quality for Type IV

Ceiling Tiles

09 62 38 SD-03 Product Data

2.1 GStatic-Control Resilient Flooring

2.5 GAccessories

2.3 GAdhesives

1.9Warranty

SD-04 Samples

2.1 GStatic-Control Resilient Flooring

2.4 GMoldings

2.5 GAccessories

SD-06 Test Reports

2.8Fire Resistance

3.2Moisture, Alkalinity and Bond

3.7Testing

SD-07 Certificates

2.3 SIndoor Air Quality for Adhesives

1.6Qualifications of Applicator

SD-08 Manufacturer’s Instructions

2.1 GStatic-Control Resilient Flooring

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 76 PAGES

09 62 38 2.5 GAccessories

SD-10 Operation and Maintenance

Data

2.1 GStatic-Control Resilient Flooring

2.5 GAccessories

09 65 00 SD-02 Shop Drawings

2.9 GResilient Flooring and

Accessories

SD-03 Product Data

2.9 GResilient Flooring and

Accessories

2.5Adhesives

SD-04 Samples

2.9 GResilient Flooring and

Accessories

SD-06 Test Reports

3.3 GMoisture, Alkalinity and Bond

Tests

SD-07 Certificates

2.5 SIndoor Air Quality for Adhesives

SD-08 Manufacturer’s Instructions

3.2 GSurface Preparation

3.1 GInstallation

SD-10 Operation and Maintenance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 76 PAGES

09 65 00 2.9 GResilient Flooring and

Accessories

09 90 00 SD-02 Shop Drawings

3.8Piping Identification

SD-03 Product Data

2.1 GCoating

2.1Product Data Sheets

SD-04 Samples

2.3 GColor

SD-07 Certificates

1.5.6.2 GQualification Testing

1.5.5Indoor Air Quality for Paints and

Primers

SD-08 Manufacturer’s Instructions

3.2.1Application Instructions

2.1Mixing

1.7.1Manufacturer's Safety Data

Sheets

SD-10 Operation and Maintenance

Data

2.1 GCoatings

10 14 00.20 SD-02 Shop Drawings

1.3.2 GDetail Drawings

SD-03 Product Data

2.1 GRoom Identification And

Directional Signage System

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 76 PAGES

10 14 00.20 2.2 GStair Signage

2.3 GExit Door Tactile Sign

SD-04 Samples

1.3.1 GInterior Signage

SD-10 Operation and Maintenance

Data

3.1 GApproved Manufacturer's

Instructions

3.1.2 GProtection and Cleaning

10 26 00 SD-02 Shop Drawings

2.2 GCorner Guards

SD-03 Product Data

2.2 GCorner Guards

2.2.1 SRecycled content for aluminum

component of corner guards

SD-04 Samples

2.2 GCorner Guards

SD-06 Test Reports

2.1.1.2Fire Resistance Rating

SD-07 Certificates

2.5 SIndoor air quality for adhesives

SD-10 Operation and Maintenance

Data

2.2 GCorner Guards

10 28 13 SD-02 Shop Drawings

2.1 GProduct Schedule

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 76 PAGES

10 28 13 SD-03 Product Data

2.1 SRecycled content for stainless

steel toilet accessories

2.1.3 GItem A5047

2.1.4 GItem A5145

2.1.5 GItem A5195

SD-10 Operation and Maintenance

Data

2.1.3 GItem A5047

2.1.4 GItem A5145

10 44 16 SD-02 Shop Drawings

2.1.1 GFire Extinguishers

Part 2 GAccessories

Part 2Cabinets

2.2.2 GWall Brackets

1.5Schedule

SD-03 Product Data

2.1.1 GFire Extinguishers

Part 2 GAccessories

Part 2Cabinets

2.2.2 GWall Brackets

3.2.1Replacement Parts List

SD-04 Samples

1.3.1Equipment Samples

SD-07 Certificates

2.1.1 GFire Extinguishers Certifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 76 PAGES

10 44 16 1.4 GManufacturer's Warranty with

Inspection Tag

12 21 00 SD-02 Shop Drawings

3.3Installation

SD-03 Product Data

2.1 GWindow Blinds

2.1 SRecycled Content for aluminum

components

SD-04 Samples

2.1 GWindow Blinds

SD-06 Test Reports

2.1Window Blinds

SD-07 Certificates

2.1 SIndoor Air Quality for window

blinds

2.1 SIndoor Air Quality for window

blinds

SD-08 Manufacturer’s Instructions

2.1 GWindow Blinds

SD-10 Operation and Maintenance

Data

2.1 GWindow Blinds

22 00 00 SD-02 Shop Drawings

3.9.1 GPlumbing System

SD-03 Product Data

2.1Recycled Content for Steel Pipe

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 76 PAGES

22 00 00 2.1Recycled Content for Cast Iron

Pipe

3.9.1.1Backflow Prevention Assemblies

2.6.2 GShower Faucets

2.6.2WaterSense Label for

Showerhead

2.4Fixtures

2.4.3Flush Tank Water Closets

2.4.2Flush Valve Water Closets

2.4.3WaterSense Label for Flush Tank

Water Closet

2.4.2WaterSense Label for Flush

Valve Water Closet

2.4.4Wall Hung Lavatories

2.4.5Countertop Lavatories

2.4.6Service Sinks

2.9Water Heaters

2.9.1.1Energy Star Label for Gas

Storage Water Heater

2.11Pumps

1.5.1Welding

3.4 GVibration-Absorbing Features

3.9.1Plumbing System

SD-06 Test Reports

3.9Tests, Flushing and Disinfection

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 76 PAGES

22 00 00 3.9.1.1 GTest of Backflow Prevention

Assemblies

SD-07 Certificates

1.3Materials and Equipment

2.1.1Bolts

SD-10 Operation and Maintenance

Data

3.9.1 GPlumbing System

22 07 19.00 40 SD-02 Shop Drawings

3.1 GInstallation Drawings

SD-03 Product Data

2.3 GAdhesives

2.3 GCoatings

2.3 GInsulating Cement

2.3 GInsulation Materials

2.3 GJacketing

2.3 GTape

SD-08 Manufacturer’s Instructions

3.1 GInstallation Manual

SD-11 Closeout Submittals

3.4Record Drawings

2.3 SAdhesives

2.3 SCoatings

2.3 SInsulation Materials

1.3.1 SRecycled Materials

23 05 15 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 76 PAGES

23 05 15 1.2Material, Equipment, and Fixture

Lists

SD-02 Shop Drawings

1.2Record Drawings

1.2Connection Diagrams

1.2Coordination Drawings

1.2Fabrication Drawings

3.1Installation Drawings

SD-03 Product Data

2.2Pipe and Fittings

2.3Piping Specialties

2.4Valves

2.5Miscellaneous Materials

2.6Supporting Elements

1.2Equipment Foundation Data

SD-04 Samples

1.2Manufacturer's Standard Color

Charts

SD-05 Design Data

2.2Pipe and Fittings

2.3Piping Specialties

2.4Valves

SD-06 Test Reports

3.1Hydrostatic Tests

3.1Air Tests

3.1Valve-Operating Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 76 PAGES

23 05 15 3.1Drainage Tests

3.1Non-Destructive Electric Tests

3.1System Operation Tests

SD-07 Certificates

1.4.2Record of Satisfactory Field

Operation

1.4.3List of Qualified Permanent

Service Organizations

1.2Listing of Product Installations

1.2Records of Existing Conditions

3.1Surface Resistance

3.1Shear and Tensile Strengths

3.1Temperature Ratings

3.1Bending Tests

3.1Flattening Tests

3.1Transverse Guided Weld Bend

Tests

SD-10 Operation and Maintenance

Data

3.12Operation and Maintenance

Manuals

23 05 48.00 40 SD-02 Shop Drawings

1.2Installation Drawings

1.2Outline Drawings

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 76 PAGES

23 05 48.00 40 1.2Equipment and Performance

Data

2.2.6Isolators

SD-06 Test Reports

2.4Type of Isolator

2.4Type of Base

2.4Allowable Deflection

2.4Measured Deflection

23 05 93 SD-01 Preconstruction Submittals

1.3.3Records of Existing Conditions

1.3.3Records of Existing Conditions

1.5.1Independent TAB Agency and

Personnel Qualifications

1.5.3.1TAB Design Review Report

1.7.2.1TAB Design Review Report

1.5.7.1TAB Firm

1.2TAB Team Assistants

1.2TAB Team Engineer

1.5.7.2TAB Specialist

1.2TAB Team Field Leader

SD-02 Shop Drawings

1.3.3TAB Schematic Drawings and

Report Forms

SD-03 Product Data

1.3Equipment and Performance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 76 PAGES

23 05 93 1.5.1.3TAB Related HVAC Submittals

1.5.7.4TAB Related HVAC Submittals

1.5.5TAB Procedures

1.5.5Calibration

1.3.3Systems Readiness Check

1.5.8TAB Execution

1.5.8.3TAB Verification

SD-06 Test Reports

3.3.5Completed Pre-Final DALT

Report

3.3.8Certified Final DALT Report

1.5.3.2Prerequisite HVAC Work

Checkout List

1.5.3.2Prerequisite HVAC Work

Checkout List

1.5.3.2Prerequisite HVAC Work

Checkout List

3.4.7.1Proportional Balancing

3.7Proportional Balancing

3.4.7.2Season 1

3.7Season 1

3.4.7.2Season 2

3.7Season 2

1.5.3.1TAB Design Review Report

1.7.2.1TAB Design Review Report

1.5.9.2TAB Report for Season 1

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 76 PAGES

23 05 93 1.5.9.2TAB Report for Season 2

SD-07 Certificates

1.5.1Independent TAB Agency and

Personnel Qualifications

1.5.3.1DALT and TAB Submittal and

Work Schedule

1.7.2DALT and TAB Submittal and

Work Schedule

1.5.3.2TAB Pre-Field Engineering

Report

1.7.2.3TAB Pre-Field Engineering

Report

1.5.4Instrument Calibration

Certificates

3.7DALT and TAB Procedures

Summary

3.7Completed Pre-Final DALT Work

Checklist

3.3.2Advance Notice of Pre-Final

DALT Field Work

3.4.7.1Proportional Balancing

3.7Proportional Balancing

3.4.7.2Season 1

3.7Season 1

3.4.7.2Season 2

3.7Season 2

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 76 PAGES

23 05 93 1.5.7.1TAB Firm

1.3.3Design Review Report

1.7.2.2Pre-field DALT Preliminary

Notification

1.7.2Advanced Notice for Season 1

TAB Field Work

1.7.2Prerequisite HVAC Work Check

Out List For Season 1

23 07 00 SD-02 Shop Drawings

3.2.2.4MICA Plates

2.3Pipe Insulation Systems

3.2Pipe Insulation Systems

3.3Duct Insulation Systems

3.4Equipment Insulation Systems

2.3.1 SRecycled content for insulation

materials

SD-03 Product Data

2.3Pipe Insulation Systems

3.2Pipe Insulation Systems

3.3Duct Insulation Systems

3.4Equipment Insulation Systems

SD-04 Samples

2.2.1.3Thermal Insulation

3.1.1Display Samples

SD-07 Certificates

2.2.1 SIndoor air quality for adhesives

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 76 PAGES

23 07 00 SD-08 Manufacturer’s Instructions

2.3Pipe Insulation Systems

3.2Pipe Insulation Systems

3.3Duct Insulation Systems

3.4Equipment Insulation Systems

23 08 00 SD-03 Product Data

2.1Test Equipment

SD-06 Test Reports

1.5Pipe Flushing, Testing, And

Water Treatment Reports

3.3Completed Pre-Functional

Checklists

3.12Full-Load Test Report

3.15Post-Construction Trend Log

Report

SD-07 Certificates

1.6Certificate Of Readiness

23 09 00 SD-02 Shop Drawings

3.3DDC Contractor Design Drawings

3.3Draft As-Built Drawings

3.3Final As-Built Drawings

SD-03 Product Data

1.8.3Programming Software

1.8.4Controller Application Programs

1.8.1Configuration Software

1.8.2Controller Configuration Settings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 76 PAGES

23 09 00 1.1.1.3Proprietary Multi-Split

Engineering Tool Software

2.2Manufacturer's Product Data

3.5.3Draft LNS Database

3.6.4Final LNS Database

3.8Final LNS Database

1.8.5Niagara Framework Supervisory

Gateway Backups

SD-05 Design Data

1.9Boiler Or Chiller Plant Gateway

Request

SD-06 Test Reports

3.1.1Existing Conditions Report

1.10.1Pre-Construction Quality Control

(QC) Checklist

1.10.2Post-Construction Quality Control

(QC) Checklist

3.5.2Start-Up Testing Report

3.6.1PVT Procedures

3.6.3PVT Report

3.7.5 GControl Contractor’s Performance

Verification Testing Plan

3.7.3.1 GEquipment Supplier’s

Performance Verification Testing

Plan

3.7.8.3 GEndurance Testing Results

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 43 OF 76 PAGES

23 09 00 3.7.9 GPerformance Verification Test

Report

SD-10 Operation and Maintenance

Data

3.9Operation and Maintenance

(O&M) Instructions

3.11.1Training Documentation

SD-11 Closeout Submittals

2.5Enclosure Keys

3.2.6.1Password Summary Report

1.10.3Closeout Quality Control (QC)

Checklist

23 09 13.34 40 SD-02 Shop Drawings

1.2Fabrication Drawings

3.1Installation Drawings

SD-03 Product Data

2.1Self-Contained Temperature

Control Valves

2.2Self-Contained

Temperature-Regulator Valves

2.3Rate-of-Flow Controller

2.4Nonmodulating Float Valve

2.5Water Pressure Regulating Valve

2.6Water Pressure Relief Valve

2.7Pilot-Operated Pressure Relief

Valve

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 44 OF 76 PAGES

23 09 13.34 40 2.8Relief Valves for Electric Water

Heaters

SD-07 Certificates

1.2List of Product Installations

3.2Manufacturer's Warranty

23 09 33.00 40 SD-01 Preconstruction Submittals

2.3Material, Equipment, and Fixture

Lists

1.5Records of Existing Conditions

SD-02 Shop Drawings

2.2Fabrication Drawings

3.1Installation Drawings

SD-03 Product Data

2.3Control Components

2.3Thermometers

2.3.1Thermometers

2.3Pressure Gages

2.3Valves

2.3Dampers

2.3.4Dampers

2.3Operators

2.3.5.1Operators

SD-04 Samples

2.4.5.2Manufacturer's Standard Color

Charts

2.4.5.2Thermostat Covers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .