J-1 Cost Pricing Spreadsheet.xls

XLS spreadsheet 247 KB Posted

Attached to
Worldwide Undersea Search and Salvage Operations in support of the Director of Ocean Engineering, Supervisor of Salvage and Diving (SUPSALV)
Solicitation number
N00024-20-R-4301
Issued by

About this file

This document package contains cost proposal templates and schedules for a federal solicitation seeking worldwide undersea search and salvage operations services. The Naval Sea Systems Command solicitation N00024-20-R-4301 requires the operation, storage, and maintenance of Supervisor of Salvage and Diving (SUPSALV) remotely operated vehicles, side scan sonar systems, and towed pinger locator equipment. Offerors may also provide commercial search, salvage, and rescue assets to supplement SUPSALV resources. The cost proposal templates include five ordering periods and cover three operational scenarios involving different equipment configurations. Scenario one involves facility operations while scenarios two and three involve specific mission operations using autonomous underwater and remotely operated vehicles. Pricing is based on labor rates by position and equipment rates by operational depth. Non-labor costs include estimated amounts for subcontracts, engineering labor, and materials. Proposals must also include any hazard or hardship pay percentages and annual facility fees. Award amounts will be determined for each ordering period based on total labor, non-labor costs, and applied fee percentages.

View the file

Other files

File Type Posted
N00024-20-R-4301 A0003.pdf PDF
N00024-20-R-4301 A0002.pdf PDF
N00024-20-R-4301 A0001.pdf PDF
J-4 Past Performance Questionnaire v2.doc DOC document
Exhibit A DD Form 1423 Contract Data Requirements List (CDRLs).pdf PDF
J-5 Resume Format.doc DOC document
J-7 Government Furnished Property.pdf PDF
J-4 Past Performance Questionnaire.doc DOC document
J-3 DD 254.pdf PDF
J-6 Scheduled Personnel.docx DOCX document
N00024-20-R-4301.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

E1-5

Schedule E: Fixed Price Scheduled Labor Rates (Tables 1 - 5 from RFP section B)
TABLE 1: Ordering Period 1FacilityOperationalTABLE 4: Ordering Period 4FacilityOperational
Hourly (hr)Overtime (hr)12 Hour DayOvertime (hr)Hourly (hr)Overtime (hr)12 Hour DayOvertime (hr)
Program Manager$0.00$0.00$0.00$0.00Program Manager$0.00$0.00$0.00$0.00
Systems Engineer$0.00$0.00$0.00$0.00Systems Engineer$0.00$0.00$0.00$0.00
Project Manager (Search and ROV Operations)$0.00$0.00$0.00$0.00Project Manager (Search and ROV Operations)$0.00$0.00$0.00$0.00
Assistant Project Manager (Search Operations)$0.00$0.00$0.00$0.00Assistant Project Manager (Search Operations)$0.00$0.00$0.00$0.00
Assistant Project Manager (ROV Operations)$0.00$0.00$0.00$0.00Assistant Project Manager (ROV Operations)$0.00$0.00$0.00$0.00
Senior Technician$0.00$0.00$0.00$0.00Senior Technician$0.00$0.00$0.00$0.00
Lead Electronic Techician$0.00$0.00$0.00$0.00Lead Electronic Techician$0.00$0.00$0.00$0.00
Lead Operator Techician$0.00$0.00$0.00$0.00Lead Operator Techician$0.00$0.00$0.00$0.00
Electronic Techician$0.00$0.00$0.00$0.00Electronic Techician$0.00$0.00$0.00$0.00
Operator Techician$0.00$0.00$0.00$0.00Operator Techician$0.00$0.00$0.00$0.00
Logistics/Financial Assistant$0.00$0.00$0.00$0.00Logistics/Financial Assistant$0.00$0.00$0.00$0.00
Technician$0.00$0.00$0.00$0.00Technician$0.00$0.00$0.00$0.00
TABLE 2: Ordering Period 2FacilityOperationalTABLE 5: Ordering Period 5FacilityOperational
Hourly (hr)Overtime (hr)12 Hour DayOvertime (hr)Hourly (hr)Overtime (hr)12 Hour DayOvertime (hr)
Program Manager$0.00$0.00$0.00$0.00Program Manager$0.00$0.00$0.00$0.00
Systems Engineer$0.00$0.00$0.00$0.00Systems Engineer$0.00$0.00$0.00$0.00
Project Manager (Search and ROV Operations)$0.00$0.00$0.00$0.00Project Manager (Search and ROV Operations)$0.00$0.00$0.00$0.00
Assistant Project Manager (Search Operations)$0.00$0.00$0.00$0.00Assistant Project Manager (Search Operations)$0.00$0.00$0.00$0.00
Assistant Project Manager (ROV Operations)$0.00$0.00$0.00$0.00Assistant Project Manager (ROV Operations)$0.00$0.00$0.00$0.00
Senior Technician$0.00$0.00$0.00$0.00Senior Technician$0.00$0.00$0.00$0.00
Lead Electronic Techician$0.00$0.00$0.00$0.00Lead Electronic Techician$0.00$0.00$0.00$0.00
Lead Operator Techician$0.00$0.00$0.00$0.00Lead Operator Techician$0.00$0.00$0.00$0.00
Electronic Techician$0.00$0.00$0.00$0.00Electronic Techician$0.00$0.00$0.00$0.00
Operator Techician$0.00$0.00$0.00$0.00Operator Techician$0.00$0.00$0.00$0.00
Logistics/Financial Assistant$0.00$0.00$0.00$0.00Logistics/Financial Assistant$0.00$0.00$0.00$0.00
Technician$0.00$0.00$0.00$0.00Technician$0.00$0.00$0.00$0.00
TABLE 3: Ordering Period 3FacilityOperational
Hourly (hr)Overtime (hr)12 Hour DayOvertime (hr)
Program Manager$0.00$0.00$0.00$0.00
Systems Engineer$0.00$0.00$0.00$0.00
Project Manager (Search and ROV Operations)$0.00$0.00$0.00$0.00
Assistant Project Manager (Search Operations)$0.00$0.00$0.00$0.00
Assistant Project Manager (ROV Operations)$0.00$0.00$0.00$0.00
Senior Technician$0.00$0.00$0.00$0.00
Lead Electronic Techician$0.00$0.00$0.00$0.00
Lead Operator Techician$0.00$0.00$0.00$0.00
Electronic Techician$0.00$0.00$0.00$0.00
Operator Techician$0.00$0.00$0.00$0.00
Logistics/Financial Assistant$0.00$0.00$0.00$0.00
Technician$0.00$0.00$0.00$0.00

E6-10

Schedule E: Fixed Price Scheduled Equipment Rates (Tables 6 - 10 from RFP section B)
* The equipment listed is for illustrative purposes. Offeror is free to propose additional or alternative equipment.
TABLE 6: Ordering Period 1Operational Day RateStandby/Transit Day RateTABLE 9: Ordering Period 4Operational Day RateStandby/Transit Day Rate
Towed Side Scan Sonar (Maximum Operational Depth 1,000')$0.00$0.00Towed Side Scan Sonar (Maximum Operational Depth 1,000')$0.00$0.00
Towed Side Scan Sonar (Maximum Operational Depth 10,000')$0.00$0.00Towed Side Scan Sonar (Maximum Operational Depth 10,000')$0.00$0.00
Towed Side Scan Sonar (Maximum Operational Depth 20,000')$0.00$0.00Towed Side Scan Sonar (Maximum Operational Depth 20,000')$0.00$0.00
AUV (Max Operational Depth 1,000')$0.00$0.00AUV (Max Operational Depth 1,000')$0.00$0.00
AUV (Max Operational Depth 10,000')$0.00$0.00AUV (Max Operational Depth 10,000')$0.00$0.00
AUV (Max Operational Depth 20,000')$0.00$0.00AUV (Max Operational Depth 20,000')$0.00$0.00
ROV (Max Operational Depth 1,000')$0.00$0.00ROV (Max Operational Depth 1,000')$0.00$0.00
ROV (Max Operational Depth 10,000')$0.00$0.00ROV (Max Operational Depth 10,000')$0.00$0.00
ROV (Max Operational Depth 20,000')$0.00$0.00ROV (Max Operational Depth 20,000')$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
TABLE 7: Ordering Period 2Operational Day RateStandby/Transit Day RateTABLE 10: Ordering Period 5Operational Day RateStandby/Transit Day Rate
Towed Side Scan Sonar (Maximum Operational Depth 1,000')$0.00$0.00Towed Side Scan Sonar (Maximum Operational Depth 1,000')$0.00$0.00
Towed Side Scan Sonar (Maximum Operational Depth 10,000')$0.00$0.00Towed Side Scan Sonar (Maximum Operational Depth 10,000')$0.00$0.00
Towed Side Scan Sonar (Maximum Operational Depth 20,000')$0.00$0.00Towed Side Scan Sonar (Maximum Operational Depth 20,000')$0.00$0.00
AUV (Max Operational Depth 1,000')$0.00$0.00AUV (Max Operational Depth 1,000')$0.00$0.00
AUV (Max Operational Depth 10,000')$0.00$0.00AUV (Max Operational Depth 10,000')$0.00$0.00
AUV (Max Operational Depth 20,000')$0.00$0.00AUV (Max Operational Depth 20,000')$0.00$0.00
ROV (Max Operational Depth 1,000')$0.00$0.00ROV (Max Operational Depth 1,000')$0.00$0.00
ROV (Max Operational Depth 10,000')$0.00$0.00ROV (Max Operational Depth 10,000')$0.00$0.00
ROV (Max Operational Depth 20,000')$0.00$0.00ROV (Max Operational Depth 20,000')$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
TABLE 8: Ordering Period 3Facility
Hourly (hr)Overtime (hr)
Towed Side Scan Sonar (Maximum Operational Depth 1,000')$0.00$0.00
Towed Side Scan Sonar (Maximum Operational Depth 10,000')$0.00$0.00
Towed Side Scan Sonar (Maximum Operational Depth 20,000')$0.00$0.00
AUV (Max Operational Depth 1,000')$0.00$0.00
AUV (Max Operational Depth 10,000')$0.00$0.00
AUV (Max Operational Depth 20,000')$0.00$0.00
ROV (Max Operational Depth 1,000')$0.00$0.00
ROV (Max Operational Depth 10,000')$0.00$0.00
ROV (Max Operational Depth 20,000')$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00

E11-13

Schedule E: Fixed Price Scheduled Equipment Rates (Tables 11 - 13 from RFP section B)
TABLE 11: Schedule Hazard / Hardship PayHazard / Hardship PremiumDescription
Ordering Period 1 (12 Months)0.0%as a % of Scheduled Labor Rates
Ordering Period 2 (12 Months)0.0%as a % of Scheduled Labor Rates
Ordering Period 3 (12 Months)0.0%as a % of Scheduled Labor Rates
Ordering Period 4 (12 Months)0.0%as a % of Scheduled Labor Rates
Ordering Period 5 (12 Months)0.0%as a % of Scheduled Labor Rates
TABLE 12: Facility RatesFacilities Cost
Ordering Period 1 (12 Months)$0.00
Ordering Period 2 (12 Months)$0.00
Ordering Period 3 (12 Months)$0.00
Ordering Period 4 (12 Months)$0.00
Ordering Period 5 (12 Months)$0.00
TABLE 13: Estimated Burden PercentageEst. Burden Percentage
Ordering Period 1 (12 Months)0.0%
Ordering Period 2 (12 Months)0.0%
Ordering Period 3 (12 Months)0.0%
Ordering Period 4 (12 Months)0.0%
Ordering Period 5 (12 Months)0.0%

D1-OP1

Schedule D: Scenario 1- Facility Operations Cost and Pricing Format (Ordering Period 1)
Col. ACol. BCol. CCol. DCol. E (A x C)Col. F (B x D)
Minimum Number RequiredSample Standard HoursSample Overtime HoursStandard RateOvertime RateTotal Standard Time AmountTotal Overtime Amount
Program Manager115600$0.00$0.00$0.00$0.00
Systems Engineer115600$0.00$0.00$0.00$0.00
Project Manager (Search and ROV Operations)23120416$0.00$0.00$0.00$0.00
Assistant Project Manager (Search Operations)23120416$0.00$0.00$0.00$0.00
Assistant Project Manager (ROV Operations)23120416$0.00$0.00$0.00$0.00
Senior Technician46240832$0.00$0.00$0.00$0.00
Lead Electronic Techician23120416$0.00$0.00$0.00$0.00
Lead Operator Techician23120416$0.00$0.00$0.00$0.00
Electronic Techician34680624$0.00$0.00$0.00$0.00
Operator Techician34680624$0.00$0.00$0.00$0.00
Logistics/Financial Assistant11560208$0.00$0.00$0.00$0.00
Technician000$0.00$0.00$0.00$0.00
Subtotals$0.00$0.00
Total of Col. E and Col. F$0.00
Facility Rate (Insert Amount from Table 12)$0.00
Award Fee$0.00
Total$0.00

D1-OP2

Schedule D: Scenario 1- Facility Operations Cost and Pricing Format (Ordering Period 2)
Col. ACol. BCol. CCol. DCol. E (A x C)Col. F (B x D)
Minimum Number RequiredSample Standard HoursSample Overtime HoursStandard RateOvertime RateTotal Standard Time AmountTotal Overtime Amount
Program Manager115600$0.00$0.00$0.00$0.00
Systems Engineer115600$0.00$0.00$0.00$0.00
Project Manager (Search and ROV Operations)23120416$0.00$0.00$0.00$0.00
Assistant Project Manager (Search Operations)23120416$0.00$0.00$0.00$0.00
Assistant Project Manager (ROV Operations)23120416$0.00$0.00$0.00$0.00
Senior Technician46240832$0.00$0.00$0.00$0.00
Lead Electronic Techician23120416$0.00$0.00$0.00$0.00
Lead Operator Techician23120416$0.00$0.00$0.00$0.00
Electronic Techician34680624$0.00$0.00$0.00$0.00
Operator Techician34680624$0.00$0.00$0.00$0.00
Logistics/Financial Assistant11560208$0.00$0.00$0.00$0.00
Technician000$0.00$0.00$0.00$0.00
Subtotals$0.00$0.00
Total of Col. E and Col. F$0.00
Facility Rate (Insert Amount from Table 12)$0.00
Award Fee$0.00
Total$0.00

D1-OP3

Schedule D: Scenario 1- Facility Operations Cost and Pricing Format (Ordering Period 3)
Col. ACol. BCol. CCol. DCol. E (A x C)Col. F (B x D)
Minimum Number RequiredSample Standard HoursSample Overtime HoursStandard RateOvertime RateTotal Standard Time AmountTotal Overtime Amount
Program Manager115600$0.00$0.00$0.00$0.00
Systems Engineer115600$0.00$0.00$0.00$0.00
Project Manager (Search and ROV Operations)23120416$0.00$0.00$0.00$0.00
Assistant Project Manager (Search Operations)23120416$0.00$0.00$0.00$0.00
Assistant Project Manager (ROV Operations)23120416$0.00$0.00$0.00$0.00
Senior Technician46240832$0.00$0.00$0.00$0.00
Lead Electronic Techician23120416$0.00$0.00$0.00$0.00
Lead Operator Techician23120416$0.00$0.00$0.00$0.00
Electronic Techician34680624$0.00$0.00$0.00$0.00
Operator Techician34680624$0.00$0.00$0.00$0.00
Logistics/Financial Assistant11560208$0.00$0.00$0.00$0.00
Technician000$0.00$0.00$0.00$0.00
Subtotals$0.00$0.00
Total of Col. E and Col. F$0.00
Facility Rate (Insert Amount from Table 12)$0.00
Award Fee$0.00
Total$0.00

D1-OP4

Schedule D: Scenario 1- Facility Operations Cost and Pricing Format (Ordering Period 4)
Col. ACol. BCol. CCol. DCol. E (A x C)Col. F (B x D)
Minimum Number RequiredSample Standard HoursSample Overtime HoursStandard RateOvertime RateTotal Standard Time AmountTotal Overtime Amount
Program Manager115600$0.00$0.00$0.00$0.00
Systems Engineer115600$0.00$0.00$0.00$0.00
Project Manager (Search and ROV Operations)23120416$0.00$0.00$0.00$0.00
Assistant Project Manager (Search Operations)23120416$0.00$0.00$0.00$0.00
Assistant Project Manager (ROV Operations)23120416$0.00$0.00$0.00$0.00
Senior Technician46240832$0.00$0.00$0.00$0.00
Lead Electronic Techician23120416$0.00$0.00$0.00$0.00
Lead Operator Techician23120416$0.00$0.00$0.00$0.00
Electronic Techician34680624$0.00$0.00$0.00$0.00
Operator Techician34680624$0.00$0.00$0.00$0.00
Logistics/Financial Assistant11560208$0.00$0.00$0.00$0.00
Technician000$0.00$0.00$0.00$0.00
Subtotals$0.00$0.00
Total of Col. E and Col. F$0.00
Facility Rate (Insert Amount from Table 12)$0.00
Award Fee$0.00
Total$0.00

D1-OP5

Schedule D: Scenario 1- Facility Operations Cost and Pricing Format (Ordering Period 5)
Col. ACol. BCol. CCol. DCol. E (A x C)Col. F (B x D)
Minimum Number RequiredSample Standard HoursSample Overtime HoursStandard RateOvertime RateTotal Standard Time AmountTotal Overtime Amount
Program Manager115600$0.00$0.00$0.00$0.00
Systems Engineer115600$0.00$0.00$0.00$0.00
Project Manager (Search and ROV Operations)23120416$0.00$0.00$0.00$0.00
Assistant Project Manager (Search Operations)23120416$0.00$0.00$0.00$0.00
Assistant Project Manager (ROV Operations)23120416$0.00$0.00$0.00$0.00
Senior Technician46240832$0.00$0.00$0.00$0.00
Lead Electronic Techician23120416$0.00$0.00$0.00$0.00
Lead Operator Techician23120416$0.00$0.00$0.00$0.00
Electronic Techician34680624$0.00$0.00$0.00$0.00
Operator Techician34680624$0.00$0.00$0.00$0.00
Logistics/Financial Assistant11560208$0.00$0.00$0.00$0.00
Technician000$0.00$0.00$0.00$0.00
Subtotals$0.00$0.00
Total of Col. E and Col. F$0.00
Facility Rate (Insert Amount from Table 12)$0.00
Award Fee$0.00
Total$0.00

D2-OP1

Schedule D: Scenario 2 - CURV21/Hugin, 4 Week Operation Cost and Pricing Format (Ordering Period 1)
Scheduled Costs - Table 1Col. ACol. BCol. C (A X B)Col. DCol. E (C + D)
Minimum Number Required12 Hour Days12 Hour Day Rate12 Hour Day AmountHazard/ Hardship PremiumTotal Amount
Project Manager (Search and ROV Operations)138$0.00$0.00$0.00$0.00
Assistant Project Manager (Search Operations)128$0.00$0.00$0.00$0.00
Assistant Project Manager (ROV Operations)128$0.00$0.00$0.00$0.00
Senior Technician256$0.00$0.00$0.00$0.00
Lead Electronic Techician128$0.00$0.00$0.00$0.00
Lead Operator Techician128$0.00$0.00$0.00$0.00
Electronic Techician128$0.00$0.00$0.00$0.00
Operator Techician128$0.00$0.00$0.00$0.00
Logistics/Financial Assistant110$0.00$0.00$0.00$0.00
Technician128$0.00$0.00$0.00$0.00
Total Scheduled Costs$0.00
Non-Scheduled Costs - Table 2Col. ACol. BCol. E (A + B)
Government Stipulated AmountApplicable Burden AmountTotal Amount
Subcontracts$500,000$0.00$500,000.00
In-house Non-Scheduled Labor (Engineering Labor)$25,000$0.00$25,000.00
In-house Non-Scheduled Labor (Non-Exempt Labor)$25,000$0.00$25,000.00
Material$50,000$0.00$50,000.00
Total Non-Scheduled Costs$600,000.00
Total Scheduled and Non-Scheduled Costs - Table 3
Total Scheduled Costs from Table 1$0.00
Total Non-Scheduled Cost from Table 2$600,000.00
Subtotal$600,000.00
Award Fee$60,000.00
Total$660,000.00

D2-OP2

Schedule D: Scenario 2 - CURV21/Hugin, 4 Week Operation Cost and Pricing Format (Ordering Period 2)
Scheduled Costs - Table 1Col. ACol. BCol. C (A X B)Col. DCol. E (C + D)
Minimum Number Required12 Hour Days12 Hour Day Rate12 Hour Day AmountHazard/ Hardship PremiumTotal Amount
Project Manager (Search and ROV Operations)138$0.00$0.00$0.00$0.00
Assistant Project Manager (Search Operations)128$0.00$0.00$0.00$0.00
Assistant Project Manager (ROV Operations)128$0.00$0.00$0.00$0.00
Senior Technician256$0.00$0.00$0.00$0.00
Lead Electronic Techician128$0.00$0.00$0.00$0.00
Lead Operator Techician128$0.00$0.00$0.00$0.00
Electronic Techician128$0.00$0.00$0.00$0.00
Operator Techician128$0.00$0.00$0.00$0.00
Logistics/Financial Assistant110$0.00$0.00$0.00$0.00
Technician128$0.00$0.00$0.00$0.00
Total Scheduled Costs$0.00
Non-Scheduled Costs - Table 2Col. ACol. BCol. E (A + B)
Government Stipulated AmountApplicable Burden AmountTotal Amount
Subcontracts$500,000$0.00$500,000.00
In-house Non-Scheduled Labor (Engineering Labor)$25,000$0.00$25,000.00
In-house Non-Scheduled Labor (Non-Exempt Labor)$25,000$0.00$25,000.00
Material$50,000$0.00$50,000.00
Total Non-Scheduled Costs$600,000.00
Total Scheduled and Non-Scheduled Costs - Table 3
Total Scheduled Costs from Table 1$0.00
Total Non-Scheduled Cost from Table 2$600,000.00
Subtotal$600,000.00
Award Fee$60,000.00
Total$660,000.00

D2-OP3

Schedule D: Scenario 2 - CURV21/Hugin, 4 Week Operation Cost and Pricing Format (Ordering Period 3)
Scheduled Costs - Table 1Col. ACol. BCol. C (A X B)Col. DCol. E (C + D)
Minimum Number Required12 Hour Days12 Hour Day Rate12 Hour Day AmountHazard/ Hardship PremiumTotal Amount
Project Manager (Search and ROV Operations)138$0.00$0.00$0.00$0.00
Assistant Project Manager (Search Operations)128$0.00$0.00$0.00$0.00
Assistant Project Manager (ROV Operations)128$0.00$0.00$0.00$0.00
Senior Technician256$0.00$0.00$0.00$0.00
Lead Electronic Techician128$0.00$0.00$0.00$0.00
Lead Operator Techician128$0.00$0.00$0.00$0.00
Electronic Techician128$0.00$0.00$0.00$0.00
Operator Techician128$0.00$0.00$0.00$0.00
Logistics/Financial Assistant110$0.00$0.00$0.00$0.00
Technician128$0.00$0.00$0.00$0.00
Total Scheduled Costs$0.00
Non-Scheduled Costs - Table 2Col. ACol. BCol. E (A + B)
Government Stipulated AmountApplicable Burden AmountTotal Amount
Subcontracts$500,000$0.00$500,000.00
In-house Non-Scheduled Labor (Engineering Labor)$25,000$0.00$25,000.00
In-house Non-Scheduled Labor (Non-Exempt Labor)$25,000$0.00$25,000.00
Material$50,000$0.00$50,000.00
Total Non-Scheduled Costs$600,000.00
Total Scheduled and Non-Scheduled Costs - Table 3
Total Scheduled Costs from Table 1$0.00
Total Non-Scheduled Cost from Table 2$600,000.00
Subtotal$600,000.00
Award Fee$60,000.00
Total$660,000.00

D2-OP4

Schedule D: Scenario 2 - CURV21/Hugin, 4 Week Operation Cost and Pricing Format (Ordering Period 4)
Scheduled Costs - Table 1Col. ACol. BCol. C (A X B)Col. DCol. E (C + D)
Minimum Number Required12 Hour Days12 Hour Day Rate12 Hour Day AmountHazard/ Hardship PremiumTotal Amount
Project Manager (Search and ROV Operations)138$0.00$0.00$0.00$0.00
Assistant Project Manager (Search Operations)128$0.00$0.00$0.00$0.00
Assistant Project Manager (ROV Operations)128$0.00$0.00$0.00$0.00
Senior Technician256$0.00$0.00$0.00$0.00
Lead Electronic Techician128$0.00$0.00$0.00$0.00
Lead Operator Techician128$0.00$0.00$0.00$0.00
Electronic Techician128$0.00$0.00$0.00$0.00
Operator Techician128$0.00$0.00$0.00$0.00
Logistics/Financial Assistant110$0.00$0.00$0.00$0.00
Technician128$0.00$0.00$0.00$0.00
Total Scheduled Costs$0.00
Non-Scheduled Costs - Table 2Col. ACol. BCol. E (A + B)
Government Stipulated AmountApplicable Burden AmountTotal Amount
Subcontracts$500,000$0.00$500,000.00
In-house Non-Scheduled Labor (Engineering Labor)$25,000$0.00$25,000.00
In-house Non-Scheduled Labor (Non-Exempt Labor)$25,000$0.00$25,000.00
Material$50,000$0.00$50,000.00
Total Non-Scheduled Costs$600,000.00
Total Scheduled and Non-Scheduled Costs - Table 3
Total Scheduled Costs from Table 1$0.00
Total Non-Scheduled Cost from Table 2$600,000.00
Subtotal$600,000.00
Award Fee$60,000.00
Total$660,000.00

D2-OP5

Schedule D: Scenario 2 - CURV21/Hugin, 4 Week Operation Cost and Pricing Format (Ordering Period 5)
Scheduled Costs - Table 1Col. ACol. BCol. C (A X B)Col. DCol. E (C + D)
Minimum Number Required12 Hour Days12 Hour Day Rate12 Hour Day AmountHazard/ Hardship PremiumTotal Amount
Project Manager (Search and ROV Operations)138$0.00$0.00$0.00$0.00
Assistant Project Manager (Search Operations)128$0.00$0.00$0.00$0.00
Assistant Project Manager (ROV Operations)128$0.00$0.00$0.00$0.00
Senior Technician256$0.00$0.00$0.00$0.00
Lead Electronic Techician128$0.00$0.00$0.00$0.00
Lead Operator Techician128$0.00$0.00$0.00$0.00
Electronic Techician128$0.00$0.00$0.00$0.00
Operator Techician128$0.00$0.00$0.00$0.00
Logistics/Financial Assistant110$0.00$0.00$0.00$0.00
Technician128$0.00$0.00$0.00$0.00
Total Scheduled Costs$0.00
Non-Scheduled Costs - Table 2Col. ACol. BCol. E (A + B)
Government Stipulated AmountApplicable Burden AmountTotal Amount
Subcontracts$500,000$0.00$500,000.00
In-house Non-Scheduled Labor (Engineering Labor)$25,000$0.00$25,000.00
In-house Non-Scheduled Labor (Non-Exempt Labor)$25,000$0.00$25,000.00
Material$50,000$0.00$50,000.00
Total Non-Scheduled Costs$600,000.00
Total Scheduled and Non-Scheduled Costs - Table 3
Total Scheduled Costs from Table 1$0.00
Total Non-Scheduled Cost from Table 2$600,000.00
Subtotal$600,000.00
Award Fee$60,000.00
Total$660,000.00

D3-OP1

Schedule D: Scenario 3 - DeepDrone/SWISS, 3 Week Operation Cost and Pricing Format (Ordering Period 1)
Scheduled Costs - Table 1Col. ACol. BCol. C (A X B)Col. DCol. E (C + D)
Minimum Number Required12 Hour Days12 Hour Day Rate12 Hour Day AmountHazard/ Hardship PremiumTotal Amount
Project Manager (Search and ROV Operations)131$0.00$0.00$0.00$0.00
Assistant Project Manager (Search Operations)121$0.00$0.00$0.00$0.00
Assistant Project Manager (ROV Operations)121$0.00$0.00$0.00$0.00
Senior Technician242$0.00$0.00$0.00$0.00
Lead Electronic Techician121$0.00$0.00$0.00$0.00
Lead Operator Techician121$0.00$0.00$0.00$0.00
Electronic Techician121$0.00$0.00$0.00$0.00
Operator Techician121$0.00$0.00$0.00$0.00
Logistics/Financial Assistant15$0.00$0.00$0.00$0.00
Technician121$0.00$0.00$0.00$0.00
Total Scheduled Costs$0.00
Non-Scheduled Costs - Table 2Col. ACol. BCol. E (A + B)
Government Stipulated AmountApplicable Burden AmountTotal Amount
Subcontracts$300,000$0.00$300,000.00
In-house Non-Scheduled Labor (Engineering Labor)$12,500$0.00$12,500.00
In-house Non-Scheduled Labor (Non-Exempt Labor)$12,500$0.00$12,500.00
Material$25,000$0.00$25,000.00
Total Non-Scheduled Costs$350,000.00
Total Scheduled and Non-Scheduled Costs - Table 3
Total Scheduled Costs from Table 1$0.00
Total Non-Scheduled Cost from Table 2$350,000.00
Subtotal$350,000.00
Award Fee$35,000.00
Total$385,000.00

D3-OP2

Schedule D: Scenario 3 - DeepDrone/SWISS, 3 Week Operation Cost and Pricing Format (Ordering Period 2)
Scheduled Costs - Table 1Col. ACol. BCol. C (A X B)Col. DCol. E (C + D)
Minimum Number Required12 Hour Days12 Hour Day Rate12 Hour Day AmountHazard/ Hardship PremiumTotal Amount
Project Manager (Search and ROV Operations)131$0.00$0.00$0.00$0.00
Assistant Project Manager (Search Operations)121$0.00$0.00$0.00$0.00
Assistant Project Manager (ROV Operations)121$0.00$0.00$0.00$0.00
Senior Technician242$0.00$0.00$0.00$0.00
Lead Electronic Techician121$0.00$0.00$0.00$0.00
Lead Operator Techician121$0.00$0.00$0.00$0.00
Electronic Techician121$0.00$0.00$0.00$0.00
Operator Techician121$0.00$0.00$0.00$0.00
Logistics/Financial Assistant15$0.00$0.00$0.00$0.00
Technician121$0.00$0.00$0.00$0.00
Total Scheduled Costs$0.00
Non-Scheduled Costs - Table 2Col. ACol. BCol. E (A + B)
Government Stipulated AmountApplicable Burden AmountTotal Amount
Subcontracts$300,000$0.00$300,000.00
In-house Non-Scheduled Labor (Engineering Labor)$12,500$0.00$12,500.00
In-house Non-Scheduled Labor (Non-Exempt Labor)$12,500$0.00$12,500.00
Material$25,000$0.00$25,000.00
Total Non-Scheduled Costs$350,000.00
Total Scheduled and Non-Scheduled Costs - Table 3
Total Scheduled Costs from Table 1$0.00
Total Non-Scheduled Cost from Table 2$350,000.00
Subtotal$350,000.00
Award Fee$35,000.00
Total$385,000.00

D3-OP3

Schedule D: Scenario 3 - DeepDrone/SWISS, 3 Week Operation Cost and Pricing Format (Ordering Period 3)
Scheduled Costs - Table 1Col. ACol. BCol. C (A X B)Col. DCol. E (C + D)
Minimum Number Required12 Hour Days12 Hour Day Rate12 Hour Day AmountHazard/ Hardship PremiumTotal Amount
Project Manager (Search and ROV Operations)131$0.00$0.00$0.00$0.00
Assistant Project Manager (Search Operations)121$0.00$0.00$0.00$0.00
Assistant Project Manager (ROV Operations)121$0.00$0.00$0.00$0.00
Senior Technician242$0.00$0.00$0.00$0.00
Lead Electronic Techician121$0.00$0.00$0.00$0.00
Lead Operator Techician121$0.00$0.00$0.00$0.00
Electronic Techician121$0.00$0.00$0.00$0.00
Operator Techician121$0.00$0.00$0.00$0.00
Logistics/Financial Assistant15$0.00$0.00$0.00$0.00
Technician121$0.00$0.00$0.00$0.00
Total Scheduled Costs$0.00
Non-Scheduled Costs - Table 2Col. ACol. BCol. E (A + B)
Government Stipulated AmountApplicable Burden AmountTotal Amount
Subcontracts$300,000$0.00$300,000.00
In-house Non-Scheduled Labor (Engineering Labor)$12,500$0.00$12,500.00
In-house Non-Scheduled Labor (Non-Exempt Labor)$12,500$0.00$12,500.00
Material$25,000$0.00$25,000.00
Total Non-Scheduled Costs$350,000.00
Total Scheduled and Non-Scheduled Costs - Table 3
Total Scheduled Costs from Table 1$0.00
Total Non-Scheduled Cost from Table 2$350,000.00
Subtotal$350,000.00
Award Fee$35,000.00
Total$385,000.00

D3-OP4

Schedule D: Scenario 3 - DeepDrone/SWISS, 3 Week Operation Cost and Pricing Format (Ordering Period 4)
Scheduled Costs - Table 1Col. ACol. BCol. C (A X B)Col. DCol. E (C + D)
Minimum Number Required12 Hour Days12 Hour Day Rate12 Hour Day AmountHazard/ Hardship PremiumTotal Amount
Project Manager (Search and ROV Operations)131$0.00$0.00$0.00$0.00
Assistant Project Manager (Search Operations)121$0.00$0.00$0.00$0.00
Assistant Project Manager (ROV Operations)121$0.00$0.00$0.00$0.00
Senior Technician242$0.00$0.00$0.00$0.00
Lead Electronic Techician121$0.00$0.00$0.00$0.00
Lead Operator Techician121$0.00$0.00$0.00$0.00
Electronic Techician121$0.00$0.00$0.00$0.00
Operator Techician121$0.00$0.00$0.00$0.00
Logistics/Financial Assistant15$0.00$0.00$0.00$0.00
Technician121$0.00$0.00$0.00$0.00
Total Scheduled Costs$0.00
Non-Scheduled Costs - Table 2Col. ACol. BCol. E (A + B)
Government Stipulated AmountApplicable Burden AmountTotal Amount
Subcontracts$300,000$0.00$300,000.00
In-house Non-Scheduled Labor (Engineering Labor)$12,500$0.00$12,500.00
In-house Non-Scheduled Labor (Non-Exempt Labor)$12,500$0.00$12,500.00
Material$25,000$0.00$25,000.00
Total Non-Scheduled Costs$350,000.00
Total Scheduled and Non-Scheduled Costs - Table 3
Total Scheduled Costs from Table 1$0.00
Total Non-Scheduled Cost from Table 2$350,000.00
Subtotal$350,000.00
Award Fee$35,000.00
Total$385,000.00

D3-OP5

Schedule D: Scenario 3 - DeepDrone/SWISS, 3 Week Operation Cost and Pricing Format (Ordering Period 5)
Scheduled Costs - Table 1Col. ACol. BCol. C (A X B)Col. DCol. E (C + D)
Minimum Number Required12 Hour Days12 Hour Day Rate12 Hour Day AmountHazard/ Hardship PremiumTotal Amount
Project Manager (Search and ROV Operations)131$0.00$0.00$0.00$0.00
Assistant Project Manager (Search Operations)121$0.00$0.00$0.00$0.00
Assistant Project Manager (ROV Operations)121$0.00$0.00$0.00$0.00
Senior Technician242$0.00$0.00$0.00$0.00
Lead Electronic Techician121$0.00$0.00$0.00$0.00
Lead Operator Techician121$0.00$0.00$0.00$0.00
Electronic Techician121$0.00$0.00$0.00$0.00
Operator Techician121$0.00$0.00$0.00$0.00
Logistics/Financial Assistant15$0.00$0.00$0.00$0.00
Technician121$0.00$0.00$0.00$0.00
Total Scheduled Costs$0.00
Non-Scheduled Costs - Table 2Col. ACol. BCol. E (A + B)
Government Stipulated AmountApplicable Burden AmountTotal Amount
Subcontracts$300,000$0.00$300,000.00
In-house Non-Scheduled Labor (Engineering Labor)$12,500$0.00$12,500.00
In-house Non-Scheduled Labor (Non-Exempt Labor)$12,500$0.00$12,500.00
Material$25,000$0.00$25,000.00
Total Non-Scheduled Costs$350,000.00
Total Scheduled and Non-Scheduled Costs - Table 3
Total Scheduled Costs from Table 1$0.00
Total Non-Scheduled Cost from Table 2$350,000.00
Subtotal$350,000.00
Award Fee$35,000.00
Total$385,000.00

D4-Total

Schedule D: Summary of Total Costs for Contract
SCENARIO 1SCENARIO 2SCENARIO 3TOTAL
Ordering Period 1$0.00$660,000.00$385,000.00$1,045,000.00
Ordering Period 2$0.00$660,000.00$385,000.00$1,045,000.00
Ordering Period 3$0.00$660,000.00$385,000.00$1,045,000.00
Ordering Period 4$0.00$660,000.00$385,000.00$1,045,000.00
Ordering Period 5$0.00$660,000.00$385,000.00$1,045,000.00
TOTAL$0.00$3,300,000.00$1,925,000.00$5,225,000.00