J-0200000-06 - ELINs.xlsx

XLSX spreadsheet 137 KB Posted

Attached to
Regional Grounds Maintenance and Landscaping Services Hampton Roads AOR
Solicitation number
N4008520R0148
Issued by

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instruction Coverpage

ATTACHMENT J-0200000-06
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N40085-20-R-0148
EXHIBIT A-E
Instructions For Filling Out Elins
Introduction:

All grounds to be maintained as a result of this contract are classified into three major Categories based on the way those areas are used by the Government. The Categories are "Improved Grounds" "Semi-Improved Grounds" and "Un-Improved Grounds".

Improved Grounds are defined as; Areas within the built-up section of an installation which contains occupied buildings, lawns and landscape development, parade grounds, drill fields, athletic facilities, cemeteries, golf courses (except roughs), and similar areas, and include the maintenance and care of ornamental and decorative growth, such as shrubs and flowers and other plantings that are appurtenant to and within lawn areas.

Semi-Improved Grounds are defined as; Areas within an installation containing open fields, airfields, small arms ranges, ammunition storage, and similar areas that are not maintained for beautification. They are maintained to prevent interference with operational needs.

Un-Improved Grounds are defined as: Areas within an installation containing agricultural areas, pastures, forests, swamps, marshes, deserts, and rocky or barren areas that are only maintained for access roads, fire breaks, utility right-of-ways, and perimeter or other fencing security requirements.

The level of effort required to Maintain Improved grounds is separated into four Common Output Levels or COLS, with COL1 being the highest level of service and COL4 being the lowest level of service. The COLS were developed to allow the Government to control the cost of grounds maintenance by reducing the required level of effort during times of tight budgets, even if the lower level of service would result in a less than pleasing appearance to the installation in general.

Elin Instructions:

The Contractor shall determine the level of effort required to maintain an average acer grounds at each level defined by an Elin. Those levels are as follows in order from most effort to least effort: (Improved Grounds: COL1 through COL4) or (Semi-Improved) or (Un-Improved). The Contractor shall determine an average level of effort for each COL and all Elins requiring the same COL level shall be priced the same per acer price.

All Elins shall be give a unit price. Even Elins that have a quantity of zero (0) shall be priced by the Contractor at the same per acre unit price as the other Elins of the same COL level or grounds type.

The Contractor shall take note and consider him/her self informed that even though an Elin currently has a quantity of zero (0) or some other value, the Government may increase or decrease that quantity without limit based on the Governments ever changing use, needs and funds available.

The Government reserves the right under this contract to change how each and every acre is designated based on its changing use of the grounds and the funds available to maintain those grounds.

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6'

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

IN ACCORDANCE WITH SECTION C, C.10.1.l

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.

Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Posts Set in Concrete/Asphalt.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.

Surface Depth to Match Surrounding.

Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.

IN ACCORDANCE WITH SECTION C, C.10.2

ELIN A001FJ

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

6' Fence Height Driven Posts

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, 6' Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, 6' Height, Free-Standing

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

With Barbwire, 7' Fence Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, With Barbwire, 7' Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, With Barbwire, 7' Height, Free-Standing

SUMMARY SHEET

ATTACHMENT J-0200000-06
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N40085-20-R-0148
EXHIBITS A-E
DescriptionRECURRINGNON-RECURRING
BASE YEAR$ - 0$ - 0
OPTION 1$ - 0$ - 0
OPTION 2$ - 0$ - 0
OPTION 3$ - 0$ - 0
OPTION 4$ - 0$ - 0

CONTRACT TOTAL $ - 0

RECURRING TOTAL$ - 0
NON-RECURRING TOTAL$ - 0

Line Item 0002 Base Period - Indefinite Quantity Work ELIN A1001 through A1004

PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK

IN ACCORDANCE WITH SECTION J, EXHIBIT J-TE1503050-04

ELIN A1001 through A1004 Line Item 0002 Base Period - Indefinite Quantity Work ELIN A1001 through A1004

PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK

IN ACCORDANCE WITH SECTION J, EXHIBIT J-TE1503050-04

ELIN A1001 through A1004

ELINs-Base Period-Recurring

ATTACHMENT J-0200000-06
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N40085-20-R-0148
EXHIBIT A
PROVIDE PRICES TO PERFORM FACILITY SERVICES - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs A001 through A012
ELINSLINDescriptionQuantityUnit of IssueUnit PriceTotal
LINE ITEM 0001- Recurring Work Base Year
A001 Yorktown - CNRMA Grounds
A001AACOL 10AC$0.00$0.00NOTE
A001ABCOL 27.33AC$0.00$0.00**Provide a unit price for all entires regardless of quantity, in the event future quantities may be added.
A001ACCOL 377.03AC$0.00$0.00**Unit price must be rounded to the nearest cent (ex. $100.50)
A001ADCOL 40AC$0.00$0.00
A001AESemi-Improved840.14AC$0.00$0.00
A001AFUn-Improved0AC$0.00$0.00
A001AGParking Lot Maintenance (Hardscape)0AC$0.00$0.00
A001AHRoad Sweeping0LF$0.00$0.00

Yorktown CNRMA Subtotal $0.00

A002 Yorktown - Indian Head Grounds
A002AACOL 10AC$0.00$0.00
A002ABCOL 20AC$0.00$0.00
A002ACCOL 30AC$0.00$0.00
A002ADCOL 40AC$0.00$0.00
A002AESemi-Improved45.09AC$0.00$0.00
A002AFUn-Improved0AC$0.00$0.00
A002AGParking Lot Maintenance (Hardscape)0AC$0.00$0.00
A002AHRoad Sweeping0LF$0.00$0.00

Yorktown Indian Head Subtotal $0.00

A003 Cheatham - CNRMA Grounds
A003AACOL 10AC$0.00$0.00
A003ABCOL 20AC$0.00$0.00
A003ACCOL 396.16AC$0.00$0.00
A003ADCOL 40AC$0.00$0.00
A003AESemi-Improved105.11AC$0.00$0.00
A003AFUn-Improved0AC$0.00$0.00
A003AGParking Lot Maintenance (Hardscape)15.89AC$0.00$0.00
A003AHRoad Sweeping27,505LF$0.00$0.00

Cheatham CNRMA Subtotal $0.00

A004 WH (Warehouse) Cheatham - CNRMA Grounds
A004AACOL 10AC$0.00$0.00
A004ABCOL 20AC$0.00$0.00
A004ACCOL 330.96AC$0.00$0.00
A004ADCOL 40AC$0.00$0.00
A004AESemi-Improved0AC$0.00$0.00
A004AFUn-Improved0AC$0.00$0.00
A004AGParking Lot Maintenance (Hardscape)0AC$0.00$0.00
A004AHRoad Sweeping0LF$0.00$0.00

WH (Warehouse) Cheatham CNRMA Subtotal $0.00

A005 Cheatham - FLC Cheatham Grounds
A005AACOL 10AC$0.00$0.00
A005ABCOL 20AC$0.00$0.00
A005ACCOL 30AC$0.00$0.00
A005ADCOL 40AC$0.00$0.00
A005AESemi-Improved9.43AC$0.00$0.00
A005AFUn-Improved0AC$0.00$0.00
A005AGParking Lot Maintenance (Hardscape)0AC$0.00$0.00
A005AHRoad Sweeping0LF$0.00$0.00

Cheatham FLC Cheatham Subtotal $0.00

A006 Cheatham - FLC Norfolk Grounds
A006AACOL 10AC$0.00$0.00
A006ABCOL 20AC$0.00$0.00
A006ACCOL 30AC$0.00$0.00
A006ADCOL 40AC$0.00$0.00
A006AESemi-Improved19.51AC$0.00$0.00
A006AFUn-Improved0AC$0.00$0.00
A006AGParking Lot Maintenance (Hardscape)0AC$0.00$0.00
A006AHRoad Sweeping0LF$0.00$0.00

Cheatham FLC Norfolk Subtotal $0.00

A007 Cheatham - MWR Grounds (CNRMA)
A007AACOL 10AC$0.00$0.00
A007ABCOL 20AC$0.00$0.00
A007ACCOL 325.5AC$0.00$0.00
A007ADCOL 40AC$0.00$0.00
A007AESemi-Improved0AC$0.00$0.00
A007AFUn-Improved0AC$0.00$0.00
A007AGParking Lot Maintenance (Hardscape)0AC$0.00$0.00
A007AHRoad Sweeping0LF$0.00$0.00

Cheatham MWR (CNRMA) Subtotal $0.00

A008 Yorktown - MARFORCOM Grounds
A008AACOL 10AC$0.00$0.00
A008ABCOL 20AC$0.00$0.00
A008ACCOL 341.94AC$0.00$0.00
A008ADCOL 40AC$0.00$0.00
A008AESemi-Improved3.02AC$0.00$0.00
A008AFUn-Improved0AC$0.00$0.00
A008AGParking Lot Maintenance (Hardscape)0AC$0.00$0.00
A008AHRoad Sweeping0LF$0.00$0.00

Yorktown MARFORCOM Subtotal $0.00

A009 Fort Story - CNRMA Grounds
A009AACOL 10AC$0.00$0.00
A009ABCOL 26.47AC$0.00$0.00
A009ACCOL 3240.38AC$0.00$0.00
A009ADCOL 40AC$0.00$0.00
A009AESemi-Improved0AC$0.00$0.00
A009AFUn-Improved0AC$0.00$0.00
A009AGParking Lot Maintenance (Hardscape)1.1AC$0.00$0.00
A009AHRoad Sweeping50,899LF$0.00$0.00

Fort Story CNRMA Subtotal $0.00

A010 Little Creek - CNRMA Grounds
A010AACOL 10AC$0.00$0.00
A010ABCOL 26.88AC$0.00$0.00
A010ACCOL 3368.95AC$0.00$0.00
A010ADCOL 40AC$0.00$0.00
A010AESemi-Improved11.97AC$0.00$0.00
A010AFUn-Improved0AC$0.00$0.00
A010AGParking Lot Maintenance (Hardscape)71.02AC$0.00$0.00
A010AHRoad Sweeping97,997LF$0.00$0.00

Little Creek CNRMA Subtotal $0.00

A011 Little Creek - PWC Utilities Grounds (CNRMA)
A011AACOL 10AC$0.00$0.00
A011ABCOL 20AC$0.00$0.00
A011ACCOL 312.14AC$0.00$0.00
A011ADCOL 40AC$0.00$0.00
A011AESemi-Improved0AC$0.00$0.00
A011AFUn-Improved0AC$0.00$0.00
A011AGParking Lot Maintenance (Hardscape)0AC$0.00$0.00
A011AHRoad Sweeping0LF$0.00$0.00

Little Creek PWC Utilities (CNRMA) Subtotal $0.00

A012 Little Creek - COMNAVSPECWARFO Grounds (CNRMA)
A012AACOL 10AC$0.00$0.00
A012ABCOL 20AC$0.00$0.00
A012ACCOL 35.68AC$0.00$0.00
A012ADCOL 40AC$0.00$0.00
A012AESemi-Improved0AC$0.00$0.00
A012AFUn-Improved0AC$0.00$0.00
A012AGParking Lot Maintenance (Hardscape)0AC$0.00$0.00
A012AHRoad Sweeping0LF$0.00$0.00

Little Creek COMNAVSPECWARFO (CNRMA) Subtotal $0.00

LINE ITEM 0001- Recurring Work Base Year TOTAL (A001 TO A012) $0.00

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

ELINs-Base Period-Non Recurring

ATTACHMENT J-0200000-06
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N40085-20-R-0148
EXHIBIT A
Line Item 0002 Non-Recurring Work Price - Base Period
PROVIDE PRICES FOR GROUNDS MAINTENANCE AND LANDSCAPING - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs A700 through A787
ELINProduct Name (120 Characters)Description ExtendedEstimated QuantityUnit of IssueUnit PriceExtended Price
A700Prestige Grass Mowing
Grass shall be mowed and trimmed to a uniform height of 3 inches and a particular pattern if requested. Edge to provide a uniform edged cut. All debris shall be removed. Grass clippings shall also be removed from walkways, driveways, hard surfaces, etc., promptly upon completion of the work.
Work to be completed in 2 working days.10AC$ - 0$ - 0
A701General Grass Mowing
Grass shall be mowed and trimmed to a uniform height of 3 inches. All debris shall be removed. Grass clippings shall also be removed from walkways, driveways, hard surfaces, etc., promptly upon completion of the work.
Work to be completed in 2 working days.50AC$ - 0$ - 0
A702Vacant Housing Mowing
Grass shall be mowed and trimmed to a uniform height of 3 inches regardless of existing grass height, fences or shape of lot. All debris shall be removed. Grass clippings shall also be removed from walkways, driveways, hard surfaces, etc., promptly upon completion of the work. Maximum lot size is 2,400 S.F.
Work to be completed in 2 working days.30EA$ - 0$ - 0
A703Field Mowing
Grass shall be mowed and trimmed to a uniform height of 4 inches.
Work to be completed in 2 working days.100AC$ - 0$ - 0
A704Industrial Mowing
Grass shall be mowed and trimmed to a uniform height of 4 inches. Storage areas, railroad beds and ramps, etc.. are considered Industrial Areas.
Work will be completed in 2 working days.20AC$ - 0$ - 0
A705Mound Mowing
Grass shall be mowed and trimmed to a uniform height of 6 inches. Mounds are man-made rises that may cover buildings or structures. Excess clippings and debris shall be removed same day as cutting.

Work to be completed in 2 working days.

10AC$ - 0$ - 0
A706Edging
Edging to provide a uniform edged cut. Grass clippings shall be removed from walkways, driveways, hard surfaces, etc., promptly upon completion of the work.
Work to be completed in 2 working days.5,000LF$ - 0$ - 0
A707Border Edging (Plastic) for Plant Beds
Install plastic of an industrial polyethylene specifically designed for this purpose, per manufacturer's specifications to provide a clear cut division between planted areas and adjacent lawns. Remove debris daily.
Work to be completed in 4 working days.500LF$ - 0$ - 0
A708Border Edging (Wood) for Plant Beds
Install treated wood timbers specifically designed for this purpose, per manufacturer's specifications to provide a clear cut division between planted areas and adjacent lawns. Timber minimum is 2" x 6". Remove debris daily.
Work to be completed in 4 working days.200LF$ - 0$ - 0
A709Border Edging (Steel) for Plant Beds
Install metal border edging specifically designed for this purpose, per manufacturer's specifications to provide a clear cut division between planted areas and adjacent lawns. The metal minimum is 1/4" thick x 5' wide. Remove debris daily.
Work to be completed in 4 working days.200LF$ - 0$ - 0
A710Leaf and Debris Raking for Lawns and Plant Beds
Rake and remove leaves, pine straw, pine cones, limbs, gumballs, nuts and other accumulated debris from lawns or Plant Bed areas. All debris shall be removed the same day as raked.
Work to be completed in 4 working days.50AC$ - 0$ - 0
A711Sod Placement - Fescue
Provide sod resulting in a level, healthy grass area per industry standards and manufacturer's recommendations.
Work to be completed in 16 working days.1,000SY$ - 0$ - 0
A712Sod Placement - Bermuda
Provide sod resulting in a level, healthy grass area per industry standards and manufacturer's recommendations.
Work to be completed in 16 working days.2,000SY$ - 0$ - 0
A713Dethatch and Aerate Lawns
Set tines according to type of grass and de-thatch by machine or by hand in small areas. Remove thatched material from the lawn and dispose of debris daily.
Work shall be completed within 4 working days.20AC$ - 0$ - 0
A714Seeding with Rye/Fescue
Place seed with equipment and application quantities suggested by the manufacturer.
Work will be completed in 2 working days.20AC$ - 0$ - 0
A715Seeding with Bermuda (Fall - Unhulled)
Place seed with equipment and application quantities suggested by the manufacturer.
Work will be completed in 2 working days.50AC$ - 0$ - 0
A716Seeding with Bermuda (Spring - Hulled)
Place seed with equipment and application quantities suggested by the manufacturer.
Work will be completed in 2 working days.50AC$ - 0$ - 0
A717Fertilization (with 25-4-7)
Uniformly apply granular slow release type fertilizer for lawns per manufacturer's recommendations.
Work will be completed in 2 working days.10,000LB$ - 0$ - 0
A718Fertilization (with 19-5-9)
Uniformly apply granular slow release type fertilizer for lawns per manufacturer's recommendations.
Work will be completed in 2 working days.10,000LB$ - 0$ - 0
A719Fertilization (with 12-25-12)
Uniformly apply granular slow release type fertilizer for lawns per manufacturer's recommendations.
Work will be completed in 2 working days.10,000LB$ - 0$ - 0
A720Fertilization (with 10-10-10)
Uniformly apply granular slow release type fertilizer for lawns per manufacturer's recommendations.
Work will be completed in 2 working days.10,000LB$ - 0$ - 0
A721Fertilization (with 10-20-20)
Uniformly apply granular slow release type fertilizer for lawns per manufacturer's recommendations.
Work will be completed in 2 working days.10,000LB$ - 0$ - 0
A722Liming of Lawns
Determine pH of soil, and based on test provide liming to achieve a pH of around 6.2.
Work to be completed in 8 working days.30,000LB$ - 0$ - 0
A723Fertilization with Broadleaf Weed Control
Uniformly apply fertilizer with broadleaf weed control to the lawn area per manufacturer's recommendations. Chemicals are limited to approved use as per the Integrated Pest Management Plan (IPMP).
Work to be completed in 2 working days.10AC$ - 0$ - 0
A724Vegetation Herbicide
Apply herbicide on undesirable vegetation per manufacturer's recommendations. Chemicals are limited to approved use as per the Integrated Pest Management Plan (IPMP).
Work will be completed in 2 working day.10,000SF$ - 0$ - 0
A725Broadleaf Weed Control
Apply broadleaf weed control per the manufacturer's recommendations. Chemicals are limited to approved use as per the Integrated Pest Management Plan (IPMP).
Work to be completed in 2 working days.10AC$ - 0$ - 0
A726Lawn Repair
Repair lawns to match the existing, adjoining lawn area. Loosen existing soil, rough grade, fine grade fertilize and seed or sod.
Work to be completed in 6 working days.10,000SF$ - 0$ - 0
A727Topsoil Placement
Place topsoil to depth requested, till mix with sub-soil and roll to provide a smooth depression-free surface.
Work to be completed in 4 working days.200CY$ - 0$ - 0
A728Soil Removal
Remove soil to directed depth (up to 24") and protect utilities and adjacent turf. Existing grass, sod, or other vegetation is considered part of soil removal. Remove all materials from Government property within same day.
Work to be completed in 4 working days.100CY$ - 0$ - 0
A729Creation of Plant BedsThe edge of the plant bed shall extend a sufficient distance from the drip line of the shrubs and groundcovers to provide a natural delineation between the lawn area and the plant bed (mowing line) and to insure their protection from damage by lawn mowers.
Work to be completed in 10 working days.3,000SF$ - 0$ - 0
A730Liming of Plant Beds
Determine pH of soil, and based on test provide liming to achieve a pH of around 6.2.
Work to be completed in 6 working days.34,000LB$ - 0$ - 0
A731Herbiciding of Plant Beds
Apply pre-emergent and post-emergent herbicides per Herbicide Application Requirements.
Work to be completed in 2 working days.2,000SF$ - 0$ - 0
A732Mulching of Plant Beds
Use organic or inert mulch to match existing mulch unless directed otherwise. The Government will direct type mulch required for new beds. Care shall be taken not to place mulch on top of annuals or bulbs partially emerging from dormancy.
Work to be completed in 6 working days.5,000SF$ - 0$ - 0
A733Mulch Removal
Mulch shall be removed in its entirety and stockpiled for future use. Care shall be taken not to disturb or damage shrubs and plants during the mulch removal process.
Work to be completed in 4 working days.5,000SF$ - 0$ - 0
A734Cultivation/Edging of Plant Beds
Remove all vegetation including the root system and cultivate area to a uniform depth. Add soil amendments to aid in drainage and root penetration. A clean cut edge shall be developed. Edging material(s), soil analysis, liming, mulching and fertilization shall be ordered on other ELINs.
Work to be completed in 6 working days.7,500SF$ - 0$ - 0
A735Vegetation Removal (Light)
Remove all vegetation including the root system around, fixtures, structures or other appurtenances. Light vegetation removal is a surface area having a maximum vegetation coverage of up to 30%.
Work to be completed in 4 working days.1,000SF$ - 0$ - 0
A736Vegetation Removal (Medium)
Remove all vegetation including the root system around, fixtures, structures or other appurtenances. Heavy vegetation removal is a surface area having a maximum vegetation coverage of 31% to 70%.
Work to be completed in 4 working days.2,000SF$ - 0$ - 0
A737Vegetation Removal (Heavy)
Remove all vegetation including the root system around, fixtures, structures or other appurtenances. Heavy vegetation removal is a surface area having a maximum vegetation coverage of more than 70%.
Work to be completed in 4 working days.5,000SF$ - 0$ - 0
A738Landscape Filter Fabric
Install this water permeable woven material for weed control as ordered by the Contracting Officer, per manufacturer's recommendations.
Work the be completed in 6 working days.500SY$ - 0$ - 0
A739Fertilization of Trees
Fertilize trees with approved commercial fertilizer under the entire area of the drip line starting from the trunk or stem outward.
Work will be completed in 2 working days.20EA$ - 0$ - 0
A740Fertilization of Shrubs, Hedges, or Ground Cover
Fertilize as recommended by the manufacturer for the type of plant.
Work will be completed in 2 working days.5,000SF$ - 0$ - 0
A741Fertilization of Roses
Roses are to be fertilized with a product recommended for the type plant and conditions of each location.
Work will be completed in 2 working days.25EA$ - 0$ - 0
A742Trimming of Shrubs
Maintain the natural form of the plant by removing new growth. Cuttings shall be disposed of daily.
Work will be completed in 4 working days.100EA$ - 0$ - 0
A743Trimming of Hedges
Maintain the natural form of the plant or plant row by removing new growth. Cuttings shall be disposed of daily.
Work will be completed in 4 working days.1,000LF$ - 0$ - 0
A744Trimming of Groundcover
Maintain ground cover at the plants natural height and within the designated bed area. Trim ground cover off of buildings, trees, or other plants as designated. At the bed and lawn edge line show a defined clean edge.
Work will be completed in 4 working days.500SF$ - 0$ - 0
A745Pruning of Shrubs and Hedges (Rejuvenation)
Pruning shall involve severe pruning of overgrown shrubs to within a few inches of the ground, or as directed by the Contracting Officer, to restore the plant to it natural shape. Trimmings shall be disposed of daily.
Work will be completed in 4 working days.100EA$ - 0$ - 0
A746Pruning Roses
Prune rose canes in a manner consistent with current industry standards for pruning. Trimmings and debris shall be disposed of daily.
Work will be completed in 4 working days.10EA$ - 0$ - 0
A747Tree Pruning (Up to 12" Caliper)
Prune trees in a manner consistent with the current industry standards for pruning. Contractor may be directed by the Government to thin crown, clean crown, or reduce crown, or raise crown by pruning, or in some case the contractor may be asked to provide two or more functions. Climbing and spikes are not allowed. Trimming and debris shall be disposed of daily.
Work will be completed in 6 working days.25EA$ - 0$ - 0
A748Tree Pruning (12 l/8" to 24" Caliper)
Prune trees in a manner consistent with the current industry standards for pruning. Contractor may be directed by the Government to thin crown, clean crown, or reduce crown, or raise crown by pruning, or in some case the contractor may be asked to provide two or more functions. Climbing and spikes are not allowed. Trimmings and debris shall be disposed of daily.
Work will be completed in 6 working days.25EA$ - 0$ - 0
A749Tree Pruning (24 l/8" to 36" Caliper)
Prune trees in a manner consistent with the current industry standards for pruning. Contractor may be directed by the Government to thin crown, clean crown, or reduce crown, or raise crown by pruning, or in some case the contractor may be asked to provide two or more functions. Climbing and spikes are not allowed. Trimmings and debris shall be disposed of daily.
Work will be completed in 6 working days.25EA$ - 0$ - 0
A750Tree Pruning (36 l/8" to 48" Caliper)
Prune trees in a manner consistent with the current industry standards for pruning. Contractor may be directed by the Government to thin crown, clean crown, or reduce crown, or raise crown by pruning, or in some case the contractor may be asked to provide two or more functions. Climbing and spikes are not allowed. Trimmings and debris shall be disposed of daily.
Work will be completed in 6 working days.25EA$ - 0$ - 0
A751Tree Pruning (48 l/8" and Above in Caliper)
Prune trees in a manner consistent with the current industry standards for pruning. Contractor may be directed by the Government to thin crown, clean crown, or reduce crown, or raise crown by pruning, or in some case the contractor may be asked to provide two or more functions. Climbing and spikes are not allowed. Trimmings and debris shall be disposed of daily.
Work will be completed in 6 working days.20EA$ - 0$ - 0
A752Pollarding Crape Myrtles
Remove all lateral branches back to the same spot on the multiple trunks. This is usually performed in the spring to developed large flower panicles.
Work will be completed in 6 working day.20EA$ - 0$ - 0
A753Limb Removal (Over 1" Caliper)
Remove dead, split, weakly attached or other branches that exceed 3" in diameter as directed by the Contracting Officer. Remove debris from the work site daily.
Work will be completed in 4 working day.10EA$ - 0$ - 0
A754Sucker Removal from Base of Tree Trunk
Remove all sucker growth in its entirety from the base of the tree trunk and up to 12" surrounding the trunk without any damage occurring to the tree. "EA" represents each TREE TRUNK. Remove debris from the work site daily.
Work will be completed in 4 working days.25EA$ - 0$ - 0
A755Sapper Removal from Tree Trunk
Remove all sapper growth (less than one inch in Caliper) in its entirety from between the lower limbs and the base of the tree trunk without any damage occurring to the tree. "EA" represents each TREE. Remove debris from the work site daily.
Work will be completed in 4 working days.25EA$ - 0$ - 0
A756Tree Removal (Up to 6" Caliper)
Cut down and remove trees using standard trade practices and safety procedures. Remove all debris from Government property daily and rake area clean.
Work will be completed 4 working days.20EA$ - 0$ - 0
A757Tree Removal ( 6 1/8" to 12" Caliper )
Cut down and remove trees using standard trade practices and safety procedures. Remove all debris from Government property daily and rake area clean.
Work will be completed 4 working days.20EA$ - 0$ - 0
A758Tree Removal (12 1/8" to 24" Caliper )
Cut down and remove trees using standard trade practices and safety procedures. Remove all debris from Government property daily and rake area clean.
Work will be completed 4 working days.20EA$ - 0$ - 0
A759Tree Removal (24 1/8" to 36" Caliper )
Cut down and remove trees using standard trade practices and safety procedures. Remove all debris from Government property daily and rake area clean.
Work will be completed 4 working days.20EA$ - 0$ - 0
A760Tree Removal (36 1/8" to 48" Caliper )
Cut down and remove trees using standard trade practices and safety procedures. Remove all debris from Government property daily and rake area clean.
Work will be completed 4 working days.20EA$ - 0$ - 0
A761Tree Removal (48 1/8" and Above Caliper )
Cut down and remove trees using standard trade practices and safety procedures. Remove all debris from Government property daily and rake area clean.
Work will be completed 6 working days.10EA$ - 0$ - 0
A762Stump Removal (Large)
Remove large stumps (4" diameter and up, measuring across the stump) to a depth of 18" below grade. Remove all debris from the process and fill void where stump was removed with earth similar to existing earth. Rake and grade new soil and seed area to match existing grass. Remove all debris from Government property daily.
Work will be completed within 4 working days of receiving a digging permit.1,000IN$ - 0$ - 0
A763Stump Removal (Small)
Remove small stumps (up to 4" diameter, measuring across the stump) to a depth of 18" below grade. Remove all debris from the process and fill void where stump was removed with earth similar to existing earth. Rake and grade new soil and seed area to match existing grass. Remove all debris from Government property daily.
Work will be completed within 2 working days of receiving a digging permit.30EA$ - 0$ - 0
A764Surface Ground Root Removal
Remove surface roots to a depth of 6" below grade. Remove all debris from the process and fill void where roots were removed with earth similar to existing earth. Rake and grade new soil and see area to match existing grass. Remove all debris from Government property daily.
Work will be completed within 4 working days of receiving a digging permit.500IN$ - 0$ - 0
A765Shrub Removal (All Sizes)
Remove shrubs and their root system n their entirety. Fill void to grade with topsoil, deed and fertilize to blend with the surrounding area. Remove all debris from Government property daily.
Work will be completed within 4 working days of receiving a digging permit.25EA$ - 0$ - 0
A766Ground Cover Removal
Remove ground cover to a depth of not less than four inches deep, including all root systems. Fill void to grad with topsoil, deed and fertilize to blend with the surrounding area. Remove all debris from Government property daily.
Work will be completed within 4 working days of receiving a digging permit.500SF$ - 0$ - 0
A767Transplanting of Trees (Up to 2" Caliper)
Remove trees from existing location and transplant in a new location in accordance with best trade practices. Use excess soil from planting area to fill void where tree was removed. Rake to grade and seed if in a lawn area. Remove all debris from Government property daily.
Work will be completed within 4 working days of receiving a digging permit.10EA$ - 0$ - 0
A768Transplanting of Trees (2 1/8" to 5" Caliper: By Mechanical Tree Spade Only)
Remove trees from existing location and transplant in a new location in accordance with best trade practices. Use excess soil from planting area to fill void where tree was removed. Rake to grade and seed if in a lawn area. Remove all debris from Government property daily.
Work will be completed within 4 working days of receiving a digging permit.10EA$ - 0$ - 0
A769Transplanting of Shrubs (Up to 3' Height and Spread)
Remove shrubs from existing location and transplant in a new location in accordance with best trade practices. Use excess soil from planting area to fill void where shrub was removed. Rake to grade and seed if in a lawn area. Remove all debris from Government property daily.

Work will be completed within 4 working days of receiving a digging permit.

10EA$ - 0$ - 0
A770Transplanting of Shrubs (3'1" to 6' Height and Spread)
Remove shrubs from existing location and transplant in a new location in accordance with best trade practices. Use excess soil from planting area to fill void where shrub was removed. Rake to grade and seed if in a lawn area. Remove all debris from Government property daily.
Work will be completed within 4 working days of receiving a digging permit.10EA$ - 0$ - 0
A771Planting of New Trees (15 Gallon Container)
New trees shall be provided and planted by the Contractor as directed by the Contracting Officer. Work includes preparation of the bed, fertilizing, mulching, setting the tree, staking the tree and all other work necessary to comply with the best trade practices for this area. Remove all debris from Government property daily.
Work will be completed within 6 working days of receiving a digging permit.30EA$ - 0$ - 0
A772Planting of New Trees (12'- 14' Height: 2 1/2" - 3" Caliper)
New trees shall be provided and planted by the Contractor as directed by the Contracting Officer. Work includes preparation of the bed, fertilizing, mulching, setting the tree, staking the tree and all other work necessary to comply with the best trade practices for this area. Remove all debris from Government property daily.
Work will be completed within 6 working days of receiving a digging permit.30EA$ - 0$ - 0
A773Planting of New Shrubs

(8-12") New trees shall be provided and planted by the Contractor as directed by the Contracting Officer. Work includes preparation of the bed, fertilizing, mulching, setting the tree, staking the tree and all other work necessary to comply with the best trade practices for this area. Remove all debris from Government property daily.

Work will be completed in 6 working days of receiving a digging permit.50EA$ - 0$ - 0
A774Planting of New shrubs

(15"- 18" Width X 18"-24" Height) (Burlap & Bagged Acceptable if Requested) New shrubs shall be provided and planted by the Contractor as directed by the Contracting Officer. Work includes preparation of the bed, fertilizing, mulching, setting the shrub and all other work necessary to comply with the best trade practices for this this area. Remove all debris from Government property daily.

Work will be completed within 4 working days of receiving a digging permit.50EA$ - 0$ - 0
A775Planting of New shrubs

(24"- 30" Width X 5'-6' Height) (Burlap & Bagged Acceptable if Requested) New shrubs shall be provided and planted by the Contractor as directed by the Contracting Officer. Work includes preparation of the bed, fertilizing, mulching, setting the shrub and all other work necessary to comply with the best trade practices for this area. Remove all debris from Government property daily.

Work will be completed in 4 working days.20EA$ - 0$ - 0
A776Planting of Ground Cover

New Ground Cover shall be provided and planted by the Contractor as directed by the Contracting Officer. Work includes preparation of the bed, fertilizing, setting the groundcover and all other work necessary to comply with the best trade practices for this area.

Work will be completed within 2 working days.200EA$ - 0$ - 0
A777Planting of Annual Flowers (6" Pot: Includes Begonias, Vincas, Impatiens, Pansies, etc.)Flowers shall be provided and planted in existing beds. Planting shall include ground preparation as recommended for the variety of flower chosen. Removal and replacement of mulch as required to facilitate planting is included. Typical flower varieties to be ordered under this ELIN are listed in J-1503050-05, Flag Housing Historical Data. However the Government will not be limited to the choice of flowers listed.
Work will be completed in 4 working days.500EA$ - 0$ - 0
A778Planting of Perennials Flowers (6" Pot: Includes Iris, Day Lilies, Liriope, etc.)Flowers shall be provided and planted in existing beds. Planting shall include ground preparation as recommended for the variety of flower chosen. Removal and replacement of mulch as required to facilitate planting is included. Typical flower varieties to be ordered under this ELIN are listed in J-1503050-05, Flag Housing Historical Data. However the Government will not be limited to the choice of flowers listed.
Work will be completed in 4 working days.500EA$ - 0$ - 0
A779Soil Analysis
Perform soil analysis and provide a written report and recommendations of the results within five working days. Seven to ten soil samples from various locations, blended or combined for each analysis, are required. The Contractor shall repair any damages to grounds caused by analysis operations.

Work will be completed in 4 working days.

5EA$ - 0$ - 0
A780Aerate
Grass shall be aerated to promote health and growth.
Work shall be completed within 6 working days.2,420SY$ - 0$ - 0
A781Snow and Ice Removal by Snow Plow (Depth Up to 12")
Remove all snow and ice from roads, parking areas, and driveways by means of motorized snow plow. After snow has been removed apply snow melting material (e.g. salt) to aid in the melting of any remaining ice.
Respond and complete in 2 working days.50,000SF$ - 0$ - 0
A782Snow and Ice Removal by Snow Plow (Depth Over 12")
Remove all snow and ice from roads, parking areas, and driveways by means of motorized snow plow. After snow and ice has been removed apply snow melting material to aid in the melting of any remaining ice.
Respond and complete in 2 working days.50,000SF$ - 0$ - 0
A783Snow and Ice Removal by Hand Shovel (Depth Up to 12")
Remove all snow and ice from walkways, steps, and porches by means of hand shoveling. After snow and ice has been removed apply snow melting material to aid in the melting of any remaining ice.
Respond and complete in 2 working days.10,000SF$ - 0$ - 0
A784Snow and Ice Removal by Hand Shovel (Depth over 12")
Remove all snow and ice from walkways, steps, and porches by means of hand shoveling. After snow and ice has been removed apply snow melting material to aid in the melting of any remaining ice.
Respond and complete in 2 working days.10,000SF$ - 0$ - 0
A785Road SweepingSweep roads as indicated in task order.
Respond and complete in 2 working days.100,000LF$ - 0$ - 0
A786Composite Hour Labor Rate - Subject to the Service Contract Act (SCA)The Composite Hour Labor Rate shall include all direct and indirect costs associated with performing an hour of work. Rate shall include all costs for preparation of cost proposal, job preparation, travel, pre-expended bin materials and supplies, ordering and stockpiling job material, additional material handling, standard items of equipment necessary to perform work, miscellaneous equipment (e.g. weight lifting equipment, chain fails, small winch, jacks, rigging, pulleys, staging, timbers, etc.), equipment set-up time, tools, profiit, field and home office overhead, craft delay allowance, clerical support, supervision, inspections, fees, taxes, licenses, bonds, permits, insurance, etc. The Government shall not reimburse the Contractor for any restocking fees or material returned for canceled work.
Estimated hours and completion time will be established with each task order per negotiations.200HR$ - 0$ - 0
A787Materials and Equipment
All materials and equipment costs required to perform work requested by the Government not identified in the IDIQ ELINs. Reasonable costs for rental, shipping, and other incidentals may be included. Costs of materials shall be adjusted for refunds, rebates, and discounts. Pre-expended bin supplies and materials shall not be included in the material costs. The Government shall not reimburse the Contractor for any restocking fees or material returned for canceled work. Materials handling costs shall be built in the Composite Hourly Labor Rate.
Completion time will be established per task order.20,000NTE$ 1.00$ 20,000.00
TOTAL NOT TO EXCEED PRICE FOR NON-RECURRING WORK SUB-ELIN's A700 THROUGH A787TOTAL$ - 0

ELINS-1st Opt Period-Recurring

ATTACHMENT J-0200000-06
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N40085-20-R-0148
EXHIBIT B
PROVIDE PRICES TO PERFORM FACILITY SERVICES - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs B001 through B012
ELINSLINDescriptionQuantityUnit of IssueUnit PriceTotal
LINE ITEM 0001- Recurring Work Base YearNOTE
B001 Yorktown - CNRMA Grounds**Provide a unit price for all entires regardless of quantity, in the event future quantities may be added.
B001AACOL 10AC$0.00$0.00**Unit price must be rounded to the nearest cent (ex. $100.50)
B001ABCOL 27.33AC$0.00$0.00
B001ACCOL 377.03AC$0.00$0.00
B001ADCOL 40AC$0.00$0.00
B001AESemi-Improved840.14AC$0.00$0.00
B001AFUn-Improved0AC$0.00$0.00
B001AGParking Lot Maintenance (Hardscape)0AC$0.00$0.00
B001AHRoad Sweeping0LF$0.00$0.00

Yorktown CNRMA Subtotal $0.00

B002 Yorktown - Indian Head Grounds
B002AACOL 10AC$0.00$0.00
B002ABCOL 20AC$0.00$0.00
B002ACCOL 30AC$0.00$0.00
B002ADCOL 40AC$0.00$0.00
B002AESemi-Improved45.09AC$0.00$0.00
B002AFUn-Improved0AC$0.00$0.00
B002AGParking Lot Maintenance (Hardscape)0AC$0.00$0.00
B002AHRoad Sweeping0LF$0.00$0.00

Yorktown Indian Head Subtotal $0.00

B003 Cheatham - CNRMA Grounds
B003AACOL 10AC$0.00$0.00
B003ABCOL 20AC$0.00$0.00
B003ACCOL 396.16AC$0.00$0.00
B003ADCOL 40AC$0.00$0.00
B003AESemi-Improved105.11AC$0.00$0.00
B003AFUn-Improved0AC$0.00$0.00
B003AGParking Lot Maintenance (Hardscape)15.89AC$0.00$0.00
B003AHRoad Sweeping27,505LF$0.00$0.00

Cheatham CNRMA Subtotal $0.00

B004 WH (Warehouse) Cheatham - CNRMA Grounds
B004AACOL 10AC$0.00$0.00
B004ABCOL 20AC$0.00$0.00
B004ACCOL 330.96AC$0.00$0.00
B004ADCOL 40AC$0.00$0.00
B004AESemi-Improved0AC$0.00$0.00
B004AFUn-Improved0AC$0.00$0.00
B004AGParking Lot Maintenance (Hardscape)0AC$0.00$0.00
B004AHRoad Sweeping0LF$0.00$0.00

WH (Warehouse) Cheatham CNRMA Subtotal $0.00

B005 Cheatham - FLC Cheatham Grounds
B005AACOL 10AC$0.00$0.00
B005ABCOL 20AC$0.00$0.00
B005ACCOL 30AC$0.00$0.00
B005ADCOL 40AC$0.00$0.00
B005AESemi-Improved9.43AC$0.00$0.00
B005AFUn-Improved0AC$0.00$0.00
B005AGParking Lot Maintenance (Hardscape)0AC$0.00$0.00
B005AHRoad Sweeping0LF$0.00$0.00

Cheatham FLC Cheatham Subtotal $0.00

B006 Cheatham - FLC Norfolk Grounds
B006AACOL 10AC$0.00$0.00
B006ABCOL 20AC$0.00$0.00
B006ACCOL 30AC$0.00$0.00
B006ADCOL 40AC$0.00$0.00
B006AESemi-Improved19.51AC$0.00$0.00
B006AFUn-Improved0AC$0.00$0.00

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .