J-0200000-05 PNSY Station Regulations.pdf
PDF 161 KB Posted
- Attached to
- Fire Suppression Services at PNSY Federal contract opportunity
- Solicitation number
- N4008522R2547
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N4008522R2547 Amendment 005.pdf | ||
| J-0200000-08 ELINs Fire Sup REV 3.17.22.xlsx | XLSX spreadsheet | |
| J-0200000-08 ELINs Fire Sup REV 3.16.22.xlsx | XLSX spreadsheet | |
| N4008522R2547 Amendment 004.pdf | ||
| N4008522R2547 Amendment 003.pdf | ||
| N4008522R2547 Amendment 002.pdf | ||
| N4008522R2547 Amendment 001.pdf | ||
| J-0200000-09 Corporate Experience Data Sheet.pdf | ||
| J-1502000-03 Equipment (2-2021).xls | XLS spreadsheet | |
| J-1502000-04 Site Map.pdf | ||
| RFP N4008522R2547.pdf | ||
| J-0200000-07 Contractor Hazardous Material Inventory Log.pdf | ||
| J- 0200000-08 ELINs Fire Sup.xls | XLS spreadsheet | |
| J-0200000-04 Invoice Form.pdf | ||
| J-0200000-10 Past Performance Questionnaire.pdf | ||
| J-0200000-11 Contractor Self Performance Cert.pdf | ||
| J-0200000-06 PNSY Crane Regulations.pdf | ||
| J-1502000-08 Historical PM Frequencies.xls | XLS spreadsheet |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J-0200000-05
PNSY Station Regs
Portsmouth Naval Shipyard Station Regulations
1. GENERAL
1.1 CONTRACTOR ACCESS AND USE OF PREMISES
Deliveries to Portsmouth Naval Shipyard are limited to 13 foot widths. Notify the Contracting Officer 30 days in advance for any wide loads exceeding 13 feet.
Ensure that Contractor personnel employed on the Station become familiar with and obey Station regulations.
Keep within the limits of the work and avenues of ingress and egress. Do not enter restricted areas unless required to do so and not until cleared for such entry.
All Contractors’ equipment shall be conspicuously marked for identification.
Permission to interrupt any station roads, crane rail, railroad, or utility services shall be requested in writing a minimum of 15 calendar days prior to the desired date of interruption in accordance with the guidelines established by NAVSHIPYD PTSMH INSTRUCTION 11300.9 (latest rev)
1.2 Station Regulations
1.2.1 Radiological
1.2.1.1 Radiological Indoctrination
a. All Contractors are required to view a 15 minute video briefing on radiological postings and controls in use at the Portsmouth Naval Shipyard. The briefing will be given at the Pass Office prior to issue of security badges and vehicle passes.
b. Any Contractor employee who disregards, alters, moves, or otherwise tampers with a radiological posting, or who disobeys a radiological instruction, may be removed from the Portsmouth Naval Shipyard and denied future access.
1.2.1.2 Yellow Materials
Contractors shall not use yellow or orange-yellow colored materials for the following purposes: Protective clothing, hoods, sheeting, tarpaulins, polyethylene bottles or other containers, tapes, bags, banding, identification marks on tools, boundary markers, ribbons, vent ducts, etc. Contractor generated yellow colored waste shall be disposed of by the Contractor off-yard. Shipyard refuse containers shall not be used for disposal of yellow colored waste materials. Yellows colored items such as described above are of special significance within the shipyard and are subject to strict controls. Yellow colored contract generated debris shall be bagged in non-translucent containers, and promptly removed from Portsmouth Naval Shipyard.
1.2.1.3 Smoke Detectors
Ionization type smoke detectors and duct smoke detectors contain radioactive material and are prohibited from use on the Shipyard. Photoelectric smoke detectors are the only type authorized for use on the Shipyard.
1.2.1.4 Radioactive Sources
Two weeks prior to performance of any work using equipment, instruments, or other components which contain a radioactive source (i.e., a "Troxler" Nuclear Density apparatus), the Contractor shall request, in writing, approval for use of such equipment. The request will be submitted to the Radiation Health Division, via the Contracting
Officer. The request shall contain such information as a copy of the NRC license; a copy of the reciprocity agreement (in accordance with 10 CFR 150) if the license is from an agreement State; work methods; locations at which the equipment will be used; operator qualifications; safety procedures to be used, etc. Use of equipment or instruments containing a radioactive source shall not be used except upon the express written approval of the
Radiation Health Division and the Contracting Officer.
1.2.2 Laser Control
Contractor shall comply with laser safety requirements under 21 CFR 1040 and ANSI 2136.1-1986 for any work under this contract utilizing lasers.
1.2.3 Mercury Control
Mercury, mercury compounds, and components containing mercury or mercury compounds are subject to control within the limits of the Shipyard. Mercury-containing items such as instruments, thermostats, thermometers, equipment and other components containing mercury or mercury compounds (with the exception of "low mercury" lighting fixtures) shall not be permitted within the confines of the Shipyard.
Non-mercury-containing instruments, thermostats, thermometers, and equipment shall be substituted for mercury-containing items to the maximum extent possible. The Contracting Officer may give written permission to use mercury- containing items in cases where a non-mercury equivalent doesn't exist, or is prohibitively expensive.
Any breakage of mercury-containing items (such as fluorescent, mercury vapor, and sodium and metal halide lamps, thermostats and thermometers) within the Shipyard constitutes a mercury spill and shall be reported to the
Mercury Control Coordinator, OSHE Office, Code 106.1, at Ext. 3634 and to the Contracting Officer.
1.2.4 Energy Conservation
In cooperation with Government representatives, the Contractor shall participate in an active program directed toward the efficient use of energy. Government furnished utilities will not be provided for air conditioning of
Contractor trailers or office areas.
1.2.5 Fire Prevention
Contractor shall familiarize and require all their employees to become familiar with fire prevention regulations within the Shipyard to include the proper method of turning in a fire alarm, storage of flammable and combustible materials and control of combustible waste and trash. Any HOT WORK (welding, burning, grinding, cutting, etc.) requires a HOT WORK PERMIT prior to commencing such work. This permit is obtained from the
Shipyard Fire Department via the Contracting Officer.
1.2.6 Emergency Medical Care
The Shipyard Fire Department provides emergency medical treatment and ambulance transport to the nearest medical facility outside the Shipyard. If a level of care is required that the Shipyard Fire Department cannot provide, or an outside ambulance called by the Shipyard Fire Department is needed, then the individual requiring care is responsible for any costs incurred.
1.2.7 Identification and Control of Seamed (Welded) Pipe and Tubing
Submarine Safety regulations prohibit the use of seamed (welded) pipe or tubing within the Shipyard, unless such pipe or tubing is identified and controlled so as to prevent its inadvertent substitution for seamless pipe or tubing.
The following requirements apply and will be strictly enforced:
a. Any seamed (welded) copper-nickel, carbon steel, carbon-molysteel, stainless steel, nickel-chromium-iron alloy, or nickel-copper pipe or tubing the Contractor intends to use on the Shipyard shall be identified in the following manner PRIOR TO DELIVERY TO THE SHIPYARD:
Using a lead-free white paint, mark a 24-inch long stripe and the word "welded" alternately along the entire length of the pipe or tubing. Apply a one-half inch wide stripe unless the size of the pipe or tubing requires use of a narrower stripe.
b. Contractor shall maintain positive control over seamed pipe or tubing until worked into place or removed from the Shipyard.
c. Seamless pipe or tubing may be substituted for any seamed (welded) pipe or tubing specified in the technical specifications.
The above requirements do not apply to square or rectangular tubing, copper or brass pipe or tubing, nor to piping or tubing which has been incorporated into equipment or fixtures prior to delivery to the Shipyard.
1.2.8 Pesticide and Herbicide Control
Contractor shall not apply pesticides nor herbicides unless specifically required by this contract. Where application of pesticides or herbicides is required, provide the submittals required by the specification and obtain written approval prior to any application.
1.2.9 Smoking Policy
In accordance with Shipyard policy, smoking is prohibited inside all buildings and other facilities except those areas specifically identified as smoking areas (e.g., smoking shelters). Smoking is not permitted within
20 feet of air intakes, doorways or windows.
1.2.10 Allowable Surface Loads
Loads transferred to soils and pavements shall be minimized to a desired maximum of 3000 pounds per square foot, by placement of cribbing or steel pads under rubber-tired crane outriggers and trailer stanchions/sand shoes, or by placement of mats under treads of crawler cranes. Visually inspect areas adjacent to cribbing or plates and report any unusual bituminous pavement surface conditions, irregularities, or cracking to the Contracting Officer.
a. Outriggers of rubber-tired cranes shall be landed on two layers of timbers of appropriate thickness, oriented at right angles to each other, or landed on properly designed steel pads. Treads of crawler cranes shall run on appropriate mats. Use and design of cribbing, plates and mats shall be in a manner consistent with general construction industry standards.
b. Position loads that will remain on trailers detached from tractors to attain a distribution of 65 percent to rear axles and 35 percent to front support stanchions/sand shoes. For example, assuming an 83000 pound maximum gross weight, and a soil bearing pressure of 3000 pounds per square foot, the required support under each sand shoe would be 2.5 feet x 2.5 feet. Accordingly, two tiers of timber cribbing at right angles, each 2.5 feet x 2.5 feet x 4 inches, or a properly designed 2.5 feet x 2.5 feet steel pad would be utilized under each trailer stanchion/ sand shoe.
1.2.11 Work in Occupied Building(s)
Work under this contract may be located in an occupied building. Move unfixed furniture away from
Contractor's working area as required to perform the work; protect; and replace in original locations upon completion of the work. Leave fixed equipment in place and protect against damage or temporarily disconnect, relocate, protect, and reinstall at completion of work. If determined necessary by the Contracting Officer, the
Government will remove and relocate other Government property in the areas of the buildings scheduled to receive work. Allow 15 calendar days after written notification from the Contractor for the Government to relocate Government property.
1.2.12 Utility Cutovers and Interruptions
a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and
Government holidays as approved by the Contracting Officer. Conform to procedures required in the paragraph
"Work Outside Regular Hours." Anticipated costs shall be included in the bid.
b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.
c. Interruption to Water, Sanitary Sewer, Storm Sewer, Telephone Service, Electric Service, Air Conditioning, Heating, Fire Alarm, Compressed Air, and other utilities shall be considered utility cutovers pursuant to the paragraph entitled "Work Outside Regular Hours." This time limit includes time for deactivation and reactivation.
d. Operation of Station Utilities: The Contractor shall not operate nor disturb the setting of control devices in the station utilities system, including water, sewer, electrical, and steam services. The Government will operate the control devices as required for normal conduct of the work. The Contractor shall notify the Contracting
Officer giving reasonable advance notice when such operation is required.
1.2.13 Crane and Railroad Trackage Interruptions
Crane and railroad trackage are considered utilities, and as such are subject to strict scheduling approvals. Where the following contract work is planned, submit written requests for outages to the Contracting Officer:
Track Outage:
Any excavation within 10 feet of a rail that will extend below the grade of the cross ties
Any work that will penetrate a track foundation
Any work involving trackage replacement or repair
Any work affecting the load bearing capacity of the trackage
No work shall be conducted in affected areas until the Contractor receives written approval to the request for outage.
Track Securement:
Track Securement differs from Track Outage in that it does not affect track certification. Track Securement requests shall be prepared by the Contractor and submitted to the Contracting Officer to obtain scheduling approval from Code 740.2 before work that would curtail the use of tracks (e.g., placing equipment or hoses within the crane envelope or within the defined Crane Clearance Zones).
1.2.14 Work Adjacent to CIA Security Fencing
Work adjacent to Controlled Industrial Area (CIA) fencing is strictly controlled to ensure security is maintained at all times.
Work which will breach CIA fencing is prohibited unless Chief of Police approval has been obtained and a
Shipyard Police representative is at the worksite during the period that the fence has been breached.
a. A minimum of 30 work days prior to performing work which requires breaching the CIA security fence, arrange through the Contracting Officer to obtain DoD Chief of Police approval and scheduling of the Shipyard
Police representative. "Breaching the fence" is any repair, alteration, or other work which would allow access into the CIA either over, under, or through an opening in a CIA fence.
b. Conditions which breach the fence shall be eliminated during all non-work periods to the satisfaction of the
Shipyard Police representative. Contractor shall not leave the worksite until such conditions are eliminated. All materials used to close openings in fencing and method of installation shall be the same type and construction as adjacent, undisturbed CIA fencing.
c. Except for temporary off-loading of materials, the 10-foot zone adjacent to CIA fencing shall remain clear of vehicles, materials, and equipment. Contractor personnel shall be at the site throughout the entire time of any off-loading.
1.2.15 Work Adjacent to an Overhead Crane
a. Provide a minimum clearance of three (3) inches between the highest point of the crane and the lowest overhead obstruction. For buildings where truss sag becomes a factor, increase the clearance as necessary to maintain the minimum required clearance.
b. The horizontal clearance between the end of the crane and the building columns, knee braces or any other obstructions shall not be less than two (2) inches with the crane centered on the runway rails. Pipes, conduits, etc. shall not reduce this clearance.
c. The vertical clearance beneath a bridge crane is to be at least three (3) inches. This clearance is not applicable to the hook block unless it is in its upmost position.
d. For work involving installation, adjustment, or replacement of rail fasteners (e.g. clips/bolts), the Contractor shall verify the existing crane envelope and clearance measurements around the rail head prior to beginning work. The Contractor shall notify the Government if the work will reduce the clearance between the bridge crane and rail fasteners and ensure newly installed items will not obstruct bridge crane travel.
e. The Contractor shall notify the Government to verify that crane clearance has been maintained when the work performed may have changed any physical dimensions of objects or structures adjacent to the crane (e.g., changing or servicing lighting fixtures/pendant assemblies, removal and reinstallation of pipes, conduits, junction boxes, etc.). If the crane is not available (e.g., undergoing maintenance, inspection, etc.), the Contractor shall verify crane clearance by taking measurements using reference points (e.g., vertical and horizontal distance from the top of crane rail with respect to the crane envelope, vertical distance from the floor with respect to the crane envelope, etc.).
1.2.16 Gas-Free Testing of Manholes and Confined Spaces
1.2.16.1 General
All manholes of the Shipyard can become filled with an explosive oxygen/fuel gas mixture if a leak should develop in the Shipyard's underground MAPP gas or PROPANE gas distribution systems or if inflammable materials should be inadvertently spilled into an underground system. Consequently, no attempt shall be made to remove the cover from any manhole in the Shipyard without first ensuring the air content of the manholes does not contain an explosive air/gas mixture. The air content of the manhole shall be tested, and attested to, only by an individual who has been trained to be a competent person in inspecting confined spaces.
The Government will not perform gas-free testing for Contractor personnel. If Shipyard and Contractor personnel must occupy the same confined space, the space shall be tested by the Contractor's competent person and the Shipyard's competent person.
1.2.17 Submittals
Prior to performing any gas-free testing, submit qualifications and ability of the "competent person" for the approval of the Contracting Officer.
1.2.18 Definitions
"Competent Person" is one who is capable of identifying existing and predictable hazards in the surroundings or working conditions which are unsanitary, hazardous, or dangerous to employees, and who has authorization to take prompt corrective measures to eliminate them.
"Confined spaces" include manholes, catch basins, drywells, vaults, tunnels, and similar structures.
1.2.19 Procedures Prior to Entry of Confined Spaces
The internal atmosphere of the confined space shall be tested for oxygen content, combustible gases and toxic gases. Following testing, ventilate the work area and take other actions as necessary to ensure the internal atmosphere of the confined space falls within the following "safe for entry" conditions:
Oxygen Content: Greater than 20 percent, less than 22 percent
Explosive: Less than 10 percent
CO2: Less than 2500 ppm
CO: Less than 10 ppm
1.2.20 Procedures While in Confined Spaces
All procedures shall be in accordance with EM-385 and where applicable 29 CFR 1915. All confined spaces shall be appropriately tagged during entry. This includes non-permit confined space entry.
Provide an adequate continuous supply of air while work is being performed in confined spaces under any of the following conditions:
Combustible or explosive gas vapors were initially detected and subsequently reduced to a safe level by ventilation;
Toxic gas or oxygen deficiency were detected
Organic solvents are in use;
Open flame torches are in use;
A manhole or confined space is located in the portion of a public right of way open to vehicular traffic and/or exposed to a seepage of gas or gases
1.2.21 Dust Control
Keep dust down at all times, including during nonworking periods. Sprinkle or treat, with dust suppressants, the soil at the site, haul roads, and other areas disturbed by operations. Dry power brooming will not be permitted.
Instead, use vacuuming, wet mopping, wet sweeping, or wet power brooming. Air blowing will be permitted only for cleaning non-particulate debris such as steel reinforcing bars. Only wet cutting will be permitted for cutting concrete blocks, concrete, and bituminous concrete. Do not unnecessarily shake bags of cement, concrete mortar, or plaster.
1.2.22 Noise
Make maximum use of low-noise emission products, as certified by the EPA. Blasting or use of explosives will not be permitted without written permission from the Contracting Officer, and then only during the designated times.
1.2.23 Fire Protection
1.2.23.1 Compliance
COE EM-385-1-1, NFPA 241, NAVSHIPYD PTSMH INST 11320.6 Fire Safety Manual, NAVSHIPYD
PTSMH INST 11300.9 Utility and Facility Outages, and activity fire regulations. Obtain approval from the activity Fire Chief via the Contracting Officer prior to commencement of hot work operations.
1.2.23.2 Fired Kettles
Melt kettles for tar, asphalt, and similar materials shall not be closer than 25 feet to buildings or combustible materials. Provide a minimum of two 20 pound ABC all-purpose type extinguishers at the melting kettle and the area of hot material application. Equip kettles with proper heat controls and means of agitation to assure controlled uniform temperatures throughout contents to prevent spot heating. Do not heat contents above flash point.
1.2.23.3 Notification of Fire
Post the activity fire poster in conspicuous locations and at telephones in construction shacks.
Fire Department from base phone 2333, from cell phone 207-438-2333
1.2.24 Abrasive Blasting and Spray Painting
Open abrasive blasting and spray painting (except aerosol can spray painting) are not allowed. Abrasive blasting and spray painting must take place in containment. Emissions from the containment must vent through bag houses or air filters.
1.2.25 Petroleum Products
Conduct fueling and lubrication of equipment and motor vehicles to protect against evaporation or spills of any size. Dispose of lubricants to be discarded as excess oil.
Surround all fuel oil or petroleum storage tanks, 55-gallons or greater with a berm of sufficient size and strength to maintain the contents if there is a leak or spill. Provide the Contracting Officer a list of all oil storage container
55-gallons or greater. The Contracting Officer will provide the list to Code 106.3.
1.2.26 Security Requirements
Contract Clause "FAR 52.204-2, Security Requirements and Alternate II" and the following apply:
Access to areas designated as "Red Badge" will require the Contractor to be escorted by a "Red Badged"
Government Representative. Escorts must be requested 14 calendar days in advance.
1.2.26.1 Access to the Portsmouth Naval Shipyard.
Obtain security badges and vehicle passes to enter the Portsmouth Naval Shipyard at Gate #1, Pass Office I.
Contractor must furnish proof that employees are U.S. citizens to obtain badges to enter the Shipyard.
Contractor must have a completed Department of Homeland Security Form I-9; Employment Eligibility
Verification for each employee and furnish proof that employees are U.S. citizens to obtain badges to enter
PNSY.
Refer to Annex 0200000 for DBIDS information.
1.2.26.2 Badges
PERSONNEL BADGES SHALL BE ATTACHED TO THE OUTER GARMENT AND DISPLAYED AT ALL
TIMES WHILE ON THE PORTSMOUTH NAVAL SHIPYARD
CONTRACTOR PERSONNEL SHALL NOT ENTER AREAS FOR WHICH THEY HAVE NOT BEEN
CLEARED. WHERE A NEED HAS BEEN DEMONSTRATED TO ENTER SUCH AREAS, CONTRACTOR
SHALL BE UNDER CONSTANT ESCORT BY PERSONNEL WHO HAVE BEEN CLEARED. FAILURE
TO ADHERE TO POSTED SECURITY REQUIREMENTS MAY RESULT IN REMOVAL OF THE
EMPLOYEE FROM THE SHIPYARD WITH FUTURE ACCESS DENIED
1.2.26.3 Application and Issue of Vehicle Passes
Vehicle passes will be issued upon satisfactory proof of a valid Operator's License, Vehicle Insurance, and State
Vehicle Registration. Temporary passes will be issued for short term or single trip requirements on a case basis.
All vehicles permitted to enter or park on the Shipyard shall comply with Shipyard traffic and parking regulations and shall only park in assigned areas, which may or may not be in the vicinity of the site of the contract work.
No vehicle shall be parked in such a manner that crane tracks, railroad tracks, and vehicle access routes are blocked. Vehicles left unattended which are blocking such access routes are subject to towing and loss of vehicle passes.
Contractor employees shall park privately owned vehicles in the JI (Jamaica Island) Parking Lot only. Contractor parking is not allowed in any other parking lot or area on the Shipyard. Contractor employee parking must not interfere with existing and established parking requirements of the Portsmouth Naval Shipyard. If a privately owned vehicle is found parked outside the JI parking lot, the vehicle will be subject to towing and may reflect poorly on prime contractor's performance and noted in their final performance evaluation. Parking on the
Shipyard may be in excess of one-half mile from the worksite.
1.2.26.4 Application and Issue of Vehicle Passes for Entry into Controlled Industrial Areas (CIA)
Contractor vehicular access to the CIA will be minimized and all vehicles will comply with the following requirements:
a. Vehicles must visibly display a CIA vehicle entry pass and inspection pass from the Commercial Vehicle
Inspection Station (CVIS), Building 386. CIA passes will only be issued to company owned or leased vehicles, rental vehicles rented in the company name, or privately owned vehicles the company has certified in writing, to be necessary in the performance of contracted work. A current license, registration, security badge, and decal number or temporary vehicle pass is required for a CIA vehicle entry pass. Contractor's company name must appear on the registration and on the vehicle. CIA passes will be issued on weekends and holidays at Building
29, from the Watch Supervisor. Contractors not possessing the level security badge required for CIA access must be accompanied by a properly badged escort to obtain the CIA vehicle pass.
Vehicles must clearly display an authorized company sign or logo, in the form of an exterior mounted magnetic signs or painted identifications on both sides of the vehicle. Paper or cardboard signs are not authorized.
Vehicles will only be allowed in the CIA for the transportation of Contractor's tools, parts, and materials to and from the worksite. An exception to this policy, Contractors may transport employees to and from the worksite if a specific security plan has been developed and approved by the Shipyard Security Officer.
Parking of privately owned or contractor owned not utilized in the execution of construction activities (e.g. not a working truck or specialty vehicle) within the CIA or in any project laydown space is prohibited.
1.2.26.5 Application and Issue of Crane Passes
In compliance with the Shipyard's "Contractor Crane Safety Program", only cranes which display a valid
Certificate of Compliance in accordance with the "Crane Operation and Maintenance" paragraph will be allowed entry into the Shipyard. To be valid, the Certificate of Compliance must be stamped with a red, Code 700 Access
Review Date and Signature Stamp displaying the current date.
1.2.26.6 Return of Badges and Vehicle Passes.
Contractor shall ensure all vehicle access permits and personnel badges are returned to the Security Officer when the need has ended. Contractor shall account in writing for each missing pass or badge prior to final payment being made on the contract.
1.2.26.7 Contractor Security Responsibilities
a. Contractor employees shall not transport, drink, or have in their possession any alcoholic beverages.
Possession of any controlled substances without a physician's prescription is also prohibited. Any contractor employee appearing to be under the influence of intoxicating liquor or narcotics will be apprehended by Shipyard
Police, escorted off of the Shipyard, and turned over to the local Police Department.
b. Any vehicle found to contain controlled substances, including usable residue, may be seized and impounded.
Within 24 hours of the work day following any vehicle seizure, the Shipyard Police will have determined whether forfeiture of the vehicle is required. If not, the vehicle will be returned to the owner or authorized agent. If the vehicle is determined to be appropriate for forfeiture, the Shipyard Legal Officer will notify the Drug
Enforcement Administration of such seizure and impoundment, for initiation of forfeiture proceedings pursuant to Title 2l, U. S. Code, Section 88l. Such actions may be taken regardless of whether the owner/operator of the vehicle had knowledge of the presence of drugs in the vehicle. The Government may pursue criminal or other disciplinary actions pursuant to Title l8, U. S. Code, Section l382.
c. Possession of firearms, ammunition and/or explosives is prohibited. In the event explosives are required for construction work, specific handling requirements and approvals shall be obtained from the Security Officer via the Contracting Officer.
d. Cameras, video equipment, or similar photographic equipment shall not be introduced into nor removed from the Shipyard. In the event such equipment is required for performance of contract work, approvals shall be obtained from the Security Officer via the Contracting Officer.
e. Weapons (firearms, personal knives with blades 2-1/2 inch long or greater, Mace, Pepper Spray etc.) are not permitted aboard the Shipyard.
f. Cell phones equipped with cameras are permitted aboard the Portsmouth Naval Shipyard outside NAVSEA controlled spaces such as the CIA, but using them to take pictures is not allowed. Cameras, or cell phones equipped with cameras, are not allowed in the CIA or in any NAVSEA space such as an NWA, CNIA or Security
Island. At a minimum, all Superintendents & SHHO (and anyone acting in this capacity) shall have a CIA compliant mobile phone on their persons any time while work is occurring at the contract jobsite(s). The phone number(s) associated with these phones shall be provided during the pre-con meeting and work will not be allowed to proceed without one.
g. Laptops and any other computer, regardless of form factor, shall not be introduced nor removed from
Portsmouth Naval Shipyard without authorization. Only business use computers are allowed. Contractors are not authorized to bring personally owned computers on-yard. If a computer is required to perform work on-yard, a Visitors Portable Computer Equipment Registration form must be completed and submitted for approval. These forms can be obtained and completed at the pass office upon entrance to the shipyard or your shipyard POC.
Laptop computers shall not be introduced into nor removed from the Shipyard
Any computing devices that also have or had an installed camera, must follow the same requirements as cell phones. If the computing device is visiting a NAVSEA space, it cannot have a camera. If the device has a camera, the only acceptable remediation is that the camera be professionally removed or drilled out and the resulting void must be filled with an epoxy.
In the event that a camera is required for the performance of the contracted work, approval must be obtained from the C1120 security office. In the event of any deviation from the requirement to remove and epoxy the camera, authorization must be sought from C1120. All requests for camera use and deviations should come to C1120 through your COR or Shipyard POC. Authorizations and approved computer registrations must remain with the devices and be presentable upon request. Devices without a documented approval or observed being used in a manner that violates the terms of the Visitor Portable Computer Equipment Registration agreement are subject to search and seizure.
Use of wireless networking and communication on-yard by a contractor requires prior authorization.
Communication devices such as cellular hotspots and wireless routers must also be registered using the same
Visitors Portable Computer Equipment Registration. This does not include air-cards and straight cellular data. It does include any device that transmits or broadcasts Wi-Fi, including cellular phones with the personal hot-spot feature enabled. Broadband internet connections must be authorized prior to use on-yard.
All requests for physical cable service from an internet service provider (ISP) must be authorized and coordinated through C109. Contractors must work through their COR to request broadband access.
h. Driver use of any portable, personal listening device worn inside the aural canal, around or covering the driver's ear while operating a motor vehicle, is prohibited. Listening devices include wired or wireless earphones and headphones (including blue tooth or similar technology), and do not include hearing aids or devices designed and required for hearing protection.
i. Driver use of any portable, personal listening device worn inside the aural canal, around or covering the driver's ear while operating a motor vehicle is prohibited. Listening devices include wired or wireless earphones and headphones (including blue tooth or similar technology), and do not include hearing aids or devices designed and required for hearing protection.
j. The use of radar or laser detection devices to indicate the presence of speed recording instruments or to transmit simulated erroneous speeds are prohibited in accordance with OPNAVINST 5100.2H
k. The Contractor shall indoctrinate personnel on access limitations to ensure security control is maintained as an integral part of their work pattern and habit.
l. Contractor is advised that any unescorted personnel found in security areas requiring a higher level clearance than the level represented by the badge displayed will be removed from the area with possible confiscation of security badges and vehicle passes.
1.2.27 Marine Activities
The Contractor shall coordinate all marine vessel movements with the Contracting Officer's Representative and the Shipyard's Port Operations Department. The Contractor shall submit a weekly updated schedule showing proposed docking locations and vessel movements to the Contracting Officer's Representative. The Contractor shall meet with the Contracting Officer Representative and Shipyard Port Operations Representative weekly to review the vessel schedule.
Any Contractor waterborne craft or vessel movements which will be adjacent to any Naval vessels shall be made under the direction of the Shipyard's Pilot. The Contractor shall notify the Contracting Officer's Representative at least 14 calendar days in advance of any movements that will require the Shipyard Pilot
All contract activities shall maintain a minimum standoff from submarines of 100' for in water work and 50'for landside work. All Contractor waterborne craft shall at all times maintain a minimum of twenty-five (25)feet clearance to any Government Barge in the vicinity of the work. This applies to subcontractors and materials suppliers as well as to the prime Contractor. This minimum clearance shall also take into account any materials or equipment present on the Contractor craft that could reduce this effective clearance distance. This restriction is in effect at all times 24/7 including overnight hours and weekends.
All marine activities shall be completed to a manner that ensures the stability of caissons, piers, berths, bulkheads, fender systems, mooring hardware and other structures adjacent to the work site. The Contractor shall repair any damage caused by the Contractors operations or vessels.
When not in use, the Contractor vessels shall be tied up at a location approved by the contracting Officer's
Representative and the Shipyard's Port Operations Department.
Any waterborne craft which is deemed to be unsafe by the Contracting Officer's Representative shall be prohibited from working at the Shipyard. Copies of all inspections and certificates shall be submitted to the
Contracting Officer's Representative for approval prior to bringing any vessel to the Shipyard.
1.2.28 Work Within Pumpwells and Dry Docks
All work completed within the dry docks and pumpwells shall have a Flooding Mitigation Strategy Plan. The process for development of this plan shall start with a meeting to determine any locations of possible flooding.
The plan shall cover all penetrations through structures which may be sources of flooding of the pumpwell, the dry dock, or an associated structure. Flooding sources considered include the Piscataqua River as well as surface rain water. The plan shall identify the source of flooding, provide a strategy for mitigating flooding from that source and details on when that mitigation will be in place (e.g. pipe that is currently open to the river will have double valve protection when not actively being worked). Provide product data sheets with the plan. The plan shall also include an inspection program to verify proper installation and maintenance of all mitigation strategies.
The plan shall be submitted and approved by the government.
1.2.29 Shipyard 6010 Training
Personnel working inside of or within 10 feet of the coping of the dry dock and its associated structures shall have Shipyard 6010 training. Associated structures include pumpwells, service tunnels, altar pits, etc. This training will be provided, at the Shipyard, to the contractor at no cost and is approximately 4 hours in duration.
Coordinate training schedule with the Contracting Officer.
Personnel that complete 6010 training can serve as an escort for up to 5 additional contractor personnel or subcontractors. The escort must be within 10 feet or audio range, whichever is closer, and is responsible for the safety of the personnel they are escorting in an emergency situation.
1.2.30 Construction Vehicles
The Contractor shall not utilize any vehicle that will exceed an HS20 wheel load. The use of "off road", "Utility", "ATV" vehicles which cannot be legally operated on State roadways or highways is prohibited.