J-01 IDIQ ELINs.pdf

PDF 229 KB Posted

Attached to
IDIQ Painting, Paving, and Roofing, Rota, Spain
Solicitation number
N33191-20-R-4024
Issued by

View the file

Other files

File Type Posted
Rota IDIQ Amend 0003 21 AUG 2020.pdf PDF
N3319120R4024 Amendment 0002.pdf PDF
N3319120R4024 Amendment 0001.pdf PDF
J-01 IDIQ ELINs REV.xls XLS spreadsheet
N33191-20-R-4024 IDIQ Rota Solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ELIN SHORT DESDRIPTION

FULL DESDRIPTION

EST

QTY

UNIT

OF

ISSUE

Unit Price

(USD)

Total

(USD)

UNIT PRIDED TASK (UPT) WORK

DEMOLITION AND REMOVAL

A700 Demolition and Removal of Bituminous Asphalt Pavement

The Contractor shall perform the demolition and removal of existing bituminous asphalt pavement. The asphalt pavement shall be saw cut, to a minimum depth of 150 mm, extending out 30.5 cm beyond the edge of the aggregate base to be removed. All saw cuts shall be made with vertical straight faces making one pair of faces at right angles to traffic flow. Broken pavement, debris and resulting loose material shall be removed from limits of the station daily. All work shall be performed in accordance with Sections 01 57

19.00 20 - “Temporary Environmental Controls” & 02 41 00 - “Demolition”.

Unit of measurement shall be square meters (SM), as computed by multiplying, in meters, area length by width (L x W). Dimensions and locations will be specified on the task order.

10,500 SM 0.00

A701 Cold Milling of Bituminous Asphalt Pavements

The Contractor shall perform cold milling 5 cm depth on existing bituminous asphalt pavement. All debris and resulting loose milled material shall be removed from limits of the station daily. All work shall be performed in accordance with Sections 32 0116 17 - "Cold Milling".

Unit of measurement shall be square meters (SM), as computed by multiplying, in meters, area length by width (L x W). Dimensions and locations will be specified on the task order

12,000 SM 0.00

A702 Demolition and Removal of Aggregate Base

The Contractor shall perform the demolition and removal of existing aggregate to a minimum depth of 20 cm. Typical details will be provided with each task order. Debris and resulting loose material shall be removed from limits of the station daily. All work shall be performed in accordance with Sections 01 57

19.00 20 - “Temporary Environmental Controls” & 02 41 00 - “Demolition”.

Unit of measurement shall be cubic meters (CM), as computed by multiplying, in meters, area length by width by depth (L x W x D).

Dimensions and locations will be specified on the task order.

2,500 CM 0.00

ELINs A700 through A869

EXHIBIT LINE ITEM NUMBERS

SOLICITATION NO. N33191-20-R-XXXX

PROVIDE UNIT PRICES FOR INDEFINITE DELIVERY INDEFINITE QUANTITY WORK

EST

QTY

UNIT

OF

ISSUE

Unit Price

(USD)

Total

(USD)

A703 Removal and Reinstallation or Disposal of Concrete Wheel Stops

The Contractor shall perform the removal and reinstallation or disposal of existing concrete wheel stops. All work shall be performed in accordance with Sections 01 57 19.00 20 - “Temporary Environmental Controls” & 02 41 00 - “Demolition”.

Unit of measurement shall be Each (EA).

Units and locations will be specified on the task order.

100 EA 0.00

A704 Demolition and Removal of Concrete Curbs

The Contractor shall perform the demolition and removal of existing pre-cast concrete curbs. All work shall be performed in accordance with Section 01 57 19.00 20 - “Temporary Environmental Controls” & 02 41 00 - “Demolition”.

Unit of measurement shall be linear meters (LM). Units and locations will be specified on the task order.

125 LM 0.00

A705 Demolition and Removal of Storm Drainage Headwalls

The Contractor shall perform the demolition and removal of existing storm drainage headwalls. Broken concrete, debris and resulting loose material shall be removed from limits of the station daily. All work shall be performed in accordance with Section 01 57

19.00 20 - “Temporary Environmental Controls” & 02 41 00 - “Demolition”.

Unit of measurement shall be Each (EA).

Units and locations will be specified on the task order.

500 EA 0.00

A706 Demolition and Removal of Concrete Pipe Culverts

The Contractor shall perform the removal of existing pipe culverts. Old culvert pipe, debris and resulting loose material shall be removed from limits of the station daily. All work shall be performed in accordance with Section 01 57 19.00 20 - “Temporary Environmental Controls” & 02 41 00 - “Demolition”.

Unit of measurement shall be linear meters (LM). Units and locations will be specified on the task order

2,000 LM 0.00

EST

QTY

UNIT

OF

ISSUE

Unit Price

(USD)

Total

(USD)

A707 Demolition and Removal of Concrete Sidewalks

The Contractor shall perform demolition and removal of existing concrete sidewalks, all as indicated on the contract task order and site plans (as applicable). Where required and indicated, concrete shall be saw cut. Typical details will be provided with each task order.

Broken concrete, debris and resulting loose material shall be removed from limits of the station daily. All work shall be performed in accordance with Sections 01 57 19.00 20-

“Temporary Environmental Controls” & 02

41 00-“Demolition”.

Unit of measurement shall be square meters

(SM), as computed by multiplying, in meters, area length by width (L x W) considering an average depth of 0.1m . Dimensions and locations will be specified on the task order.

2,500 SM 0.00

A708 Demolition and Removal of Reinforced Concrete Slabs

Includes all labor, materials, equipment, supervision and transportation required to perform the demolition and removal of existing plain concrete slabs, all as indicated on the contract delivery order and site plans (as applicable). Where required and indicated, concrete shall be saw cut. Typical details will be provided with each delivery order. Broken concrete, debris and resulting loose material shall be removed from limits of the station daily. All work shall be performed in accordance with Sections 01575-“Temporary Environmental Controls” & 02220- “Demolition and Removal”.

Unit of measurement shall be cubic meters (CM), as computed by multiplying, in meters, area length by width by depth (L x W x D).

Dimensions and locations will be specified on the task order.

2,500 CM 0.00

A709 Reserved nos.

A710 Reserved nos.

A711 Reserved nos.

EARTHWORK

EST

QTY

UNIT

OF

ISSUE

Unit Price

(USD)

Total

(USD)

A712 Earthwork for Construction of Bituminous Asphalt Pavements

The Contractor shall perform the general earthwork required for the construction of bituminous asphalt paved roads and parking lots. The work includes performing site preparation, excavation, compaction, removal of excess material and grading, all as necessary to construct bituminous asphalt paved roads, and parking lots at the finished grade and elevations indicated. Typical details are shown on contract drawing Paviment Plate #'s 7 & 8. All work shall be performed in accordance with Section 31 23 00.00 20 - “Excavation and Fill”.

Unit of measurement shall be cubic meters (CM), as computed by multiplying, in meters, area length by width by depth (L x W x D).

Dimensions, slopes and finished grade will be specified on the task order.

2,500 CM 0.00

A713 Earthwork for Storm Sewer Pipe (4 meter max. depth)

The Contractor shall perform the general excavation required for the installation storm drainage pipe. The work includes performing site preparation, excavation, installation of granular pipe bedding, backfill, compacting, removal of excess material and grading, all as necessary to install storm sewer pipe and other related appurtenances at the finished grade and elevations indicated. Maximum depth shall be 4 meter. Typical details are shown on contract drawing Paviment Plate #

1. All work shall be performed in accordance with Section 31 23 00.00 20 - “Excavation and Fill”.

Unit of measurement shall be cubic meters (CM), as computed by multiplying, in meters, length by width by depth (L x W x D).

Dimensions, slopes and finished grade will be specified on the task order.

2,500 CM 0.00

EST

QTY

UNIT

OF

ISSUE

Unit Price

(USD)

Total

(USD)

A714 Earthwork for Storm Sewer Manholes (4 meter max. depth)

The Contractor shall perform the general excavation required for the construction of storm sewer manholes. The work includes performing site preparation, excavation, backfill, compacting, removal of excess material and grading, all as necessary to install storm sewer manholes at the finished grade and elevations indicated. Maximum depth shall be 4 meter. Typical details are shown on contract drawing Paviment Plate #2.

All work shall be performed in accordance with Section 31 23 00.00 20 - “Excavation and Fill”.

Unit of measurement shall be cubic meters (CM), as computed by multiplying, in meters, length by width by depth (L x W x D).

Dimensions, slopes and finished grade will be specified on the task order

1,000 CM 0.00

A715 Earthwork For Storm Drainage Channels/Reshaping (4 meter max.

depth)

The Contractor shall perform the general excavation required for the construction of storm drainage channels. The work includes performing site preparation, excavation for new channel and reshaping for old channel, backfill, compaction, installation of organic mat, removal of excess material and grading, all as necessary to construct storm drainage channels at the finished grade and elevations indicated. Typical details are shown on contract drawing Paviment Plate #3. All work shall be performed in accordance with Section

31 23 00.00 20 - “Excavation and Fill”.

Unit of measurement shall be cubic meters

(CM), as computed by multiplying, in meters, length by width by depth (L x W x D).

Dimensions, slopes and finished grade will be specified on the task order.

150 CM 0.00

EST

QTY

UNIT

OF

ISSUE

Unit Price

(USD)

Total

(USD)

A716 Earthwork for Construction of Sidewalks

The Contractor shall perform the general earthwork required for the construction of concrete sidewalks. The work includes performing site preparation, excavation, compaction, and removal of excess material and grading, all as necessary to construct concrete sidewalks at the finished grade and elevations indicated. Typical details are shown on contract drawing Paviment Plate #18. All work shall be performed in accordance with Section 31 00 00 - “Earthwork”.

Unit of measurement shall be square meters (SM), as computed by multiplying, in meters, area length by width (L x W) considering an average depth of 0.1m . Dimensions and locations will be specified on the task order.

1,500 SM 0.00

A717 Grading Includes all labor, materials, equipment, supervision and transportation required to grade areas to drain water away from structures and to provide suitable surfaces for mowing machines at the finished grade and elevations indicated. All work shall be performed in accordance with Section 02302- “Excavation, Back-filling, and Compacting for Utilities”.

Unit of measurement shall be cubic meters (CM), as computed by multiplying, in meters, area length by width by depth (L x W x D).

Dimensions, slopes and finished grade will be specified on the delivery order

100 CM 0.00

A718 Reserved nos.

A719 Reserved nos.

A720 Reserved nos.

STORM DRAINAGE

A721 Concrete Storm Sewer Pipe (Ø20 cm) The Contractor shall perform the installation of 20 cm. diameter concrete storm drainage pipe. The work includes providing granular pipe bedding material, concrete storm drainage pipe, fittings and joints at the finished grade and elevations indicated.

Typical details are shown on contract drawing Paviment Plate # 1. All work shall be performed in accordance with Sections 31 23

00.00 20 - “Excavation and Fill” and 33 40 01

- “Storm Drainage”.

Unit of measurement shall be linear meters (LM). Dimensions, slopes and locations will be specified on the task order

1,000 LM 0.00

EST

QTY

UNIT

OF

ISSUE

Unit Price

(USD)

Total

(USD)

A722 Concrete Storm Sewer Pipe (Ø30 cm) The Contractor shall perform the installation of 30 cm. diameter concrete storm drainage pipe. The work includes providing granular pipe bedding material, concrete storm drainage pipe, fittings and joints at the finished grade and elevations indicated.

Typical details are shown on contract drawing Paviment Plate # 1. All work shall be performed in accordance with Sections 31 23

00.00 20 - “Excavation and Fill” and 33 40 01

- “Storm Drainage”.

Unit of measurement shall be linear meters (LM). Dimensions, slopes and locations will be specified on the task order

1,000 LM 0.00

A723 Concrete Storm Sewer Pipe (Ø40 cm) The Contractor perform the installation of 40

cm. diameter concrete storm drainage pipe.

The work includes providing granular pipe bedding material, concrete storm drainage pipe, fittings and joints at the finished grade and elevations indicated. Typical details are shown on contract drawing Paviment Plate #

1. All work shall be performed in accordance with Sections 31 23 00.00 20 - “Excavation and Fill” and 33 40 01 - “Storm Drainage”.

Unit of measurement shall be linear meters (LM). Dimensions, slopes and locations will be specified on the task order.

1,000 LM 0.00

A724 Concrete Storm Sewer Pipe (Ø50 cm) The Contractor shall perform the installation of 50 cm. diameter concrete storm drainage pipe. The work includes providing granular pipe bedding material, concrete storm drainage pipe, fittings and joints at the finished grade and elevations indicated.

Typical details are shown on contract drawing Paviment Plate #1. All work shall be performed in accordance with Sections 31 23

00.00 20 - “Excavation and Fill” and 33 40 01

- “Storm Drainage".

Unit of measurement shall be linear meters (LM). Dimensions, slopes and locations will be specified on the task order

EST

QTY

UNIT

OF

ISSUE

Unit Price

(USD)

Total

(USD)

A725 Concrete Storm Sewer Pipe (Ø60 cm) The Contractor shall perform the installation of 60 cm. diameter concrete storm drainage pipe. The work includes providing granular pipe bedding material, concrete storm drainage pipe, fittings and joints at the finished grade and elevations indicated.

Typical details are shown on contract drawing Paviment Plate #1. All work shall be performed in accordance with Sections 31 23

00.00 20 - “Excavation and Fill” and 33 40 01

- “Storm Drainage”.

Unit of measurement shall be linear meters (LM). Dimensions, slopes and locations will be specified on the task order

1,000 LM 0.00

A726 PVC Storm Sewer Pipe (Ø12.5 cm) The Contractor shall perform the installation of 12.5 cm. diameter PVC storm drainage pipe. The work includes providing granular pipe bedding material, PVC storm drainage pipe, fittings and joints at the finished grade and elevations indicated. Typical details are shown on contract drawing Paviment Plate #3.

All work shall be performed in accordance with Sections 31 23 00.00 20 - “Excavation and Fill” and 33 40 01 - “Storm Drainage”.

Unit of measurement shall be linear meters (LM). Dimensions, slopes and locations will be specified on the task order.

1,000 LM 0.00

A727 PVC Storm Sewer Pipe (Ø16 cm) The Contractor shall perform the installation of 16 cm. diameter PVC storm drainage pipe.

The work includes providing granular pipe bedding material, PVC storm drainage pipe, fittings and joints at the finished grade and elevations indicated. Typical details are shown on contract drawing Paviment Plate #3.

All work shall be performed in accordance with Sections 31 23 00.00 20 - “Excavation and Fill” and 33 40 01 - “Storm Drainage”.

Unit of measurement shall be linear meters (LM). Dimensions, slopes and locations will be specified on the task order.

EST

QTY

UNIT

OF

ISSUE

Unit Price

(USD)

Total

(USD)

A728 PVC Storm Sewer Pipe (20 cm) The Contractor shall perform the installation of 20 cm. diameter PVC storm drainage pipe.

The work includes providing granular pipe bedding material, PVC storm drainage pipe, fittings and joints at the finished grade and elevations indicated. Typical details are shown on contract drawing Paviment Plate #3.

All work shall be performed in accordance with Sections 31 23 00.00 20 - “Excavation and Fill” and 33 40 01 - “Storm Drainage”.

Unit of measurement shall be linear meters (LM). Dimensions, slopes and locations will be specified on the task order.

1,000 LM 0.00

A729 PVC Storm Sewer Pipe (Ø25 cm) The Contractor shall perform the installation of 25 cm. diameter PVC storm drainage pipe.

The work includes providing granular pipe bedding material, PVC storm drainage pipe, fittings and joints at the finished grade and elevations indicated. Typical details are shown on contract drawing Paviment Plate #1.

All work shall be performed in accordance with Sections 31 23 00.00 20 - “Excavation and Fill” and 33 40 01 - “Storm Drainage".

Unit of measurement shall be linear meters (LM). Dimensions, slopes and locations will be specified on the task order.

1,000 LM 0.00

A730 PVC Storm Sewer Pipe (Ø31.5 cm) The Contractor shall perform the installation of 31.5 cm. diameter PVC storm drainage pipe. The work includes providing granular pipe bedding material, PVC storm drainage pipe, fittings and joints at the finished grade and elevations indicated. Typical details are shown on contract drawing Paviment Plate #1.

All work shall be performed in accordance with Sections 31 23 00.00 20 - “Excavation and Fill” and 33 40 01 - “Storm Drainage”.

Unit of measurement shall be linear meters (LM). Dimensions, slopes and locations will be specified on the task order.

EST

QTY

UNIT

OF

ISSUE

Unit Price

(USD)

Total

(USD)

A731 PVC Storm Sewer Pipe (Ø40 cm) The Contractor shall perform the installation of 40 cm. diameter PVC storm drainage pipe.

The work includes providing granular pipe bedding material, PVC storm drainage pipe, fittings and joints at the finished grade and elevations indicated. Typical details are shown on contract drawing Paviment Plate #1.

All work shall be performed in accordance with Sections 31 23 00.00 20 - “Excavation and Fill” and 33 40 01 - “Storm Drainage”.

Unit of measurement shall be linear meters (LM). Dimensions, slopes and locations will be specified on the task order.

1,000 LM 0.00

A732 Construct Storm Drainage Headwalls The Contractor shall perform the construction of reinforced concrete headwalls. The work includes performing site preparation, excavation and /or fill, forming, reinforcement, concrete placement, backfill, compaction, removal of excess material and grading, all as necessary to construct concrete storm drainage headwalls at the finished grades and elevations indicated. Typical details are shown on contract drawing Paviment Plate #5. All work shall be performed in accordance with Sections 31 23

00.00 20 - “Excavation and Fill”, 33 40 01 - “Storm Drainage”, and 03 33 00 -“Cast-In- Place Architectural Concrete”.

Unit of measurement shall be Each (EA).

Units and locations will be specified on the task order.

500 EA 0.00

A733 Install Pre-Cast Storm Sewer Manhole (0 - 1 meter depth)

The Contractor shall perform the installation of pre-cast concrete storm sewer manholes.

The work includes supply, delivery and installation of pre-cast concrete manholes, including manhole base, riser, eccentric cone, frames and covers, as applicable, and connection of pipe, all as necessary for the construction of concrete storm drainage manholes at the finished grades and elevations indicated. Typical details are shown on contract drawing Paviment Plate #2. All work shall be performed in accordance with Sections 31 23 00.00 20 - “Excavation and Fill”, 33 40 01 - “Storm Drainage”, 03 33 00 - “Cast-In-Place Architectural Concrete”.

Unit of measurement shall be Each (EA).

Units and locations will be specified on the task order.

600 EA 0.00

EST

QTY

UNIT

OF

ISSUE

Unit Price

(USD)

Total

(USD)

A734 Install Pre-Cast Storm Sewer Manhole (1 - 3 meter depth)

The Contractor shall perform the installation of pre-cast concrete storm sewer manholes.

The work includes supply, delivery and installation of pre-cast concrete manholes, including manhole base, riser, eccentric cone, frames and covers, as applicable, and connection of pipe, all as necessary for the construction of concrete storm drainage manholes at the finished grades and elevations indicated. Typical details are shown on contract drawing Paviment Plate #2. All work shall be performed in accordance with Sections 31 23 00.00 20 - “Excavation and Fill”, 33 40 01 - “Storm Drainage”, 03 33 00 - “Cast-In-Place Architectural Concrete”.

Unit of measurement shall be Each (EA).

Units and locations will be specified on the task order.

600 EA 0.00

A735 Install Pre-cast Concrete Storm Drainage Catch Basin

The Contractor shall perform the installation of pre-cast concrete storm drainage catch basins. The work includes excavation, supply, delivery and installation of pre-cast concrete catch basins, including base, riser, frames and grating, as applicable, and connection to piping, all as necessary for the construction of concrete storm drainage catch basins at the finished grades and elevations indicated. Typical details are shown on contract drawing Paviment Plate #6. All work shall be performed in accordance with

Sections 31 23 00.00 20 - “Excavation and

Fill”, 33 40 01 - “Storm Drainage”.

Unit of measurement shall be Each (EA).

Units and locations will be specified on the task order.

600 EA 0.00

A736 Construct Brick Storm Drainage Catch Basin

The Contractor shall perform the fabrication of brick storm drainage catch basins. The work includes excavation, brick work, armored concrete base, riser, walls, patching and finish, frames and grating, as applicable, and connection to piping, all as necessary for the construction of brick storm drainage catch basins at the finished grades and elevations indicated. All work shall be performed in accordance with Sections 31 23 00.00 20 - “Excavation and Fill”, 33 40 01 - “Storm Drainage”.

Unit of measurement shall be Each (EA).

Units and locations will be specified on the task order.

EST

QTY

UNIT

OF

ISSUE

Unit Price

(USD)

Total

(USD)

A737 Install Rip-Rap Storm Drainage Channel Lining

The Contractor shall install rip-rap storm drainage channel lining. The work includes supply, delivery and installation of rip-rap channel lining. Typical detail is shown on contract drawing Paviment Plate #4. All work shall be performed in accordance with Sections 31 23 00.00 20 - “Excavation and Fill”, 33 40 01 - “Storm Drainage”, and 03 33 00 -“Cast-In-Place Architectural Concrete”.

Unit of measurement shall be square meters (SM), as computed by multiplying, in meters, area length by width, (L x W).

Dimensions and locations will be specified on the task order

3,000 SM 0.00

A738 Up-rise Manhole The Contractor shall perform the uprising of manhole. The work includes performing removal of frame and cover, bricks placement, reinstallation of frame and cover, removal of excess material and grading, all as necessary to up-rise manhole at the finished grades and elevations indicated. Typical details are shown on contract drawing Paviment Plate #2.

All work shall be performed in accordance with Section 33 40 01 - “Storm Drainage Utilities”.

Unit of measurement shall be Each (EA).

Units and locations will be specified on the task order.

600 EA 0.00

A739 Up-rise Drainage Grate The Contractor shall perform the uprising of drainage grate. The work includes performing removal of frame and grate, bricks placement, reinstallation of frame and grate, removal of excess material and grading, all as necessary to up-rise drainage grate at the finished grades and elevations indicated. Typical details are shown on contract drawing Paviment Plate #6.

All work shall be performed in accordance with Section 33 40 01 - “Storm Drainage”.

Unit of measurement shall be Each (EA).

Units and locations will be specified on the task order.

EST

QTY

UNIT

OF

ISSUE

Unit Price

(USD)

Total

(USD)

A740 Up-rise Valve or Meter Cover The Contractor shall perform the uprising of valve/meter cover. The work includes performing removal of frame and cover, bricks placement, reinstallation of frame and cover, removal of excess material and grading, all as necessary to up-rise frame and cover at the finished grades and elevations indicated. All work shall be performed in accordance with Section 33 40 01 - “Storm Drainage Utilities”.

Unit of measurement shall be Each (EA).

Units and locations will be specified on the task order

600 EA 0.00

A741 Reserved nos.

A742 Reserved nos.

A743 Reserved nos.

BITUMINOUS ASPHALT PAVEMENT

A744 Aggregate Sub-Base Course for

Bituminous Asphalt Pavements The Contractor shall perform the placement of crushed aggregate sub-base course for the bituminous asphalt pavement. The work includes performing site preparation, scarifying existing sub-grade, placement of ZA-40 aggregate sub-base, grading and compaction, as necessary for the construction of bituminous asphalt pavement. Sub-base courses must be compacted to 98% modified proctor density IAW UFC 3-201-01. When damage affects the base and sub-base courses, the damaged courses shall be entirely replaced with new material, which shall match the existing. Typical details are shown on contract drawing Paviment Plate #''s 7, 8 &

10. All work shall be performed in accordance with Section 32 11 24 - “Graded Crushed Aggregate Base Course for Flexible Pavement”.

Unit of measurement shall be cubic meters (CM), as computed by multiplying, in meters, area length by width by depth, (L x W x D).

Dimensions will be specified on the task order.

4,500 CM 0.00

EST

QTY

UNIT

OF

ISSUE

Unit Price

(USD)

Total

(USD)

A745 Aggregate Base Course for Bituminous Asphalt Pavements and Concrete Sidewalks

The Contractor shall perform the placement of aggregate base course for bituminous asphalt pavement and concrete sidewalks. The work includes performing site preparation, placement of ZA-25 aggregate base, grading and compaction, as necessary for the construction of the bituminous asphalt pavement and concrete sidewalks. Base courses must be. compacted to 100% modified proctor density. Minimum base thickness for concrete sidewalks shall be 150 mm compacted to 98% modified proctor density IAW UFC 3-201-01. When damage affects the base and sub-base courses, the damaged courses shall be entirely replaced with new material. Typical details are shown on contract drawing Paviment Plate #''s 7, 8 &

10. All work shall be performed in accordance with Section 32 11 24 - “Graded Crushed Aggregate Base Course for Flexible Pavement”.

Unit of measurement shall be cubic meters (CM), as computed by multiplying, in meters, area length by width by depth, (L x W x D).

Dimensions will be specified on the task order.

4,500 CM 0.00

A746 Bituminous Asphalt Pavement Crack Sealing

The Contractor shall perform crack repair in existing asphalt pavements. The work includes site preparation, cleaning and sealing of cracks by application of hot-poured asphalt cement or bitumen sealant. Typical details are shown on contract drawing Paviment Plate #

9. All work shall be performed in accordance with Section 32 12 11 - “Bituminous Surface Treatment” or Section 32 01 22 "Bituminous Rejuvenation: Slurry Seal".

Unit of measurement shall be linear meters (LM), as computed by measurement, in meters, area length (L).

1,500 LM 0.00

EST

QTY

UNIT

OF

ISSUE

Unit Price

(USD)

Total

(USD)

A747 Bituminous Asphalt Pavement Repair The Contractor shall perform repair of existing bituminous asphalt pavement. The work includes surface preparation, supply, delivery and placement at least of 150 mm thick (50mm surface wearing course over a 100 mm thick base course) IAW UFC 3-201-

01. Typical details are shown on contract drawing Paviment Plate #10. All work shall be performed in accordance with Section 32 12 17 - “Hot Mix Bituminous Pavement” and Section 32 12 10 – “Bituminous Tack and Prime Coats”.

Unit of measurement shall be square meters (SM), as computed by multiplying, in meters, area length by width, (L x W).

5,000 SM 0.00

A748 Bituminous Asphalt Pavement Overlay

The Contractor shall perform the application of bituminous asphalt pavement overlay to the existing pavement. The work includes surface preparation, supply, delivery and placement at least of 50 mm surface wearing course IAW

UFC 3-201-01compacted hot bituminous asphalt cement D12 wearing coat and tack coat. Typical details are shown on contract drawing Paviment Plate #11. All work shall be performed in accordance with Sections 32

12 17 - “Hot Mix Bituminous Pavement” and

Section 32 12 10 – “Bituminous Tack and

Prime Coats”.

Unit of measurement shall be square meters

(SM), as computed by multiplying, in meters, area length by width, (L x W).

5,000 SM 0.00

A749 Bituminous Asphalt Pavement Slurry Seal

The Contractor shall perform the application of slurry seal on existing pavement. The work includes all labor, materials, equipment, supervision and transportation required to perform the application of asphalt slurry seal to existing asphalt pavement. The work includes surface preparation, and application of asphalt slurry seal. Typical details are shown on contract drawing Paviment Plate

#17. All work shall be performed in accordance with Sections 32 12 17 -

“Bituminous Hot Mix Pavement” and 32 01

22 -“Bituminous Rejuvenation: Slurry Seal”.

Unit of measurement shall be square meters

(SM), as computed by multiplying, in meters, area length by width, (L x W). Dimensions will be specified on the task order.

10,000 SM 0.00

EST

QTY

UNIT

OF

ISSUE

Unit Price

(USD)

Total

(USD)

A750 Bituminous Asphalt Pavement Surface Treatment

The Contractor shall perform treatment on the bituminous asphalt pavement. The work includes all labor, materials, equipment, supervision and transportation required to perform the application of bituminous surface treatment. The work includes surface preparation and application of bituminous surface treatment. Typical details are shown on contract drawing Paviment Plate #17.All work shall be performed in accordance with

Sections 32 12 17 Hot Mix Bituminous

Pavement & Section 32 12 11-“Bituminous

Surface Treatment”.

Unit of measurement shall be square meters

(SM), as computed by multiplying, in meters, area length by width, (L x W). Dimensions will be specified on the task order.

1,000 SM 0.00

A751 New Bituminous Asphalt Pavement The Contractor shall perform the application of new bituminous asphalt pavement. The work includes surface preparation, supply, delivery and placement at least of 150mm thick (50mm surface wearing course over a

100 mm thick base course) IAW UFC 3-201-

01 compacted bituminous asphalt pavement D

12 wearing course, and tack coat. Typical details are shown on contract drawing

Paviment Plate #'s 7 & 8. All work shall be performed in accordance with Section 32 12

17 - “Hot Mix Bituminous Pavement”.

Unit of measurement shall be square meters

(SM), as computed by multiplying, in meters, area length, by width, (L x W). Dimensions will be specified on the task order.

2,500 SM 0.00

A752 Reserved nos.

A753 Reserved nos.

A754 Reserved nos.

PAVEMENT MARKINGS

A755 Obliteration of Existing Bituminous

Asphalt Pavement Road Markings The Contractor shall perform the obliteration of existing road and airfield markings. All work shall be performed in accordance with Section 32 17 23.00 20-“Pavement Markings”.

Unit of measurement shall be square meters (SM) of painted area, as computed by multiplying, in meters, area length, by width, (L x W). Dimensions and locations will be specified on the task order

1,000 SM 0.00

EST

QTY

UNIT

OF

ISSUE

Unit Price

(USD)

Total

(USD)

A756 Paint Solid Pavement Lines The Contractor shall perform the painting of solid pavement lines. The work includes surface preparation and painting of 10 cm wide solid pavement lines. Application of this ELIN will be used for pavement lines, parking stall, diagonal no-parking lines and airfield lines. All work shall be performed in accordance with Section 32 17 23.00 20 - “Pavement Markings”.

Unit of measurement shall be linear meters (LM) of painted area. Paint colors, dimensions and locations will be specified on the task order.

500 LM 0.00

A757 Paint Reflective Solid Pavement Lines The Contractor shall perform the painting of solid reflective pavement lines. The work includes surface preparation and painting of 10 cm (4 inch) wide solid pavement lines.

Application of this ELIN will be used for pavement lines, parking stall, diagonal no-parking lines and airfield lines. All work shall be performed in accordance with Section 32 17 23.00 20 -“Pavement Markings”.

Unit of measurement shall be linear meters (LM) of painted area. Paint colors, dimensions and locations will be specified on the task order.

500 LM 0.00

A758 Paint Center Pavement Lines The Contractor shall perform the painting of center pavement lines. The work includes surface preparation and painting of 10 cm wide center pavement lines. Application of this ELIN will be used for pavement lines, parking stall, diagonal no-parking lines and airfield lines. All work shall be performed in accordance with Section 32 17 23.00 20 - “Pavement Markings”.

Unit of measurement shall be linear meters (LM) of painted area. Paint colors, dimensions and locations will be specified on the task order.

500 LM 0.00

EST

QTY

UNIT

OF

ISSUE

Unit Price

(USD)

Total

(USD)

A759 Paint Reflective Center Pavement Lines

The Contractor shall perform the painting of center reflective pavement lines. The work includes surface preparation and painting of 10 cm (4 inch) wide reflective center pavement lines. Application of this ELIN will be used for pavement lines, parking stall, diagonal no-parking lines and airfield lines.

All work shall be performed in accordance with Section 32 17 23.00 20 -“Pavement Markings”.

Unit of measurement shall be linear meters (LM) of painted area. Paint colors, dimensions and locations will be specified on the task order

500 LM 0.00

A760 Paint Concrete Wheel Stops and Curbs

The Contractor shall perform the painting of existing concrete wheel stops and pavement curbs. The work includes surface preparation and painting of all designated exposed surfaces. All work shall be performed in accordance with Section 32 17 23.00 20 - “Pavement Markings”.

Unit of measurement shall be square meters (SM) of painted area, as computed by multiplying actual dimensions of paint length, by width, (L x W). Paint colors, dimensions and locations will be specified on the task order.

500 SM 0.00

A761 Paint Pedestrian Crosswalk Markings The Contractor shall perform the painting of pedestrian crosswalk markings. The work includes surface preparation and painting.

Typical details are shown on contract drawing

Paviment Plate #14. All work shall be performed in accordance with Section 32 17

23.00 20 -“Pavement Markings”.

Unit of measurement shall be square meters

(SM) of actual painted area, as computed by multiplying actual dimensions of paint length, by width, (L x W). Paint colors and locations will be specified on the task order.

2,000 SM 0.00

EST

QTY

UNIT

OF

ISSUE

Unit Price

(USD)

Total

(USD)

A762 Paint Reflective Pedestrian Crosswalk Markings

The Contractor shall perform the painting of reflective pedestrian crosswalk markings. The work includes surface preparation and painting. Typical details are shown on contract drawing Paviment Plate #14. All work shall be performed in accordance with Section 32 17 23.00 20 -“Pavement Markings”.

Unit of measurement shall be square meters (SM) of actual painted area, as computed by multiplying actual dimensions of paint length, by width, (L x W). Paint colors and locations will be specified on the task order.

2,000 SM 0.00

A763 Paint Stop Markings The Contractor shall perform the painting of stop markings. The work includes surface preparation and painting. Typical details are shown on contract drawing Paviment Plate #14. All work shall be performed in accordance with Section 32 17 23.00 20 - “Pavement Markings”.

Unit of measurement shall be square meters (SM) of actual painted area, as computed by multiplying actual dimensions of paint length, by width, (L x W). Paint colors and locations will be specified on the task order.

2,000 SM 0.00

A764 Paint Reflective Stop Markings The Contractor shall perform the painting of reflective stop markings. The work includes surface preparation and painting. Typical details are shown on contract drawing Paviment Plate #14. All work shall be performed in accordance with Section 32 17

23.00 20-“Pavement Markings”.

Unit of measurement shall be square meters (SM) of actual painted area, as computed by multiplying actual dimensions of paint length, by width, (L x W). Paint colors and locations will be specified on the task order.

2,000 SM 0.00

A765 Paint Yield Markings The Contractor shall perform the painting of yield markings. The work includes surface preparation and painting. Typical details are shown on contract drawing Paviment Plate #15. All work shall be performed in accordance with Section 32 17 23.00 20 - “Pavement Markings”.

Unit of measurement shall be Each (EA).

Paint colors and locations will be specified on the task order

1,000 EA 0.00

EST

QTY

UNIT

OF

ISSUE

Unit Price

(USD)

Total

(USD)

A766 Paint Reflective Yield Markings The Contractor shall perform the painting of yield markings. The work includes surface preparation and painting. Typical details are shown on contract drawing Pavimjent Plate #15. All work shall be performed in accordance with Section 32 17 23.00 20 - “Pavement Markings”.

Unit of measurement shall be Each (EA).

Paint colors and locations will be specified on the task order

1,000 EA 0.00

A767 Paint Direction Arrows Markings The Contractor shall perform the painting of directional arrow markings. The work includes surface preparation and painting.

Typical details are shown on contract drawing Paviment Plate #15. All work shall be performed in accordance with Section 32 17

23.00 20 -“Pavement Markings”. Unit of measurement shall be EA (EA). Paint colors and locations will be specified on the task order.

Unit of measurement shall be Each (EA).

Paint colors and locations will be specified on the task order

10 EA 0.00

A768 Paint Reflective Direction Arrows Markings

The Contractor shall perform the painting of reflective directional arrow markings. The work includes surface preparation and painting. Typical details are shown on contract drawing Paviment Plate #15. All work shall be performed in accordance with Section 32 17 23.00 20 -“Pavement Markings”.

Unit of measurement shall be Each (EA).

Paint colors and locations will be specified on the task order

5 EA 0.00

A769 Paint Special Markings The Contractor shall perform the painting of special pavement markings, such as but not limited to, handicap parking symbols and "NO PARKING" letters. The work includes surface preparation and painting. Typical details are shown on contract drawing Paviment Plate #14. All work shall be performed in accordance with Section 32 17

23.00 20 -“Pavement Markings”.

Unit of measurement shall be square meters (SM) of actual painted area, as computed by multiplying actual dimensions of paint area length, by width, (L x W). Paint colors and locations will be specified on the task order.

500 SM 0.00

EST

QTY

UNIT

OF

ISSUE

Unit Price

(USD)

Total

(USD)

A770 Pavement Traffic Road Reflectors The Contractor shall perform the installation of pavement traffic reflectors. The work includes supply, delivery, surface preparation and installation. All work shall be performed in accordance with Section 32 17 23.00 20 -

“Pavement Markings”.

Unit of measurement shall be Each (EA).

Reflector colors and locations will be specified on the task order.

2,000 EA 0.00

A771 Pavement Striping The Contractor shall perform the re-striping of existing striped roads and to stripe newly paved or otherwise un-striped roads, in accordance with the Spanish law and PG-3.

The work shall include all types of solid and reflective striping and pavement marking of all types, including but not limited to:

obliteration of existing road markings, solid and broken striping center and lateral striping, pavement traffic reflectors, all pavement edge markings, turning radius markings, pedestrian crosswalk markings, directional arrows, stop or yield pavement markings, and any special markings required. Typical details are shown on contract drawing Paviment Plate #'s 14 &

15. All work shall be performed in accordance with Section 32 17 23.00 20 - “Pavement Markings”.

Unit of measurement shall be kilometer (KM) of painted area. Paint colors, dimensions and locations will be specified on the task order.

20 KM 0.00

EST

QTY

UNIT

OF

ISSUE

Unit Price

(USD)

Total

(USD)

A772 Parking Lot Striping The Contractor shall perform the re-striping of existing striped parking lots same as existing and to stripe newly paved or otherwise un-striped parking areas. The work shall include all types of solid and reflective striping and pavement marking of all types, including but not limited to: obliteration of existing markings, solid and broken striping, pavement traffic reflectors, all pavement edge makings, turning radius markings, pedestrian crosswalk markings, directional arrows, stop or yield pavement markings, any special markings required, and concrete wheel stops and curbs. Typical details are shown on contract drawing Paviment Plate #'s 14 & 15.

All work shall be performed in accordance with Section 32 17 23.00 20-“Pavement Markings”.

Unit of measurement shall be square meter (SM) of painted area. Paint colors, dimensions and locations will be specified on the task order.

5,000 SM 0.00

A773 Repaing Airfield Markings The work includes the removal of of horizontal repaint and striping in requested areas and cleaning up; and incidental related work. The work shall include all types of solid and reflective striping and marking of all types, including but not limited to:

obliteration of existing markings, solid and broken striping, all edge makings, turning radius markings and any special markings required. All work shall be in accordance with paint removal from airfield pavements and section 32 17 23.00 20 pavement markings.

Contractor shall provide equipment capable to remove and paint pavement markings.Work shall be requires special scheduling and shall be executed in several shifts, 24 hours per day and weekends. The work shall be completed within the week scheduled by the Government, including painting and cleaning.

Some areas may be painted before the scheduled week. During the time scheduled, the airport will be closed. Only in case of emergency, the contractor shall have to immediately clear the work area upon request.

The selection of the working days will be made by the Government at least one (1) month in advance. The contractor shall identify on the construction schedule each factor which constitutes a potential interruption to operations and shall prepare remedial actions for those events.The

5,000 SM 0.00

EST

QTY

UNIT

OF

ISSUE

Unit Price

(USD)

Total

(USD)

A774 Reserved nos.

A775 Reserved nos.

A776 Reserved nos.

CAST-IN PLACE CONCRETE WORK

A777 Reinforced Sidewalks Construction The Contractor shall perform the construction of 10 cm thick reinforced concrete sidewalks.

The work includes site preparation, construction and installation of forms, placement of WWF steel, concrete placement, installation of vapor barrier, installation of expansion joints and control joints, and finish.

Typical details are shown on contract drawing

Paviment Plate #18. All work shall be performed in accordance with Section 03 33

00-“Cast-In-Place Architectural Concrete”.

Unit of measurement shall be square meter

(SM), as computed by multiplying, in meters, area length, by width, (L x W). Dimensions will be specified on the task order.

4,000 SM 0.00

A778 Concrete Wheel Stops The Contractor shall provide and install concrete wheel stops. The work includes fabrication and installation of concrete wheel stops. Typical wheel stop construction detail is shown on contract drawing Paviment Plate #16. All work shall be performed in accordance with Section 03 33 00 -“Cast-In- Place Architectural Concrete”.

Unit of measurement shall be each (EA).

Units and locations will be specified on the task order.

10 EA 0.00

A779 Reserved nos.

A780 Reserved nos.

A781 Reserved nos.

REINFORCEMENT

EST

QTY

UNIT

OF

ISSUE

Unit Price

(USD)

Total

(USD)

A782 Reinforced Concrete Slabs of Compressive Strength 210 fck 250 Kg/cm²

Includes all labor, materials, equipment, supervision and transportation required to perform the construction of concrete slabs of a compressive strength 210 fck 250 Kg/cm².

The work includes site preparation, construction and installation of forms, concrete placement, installation of vapor barrier, installation of expansion joints and finish. Minimum reinforced concrete slab thickness shall be 15 cm (6 inch). Any other slab thickness higher than the minimum will be specified on each task order. Typical details are shown on contract drawing Paviment Plate #19. Minimum concrete compressive strength shall be fck = 210 Kg/cm². Any other concrete compressive strength stronger than the minimum will be specified on each delivery order. Minimum WWF reinforcement shall be 15 x 15 cm, 6

mm. Any other WWF reinforcement stronger than the minimum will be specified on each delivery order. All work shall be performed in accordance with Sections 03100-“Concrete Forms and Accessories”, and 03300-“Cast-In- Place Concrete”.

Unit of measurement shall be cubic meters (CM), as computed by multiplying, in meters, area length by width by depth (L x W x D).

Dimensions will be specified on the delivery order.

1,350 CM 0.00

EST

QTY

UNIT

OF

ISSUE

Unit Price

(USD)

Total

(USD)

A783 Reinforced Concrete Slabs of Compressive Strength 250 fck 300 Kg/cm²

Includes all labor, materials, equipment, supervision and transportation required to perform the construction of concrete slabs of a compressive strength 250 fck 300 Kg/cm².

The work includes site preparation, construction and installation of forms, concrete placement, installation of vapor barrier, installation of expansion joints and finish. Minimum reinforced concrete slab thickness shall be 15 cm (6 inch). Any other slab thickness higher than the minimum will be specified on each delivery order. Typical details are shown on contract drawing Paviment Plate #19. Any other concrete compressive strength included in the above values will be specified on each delivery order. Minimum WWF reinforcement shall be 15 x 15 cm, 6 mm. Any other WWF reinforcement stronger than the minimum will be specified on each task order. All work shall be performed in accordance with Sections 03100-“Concrete Forms and Accessories”, and 03300-“Cast-In-Place Concrete”.

Unit of measurement shall be cubic meters (CM), as computed by multiplying, in meters, area length by width by depth (L x W x D).

Dimensions will be specified on the delivery order.

1,350 CM 0.00

A784 Welded Wire Fabric (WWF) (15 x 15) cm, 6 mm²

Includes all labor, materials, equipment, supervision and transportation required to perform the reinforcement of concrete slabs with 15 x 15 cm reticle 6 mm² WWF. The work includes preparation, fabrication and placement of welded wire fabric, wire ties, supports, and other devices necessary to install and secure reinforcing WWF. Typical details are shown on contract drawing Paviment Plate #19. All work shall be performed in accordance with Section 03200- “Concrete Reinforcement”.

Unit of measurement shall be square meter (SM), as computed by multiplying, in meters, area length, by width, (L x W).

4,000 SM 0.00

EST

QTY

UNIT

OF

ISSUE

Unit Price

(USD)

Total

(USD)

A785 Welded Wire Fabric (WWF) (15 x 15) cm, 8 mm

Includes all labor, materials, equipment, supervision and transportation required to perform the reinforcement of concrete slabs with 15 x 15 cm reticle 8 mm² WWF. The work includes preparation, fabrication and placement of welded wire fabric, wire ties, supports, and other devices necessary to install and secure reinforcing WWF. Typical details are shown on contract drawing Paviment Plate #19. All work shall be performed in accordance with Section 03200- “Concrete Reinforcement”.

Unit of measurement shall be square meter (SM), as computed by multiplying, in meters, area length, by width, (L x W).

4,000 SM 0.00

A786 Welded Wire Fabric (WWF) (15 x 15) cm, 10 mm²

Includes all labor, materials, equipment, supervision and transportation required to perform the reinforcement of concrete slabs with 15 x 15 cm reticle 10 mm² WWF. The work includes preparation, fabrication and placement of welded wire fabric, wire ties, supports, and other devices necessary to install and secure reinforcing WWF. Typical details are shown on contract drawing Paviment Plate #19. All work shall be performed in accordance with Section 03200- “Concrete Reinforcement”.

Unit of measurement shall be square meter (SM), as computed by multiplying, in meters, area length, by width, (L x W).

4,000 SM 0.00

A787 Reserved nos.

A788 Reserved nos.

A789 Reserved nos.

ROOFING

A790 Removal of Corrugated and Pre-

Formed Metal Roofing Ridge.

The Contractor shall perform the removal of existing corrugated and pre-formed metal roofing ridge. All rubbish, debris and loose material resulting from removal of corrugated and pre-formed metal roofing ridge shall be removed from limits of the Naval Station daily. All work shall be performed in accordance with Sections 01 57 19.00 20 & 02 41 00 Unit of measurement shall be linear meters (LM) of removed roof ridge. Dimensions and locations will be specified on the task order.

60 LM 0.00

EST

QTY

UNIT

OF

ISSUE

Unit Price

(USD)

Total

(USD)

A791 Removal of Corrugated Cement- Asbestos Sheet Roofing.

The Contractor shall perform the removal of existing cement-asbestos sheet roofing. All rubbish, debris and loose material resulting from removal of cement-asbestos sheet roofing shall be removed from limits of the Naval Station daily. All work shall be performed in accordance with Sections 01 57

19.00 20, 02 41 00 & 02 82 14.00 10 Unit of measurement shall be square meters (SM), as computed by multiplying, in meters, area length by width (L x W) , including all overlaps, overhangs, around roofing equipment/vents. Vertical walls and general obstructions 30.48 cm. (one foot) and under and all vertical walls over 30.48 cm (one foot) should be added to the square meter total.

Dimensions and locations will be specified on the task order.

250 SM 0.00

A792 Removal of Corrugated Plastic Sheet Roofing.

The Contractor shall perform the removal of existing corrugated plastic sheet roofing. All rubbish, debris and loose material resulting from removal of corrugated plastic sheet roofing shall be removed from limits of the

Naval Station daily. All work shall be performed in accordance with Sections 01 57

19.00 20 & 02 41 00

Unit of measurement shall be square meters

(SM), as computed by multiplying, in meters, area length by width (L x W) , including all overlaps, overhangs, around roofing equipment/vents. Vertical walls and general obstructions 30.48 cm.