Ivy_Bid Tabs OregonBuys 4-9-2024.xlsx
XLSX spreadsheet 123 KB Posted
- Solicitation number
- S-C01010-00009498
- Issued by
- Clackamas County, Canyonville City, Oregon
About this file
This document is a bid tabulation for the Ivy Street Pedestrian Improvements project, a state and local contract opportunity posted by the Clackamas County and Oregon City governments. The project involves upgrading pedestrian infrastructure along S Ivy Street, including road widening, bike lane and sidewalk additions, signal upgrades, curb ramp construction, and stormwater system improvements. The bid documents specify a substantial completion date of October 31, 2025 and a final completion date of December 31, 2026. Bidders must be pre-qualified in the Earthwork and Drainage (EART) category, and bids are due by March 26, 2024 at 2:00 PM PT.
The Engineer's Estimate for the project is $4,640,500, and the apparent low bid received was for $3,658,000. Funding for the project is being provided by Clackamas County and the City of Oregon City, but no other budget information or award value ranges are specified. The contract opportunity does not mention any set-aside designations or restrictions on the types of organizations that can respond, and no details are provided about incumbent vendors or current contractors.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID TABS
| IVY STREET PEDESTRIAN IMPROVEMENTS | ||||||||||||||||||||||||||||||
| Bid Opening March 26, 2024 | ||||||||||||||||||||||||||||||
| Western United Civil Group LLC | Eagle Elsner | Brown Contracting | Canby Excavating | Pacific Excavation | Corpac Construction Company | Moore Excavation Inc | K&L Industries | Kodiak Pacific Construction | D&D Concrete & Utilities | Knife River Construction | K&E Excavating | Icon Construction | ||||||||||||||||||
| Item # | Spec | Item Description | Unit | Quantity | Unit Price | Total Price | Unit Price | Total Price | Unit Price | Total Price | Unit Price | Total Price | Unit Price | Total Price | Unit Price | Total Price | Unit Price | Total Price | Unit Price | Total Price | Unit Price | Total Price | Unit Price | Total Price | Unit Price | Total Price | Unit Price | Total Price | Unit Price | Total Price |
| 1 | 00180 | Workplace Harrassment Prevention Plan | LS | 1 | 2,500.00 | 2,500.00 | 1,000.00 | 1,000.00 | 500.00 | 500.00 | 1,000.00 | 1,000.00 | 2,000.00 | 2,000.00 | 2,500.00 | 2,500.00 | 2,500.00 | 2,500.00 | 2,000.00 | 2,000.00 | 1,733.27 | 1,733.27 | 1,500.00 | 1,500.00 | 1,000.00 | 1,000.00 | 3,000.00 | 3,000.00 | 10,000.00 | 10,000.00 |
| 2 | 00196 | Extra Work As Authorized | AA | 1 | 150,000.00 | 150,000.00 | 150,000.00 | 150,000.00 | 150,000.00 | 150,000.00 | 150,000.00 | 150,000.00 | 150,000.00 | 150,000.00 | 150,000.00 | 150,000.00 | 150,000.00 | 150,000.00 | 150,000.00 | 150,000.00 | 150,000.00 | 150,000.00 | 150,000.00 | 150,000.00 | 150,000.00 | 150,000.00 | 150,000.00 | 150,000.00 | 150,000.00 | 150,000.00 |
| 3 | 00210 | Mobilization | LS | 1 | 500,000.00 | 500,000.00 | 250,000.00 | 250,000.00 | 415,000.00 | 415,000.00 | 380,000.00 | 380,000.00 | 320,530.75 | 320,530.75 | 459,370.00 | 459,370.00 | 420,000.00 | 420,000.00 | 180,000.00 | 180,000.00 | 251,891.62 | 251,891.62 | 370,000.00 | 370,000.00 | 440,000.00 | 440,000.00 | 343,500.00 | 343,500.00 | 315,000.00 | 315,000.00 |
| 4 | 00221 | Temporary Work Zone Traffic Control, Complete | LS | 1 | 200,000.00 | 200,000.00 | 232,670.35 | 232,670.35 | 156,000.00 | 156,000.00 | 100,000.00 | 100,000.00 | 285,000.00 | 285,000.00 | 385,000.00 | 385,000.00 | 275,000.00 | 275,000.00 | 350,000.00 | 350,000.00 | 286,314.22 | 286,314.22 | 220,000.00 | 220,000.00 | 315,000.00 | 315,000.00 | 135,500.00 | 135,500.00 | 275,000.00 | 275,000.00 |
| 5 | 00225 | Stripe Removal | LF | 15,000 | 1.00 | 15,000.00 | 0.40 | 6,000.00 | 0.50 | 7,500.00 | 1.00 | 15,000.00 | 0.50 | 7,500.00 | 0.60 | 9,000.00 | 0.66 | 9,900.00 | 0.60 | 9,000.00 | 0.42 | 6,300.00 | 1.00 | 15,000.00 | 0.40 | 6,000.00 | 0.45 | 6,750.00 | 0.80 | 12,000.00 |
| 6 | 00225 | Temporary Striping | LF | 13,755 | 0.50 | 6,877.50 | 0.35 | 4,814.25 | 0.50 | 6,877.50 | 1.00 | 13,755.00 | 0.40 | 5,502.00 | 0.38 | 5,226.90 | 0.61 | 8,390.55 | 0.44 | 6,052.20 | 0.37 | 5,089.35 | 1.00 | 13,755.00 | 0.35 | 4,814.25 | 0.40 | 5,502.00 | 0.70 | 9,628.50 |
tc={D7096797-9593-4464-9DBD-B0F0C415040E}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
Bid reflects $9628.00.
| 7 | 00280 | Erosion Control | LS | 1 | 40,000.00 | 40,000.00 | 22,000.00 | 22,000.00 | 10,000.00 | 10,000.00 | 17,000.00 | 17,000.00 | 30,000.00 | 30,000.00 | 36,750.00 | 36,750.00 | 35,000.00 | 35,000.00 | 10,000.00 | 10,000.00 | 10,423.02 | 10,423.02 | 6,000.00 | 6,000.00 | 8,000.00 | 8,000.00 | 8,500.00 | 8,500.00 | 50,000.00 | 50,000.00 |
| 8 | 00280 | Sediment Fence | LF | 4,344 | 4.50 | 19,548.00 | 4.35 | 18,896.40 | 4.00 | 17,376.00 | 5.00 | 21,720.00 | 2.50 | 10,860.00 | 3.75 | 16,290.00 | 4.50 | 19,548.00 | 2.00 | 8,688.00 | 3.16 | 13,727.04 | 5.00 | 21,720.00 | 3.00 | 13,032.00 | 4.00 | 17,376.00 | 4.00 | 17,376.00 |
| 9 | 00280 | Inlet protection, Type 3 | EA | 52 | 110.00 | 5,720.00 | 90.00 | 4,680.00 | 85.00 | 4,420.00 | 110.00 | 5,720.00 | 100.00 | 5,200.00 | 95.00 | 4,940.00 | 120.00 | 6,240.00 | 165.00 | 8,580.00 | 89.41 | 4,649.32 | 80.00 | 4,160.00 | 85.00 | 4,420.00 | 70.00 | 3,640.00 | 85.00 | 4,420.00 |
| 10 | 00280 | Construction Entrance, Type 1 | EA | 1 | 5,800.00 | 5,800.00 | 1,000.00 | 1,000.00 | 4,500.00 | 4,500.00 | 5,000.00 | 5,000.00 | 1,500.00 | 1,500.00 | 1,800.00 | 1,800.00 | 5,000.00 | 5,000.00 | 10,000.00 | 10,000.00 | 5,587.82 | 5,587.82 | 200.00 | 200.00 | 3,000.00 | 3,000.00 | 2,000.00 | 2,000.00 | 10,000.00 | 10,000.00 |
| 11 | 00280 | Concrete Washout Facility | EA | 1 | 1,300.00 | 1,300.00 | 1,500.00 | 1,500.00 | 2,000.00 | 2,000.00 | 8,000.00 | 8,000.00 | 6,500.00 | 6,500.00 | 2,850.00 | 2,850.00 | 2,000.00 | 2,000.00 | 10,000.00 | 10,000.00 | 2,341.82 | 2,341.82 | 1,000.00 | 1,000.00 | 33,000.00 | 33,000.00 | 500.00 | 500.00 | 5,500.00 | 5,500.00 |
| 12 | 00290 | Pollution Control Plan | LS | 1 | 900.00 | 900.00 | 1,000.00 | 1,000.00 | 500.00 | 500.00 | 1,200.00 | 1,200.00 | 250.00 | 250.00 | 2,000.00 | 2,000.00 | 2,500.00 | 2,500.00 | 2,500.00 | 2,500.00 | 866.63 | 866.63 | 500.00 | 500.00 | 1,000.00 | 1,000.00 | 800.00 | 800.00 | 10,000.00 | 10,000.00 |
| 13 | 00305 | Construction Survey Work | LS | 1 | 60,000.00 | 60,000.00 | 60,000.00 | 60,000.00 | 75,000.00 | 75,000.00 | 87,000.00 | 87,000.00 | 89,000.00 | 89,000.00 | 80,000.00 | 80,000.00 | 75,000.00 | 75,000.00 | 80,000.00 | 80,000.00 | 78,876.95 | 78,876.95 | 80,000.00 | 80,000.00 | 54,760.00 | 54,760.00 | 60,000.00 | 60,000.00 | 95,000.00 | 95,000.00 |
| 14 | 00310 | Removal of Structures and Obstructions | LS | 1 | 145,000.00 | 145,000.00 | 45,000.00 | 45,000.00 | 25,000.00 | 25,000.00 | 45,000.00 | 45,000.00 | 45,000.00 | 45,000.00 | 199,950.00 | 199,950.00 | 95,000.00 | 95,000.00 | 75,000.00 | 75,000.00 | 67,814.11 | 67,814.11 | 100,000.00 | 100,000.00 | 25,000.00 | 25,000.00 | 70,000.00 | 70,000.00 | 100,000.00 | 100,000.00 |
| 15 | 00310 | Removal of Inlets | EA | 13 | 1,400.00 | 18,200.00 | 500.00 | 6,500.00 | 950.00 | 12,350.00 | 800.00 | 10,400.00 | 400.00 | 5,200.00 | 650.00 | 8,450.00 | 450.00 | 5,850.00 | 1,000.00 | 13,000.00 | 651.28 | 8,466.64 | 600.00 | 7,800.00 | 13.50 | 175.50 |
tc={3D04484F-2B51-47D4-9032-E3C96EBC0D37}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
| Bid reflects $17,550. | 1,000.00 | 13,000.00 | 550.00 | 7,150.00 | ||||||||||||||||||||||||||||
| 16 | 00310 | Removal of Pipes | LF | 150 | 150.00 | 22,500.00 | 40.00 | 6,000.00 | 125.00 | 18,750.00 | 25.00 | 3,750.00 | 25.00 | 3,750.00 | 35.00 | 5,250.00 | 15.00 | 2,250.00 | 150.00 | 22,500.00 | 39.36 | 5,904.00 | 35.00 | 5,250.00 | 60.00 | 9,000.00 | 29.00 | 4,350.00 | 58.00 | 8,700.00 | ||
| 17 | 00310 | Abandon Pipes In Place | LF | 2,200 | 5.25 | 11,550.00 | 15.00 | 33,000.00 | 16.00 | 35,200.00 | 5.00 | 11,000.00 | 15.00 | 33,000.00 | 15.00 | 33,000.00 | 14.00 | 30,800.00 | 8.00 | 17,600.00 | 21.64 | 47,608.00 | 8.00 | 17,600.00 | 30.00 | 66,000.00 | 20.00 | 44,000.00 | 14.00 | 30,800.00 | ||
| 18 | 00320 | Clearing and Grubbing | LS | 1 | 95,000.00 | 95,000.00 | 50,000.00 | 50,000.00 | 60,000.00 | 60,000.00 | 72,926.00 | 72,926.00 | 60,000.00 | 60,000.00 | 76,500.00 | 76,500.00 | 60,000.00 | 60,000.00 | 75,000.00 | 75,000.00 | 19,597.61 | 19,597.61 | 40,000.00 | 40,000.00 | 65,000.00 | 65,000.00 | 50,000.00 | 50,000.00 | 70,000.00 | 70,000.00 | ||
| 19 | 00330 | General Excavation | CY | 3,084 | 50.00 | 154,200.00 | 36.00 | 111,024.00 | 85.00 | 262,140.00 | 45.00 | 138,780.00 | 48.00 | 148,032.00 | 45.50 | 140,322.00 | 66.00 | 203,544.00 | 40.00 | 123,360.00 | 86.43 | 266,550.12 | 40.00 | 123,360.00 | 50.00 | 154,200.00 | 30.00 | 92,520.00 | 87.00 | 268,308.00 | ||
| 20 | 00331 | 18 Inch Subgrade Stabilization | SY | 250 | 51.00 | 12,750.00 | 48.00 | 12,000.00 | 125.00 | 31,250.00 | 75.00 | 18,750.00 | 48.00 | 12,000.00 | 65.00 | 16,250.00 | 45.00 | 11,250.00 | 50.00 | 12,500.00 | 29.83 | 7,457.50 | 22.00 | 5,500.00 | 45.00 | 11,250.00 | 54.00 | 13,500.00 | 70.00 | 17,500.00 | ||
| 21 | 00332 | Vault Modification | LS | 1 | 8,500.00 | 8,500.00 | 11,000.00 | 11,000.00 | 2,600.00 | 2,600.00 | 5,000.00 | 5,000.00 | 15,000.00 | 15,000.00 | 20,231.95 | 20,231.95 | 20,000.00 | 20,000.00 | 12,500.00 | 12,500.00 | 23,723.92 | 23,723.92 | 10,000.00 | 10,000.00 | 7,590.00 | 7,590.00 | 16,000.00 | 16,000.00 | 10,000.00 | 10,000.00 | ||
| 22 | 00350 | Subgrade Geotextile | SY | 4,103 | 1.50 | 6,154.50 | 1.50 | 6,154.50 | 2.00 | 8,206.00 | 4.00 | 16,412.00 | 2.00 | 8,206.00 | 1.75 | 7,180.25 | 1.50 | 6,154.50 | 3.00 | 12,309.00 | 2.23 | 9,149.69 | 2.00 | 8,206.00 | 3.00 | 12,309.00 | 1.00 | 4,103.00 | 4.00 | 16,412.00 | ||
| 23 | 00405 | Concrete Excavation | CY | 150 | 60.00 | 9,000.00 | 125.00 | 18,750.00 | 200.00 | 30,000.00 | 90.00 | 13,500.00 | 65.00 | 9,750.00 | 320.00 | 48,000.00 | 50.00 | 7,500.00 | 100.00 | 15,000.00 | 115.92 | 17,388.00 | 50.00 | 7,500.00 | 100.00 | 15,000.00 | 185.00 | 27,750.00 | 225.00 | 33,750.00 | ||
| 24 | 00445 | 12" HDPE Drain Pipe | LF | 2,200 | 219.00 | 481,800.00 | 140.00 | 308,000.00 | 175.00 | 385,000.00 | 130.00 | 286,000.00 | 130.00 | 286,000.00 | 178.00 | 391,600.00 | 210.00 | 462,000.00 | 125.00 | 275,000.00 | 144.35 | 317,570.00 | 170.00 | 374,000.00 | 274.00 | 602,800.00 | 115.00 | 253,000.00 | 165.00 | 363,000.00 | ||
| 25 | 00470 | Precast 48" Standard Manhole Installation | EA | 9 | 12,500.00 | 112,500.00 | 9,000.00 | 81,000.00 | 8,500.00 | 76,500.00 | 7,600.00 | 68,400.00 | 5,500.00 | 49,500.00 | 8,450.00 | 76,050.00 | 8,500.00 | 76,500.00 | 9,500.00 | 85,500.00 | 9,781.38 | 88,032.42 | 6,000.00 | 54,000.00 | 14,135.00 | 127,215.00 | 7,000.00 | 63,000.00 | 5,500.00 | 49,500.00 | ||
| 26 | 00470 | Precast 60" Sumped Sedimentation Manhole Installation | EA | 6 | 15,000.00 | 90,000.00 | 17,000.00 | 102,000.00 | 17,800.00 | 106,800.00 | 10,800.00 | 64,800.00 | 12,000.00 | 72,000.00 | 13,450.00 | 80,700.00 | 16,500.00 | 99,000.00 | 13,500.00 | 81,000.00 | 18,642.63 | 111,855.78 | 7,800.00 | 46,800.00 | 19,100.00 | 114,600.00 | 16,700.00 | 100,200.00 | 13,000.00 | 78,000.00 | ||
| 27 | 00470 | Precast 72" Sumped Sedimentation Manhole Installation | EA | 1 | 18,000.00 | 18,000.00 | 20,000.00 | 20,000.00 | 21,000.00 | 21,000.00 | 15,700.00 | 15,700.00 | 14,000.00 | 14,000.00 | 16,645.00 | 16,645.00 | 20,000.00 | 20,000.00 | 15,000.00 | 15,000.00 | 30,557.22 | 30,557.22 | 11,000.00 | 11,000.00 | 22,500.00 | 22,500.00 | 19,200.00 | 19,200.00 | 17,500.00 | 17,500.00 | ||
| 28 | 00470 | CG-48 Sumped Sedimentation Manhole Over Existing Line Installation | EA | 1 | 13,000.00 | 13,000.00 | 9,000.00 | 9,000.00 | 13,000.00 | 13,000.00 | 12,000.00 | 12,000.00 | 9,000.00 | 9,000.00 | 18,500.00 | 18,500.00 | 11,500.00 | 11,500.00 | 10,000.00 | 10,000.00 | 16,658.71 | 16,658.71 | 11,000.00 | 11,000.00 | 23,000.00 | 23,000.00 | 8,500.00 | 8,500.00 | 9,200.00 | 9,200.00 | ||
| 29 | 00470 | Precast 60" Flattop Sumped Sedimentation Manhole Over Existing Line Installation | EA | 1 | 19,000.00 | 19,000.00 | 17,000.00 | 17,000.00 | 15,000.00 | 15,000.00 | 15,100.00 | 15,100.00 | 11,000.00 | 11,000.00 | 19,850.00 | 19,850.00 | 18,500.00 | 18,500.00 | 12,000.00 | 12,000.00 | 18,964.74 | 18,964.74 | 10,000.00 | 10,000.00 | 16,200.00 | 16,200.00 | 16,000.00 | 16,000.00 | 15,000.00 | 15,000.00 | ||
| 30 | 00470 | Concrete Inlet, Type G-2 | EA | 11 | 5,000.00 | 55,000.00 | 3,500.00 | 38,500.00 | 3,500.00 | 38,500.00 | 3,500.00 | 38,500.00 | 4,500.00 | 49,500.00 | 3,450.00 | 37,950.00 | 4,200.00 | 46,200.00 | 5,000.00 | 55,000.00 | 3,819.41 | 42,013.51 | 3,000.00 | 33,000.00 | 6,000.00 | 66,000.00 | 2,900.00 | 31,900.00 | 4,200.00 | 46,200.00 | ||
| 31 | 00470 | Concrete Inlet, WES Modified Type CG-1 | EA | 21 | 6,000.00 | 126,000.00 | 5,000.00 | 105,000.00 | 4,500.00 | 94,500.00 | 6,300.00 | 132,300.00 | 6,500.00 | 136,500.00 | 3,875.00 | 81,375.00 | 6,200.00 | 130,200.00 | 6,500.00 | 136,500.00 | 5,470.59 | 114,882.39 | 4,400.00 | 92,400.00 | 9,500.00 | 199,500.00 | 4,700.00 | 98,700.00 | 5,500.00 | 115,500.00 | ||
| 32 | 00470 | Trapped Concrete Inlet, WES Modified Type CG-1 | EA | 2 | 5,900.00 | 11,800.00 | 6,500.00 | 13,000.00 | 5,500.00 | 11,000.00 | 8,000.00 | 16,000.00 | 6,500.00 | 13,000.00 | 4,210.00 | 8,420.00 | 6,500.00 | 13,000.00 | 10,000.00 | 20,000.00 | 6,791.36 | 13,582.72 | 5,400.00 | 10,800.00 | 12,000.00 | 24,000.00 | 5,550.00 | 11,100.00 | 5,500.00 | 11,000.00 | ||
| 33 | 00490 | Filling Abandoned Structures | EA | 1 | 3,200.00 | 3,200.00 | 3,500.00 | 3,500.00 | 3,600.00 | 3,600.00 | 2,150.00 | 2,150.00 | 3,000.00 | 3,000.00 | 3,500.00 | 3,500.00 | 2,500.00 | 2,500.00 | 6,500.00 | 6,500.00 | 4,632.65 | 4,632.65 | 2,000.00 | 2,000.00 | 13,000.00 | 13,000.00 | 2,400.00 | 2,400.00 | 2,500.00 | 2,500.00 | ||
| 34 | 00490 | Adjusting Boxes | EA | 70 | 520.00 | 36,400.00 | 175.00 | 12,250.00 | 500.00 | 35,000.00 | 400.00 | 28,000.00 | 315.00 | 22,050.00 | 650.00 | 45,500.00 | 200.00 | 14,000.00 | 1,250.00 | 87,500.00 | 516.19 | 36,133.30 | 200.00 | 14,000.00 | 400.00 | 28,000.00 | 150.00 | 10,500.00 | 500.00 | 35,000.00 | ||
| 35 | 00490 | Minor Adjustment of Manhole | EA | 17 | 2,020.00 | 34,340.00 | 2,000.00 | 34,000.00 | 500.00 | 8,500.00 | 725.00 | 12,325.00 | 1,200.00 | 20,400.00 | 1,875.00 | 31,875.00 | 1,500.00 | 25,500.00 | 1,750.00 | 29,750.00 | 1,607.74 | 27,331.58 | 800.00 | 13,600.00 | 2,000.00 | 34,000.00 | 1,400.00 | 23,800.00 | 1,000.00 | 17,000.00 | ||
| 36 | 00490 | Connection to Existing Structures | EA | 8 | 1,057.00 | 8,456.00 | 1,000.00 | 8,000.00 | 2,200.00 | 17,600.00 | 3,400.00 | 27,200.00 | 4,000.00 | 32,000.00 | 3,500.00 | 28,000.00 | 2,500.00 | 20,000.00 | 2,500.00 | 20,000.00 | 1,417.73 | 11,341.84 | 2,000.00 | 16,000.00 | 400.00 | 3,200.00 | 2,300.00 | 18,400.00 | 2,800.00 | 22,400.00 | ||
| 37 | 00490 | Connection New Structure to Existing Storm Line | EA | 3 | 1,800.00 | 5,400.00 | 1,000.00 | 3,000.00 | 1,000.00 | 3,000.00 | 2,000.00 | 6,000.00 | 3,600.00 | 10,800.00 | 4,250.00 | 12,750.00 | 2,000.00 | 6,000.00 | 4,350.00 | 13,050.00 | 1,466.73 | 4,400.19 | 2,000.00 | 6,000.00 | 1,200.00 | 3,600.00 | 2,600.00 | 7,800.00 | 6,800.00 | 20,400.00 | ||
| 38 | 00620 | Cold Plane Pavement Removal, 0 - 2 1/2 Inches Deep | SY | 13,715 | 4.15 | 56,917.25 | 2.85 | 39,087.75 | 7.00 | 96,005.00 | 4.00 | 54,860.00 | 6.00 | 82,290.00 | 9.00 | 123,435.00 | 4.00 | 54,860.00 | 3.00 | 41,145.00 | 4.54 | 62,266.10 | 3.00 | 41,145.00 | 3.00 | 41,145.00 | 4.00 | 54,860.00 | 8.73 | 119,731.95 |
tc={68E9D969-CEF1-431F-A654-3BD109ACE5B6}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
Bid reflects $120,006.25.
tc={3D04484F-2B51-47D4-9032-E3C96EBC0D37}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
| Bid reflects $17,550. | 39 | 00641 | Aggregate Base | TON | 4,073 | 44.00 | 179,212.00 | 43.00 | 175,139.00 | 58.00 | 236,234.00 | 36.00 | 146,628.00 | 40.00 | 162,920.00 | 48.50 | 197,540.50 | 45.00 | 183,285.00 | 40.00 | 162,920.00 | 63.80 | 259,857.40 | 45.00 | 183,285.00 | 48.00 | 195,504.00 | 41.00 | 166,993.00 | 50.00 | 203,650.00 |
| 40 | 00744 | Level 3, 1/2" ACP Mixture | TON | 2,823 | 130.00 | 366,990.00 | 98.00 | 276,654.00 | 180.00 | 508,140.00 | 128.00 | 361,344.00 | 100.00 | 282,300.00 | 105.00 | 296,415.00 | 103.00 | 290,769.00 | 110.00 | 310,530.00 | 134.63 | 380,060.49 | 120.00 | 338,760.00 | 125.00 | 352,875.00 | 116.00 | 327,468.00 | 180.00 | 508,140.00 | |
| 41 | 00749 | Extra for Asphalt Approaches | SF | 7,302 | 3.50 | 25,557.00 | 2.25 | 16,429.50 | 10.00 | 73,020.00 | 2.50 | 18,255.00 | 3.00 | 21,906.00 | 3.00 | 21,906.00 | 7.00 | 51,114.00 | 3.00 | 21,906.00 | 2.10 | 15,334.20 | 6.00 | 43,812.00 | 3.00 | 21,906.00 | 4.00 | 29,208.00 | 5.50 | 40,161.00 | |
| 42 | 00759 | Concrete Curbs - Standard Curb | LF | 1,048 | 55.00 | 57,640.00 | 39.00 | 40,872.00 | 50.00 | 52,400.00 | 36.00 | 37,728.00 | 42.00 | 44,016.00 | 31.00 | 32,488.00 | 36.00 | 37,728.00 | 50.00 | 52,400.00 | 42.70 | 44,749.60 | 24.00 | 25,152.00 | 29.05 | 30,444.40 | 42.00 | 44,016.00 | 32.00 | 33,536.00 | |
| 43 | 00759 | Concrete Curbs - Standard Curb & Gutter | LF | 5,633 | 48.00 | 270,384.00 | 25.00 | 140,825.00 | 40.00 | 225,320.00 | 24.00 | 135,192.00 | 29.00 | 163,357.00 | 38.00 | 214,054.00 | 37.00 | 208,421.00 | 60.00 | 337,980.00 | 41.44 | 233,431.52 | 21.00 | 118,293.00 | 28.66 | 161,441.78 | 37.00 | 208,421.00 | 39.00 | 219,687.00 | |
| 44 | 00759 | Concrete Islands | SF | 251 | 95.00 | 23,845.00 | 33.00 | 8,283.00 | 26.00 | 6,526.00 | 22.00 | 5,522.00 | 31.00 | 7,781.00 | 23.00 | 5,773.00 | 20.00 | 5,020.00 | 30.00 | 7,530.00 | 40.51 | 10,168.01 | 16.00 | 4,016.00 | 14.42 | 3,619.42 | 24.00 | 6,024.00 | 22.00 | 5,522.00 | |
| 45 | 00759 | Concrete Driveways | SF | 9,520 | 19.00 | 180,880.00 | 14.00 | 133,280.00 | 15.00 | 142,800.00 | 17.00 | 161,840.00 | 16.00 | 152,320.00 | 15.00 | 142,800.00 | 15.50 | 147,560.00 | 20.00 | 190,400.00 | 15.94 | 151,748.80 | 11.00 | 104,720.00 | 10.18 | 96,913.60 | 15.00 | 142,800.00 | 23.00 | 218,960.00 | |
| 46 | 00759 | Concrete Driveways, Reinforced | SF | 3,223 | 30.00 | 96,690.00 | 16.00 | 51,568.00 | 20.00 | 64,460.00 | 20.00 | 64,460.00 | 19.00 | 61,237.00 | 17.00 | 54,791.00 | 18.25 | 58,819.75 | 30.00 | 96,690.00 | 20.28 | 65,362.44 | 13.00 | 41,899.00 | 13.24 | 42,672.52 | 21.00 | 67,683.00 | 29.00 | 93,467.00 | |
| 47 | 00759 | Concrete Walks | SF | 22,275 | 13.00 | 289,575.00 | 10.00 | 222,750.00 | 10.00 | 222,750.00 | 13.00 | 289,575.00 | 12.00 | 267,300.00 | 10.00 | 222,750.00 | 10.50 | 233,887.50 | 15.00 | 334,125.00 | 12.05 | 268,413.75 | 8.00 | 178,200.00 | 7.11 | 158,375.25 | 10.00 | 222,750.00 | 21.00 | 467,775.00 | |
| 48 | 00759 | Extra For Thickened Edge Sidewalk | SF | 360 | 120.00 | 43,200.00 | 11.00 | 3,960.00 | 44.00 | 15,840.00 | 10.00 | 3,600.00 | 9.00 | 3,240.00 | 19.00 | 6,840.00 | 42.00 | 15,120.00 | 25.00 | 9,000.00 | 43.83 | 15,778.80 | 8.00 | 2,880.00 | 41.67 | 15,001.20 | 36.00 | 12,960.00 | 38.00 | 13,680.00 | |
| 49 | 00759 | Extra for New Curb Ramps | EA | 47 | 3,200.00 | 150,400.00 | 2,000.00 | 94,000.00 | 1,200.00 | 56,400.00 | 2,350.00 | 110,450.00 | 2,800.00 | 131,600.00 | 1,000.00 | 47,000.00 | 1,800.00 | 84,600.00 | 3,250.00 | 152,750.00 | 1,354.90 | 63,680.30 | 2,000.00 | 94,000.00 | 1,288.13 | 60,542.11 | 2,700.00 | 126,900.00 | 5,000.00 | 235,000.00 | |
| 50 | 00759 | Extra for Exposed Aggregate Concrete | SF | 150 | 69.00 | 10,350.00 | 17.00 | 2,550.00 | 16.00 | 2,400.00 | 19.00 | 2,850.00 | 18.00 | 2,700.00 | 26.00 | 3,900.00 | 16.50 | 2,475.00 | 20.00 | 3,000.00 | 17.44 | 2,616.00 | 16.00 | 2,400.00 | 16.58 | 2,487.00 | 26.00 | 3,900.00 | 24.00 | 3,600.00 | |
| 51 | 00759 | Tall Curb | LF | 58 | 230.00 | 13,340.00 | 85.00 | 4,930.00 | 150.00 | 8,700.00 | 95.00 | 5,510.00 | 131.00 | 7,598.00 | 66.00 | 3,828.00 | 133.00 | 7,714.00 | 100.00 | 5,800.00 | 112.17 | 6,505.86 | 80.00 | 4,640.00 | 106.64 | 6,185.12 | 85.00 | 4,930.00 | 75.00 | 4,350.00 | |
| 52 | 00855 | Truncated Domes on New Surfaces | SF | 517 | 31.00 | 16,027.00 | 50.00 | 25,850.00 | 50.00 | 25,850.00 | 58.00 | 29,986.00 | 56.00 | 28,952.00 | 35.00 | 18,095.00 | 35.00 | 18,095.00 | 50.00 | 25,850.00 | 36.81 | 19,030.77 | 50.00 | 25,850.00 | 35.00 | 18,095.00 | 50.00 | 25,850.00 | 32.00 | 16,544.00 | |
| 53 | 00865 | Bi-Directional Yellow Type l Markers | EA | 6 | 62.00 | 372.00 | 18.00 | 108.00 | 20.00 | 120.00 | 65.00 | 390.00 | 19.00 | 114.00 | 20.00 | 120.00 | 17.00 | 102.00 | 19.00 | 114.00 | 17.88 | 107.28 | 18.00 | 108.00 | 17.00 | 102.00 | 19.00 | 114.00 | 23.00 | 138.00 | |
| 54 | 00867 | Thermoplastic, Extruded or Sprayed, Surface, Non-profiled | LF | 19,905 | 1.00 | 19,905.00 | 1.25 | 24,881.25 | 1.50 | 29,857.50 | 1.00 | 19,905.00 | 1.25 | 24,881.25 | 1.50 | 29,857.50 | 1.60 | 31,848.00 | 1.31 | 26,075.55 | 1.29 | 25,677.45 | 1.50 | 29,857.50 | 1.23 | 24,483.15 | 1.40 | 27,867.00 | 1.60 | 31,848.00 | |
| 55 | 00867 | Pavement Legend, Type AB: Arrows | EA | 22 | 400.00 | 8,800.00 | 320.00 | 7,040.00 | 350.00 | 7,700.00 | 425.00 | 9,350.00 | 350.00 | 7,700.00 | 320.00 | 7,040.00 | 320.00 | 7,040.00 | 325.00 | 7,150.00 | 333.43 | 7,335.46 | 350.00 | 7,700.00 | 317.00 | 6,974.00 | 360.00 | 7,920.00 | 500.00 | 11,000.00 | |
| 56 | 00867 | Pavement Legend, Type B-HS: Bike Lane Stencil | EA | 22 | 400.00 | 8,800.00 | 315.00 | 6,930.00 | 320.00 | 7,040.00 | 425.00 | 9,350.00 | 325.00 | 7,150.00 | 300.00 | 6,600.00 | 294.00 | 6,468.00 | 325.00 | 7,150.00 | 309.24 | 6,803.28 | 350.00 | 7,700.00 | 294.00 | 6,468.00 | 335.00 | 7,370.00 | 500.00 | 11,000.00 | |
| 57 | 00867 | Pavement Legend, Type AB: "SCHOOL" Large | EA | 1 | 1,400.00 | 1,400.00 | 750.00 | 750.00 | 800.00 | 800.00 | 1,550.00 | 1,550.00 | 800.00 | 800.00 | 750.00 | 750.00 | 725.00 | 725.00 | 900.00 | 900.00 | 762.58 | 762.58 | 800.00 | 800.00 | 725.00 | 725.00 | 820.00 | 820.00 | 1,000.00 | 1,000.00 | |
| 58 | 00867 | Pavement Legend, Type AB: "CROSSING" Large | EA | 1 | 1,000.00 | 1,000.00 | 950.00 | 950.00 | 990.00 | 990.00 | 1,100.00 | 1,100.00 | 1,000.00 | 1,000.00 | 900.00 | 900.00 | 895.00 | 895.00 | 1,000.00 | 1,000.00 | 941.39 | 941.39 | 1,000.00 | 1,000.00 | 895.00 | 895.00 | 1,000.00 | 1,000.00 | 1,100.00 | 1,100.00 | |
| 59 | 00867 | Pavement Bar, Type B-HS | SF | 748 | 18.00 | 13,464.00 | 12.00 | 8,976.00 | 15.00 | 11,220.00 | 19.00 | 14,212.00 | 12.00 | 8,976.00 | 11.50 | 8,602.00 | 11.00 | 8,228.00 | 12.50 | 9,350.00 | 11.80 | 8,826.40 | 13.00 | 9,724.00 | 11.22 | 8,392.56 | 12.00 | 8,976.00 | 19.00 | 14,212.00 | |
| 60 | 00869 | Curb Marking, Paint | FT | 50 | 12.30 | 615.00 | 5.00 | 250.00 | 5.00 | 250.00 | 13.00 | 650.00 | 5.00 | 250.00 | 5.00 | 250.00 | 5.00 | 250.00 | 7.00 | 350.00 | 5.19 | 259.50 | 5.00 | 250.00 | 4.93 | 246.50 | 5.50 | 275.00 | 7.50 | 375.00 | |
| 61 | 00902 | Crosswalk Closed Support | EA | 12 | 1,900.00 | 22,800.00 | 850.00 | 10,200.00 | 1,200.00 | 14,400.00 | 1,400.00 | 16,800.00 | 1,200.00 | 14,400.00 | 1,450.00 | 17,400.00 | 1,100.00 | 13,200.00 | 850.00 | 10,200.00 | 1,146.90 | 13,762.80 | 1,100.00 | 13,200.00 | 1,600.00 | 19,200.00 | 1,200.00 | 14,400.00 | 850.00 | 10,200.00 | |
| 62 | 00905 | Remove Existing Signs | LS | 1 | 13,500.00 | 13,500.00 | 6,500.00 | 6,500.00 | 3,000.00 | 3,000.00 | 4,600.00 | 4,600.00 | 4,000.00 | 4,000.00 | 3,750.00 | 3,750.00 | 3,550.00 | 3,550.00 | 2,500.00 | 2,500.00 | 3,738.42 | 3,738.42 | 4,000.00 | 4,000.00 | 10,600.00 | 10,600.00 | 6,800.00 | 6,800.00 | 5,000.00 | 5,000.00 | |
| 63 | 00920 | Sign Support Footings | LS | 1 | 6,800.00 | 6,800.00 | 10,000.00 | 10,000.00 | 12,000.00 | 12,000.00 | 9,000.00 | 9,000.00 | 8,000.00 | 8,000.00 | 7,500.00 | 7,500.00 | 6,952.00 | 6,952.00 | 10,000.00 | 10,000.00 | 7,311.40 | 7,311.40 | 2,000.00 | 2,000.00 | 13,000.00 | 13,000.00 | 7,800.00 | 7,800.00 | 7,500.00 | 7,500.00 | |
| 64 | 00930 | Perforated Steel Square Tube Anchor Sign Supports | LS | 1 | 31,000.00 | 31,000.00 | 13,000.00 | 13,000.00 | 6,000.00 | 6,000.00 | 16,000.00 | 16,000.00 | 14,000.00 | 14,000.00 | 13,500.00 | 13,500.00 | 12,700.00 | 12,700.00 | 10,000.00 | 10,000.00 | 13,347.02 | 13,347.02 | 4,000.00 | 4,000.00 | 20,000.00 | 20,000.00 | 14,300.00 | 14,300.00 | 15,000.00 | 15,000.00 | |
| 65 | 00940 | Signs, Standard Sheeting, Extruded Aluminum | SF | 314 | 29.00 | 9,106.00 | 25.00 | 7,850.00 | 40.00 | 12,560.00 | 35.00 | 10,990.00 | 30.00 | 9,420.00 | 28.00 | 8,792.00 | 26.50 | 8,321.00 | 30.00 | 9,420.00 | 27.85 | 8,744.90 | 40.00 | 12,560.00 | 20.00 | 6,280.00 | 30.00 | 9,420.00 | 22.00 | 6,908.00 | |
| 66 | 00963 | 36 Inch Diameter Signal Support Drilled Shaft | FT | 45 | 600.00 | 27,000.00 | 500.00 | 22,500.00 | 550.00 | 24,750.00 | 1,100.00 | 49,500.00 | 550.00 | 24,750.00 | 500.00 | 22,500.00 | 800.00 | 36,000.00 | 1,500.00 | 67,500.00 | 515.40 | 23,193.00 | 600.00 | 27,000.00 | 4.90 | 220.50 |
tc={420C04C1-E8E1-4AA4-AB23-610A24936721}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
| Bid reflects $22,050. | 550.00 | 24,750.00 | 860.00 | 38,700.00 | ||||||||||||||||||||||||||||
| 67 | 00990 | Traffic Signal Installation, Complete (S Ivy St & S Township Rd) | LS | 1 | 391,800.00 | 391,800.00 | 320,000.00 | 320,000.00 | 320,000.00 | 320,000.00 | 360,000.00 | 360,000.00 | 360,000.00 | 360,000.00 | 320,000.00 | 320,000.00 | 365,000.00 | 365,000.00 | 350,000.00 | 350,000.00 | 336,448.73 | 336,448.73 | 340,000.00 | 340,000.00 | 319,869.00 | 319,869.00 | 361,500.00 | 361,500.00 | 400,000.00 | 400,000.00 | ||
| 68 | 00990 | Rectangular Rapid Flashing Beacon Installation, 11th St | LS | 1 | 108,500.00 | 108,500.00 | 90,000.00 | 90,000.00 | 75,000.00 | 75,000.00 | 100,000.00 | 100,000.00 | 100,000.00 | 100,000.00 | 89,000.00 | 89,000.00 | 78,750.00 | 78,750.00 | 99,000.00 | 99,000.00 | 93,172.41 | 93,172.41 | 95,000.00 | 95,000.00 | 88,581.00 | 88,581.00 | 100,000.00 | 100,000.00 | 92,000.00 | 92,000.00 | ||
| 69 | 01030 | Permanent Seeding | ACRE | 0.147 | 16,000.00 | 2,352.00 | 21,000.00 | 3,087.00 | 36,000.00 | 5,292.00 | 6,768.70 | 995.00 | 14,000.00 | 2,058.00 | 13,000.00 | 1,911.00 | 13,265.00 | 1,949.96 | 12,500.00 | 1,837.50 | 13,673.83 | 2,010.05 | 15,000.00 | 2,205.00 | 19,047.62 | 2,800.00 | 14,693.87 | 2,160.00 | 9,000.00 | 1,323.00 | ||
| 70 | 01040 | Topsoil | CY | 119 | 100.00 | 11,900.00 | 95.00 | 11,305.00 | 100.00 | 11,900.00 | 60.00 | 7,140.00 | 95.00 | 11,305.00 | 90.00 | 10,710.00 | 85.00 | 10,115.00 | 70.00 | 8,330.00 | 89.41 | 10,639.79 | 80.00 | 9,520.00 | 80.00 | 9,520.00 | 96.00 | 11,424.00 | 65.00 | 7,735.00 | ||
| 71 | 01040 | Bark Mulch | CY | 292 | 100.00 | 29,200.00 | 90.00 | 26,280.00 | 95.00 | 27,740.00 | 50.00 | 14,600.00 | 95.00 | 27,740.00 | 90.00 | 26,280.00 | 85.00 | 24,820.00 | 70.00 | 20,440.00 | 89.41 | 26,107.72 | 80.00 | 23,360.00 | 80.24 | 23,430.08 | 96.00 | 28,032.00 | 90.00 | 26,280.00 | ||
| 72 | 01070 | Single Mailbox Supports | EA | 7 | 1,200.00 | 8,400.00 | 450.00 | 3,150.00 | 1,200.00 | 8,400.00 | 900.00 | 6,300.00 | 800.00 | 5,600.00 | 725.00 | 5,075.00 | 703.00 | 4,921.00 | 300.00 | 2,100.00 | 739.37 | 5,175.59 | 400.00 | 2,800.00 | 1,150.00 | 8,050.00 | 800.00 | 5,600.00 | 2,500.00 | 17,500.00 | ||
| 73 | 01070 | Multiple Mailbox Supports | EA | 6 | 1,900.00 | 11,400.00 | 500.00 | 3,000.00 | 1,800.00 | 10,800.00 | 1,300.00 | 7,800.00 | 1,200.00 | 7,200.00 | 1,200.00 | 7,200.00 | 1,022.00 | 6,132.00 | 500.00 | 3,000.00 | 1,074.76 | 6,448.56 | 800.00 | 4,800.00 | 1,150.00 | 6,900.00 | 1,150.00 | 6,900.00 | 5,000.00 | 30,000.00 | ||
| 74 | 01070 | Mailbox Concrete Collars | EA | 13 | 1,250.00 | 16,250.00 | 85.00 | 1,105.00 | 800.00 | 10,400.00 | 350.00 | 4,550.00 | 400.00 | 5,200.00 | 375.00 | 4,875.00 | 360.00 | 4,680.00 | 500.00 | 6,500.00 | 377.29 | 4,904.77 | 100.00 | 1,300.00 | 500.00 | 6,500.00 | 400.00 | 5,200.00 | 500.00 | 6,500.00 | ||
| 75 | 00495 | Trench Resurfacing | SY | 612 | 78.00 | 47,736.00 | 60.00 | 36,720.00 | 75.00 | 45,900.00 | 65.00 | 39,780.00 | 84.00 | 51,408.00 | 75.00 | 45,900.00 | 103.00 | 63,036.00 | 36.00 | 22,032.00 | 102.48 | 62,717.76 | 60.00 | 36,720.00 | 55.00 | 33,660.00 | 95.00 | 58,140.00 | 79.00 | 48,348.00 | ||
| $5,078,503.25 | $3,658,000.00 | $4,547,134.00 | $3,997,750.00 | $4,098,000.00 | $4,593,704.10 | $4,493,478.26 | $4,479,364.25 | $4,396,858.00 | $3,748,307.50 | $4,501,269.94 | $3,892,322.00 | $5,296,215.45 | ||||||||||||||||||||
| $5,078,503.25 | $3,658,000.00 | $4,547,134.00 | $3,997,750.00 | $4,098,000.00 | $4,593,704.10 | $4,493,478.26 | $4,479,364.25 | $4,396,858.00 | $3,748,307.50 | $4,540,473.94 | $3,892,322.00 | $5,296,489.75 | ||||||||||||||||||||
| Western United Civil Group LLC | Eagle Elsner | Brown Contracting | Canby Excavating | Pacific Excavation | Corpac Construction Company | Moore Excavation Inc | K&L Industries | Kodiak Pacific Construction | D&D Concrete & Utilities | Knife River Construction | K&E Excavating | Icon Construction | ||||||||||||||||||||
| Western United Civil Group LLC | $5,078,503.25 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | -$0.00 | $0.00 | $39,204.00 | $0.00 | $274.30 | ||||||||||||||||||
| Eagle Elsner | $3,658,000.00 | 1 | ||||||||||||||||||||||||||||||
| Brown Contracting | $4,547,134.00 | |||||||||||||||||||||||||||||||
| Canby Excavating | $3,997,750.00 | 4 | ||||||||||||||||||||||||||||||
| Pacific Excavation | $4,098,000.00 | 5 | ||||||||||||||||||||||||||||||
| Corpac Construction Company | $4,593,704.10 | |||||||||||||||||||||||||||||||
| Moore Excavation Inc | $4,493,478.26 | |||||||||||||||||||||||||||||||
| K&L Industries | $4,479,364.25 | |||||||||||||||||||||||||||||||
| Kodiak Pacific Construction | $4,396,858.00 | |||||||||||||||||||||||||||||||
| D&D Concrete & Utilities | $3,748,307.50 | 2 | ||||||||||||||||||||||||||||||
| Knife River Construction | $4,540,473.94 | |||||||||||||||||||||||||||||||
| K&E Excavating | $3,892,322.00 | 3 | ||||||||||||||||||||||||||||||
| Icon Construction | $5,296,489.75 |
Bid reflects $9628.00.
Bid reflects $17,550.
Bid reflects $120,006.25.
Bid reflects $22,050.
3 lowest Bid Analysis
| IVY STREET PEDESTRIAN IMPROVEMENTS | ||||||||||||||||
| Bid Opening March 26, 2024 | ||||||||||||||||
| Eagle Elsner | % OVR/UND. | ITEM % OF | D&D Concrete & Utilities | K&E Excavating | ||||||||||||
| Item # | Spec | |||||||||||||||
| Sec | Description | Unit | Quantity | Unit Price | Total Price | 3 Lowest Bidders | ||||||||||
| Average | Lowest Bid | |||||||||||||||
| to Total Bid | Unit Price | Total Price | Unit Price | Total Price | ||||||||||||
| 1 | 180 | Workplace Harrassment Prevention Plan | LS | 1 | 1,000.00 | $ 1,000.00 | -83.33% | 0.03% | 1 | 1,500.00 | $ 1,500.00 | 3,000.00 | $ 3,000.00 | 1 | ||
| 2 | 196 | Extra Work As Authorized | AA | 1 | 150,000.00 | 150,000.00 | 0.00% | 4.10% | 2 | 150,000.00 | 150,000.00 | 150,000.00 | 150,000.00 | 2 | ||
| 3 | 210 | Mobilization | LS | 1 | 250,000.00 | 250,000.00 | -28.47% | 6.83% | 3 | 370,000.00 | 370,000.00 | 343,500.00 | 343,500.00 | 3 | ||
| 4 | 221 | Temporary Work Zone Traffic Control, Complete | LS | 1 | 232,670.35 | 232,670.35 | 15.74% | 6.36% | 4 | 220,000.00 | 220,000.00 | 135,500.00 | 135,500.00 | 4 | ||
| 5 | 225 | Stripe Removal | LF | 15000 | 0.40 | 6,000.00 | -54.17% | 0.16% | 5 | 1.00 | 15,000.00 | 0.45 | 6,750.00 | 5 | ||
| 6 | 225 | Temporary Striping | LF | 13755 | 0.35 | 4,814.25 | -66.67% | 0.13% | 6 | 1.00 | 13,755.00 | 0.40 | 5,502.00 | 6 | ||
| 7 | 280 | Erosion Control | LS | 1 | 22,000.00 | 22,000.00 | 44.70% | 0.60% | 7 | 6,000.00 | 6,000.00 | 8,500.00 | 8,500.00 | 7 | ||
| 8 | 280 | Sediment Fence | LF | 4344 | 4.35 | 18,896.40 | -2.30% | 0.52% | 8 | 5.00 | 21,720.00 | 4.00 | 17,376.00 | 8 | ||
| 9 | 280 | Inlet protection, Type 3 | EA | 52 | 90.00 | 4,680.00 | 11.11% | 0.13% | 9 | 80.00 | 4,160.00 | 70.00 | 3,640.00 | 9 | ||
| 10 | 280 | Construction Entrance, Type 1 | EA | 1 | 1,000.00 | 1,000.00 | -6.67% | 0.03% | 10 | 200.00 | 200.00 | 2,000.00 | 2,000.00 | 10 | ||
| 11 | 280 | Concrete Washout Facility | EA | 1 | 1,500.00 | 1,500.00 | 33.33% | 0.04% | 11 | 1,000.00 | 1,000.00 | 500.00 | 500.00 | 11 | ||
| 12 | 290 | Pollution Control Plan | LS | 1 | 1,000.00 | 1,000.00 | 23.33% | 0.03% | 12 | 500.00 | 500.00 | 800.00 | 800.00 | 12 | ||
| 13 | 305 | Construction Survey Work | LS | 1 | 60,000.00 | 60,000.00 | -11.11% | 1.64% | 13 | 80,000.00 | 80,000.00 | 60,000.00 | 60,000.00 | 13 | ||
| 14 | 310 | Removal of Structures and Obstructions | LS | 1 | 45,000.00 | 45,000.00 | -59.26% | 1.23% | 14 | 100,000.00 | 100,000.00 | 70,000.00 | 70,000.00 | 14 | ||
| 15 | 310 | Removal of Inlets | EA | 13 | 500.00 | 6,500.00 | -40.00% | 0.18% | 15 | 600.00 | 7,800.00 | 1,000.00 | 13,000.00 | 15 | ||
| 16 | 310 | Removal of Pipes | LF | 150 | 40.00 | 6,000.00 | 13.33% | 0.16% | 16 | 35.00 | 5,250.00 | 29.00 | 4,350.00 | 16 | ||
| 17 | 310 | Abandon Pipes In Place | LF | 2200 | 15.00 | 33,000.00 | 4.44% | 0.90% | 17 | 8.00 | 17,600.00 | 20.00 | 44,000.00 | 17 | ||
| 18 | 320 | Clearing and Grubbing | LS | 1 | 50,000.00 | 50,000.00 | 6.67% | 1.37% | 18 | 40,000.00 | 40,000.00 | 50,000.00 | 50,000.00 | 18 | ||
| 19 | 330 | General Excavation | CY | 3084 | 36.00 | 111,024.00 | 1.85% | 3.04% | 19 | 40.00 | 123,360.00 | 30.00 | 92,520.00 | 19 | ||
| 20 | 331 | 18 Inch Subgrade Stabilization | SY | 250 | 48.00 | 12,000.00 | 13.89% | 0.33% | 20 | 22.00 | 5,500.00 | 54.00 | 13,500.00 | 20 | ||
| 21 | 332 | Vault Modification | LS | 1 | 11,000.00 | 11,000.00 | -12.12% | 0.30% | 21 | 10,000.00 | 10,000.00 | 16,000.00 | 16,000.00 | 21 | ||
| 22 | 350 | Subgrade Geotextile | SY | 4103 | 1.50 | 6,154.50 | 0.00% | 0.17% | 22 | 2.00 | 8,206.00 | 1.00 | 4,103.00 | 22 | ||
| 23 | 405 | Concrete Excavation | CY | 150 | 125.00 | 18,750.00 | 4.00% | 0.51% | 23 | 50.00 | 7,500.00 | 185.00 | 27,750.00 | 23 | ||
| 24 | 445 | 12" HDPE Drain Pipe | LF | 2200 | 140.00 | 308,000.00 | -1.19% | 8.42% | 24 | 170.00 | 374,000.00 | 115.00 | 253,000.00 | 24 | ||
| 25 | 470 | Precast 48" Standard Manhole Installation | EA | 9 | 9,000.00 | 81,000.00 | 18.52% | 2.21% | 25 | 6,000.00 | 54,000.00 | 7,000.00 | 63,000.00 | 25 | ||
| 26 | 470 | Precast 60" Sumped Sedimentation Manhole Installation | EA | 6 | 17,000.00 | 102,000.00 | 18.63% | 2.79% | 26 | 7,800.00 | 46,800.00 | 16,700.00 | 100,200.00 | 26 | ||
| 27 | 470 | Precast 72" Sumped Sedimentation Manhole Installation | EA | 1 | 20,000.00 | 20,000.00 | 16.33% | 0.55% | 27 | 11,000.00 | 11,000.00 | 19,200.00 | 19,200.00 | 27 | ||
| 28 | 470 | CG-48 Sumped Sedimentation Manhole Over Existing Line Installation | EA | 1 | 9,000.00 | 9,000.00 | -5.56% | 0.25% | 28 | 11,000.00 | 11,000.00 | 8,500.00 | 8,500.00 | 28 | ||
| 29 | 470 | Precast 60" Flattop Sumped Sedimentation Manhole Over Existing Line Installation | EA | 1 | 17,000.00 | 17,000.00 | 15.69% | 0.46% | 29 | 10,000.00 | 10,000.00 | 16,000.00 | 16,000.00 | 29 | ||
| 30 | 470 | Concrete Inlet, Type G-2 | EA | 11 | 3,500.00 | 38,500.00 | 10.48% | 1.05% | 30 | 3,000.00 | 33,000.00 | 2,900.00 | 31,900.00 | 30 | ||
| 31 | 470 | Concrete Inlet, WES Modified Type CG-1 | EA | 21 | 5,000.00 | 105,000.00 | 6.00% | 2.87% | 31 | 4,400.00 | 92,400.00 | 4,700.00 | 98,700.00 | 31 | ||
| 32 | 470 | Trapped Concrete Inlet, WES Modified Type CG-1 | EA | 2 | 6,500.00 | 13,000.00 | 10.51% | 0.36% | 32 | 5,400.00 | 10,800.00 | 5,550.00 | 11,100.00 | 32 | ||
| 33 | 490 | Filling Abandoned Structures | EA | 1 | 3,500.00 | 3,500.00 | 24.76% | 0.10% | 33 | 2,000.00 | 2,000.00 | 2,400.00 | 2,400.00 | 33 | ||
| 34 | 490 | Adjusting Boxes | EA | 70 | 175.00 | 12,250.00 | 0.00% | 0.33% | 34 | 200.00 | 14,000.00 | 150.00 | 10,500.00 | 34 | ||
| 35 | 490 | Minor Adjustment of Manhole | EA | 17 | 2,000.00 | 34,000.00 | 30.00% | 0.93% | 35 | 800.00 | 13,600.00 | 1,400.00 | 23,800.00 | 35 | ||
| 36 | 490 | Connection to Existing Structures | EA | 8 | 1,000.00 | 8,000.00 | -76.67% | 0.22% | 36 | 2,000.00 | 16,000.00 | 2,300.00 | 18,400.00 | 36 | ||
| 37 | 490 | Connection New Structure to Existing Storm Line | EA | 3 | 1,000.00 | 3,000.00 | -86.67% | 0.08% | 37 | 2,000.00 | 6,000.00 | 2,600.00 | 7,800.00 | 37 | ||
| 38 | 620 | Cold Plane Pavement Removal, 0 - 2 1/2 Inches Deep | SY | 13715 | 2.85 | 39,087.75 | -15.20% | 1.07% | 38 | 3.00 | 41,145.00 | 4.00 | 54,860.00 | 38 | ||
| 39 | 641 | Aggregate Base | TON | 4073 | 43.00 | 175,139.00 | 0.00% | 4.79% | 39 | 45.00 | 183,285.00 | 41.00 | 166,993.00 | 39 | ||
| 40 | 744 | Level 3, 1/2" ACP Mixture | TON | 2823 | 98.00 | 276,654.00 | -13.61% | 7.56% | 40 | 120.00 | 338,760.00 | 116.00 | 327,468.00 | 40 | ||
| 41 | 749 | Extra for Asphalt Approaches | SF | 7302 | 2.25 | 16,429.50 | -81.48% | 0.45% | 41 | 6.00 | 43,812.00 | 4.00 | 29,208.00 | 41 | ||
| 42 | 759 | Concrete Curbs - Standard Curb | LF | 1048 | 39.00 | 40,872.00 | 10.26% | 1.12% | 42 | 24.00 | 25,152.00 | 42.00 | 44,016.00 | 42 | ||
| 43 | 759 | Concrete Curbs - Standard Curb & Gutter | LF | 5633 | 25.00 | 140,825.00 | -10.67% | 3.85% | 43 | 21.00 | 118,293.00 | 37.00 | 208,421.00 | 43 | ||
| 44 | 759 | Concrete Islands | SF | 251 | 33.00 | 8,283.00 | 26.26% | 0.23% | 44 | 16.00 | 4,016.00 | 24.00 | 6,024.00 | 44 | ||
| 45 | 759 | Concrete Driveways | SF | 9520 | 14.00 | 133,280.00 | 4.76% | 3.64% | 45 | 11.00 | 104,720.00 | 15.00 | 142,800.00 | 45 | ||
| 46 | 759 | Concrete Driveways, Reinforced | SF | 3223 | 16.00 | 51,568.00 | -4.17% | 1.41% | 46 | 13.00 | 41,899.00 | 21.00 | 67,683.00 | 46 | ||
| 47 | 759 | Concrete Walks | SF | 22275 | 10.00 | 222,750.00 | 6.67% | 6.09% | 47 | 8.00 | 178,200.00 | 10.00 | 222,750.00 | 47 | ||
| 48 | 759 | Extra For Thickened Edge Sidewalk | SF | 360 | 11.00 | 3,960.00 | -66.67% | 0.11% | 48 | 8.00 | 2,880.00 | 36.00 | 12,960.00 | 48 | ||
| 49 | 759 | Extra for New Curb Ramps | EA | 47 | 2,000.00 | 94,000.00 | -11.67% | 2.57% | 49 | 2,000.00 | 94,000.00 | 2,700.00 | 126,900.00 | 49 | ||
| 50 | 759 | Extra for Exposed Aggregate Concrete | SF | 150 | 17.00 | 2,550.00 | -15.69% | 0.07% | 50 | 16.00 | 2,400.00 | 26.00 | 3,900.00 | 50 | ||
| 51 | 759 | Tall Curb | LF | 58 | 85.00 | 4,930.00 | 1.96% | 0.13% | 51 | 80.00 | 4,640.00 | 85.00 | 4,930.00 | 51 | ||
| 52 | 855 | Truncated Domes on New Surfaces | SF | 517 | 50.00 | 25,850.00 | 0.00% | 0.71% | 52 | 50.00 | 25,850.00 | 50.00 | 25,850.00 | 52 | ||
| 53 | 865 | Bi-Directional Yellow Type l Markers | EA | 6 | 18.00 | 108.00 | -1.85% | 0.00% | 53 | 18.00 | 108.00 | 19.00 | 114.00 | 53 | ||
| 54 | 867 | Thermoplastic, Extruded or Sprayed, Surface, Non-profiled | LF | 19905 | 1.25 | 24,881.25 | -10.67% | 0.68% | 54 | 1.50 | 29,857.50 | 1.40 | 27,867.00 | 54 | ||
| 55 | 867 | Pavement Legend, Type AB: Arrows | EA | 22 | 320.00 | 7,040.00 | -7.29% | 0.19% | 55 | 350.00 | 7,700.00 | 360.00 | 7,920.00 | 55 | ||
| 56 | 867 | Pavement Legend, Type B-HS: Bike Lane Stencil | EA | 22 | 315.00 | 6,930.00 | -5.82% | 0.19% | 56 | 350.00 | 7,700.00 | 335.00 | 7,370.00 | 56 | ||
| 57 | 867 | Pavement Legend, Type AB: "SCHOOL" Large | EA | 1 | 750.00 | 750.00 | -5.33% | 0.02% | 57 | 800.00 | 800.00 | 820.00 | 820.00 | 57 | ||
| 58 | 867 | Pavement Legend, Type AB: "CROSSING" Large | EA | 1 | 950.00 | 950.00 | -3.51% | 0.03% | 58 | 1,000.00 | 1,000.00 | 1,000.00 | 1,000.00 | 58 | ||
| 59 | 867 | Pavement Bar, Type B-HS | SF | 748 | 12.00 | 8,976.00 | -2.78% | 0.25% | 59 | 13.00 | 9,724.00 | 12.00 | 8,976.00 | 59 | ||
| 60 | 869 | Curb Marking, Paint | FT | 50 | 5.00 | 250.00 | -3.33% | 0.01% | 60 | 5.00 | 250.00 | 5.50 | 275.00 | 60 | ||
| 61 | 902 | Crosswalk Closed Support | EA | 12 | 850.00 | 10,200.00 | -23.53% | 0.28% | 61 | 1,100.00 | 13,200.00 | 1,200.00 | 14,400.00 | 61 | ||
| 62 | 905 | Remove Existing Signs | LS | 1 | 6,500.00 | 6,500.00 | 11.28% | 0.18% | 62 | 4,000.00 | 4,000.00 | 6,800.00 | 6,800.00 | 62 | ||
| 63 | 920 | Sign Support Footings | LS | 1 | 10,000.00 | 10,000.00 | 34.00% | 0.27% | 63 | 2,000.00 | 2,000.00 | 7,800.00 | 7,800.00 | 63 | ||
| 64 | 930 | Perforated Steel Square Tube Anchor Sign Supports | LS | 1 | 13,000.00 | 13,000.00 | 19.74% | 0.36% | 64 | 4,000.00 | 4,000.00 | 14,300.00 | 14,300.00 | 64 | ||
| 65 | 940 | Signs, Standard Sheeting, Extruded Aluminum | SF | 314 | 25.00 | 7,850.00 | -26.67% | 0.21% | 65 | 40.00 | 12,560.00 | 30.00 | 9,420.00 | 65 | ||
| 66 | 963 | 36 Inch Diameter Signal Support Drilled Shaft | FT | 45 | 500.00 | 22,500.00 | -10.00% | 0.62% | 66 | 600.00 | 27,000.00 | 550.00 | 24,750.00 | 66 | ||
| 67 | 990 | Traffic Signal Installation, Complete (S Ivy St & S Township Rd) | LS | 1 | 320,000.00 | 320,000.00 | -6.41% | 8.75% | 67 | 340,000.00 | 340,000.00 | 361,500.00 | 361,500.00 | 67 | ||
| 68 | 990 | Rectangular Rapid Flashing Beacon Installation, 11th St | LS | 1 | 90,000.00 | 90,000.00 | -5.56% | 2.46% | 68 | 95,000.00 | 95,000.00 | 100,000.00 | 100,000.00 | 68 | ||
| 69 | 1030 | Permanent Seeding | ACRE | 0 | 21,000.00 | 3,087.00 | 19.53% | 0.08% | 69 | 15,000.00 | 2,205.00 | 14,693.87 | 2,160.00 | 69 | ||
| 70 | 1040 | Topsoil | CY | 119 | 95.00 | 11,305.00 | 4.91% | 0.31% | 70 | 80.00 | 9,520.00 | 96.00 | 11,424.00 | 70 | ||
| 71 | 1040 | Bark Mulch | CY | 292 | 90.00 | 26,280.00 | 1.48% | 0.72% | 71 | 80.00 | 23,360.00 | 96.00 | 28,032.00 | 71 | ||
| 72 | 1070 | Single Mailbox Supports | EA | 7 | 450.00 | 3,150.00 | -22.22% | 0.09% | 72 | 400.00 | 2,800.00 | 800.00 | 5,600.00 | 72 | ||
| 73 | 1070 | Multiple Mailbox Supports | EA | 6 | 500.00 | 3,000.00 | -63.33% | 0.08% | 73 | 800.00 | 4,800.00 | 1,150.00 | 6,900.00 | 73 | ||
| 74 | 1070 | Mailbox Concrete Collars | EA | 13 | 85.00 | 1,105.00 | -129.41% | 0.03% | 74 | 100.00 | 1,300.00 | 400.00 | 5,200.00 | 74 | ||
| 75 | 495 | Trench Resurfacing | SY | 612 | 60.00 | 36,720.00 | -19.44% | 1.00% | 75 | 60.00 | 36,720.00 | 95.00 | 58,140.00 | 75 | ||
| 3,658,000.00 | -2.96% | 100.00% | 3,748,307.50 | 3,892,322.00 |
| Eagle Elsner | % OVR/UND. | ITEM % OF | D&D Concrete & Utilities | K&E Excavating | ||||
| 3 Lowest Bidders | ||||||||
| Average | Lowest Bid | |||||||
| to Total Bid | 2.5% | 6.4% |
File details come from the government source that posted it. Updated .