IVHM Transfer Switch Appendix A~2.docx

DOCX document 15 KB Posted

Attached to
IVHM Transfer Switch Replacement
Solicitation number
23-497DVA-MANTE-B-31853
Issued by
Kane County, Manteno Village, Illinois

About this file

This document is an appendix related to a state and local contract opportunity for the replacement of an automatic transfer switch in Illinois. The scope of work includes the removal of the existing automatic transfer switch and installation of a new 225 Amp, 208 Volt, 3-phase automatic transfer switch, including all new conduit, wiring, and mounting hardware. The vendor must be a licensed electrical contractor in the state of Illinois and is responsible for the proper disposal of any waste generated during the project. The work must be coordinated with the facility's Chief Engineer and completed during normal business hours. The vendor will be required to provide all manufacturer documentation and warranty information upon completion.

The contract requires the use of a specific brand name transfer switch, but allows for "or equal" submissions. The vendor is responsible for any property damage during the demolition, removal, and installation process. The facility will not provide storage or transportation of tools and materials. Pricing terms, funding sources, and other contract details are not included in this appendix.

View the file

Other files

File Type Posted
Forms B Section~2.docx DOCX document
Forms A Section~4.docx DOCX document
IVHM Transfer Switch Pictures.docx DOCX document
Standard Certifications~53.doc DOC document
IVHM Transfer Switch RFQ~3.doc DOC document
Standard Terms_1~42.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IVHM Automatic Transfer Switch Replacement Appendix A Provide labor and materials for the removal of (1) existing automatic transfer switch and install (1) automatic transfer switch utilized for sewage system.

Scope of Work

· Vendor will be responsible for the demolition and removal of entire existing automatic transfer switch including wiring, transfer switch, and transfer switch

· Vendor will utilize existing control panel system

· Wiring from control panel will be removed and replaced with new

· Vendor will install new complete transfer switch system to include

· New 225 Amp 208 Volt Automatic Transfer Switch

· New electrical conduit to automatic transfer switch

· New wiring from control panel

· New Unistrut system to hold switch

· Mount Control panel onto new Unistrut system

· Automatic transfer switch must meet the minimum specifications of the below item.

· Asco 2225 Amp 208 Volt Automatic Transfer Switch

· Automatic Transfer Switch is 225 Amps 208/240 VAC 50/60 Cycles

· Automatic Transfer Switch is 3 Phase

· The use of a brand name is for describing the standard of quality, performance, and characteristics desired and is not intended to limit or restrict competition. "Or equal" submissions will not be rejected because of minor differences in design, construction or features that do not affect the suitability of the product for its intended use. Burden of proof that the product is equal is on the bidder.

· Vendor will need to ensure entire system is weatherproof as it will remain in an open-air environment which will be exposed to all weather conditions.

· Vendor must be a Licensed Electrical Contractor in the State of Illinois

· Vendor must provide proof of Electrical Contractors License prior to award

· Vendor will be responsible for the proper removal and disposal of any waste created during job from facility grounds.

· Vendor will be responsible for any property damage during the demolition, removal, and installation of Transfer Switch System.

· Vendor will ensure work area is clear of debris and garbage when work is completed.

· Vendor will coordinate and schedule all work through the Chief Engineer.

· All work to be completed during normal business hours Monday-Friday 08:00 AM – 05:00 PM excluding State and Federal holidays.

· Chief engineer will sign off on work at the completion of the project.

· Vendor will be responsible for providing the Chief Engineer with all manufacturer paperwork and warranty information.

· Vendor must bring all materials and tools to job site. The facility will not be responsible for the storage or transportation of any tools and/or materials.

File details come from the government source that posted it. Updated .