IVHM BAS System Appendix A.docx
DOCX document 18 KB Posted
- Attached to
- IVHM FY24/25 BAS System Preventative Maintenance
- Solicitation number
- 24-497DVA-MANTE-B-41996
- Issued by
- Kane County, Manteno Village, Illinois
About this file
This document is the Scope of Work for the IVHM BAS System Appendix A of a state and local government contract opportunity. The services requested include performing a series of tests and verifications for all valves or actuators, conducting stroke tests, checking sub-level controllers for communication, reviewing alarm histories, and backing up all controllers. The contract requires quarterly preventative maintenance services for Fiscal Years 2024 and 2025, with the vendor replacing any broken or defective parts. Remote support services are also included for building engineers, service vendors, and other contractors. The contract covers multiple buildings, with a detailed list of the MACH Pro-Sys, MACH Pro-Com, MACH Pro-Air, MACH Pro-Zone88 controllers, BACnet routers, SRPM room pressure monitors, and BACnet flow controllers for the various HVAC system components.
The document does not provide information on pricing terms, set asides, incumbents, funding requirements and sources, or other salient financial details. The focus is on the technical specifications and scope of work for the IVHM BAS System maintenance and support services.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IVHM BAS System RFQ.docx | DOCX document | |
| IVHM B-41996 BAS System Questions~2.docx | DOCX document | |
| standard-illinois-certifications-v.23.1 (2)~2.docx | DOCX document | |
| standard-terms-and-conditions~46.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IVHM BAS System Appendix A
· Scope of Work
· PM work shall be performed at one (1) work site.
· Shall perform a series of tests and verifications for all valves or actuators, shall perform stroke tests.
· View any active points to ensure that information is being received.
· Check of sub-level controllers for communication
· Review of alarm histories
· Backup all controllers to Server, Workstation, and Technician laptop Schedules and settings are tailored over time.
· Include in maintenance cost the Lynxspring/Tridium N4 software subscription and keep Supervisor software upgraded at the newest available revision.
· Fiscal Year 2024 Service – QTY (1) Quarterly Preventative Maintenance
· Fiscal Year 2025 Service – QTY (4) Quarterly Preventative Maintenance
· Vendor to replace any broken or defective parts with manufacturer recommend replacement parts.
· Remote Support
· Shall provide remote support for building engineers, service vendors/ other contractors, and any applicable staff.
· Preventative Maintenance:
· All installed TCP controls.
Building 1 East Wing:
Supervisor Workstation (Engineer’s Office) TCP-AHU-NE (Northeastern Basement)
0. (1) MACH Pro-Sys Controller AHU-NE TCP-AHU-SE (Southeast Basement)
0. (1) MACH Pro-Sys Controller AHU-SE
0. TCP- R1E (Southeast Basement)
(1) MACH ProCom Controller VAVs, SRPMs, FFUs
(32) MACH Pro-Air Controllers VAV-111, 112-12, 114-15, 116, 117, 118-19, 120
VAV-SE-COR1, SE-COR2, SE-COR3, SE-ANTE
VAV-E5, E6, E7, E8, SE-REC
VAV-101, 102-03, 104-05, 106, 107, 108-09, 110
VAV-NE-COR1, NE-COR2, NE-COR3, NE-ANTE
VAV-E1, E2, E3, E4, NE-REC
(4) MACH Pro-Zone88 Controllers FFUs, EF-TLT (SE Wing North Alcove) FFUs, EF-TLT (SE Wing South Alcove) FFUs, EF-TLT (NE Wing North Alcove) FFUs, EF-TLT (NE Wing South Alcove)
(1) BACnet Router SRPMs, FFUs
(22) SRPM Room Pressure Monitors FFU Rm 111, 112, 113, 114, 115, 116, 117, 118, 119, 120, SE Anteroom FFU RM 101, 102, 103, 104, 105, 106, 107, 108, 109, 110, NE Anteroom
(20) BACnet Flow Controllers for FFUs Rm 111, 112, 113, 114, 115, 116, 117, 118, 119, 120 Rm 101, 102, 103, 104, 105, 106, 107, 108, 109, 110 Building 1 West Wing:
TCP-AHU-NW
0. (1) MACH Pro-Sys Controller AHU-NW
TCP-AHU-SW
0. (1) MACH Pro-Sys Controller AHU-SW
TCP-R1W
(1) MACH Pro-Com Controller VAVs, SRPMs, FFUs
(32) MACH Pro-Air Controllers VAV-131, 132-33, 134-35, 136, 137, 138-39, 140 VAV-SW-COR1, COR2, COR3, ANTE Rm
VAV-W5, W6, W7, W8, SW-REC
VAV-121, 122-33, 124-25, 126, 127, 128-29, 130
0. VAV-NE-COR1, COR2, COR3, ANTE Rm
0. VAV-W1, W2, W3, W4, REC
0. FFUs, EF-TLT (SW Wing North Alcove)
0. FFUs, EF-TLT (SW Wing South Alcove)
0. FFUs, EF-TLT (NW Wing North Alcove)
0. FFUs, EF-TLT (NW Wing South Alcove)
0. SRPMs, FFUs
0. FFU Rm 131, 132, 133, 134,135, 136, 137, 138, 139, 140, SE Anteroom
0. FFU Rm 121, 122, 123, 124, 125, 126, 127, 128, 129, 130, NE Anteroom
0. Rm 131, 132, 133, 134,135, 136, 137, 138, 139, 140
0. Rm 121, 122, 123, 124, 125, 126, 127, 128, 129, 130
(4) MACH Pro-Zone88 Controllers, (1) BACnet Router, (22) SRPM Room Pressure, (20) BACnet Flow Controllers for FFUs
Building 2 East Wing:
Supervisor Workstation (Engineer’s Office) TCP-AHU-NE (Northeastern Basement)
0. (1) MACH Pro-Sys Controller AHU-NE TCP-AHU-SE (Southeast Basement)
0. (1) MACH Pro-Sys Controller AHU-SE TCP- R2E (Southeast Basement)
0. (1) MACH ProCom Controller VAVs, SRPMs, FFUs
- (32) MACH Pro-Air Controllers VAV-211, 212-12, 214-15, 216, 217, 218-19, 220
VAV-SE-COR1, SE-COR2, SE-COR3, SE-ANTE
VAV-E5, E6, E7, E8, SE-REC
VAV-201, 202-03, 204-05, 206, 207, 208-09, 210
VAV-NE-COR1, NE-COR2, NE-COR3, NE-ANTE
VAV-E1, E2, E3, E4, NE-REC
- (4) MACH Pro-Zone88 Controllers FFUs, EF-TLT (SE Wing North Alcove) FFUs, EF-TLT (SE Wing South Alcove) FFUs, EF-TLT (NE Wing North Alcove) FFUs, EF-TLT (NE Wing South Alcove)
0. TCP- R1E (Basement)
(1) BACnet Router SRPMs, FFUs
(22) SRPM Room Pressure Monitors FFU Rm 211, 212, 213, 214, 215, 216, 217, 218, 219, 220, SE Anteroom FFU RM 201, 202, 203, 204, 205, 206, 207, 208, 209, 210, NE Anteroom
(20) BACnet Flow Controllers for FFUs Rm 211, 212, 213, 214, 215, 216, 217, 218, 219, 220 Rm 201, 202, 203, 204, 205, 206, 207, 208, 209, 210
Building 2 West Wing:
TCP-AHU-NW (Northwestern Basement)
0. (1) MACH Pro-Sys Controller AHU-NE TCP-AHU-SW (Southwest Basement)
0. (1) MACH Pro-Sys Controller AHU-SE TCP- R2W (Southwest Basement)
(1) MACH ProCom Controller VAVs, SRPMs, FFUs
(32) MACH Pro-Air Controllers VAV-231, 232-32, 234-35, 236, 237, 238-39, 230
VAV-SW-COR1, SW-COR2, SW-COR3, SW-ANTE
VAV-W5, W6, W7, W8, SW-REC
VAV-221, 222-23, 224-25, 226, 227, 228-29, 230
VAV-NE-COR1, NE-COR2, NE-COR3, NE-ANTE
VAV-W1, W2, W3, W4, WE-REC
0. (4) MACH Pro-Zone88 Controllers FFUs, EF-TLT (SW Wing North Alcove)
0. FFUs, EF-TLT (SW Wing South Alcove)
0. FFUs, EF-TLT (NW Wing North Alcove)
0. FFUs, EF-TLT (NW Wing South Alcove) TCP- R1W (Basement)
(1) BACnet Router SRPMs, FFUs
(22) SRPM Room Pressure Monitors FFU Rm 231, 232, 233, 234, 235, 236, 237, 238, 239, 240, SE Anteroom FFU RM 221, 222, 223, 224, 225, 226, 227, 228, 229, 230, NE Anteroom
(20) BACnet Flow Controllers for FFUs Rm 231, 232, 233, 234, 235, 236, 237, 238, 239, 240 Rm 221, 222, 223, 224, 225, 226, 227, 228, 229, 230
File details come from the government source that posted it. Updated .