This document is a Price Proposal (Exhibit B) for ITB#FLT/250141 Citywide Generator Load Bank Testing, issued by the City of Ocala, Florida. The solicitation seeks a contractor to perform annual load bank testing on generators ranging from 25 kW to 1,850 kW at various city-owned sites. A mandatory pre-bid meeting is scheduled for 11/26/2024 at 10:00 AM EST, located at 1805 NE 30th Ave., Ocala, FL, in Building 200. The pricing schedule details 45 different generator configurations with varying power ratings, voltages, and phases, covering single and three-phase generators from 25 kW to 1,250 kW.
The price proposal template allows bidders to enter unit costs for each generator type, with quantities ranging from 1 to 11 units per configuration. Currently, all unit and extended cost fields are set to zero, indicating that an actual bidder would need to complete these sections with their proposed pricing. The document appears to be a comprehensive pricing template designed to capture detailed cost information for a citywide generator load bank testing contract, enabling a transparent and comprehensive bid evaluation process.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 Exhibit B - PRICE PROPOSAL CONTRACT# FLT/250141
| Bidder name | Bidder Location |
| ENTER COMPANY NAME HERE | ENTER OFFICE LOCATION HERE |
| INITIAL CONTRACT TERM PRICING | |||||
| ITEM | DESCRIPTION | UOM | QTY | UNIT COST | EXTENDED COST |
| Power Rating - Sample Set | |||||
| 1 | 25 kW / 240 VOLT / SINGLE PHASE | Each | 1 | 0 | $ - 0 |
| 2 | 30 kW / 120/240 VOLT / 3 PHASE | Each | 1 | 0 | $ - 0 |
| 3 | 30 kW / 208 VOLT / 3 PHASE | Each | 1 | 0 | $ - 0 |
| 4 | 30 kW/ 120/240 V / SINGLE PHASE | Each | 1 | 0 | $ - 0 |
| 5 | 30 kW / 240 VOLT / 3 PHASE | Each | 1 | 0 | $ - 0 |
| 6 | 40 kW / 240 VOLT / 3 PHASE | Each | 1 | 0 | $ - 0 |
| 7 | 45 kW / 240 VOLT / 3 PHASE | Each | 1 | 0 | $ - 0 |
| 8 | 50 kW / 120/208 VOLT / 3 PHASE | Each | 1 | 0 | $ - 0 |
| 9 | 50 kW / 120/240 VOLT / 1 PHASE | Each | 1 | 0 | $ - 0 |
| 10 | 50 kW / 120/240 VOLT / 3 PHASE | Each | 1 | 0 | $ - 0 |
| 11 | 56 kW / 120/240 VOLT / 3 PHASE | Each | 1 | 0 | $ - 0 |
| 12 | 60 kW / 127-220 VOLT / 3 PHASE | Each | 1 | 0 | $ - 0 |
| 13 | 60kW / 208 VOLT / 3 PHASE | Each | 3 | 0 | $ - 0 |
| 16 | 75 kW / 480/208 VOLT / 3 PHASE | Each | 2 | 0 | $ - 0 |
| 17 | 75 kW / 480/240 VOLT / 3 PHASE | Each | 5 | 0 | $ - 0 |
| 18 | 75 kW / 480/240/208 VOLT / 3 PHASE | Each | 11 | 0 | $ - 0 |
| 19 | 80 kW / 122/240 VOLT / 3 PHASE | Each | 1 | 0 | $ - 0 |
| 20 | 80 kW / 208 VOLT / 3 PHASE | Each | 1 | 0 | $ - 0 |
| 21 | 80 kW / 240/480 VOLT / 3 PHASE | Each | 1 | 0 | $ - 0 |
| 22 | 80 kW / 480/277 VOLT / 3 PHASE | Each | 2 | 0 | $ - 0 |
| 23 | 100 kW / 120/208 VOLT / 3 PHASE | Each | 2 | 0 | $ - 0 |
| 24 | 100 kW / 208/120 VOLT / 3 PHASE | Each | 2 | 0 | $ - 0 |
| 25 | 100 kW / 240 VOLT / 3 PHASE | Each | 3 | 0 | $ - 0 |
| 26 | 100 kW / 480 VOLT / 3 PHASE | Each | 1 | 0 | $ - 0 |
| 27 | 100 kW /277/480 VOLT / 3 PHASE | Each | 1 | 0 | $ - 0 |
| 28 | 125 kW / 480 VOLT / 3 PHASE | Each | 1 | 0 | $ - 0 |
| 29 | 130 kW/60HZ 120/208 VOLTS 3 PHASE NG | Each | 1 | 0 | $ - 0 |
| 30 | 150 kW / 120/208 VOLT / 3 PHASE | Each | 2 | 0 | $ - 0 |
| 31 | 150 kW / 240/Volt/3 PHASE | Each | 1 | 0 | $ - 0 |
| 32 | 150 kW / 277/480 VOLT / 3 PHASE | Each | 2 | 0 | $ - 0 |
| 33 | 150 kW / 480 VOLT / 3 PHASE | Each | 1 | 0 | $ - 0 |
| 34 | 150 kW / 480/240 VOLT / 3 PHASE | Each | 1 | 0 | $ - 0 |
| 35 | 175 kW / 480 VOLT / 3 PHASE | Each | 1 | 0 | $ - 0 |
| 36 | 180 kW / 480 VOLT / 3 PHASE | Each | 1 | 0 | $ - 0 |
| 37 | 200 kW / 480 VOLT / 3 PHASE | Each | 1 | 0 | $ - 0 |
| 38 | 200 kW / 480/277 VOLT / 3 PHASE | Each | 2 | 0 | $ - 0 |
| 39 | 250 kW / 480 VOLT / 3 PHASE | Each | 2 | 0 | $ - 0 |
| 40 | 300 kW / 480 VOLT / 3 PHASE | Each | 1 | 0 | $ - 0 |
| 41 | 350 kW/ 480 VOLT / 3 PHASE | Each | 1 | 0 | $ - 0 |
| 42 | 375 kW / 277/480 VOLT / 3 PHASE | Each | 1 | 0 | $ - 0 |
| 43 | 400 kW / 480 VOLT / 3 PHASE | Each | 2 | 0 | $ - 0 |
| 44 | 500 kW / 480 VOLT / 3 PHASE | Each | 2 | 0 | $ - 0 |
| 45 | 1250 kW/480 V/3 PHASE | Each | 1 | 0 | $ - 0 |
| TOTAL EXTENDED COST | $ - 0 | ||||
| INITIAL CONTRACT TERM PRICING | $ - 0 |