ITBFLT250141_Citywide_Generator_Load_Bank_Testing_-_Exhibit_B_-_Price_Proposal.xlsx
XLSX spreadsheet 44 KB Posted
- Attached to
- Citywide Generator Load Bank Testing
- Solicitation number
- ITB#FLT/250141
- Issued by
- Marion County, Orlando City, Florida
About this file
The file is an Exhibit B Price Proposal for ITB#FLT/250141 Citywide Generator Load Bank Testing, issued by the City of Ocala, Florida. The solicitation requires a contractor to perform annual load bank testing on generators ranging from 25 kW to 1,850 kW at city-owned sites. A mandatory pre-bid meeting is scheduled for 11/26/2024 at 10:00 AM EST, located at 1805 NE 30th Ave., Ocala, FL in Building 200, Room Number unspecified. The price proposal includes a comprehensive list of 46 different generator configurations with varying power ratings, voltages, and phases, covering single and three-phase generators from 25 kW to 1800 kW.
The price proposal document is structured to allow bidders to input unit costs for each generator type, with quantities specified for each configuration. The total extended cost and initial contract term pricing fields are currently blank, indicating that bidders must complete these sections. The document suggests the city is seeking a comprehensive generator load bank testing service that can accommodate a wide range of generator specifications and sizes across multiple city-owned facilities. No specific pricing limitations, set-asides, or funding sources are explicitly detailed in this pricing exhibit.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 Exhibit B - PRICE PROPOSAL CONTRACT# FLT/250141
| Bidder name | Bidder Location |
| ENTER COMPANY NAME HERE | ENTER OFFICE LOCATION HERE |
| INITIAL CONTRACT TERM PRICING | |||||
| ITEM | DESCRIPTION | UOM | QTY | UNIT COST | EXTENDED COST |
| Power Rating - Sample Set | |||||
| 1 | 25 kW / 240 VOLT / SINGLE PHASE | Each | 1 | 0 | $ - 0 |
| 2 | 30 kW / 120/240 VOLT / 3 PHASE | Each | 1 | 0 | $ - 0 |
| 3 | 30 kW / 208 VOLT / 3 PHASE | Each | 1 | 0 | $ - 0 |
| 4 | 30 kW/ 120/240 V / SINGLE PHASE | Each | 1 | 0 | $ - 0 |
| 5 | 30 kW / 240 VOLT / 3 PHASE | Each | 1 | 0 | $ - 0 |
| 6 | 40 kW / 240 VOLT / 3 PHASE | Each | 1 | 0 | $ - 0 |
| 7 | 45 kW / 240 VOLT / 3 PHASE | Each | 1 | 0 | $ - 0 |
| 8 | 50 kW / 120/208 VOLT / 3 PHASE | Each | 1 | 0 | $ - 0 |
| 9 | 50 kW / 120/240 VOLT / 1 PHASE | Each | 1 | 0 | $ - 0 |
| 10 | 50 kW / 120/240 VOLT / 3 PHASE | Each | 1 | 0 | $ - 0 |
| 11 | 56 kW / 120/240 VOLT / 3 PHASE | Each | 1 | 0 | $ - 0 |
| 12 | 60 kW / 127-220 VOLT / 3 PHASE | Each | 1 | 0 | $ - 0 |
| 13 | 60kW / 208 VOLT / 3 PHASE | Each | 3 | 0 | $ - 0 |
| 16 | 75 kW / 480/208 VOLT / 3 PHASE | Each | 2 | 0 | $ - 0 |
| 17 | 75 kW / 480/240 VOLT / 3 PHASE | Each | 5 | 0 | $ - 0 |
| 18 | 75 kW / 480/240/208 VOLT / 3 PHASE | Each | 11 | 0 | $ - 0 |
| 19 | 80 kW / 122/240 VOLT / 3 PHASE | Each | 1 | 0 | $ - 0 |
| 20 | 80 kW / 208 VOLT / 3 PHASE | Each | 1 | 0 | $ - 0 |
| 21 | 80 kW / 240/480 VOLT / 3 PHASE | Each | 1 | 0 | $ - 0 |
| 22 | 80 kW / 480/277 VOLT / 3 PHASE | Each | 2 | 0 | $ - 0 |
| 23 | 100 kW / 120/208 VOLT / 3 PHASE | Each | 2 | 0 | $ - 0 |
| 24 | 100 kW / 208/120 VOLT / 3 PHASE | Each | 2 | 0 | $ - 0 |
| 25 | 100 kW / 240 VOLT / 3 PHASE | Each | 3 | 0 | $ - 0 |
| 26 | 100 kW / 480 VOLT / 3 PHASE | Each | 1 | 0 | $ - 0 |
| 27 | 100 kW /277/480 VOLT / 3 PHASE | Each | 1 | 0 | $ - 0 |
| 28 | 125 kW / 480 VOLT / 3 PHASE | Each | 1 | 0 | $ - 0 |
| 29 | 130 kW/60HZ 120/208 VOLTS 3 PHASE NG | Each | 1 | 0 | $ - 0 |
| 30 | 150 kW / 120/208 VOLT / 3 PHASE | Each | 2 | 0 | $ - 0 |
| 31 | 150 kW / 240/Volt/3 PHASE | Each | 1 | 0 | $ - 0 |
| 32 | 150 kW / 277/480 VOLT / 3 PHASE | Each | 2 | 0 | $ - 0 |
| 33 | 150 kW / 480 VOLT / 3 PHASE | Each | 1 | 0 | $ - 0 |
| 34 | 150 kW / 480/240 VOLT / 3 PHASE | Each | 1 | 0 | $ - 0 |
| 35 | 175 kW / 480 VOLT / 3 PHASE | Each | 1 | 0 | $ - 0 |
| 36 | 180 kW / 480 VOLT / 3 PHASE | Each | 1 | 0 | $ - 0 |
| 37 | 200 kW / 480 VOLT / 3 PHASE | Each | 1 | 0 | $ - 0 |
| 38 | 200 kW / 480/277 VOLT / 3 PHASE | Each | 2 | 0 | $ - 0 |
| 39 | 250 kW / 480 VOLT / 3 PHASE | Each | 2 | 0 | $ - 0 |
| 40 | 300 kW / 480 VOLT / 3 PHASE | Each | 1 | 0 | $ - 0 |
| 41 | 350 kW/ 480 VOLT / 3 PHASE | Each | 1 | 0 | $ - 0 |
| 42 | 375 kW / 277/480 VOLT / 3 PHASE | Each | 1 | 0 | $ - 0 |
| 43 | 400 kW / 480 VOLT / 3 PHASE | Each | 2 | 0 | $ - 0 |
| 44 | 500 kW / 480 VOLT / 3 PHASE | Each | 2 | 0 | $ - 0 |
| 45 | 1250 kW/480 V/3 PHASE | Each | 1 | 0 | $ - 0 |
| 46 | 1800 kW / 4160 VOLT / 3 PHASE | Each | 1 | 0 | $ - 0 |
| TOTAL EXTENDED COST | $ - 0 | ||||
| INITIAL CONTRACT TERM PRICING | $ - 0 |
image1.png
File details come from the government source that posted it. Updated .