ITB127 - Attachment 12 - Pre Bid -Build Registration.docx

DOCX document 27 KB Posted

Attached to
INVITATION TO BID 10CY Dump Bodies Hydraulic System
Solicitation number
127
Issued by
Ada County, Idaho

About this file

This document is an attachment for the Pre-Bid/Build Conference Registration related to Invitation to Bid (ITB) 127 issued by the State of Idaho for 10CY Dump Bodies, Hydraulic System Install, V-Box Spreader, and Wing Plows. Potential bidders are required to pre-register for the Pre-Bid/Build conference by submitting the completed form via email to the ITB Lead. The conference will be held on October 31, 2023 and November 1, 2023, with attendees able to choose from either an 8:15am-12:15pm or 1:15pm-5:15pm timeslot. Once registered, the State will provide a Microsoft Teams link for the video call. Attendees are asked to RSVP as soon as possible, as timeslots will be scheduled on a first-come, first-served basis.

The document does not provide any details on pricing terms, set asides, incumbents, funding requirements and sources, or contract amounts. It focuses solely on the logistics of the Pre-Bid/Build conference registration process.

View the file

Other files

File Type Posted
RFQ_Event 206 Microsoft eLearning Tools.docx DOCX document
ITB127 - Attachment 6 and 6A - Contract Management.docx DOCX document
ITB127 - Attachment 2 - Requirements and Specifications.docx DOCX document
RFP Event 427 Administrative Document.docx DOCX document
solicitation_instructions+Jan+2017.pdf PDF
ITB127 - Attachment 13 - Acronyms.docx DOCX document
ITB_Event 105 ITS Peripherals and Optics.docx DOCX document
Standard-Terms-and-Conditions_May-2021 (7).pdf PDF
RFQ_Event 134 Password Vault Software V3.docx DOCX document
ITB127 - Attachment 5 - Delivery Acceptance Form.docx DOCX document
FY24 Peripherals and Optics Contract BID.xlsx XLSX spreadsheet
ITB127 - Attachment 7 - Change Request Form.docx DOCX document
ITB127 - Exhibit A & B - Drawings.docx DOCX document
ITB127 - Attachment 9 - Optional Bid Items.docx DOCX document
Signature-Page-RFQ.docx DOCX document
ITB127 - Attachment 8 - Insurance Requirements.docx DOCX document
ITB127- Attachment 10 - Key Monitoring Metrics.docx DOCX document
Signature-Page-ITB-RFP-1.pdf PDF
ITB127 - Administrative Document - 10CY Dump Bodies Hydraulic System Install V Box Spreader and Wing.docx DOCX document
ITB127 - Attachment 4 - Bid Schedule.docx.xlsx XLSX spreadsheet
ITB127 - Attachment 11 - Pre Bid-Build Conference.docx DOCX document
Standard-Terms-and-Conditions_May-2021.pdf PDF
ITB127 - Attachment 3 - Product Information Sheet.docx DOCX document
Insurance Requirements.docx DOCX document
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITB127

ATTACHMENT 12 – Pre-Bid/Build Conference Registration

PRE-Bid/Build Conference
Preferred Method
10CY Dump Bodies Hydraulic System Install V-Box Sprader and Wing Plows
In Person

Via Teams Link

Potential Bidder’s choosing to participate in the Pre-Bid/Build meeting must pre-register by submitting this completed form, via e-mail, to the ITB Lead at bob.morlan@adm.idaho.gov . Please identify at least 2-3 dates/times that will work for your team. Please RSVP as soon as possible. Attendees are asked to register for the Pre-Bid/Build meeting no later than 5:00 PM Mountain Time, 2023. Timeslots will be scheduled on a first-come, first-served basis. Once your timeslot is confirmed, the State will provide a Teams link to the video-call.

PLEASE PRINT:

Name
Company
Email Address
Phone Number
Date 1
Date 2
October 31, 2023
November 1, 2023

8:15am – 12:15pm

8:15am – 12:15pm

1:15pm – 5:15pm

1:15pm – 5:15pm

1 | Page ITB127 - Attachment 12 – Pre-Bid/Build Conference Registration 10 CY Dump Bodies, Hydraulic System Install, V-Box Spreader, and Wing Plows

File details come from the government source that posted it. Updated .