ITB_FAC261122_Flooring_Installation_Project_City_Hall__Pre_Bid_Sign_In_Sheet.pdf
PDF 145 KB Posted
- Attached to
- Flooring Installation Project- City Hall
- Solicitation number
- ITB# FAC/261122
- Issued by
- Marion County, Orlando City, Florida
About this file
This is a Pre-Bid Sign-In Sheet for ITB FAC/261122, a flooring installation project by the City of Ocala, Florida. The mandatory pre-bid meeting was held on September 14, 2026, at 10:00 a.m. at City Hall, 110 SE Watula Avenue, Ocala, Florida. The project involves demolition and removal of existing flooring, substrate preparation, and installation of epoxy matrix terrazzo flooring at 3/8" thickness covering approximately 1,500 square feet, including floor leveling, anti-crack and anti-fracture suppressant membranes, and work-zone containment with partition systems and polyethylene sheeting. Work must be completed during off-hours (3:00 p.m. to 6:00 a.m., Monday through Friday) with 48-hour advance notice required for any outside-standard-hours work. The contract initial term is 14 business days from notice to proceed, and bids were due September 23, 2026. Attendance at the pre-bid meeting was mandatory; only vendors present were eligible to submit bids.
The estimated contract award is $75,000 on a lump-sum basis, which includes a 10% contingency account for unforeseen conditions. Bidders must hold terrazzo manufacturer certifications with individual certifications for all applicators and demonstrate a minimum of five years of verifiable experience installing cementitious, epoxy, and pre-fabricated epoxy terrazzo systems on individual projects valued between $25,000 and $1,000,000 or more. Subcontracting of terrazzo work is not permitted; vendors must self-perform all work. Insurance requirements include Commercial General Liability of $1 million per occurrence/$2 million aggregate, Commercial Automotive Liability of $1 million combined, and Workers' Compensation per Florida statutory requirements. A five-year material and labor warranty from completion date is required, and monthly progress reports must be submitted.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .