ITB_CIP260548_CONSTRUCT-_Auxiliary_Apparatus_Storage_for_Fire_Station_7_-_NEW_Exhibit_F_-_S201_Foundation_Plan__Details.pdf

PDF 978 KB Posted

Attached to
CONSTRUCT- Auxiliary Apparatus Storage for Fire Station #7
Solicitation number
ITB# CIP/260548
Issued by
Marion County, Orlando City, Florida

About this file

This is a construction specification document for Invitation to Bid (ITB) #CIP/260548 issued by the City of Ocala, Florida, for the construction of auxiliary apparatus storage for Fire Station #7. The project involves construction of a pre-engineered metal building (PEMB) of approximately 7,500 square feet located at 885 SE 31st Street, Ocala, Florida 34471. The scope includes metal panel siding combined with partial mesh exterior siding, additional canopies, exterior signage, and one enclosed shop area with a rolling door and work bench space. A non-mandatory pre-bid meeting and site visit will be held on April 14, 2026, at 10:00 AM EST at Fire Station #7. The final bid submission deadline is May 6, 2026. Upon award, the contractor must achieve substantial completion within 75 calendar days of the notice to proceed, followed by 15 calendar days for final completion. The contractor is responsible for providing all labor, materials, and equipment necessary to complete the project.

Bids will be evaluated on a lump sum basis with award going to the lowest qualified bidder. Bidders must be Florida-licensed general contractors with a minimum of five years of verifiable building construction experience and must bid on all line items, with an additional bid alternate for an exhaust removal system to be evaluated separately. Bonding and insurance requirements include a five percent bid bond, a public construction bond equal to the total bid amount, and a maintenance and guarantee bond of ten percent of the project value for three years; general liability insurance of $1,000,000 per occurrence/$2,000,000 aggregate and automotive liability of $1,000,000 combined are required. Contractors must perform a minimum of 30 percent of the work with their own forces and must obtain all required permits at no additional cost to the City, with estimated permit costs of approximately $7,350. A five percent retainage will be held until final project acceptance, and liquidated damages range from $904 to $10,224 plus 0.00005 of any amount over $40 million per calendar day of delay. No set-aside designations for disadvantaged enterprises are identified, and all non-governmental vendors must provide a notarized affidavit attesting compliance with Florida Statutes Section 787.06 regarding coercion for labor or services.

View the file

Other files

File Type Posted
ITB_CIP260548_CONSTRUCT-_Auxiliary_Apparatus_Storage_for_Fire_Station_7_-_Addendum_4.pdf PDF
ITB_CIP260548_CONSTRUCT-_Auxiliary_Apparatus_Storage_for_Fire_Station_7_-_REV_4.28.26_Exhibit_G_-__Geo-Tech_Report_No._25-1729.132.1.pdf PDF
ITB_CIP260548_CONSTRUCT-_Auxiliary_Apparatus_Storage_for_Fire_Station_7_-_REV_4.22.2026_Exhibit_A_-_Scope_of_Work.pdf PDF
ITB_CIP260548_CONSTRUCT-_Auxiliary_Apparatus_Storage_for_Fire_Station_7_-_NEW_Exhibit_G_-_Geo-Tech_Report.pdf PDF
ITB_CIP260548_CONSTRUCT-_Auxiliary_Apparatus_Storage_for_Fire_Station_7_-_Addendum_3.pdf PDF
ITB_CIP260548_CONSTRUCT-_Auxiliary_Apparatus_Storage_for_Fire_Station_7_-_Sign-In_Sheet.pdf PDF
ITB_CIP260548_CONSTRUCT-_Auxiliary_Apparatus_Storage_for_Fire_Station_7_-_Addendum_1.pdf PDF
ITB_CIP260548_CONSTRUCT-_Auxiliary_Apparatus_Storage_for_Fire_Station_7_-_REV_3.30.2026_Exhibit_A_-_Scope_of_Work.pdf PDF
ITB_CIP260548_CONSTRUCT-_Auxiliary_Apparatus_Storage_for_Fire_Station_7_-_NEW_Exhibit_E_-_Trench_Width_Pavement_Replacement.pdf PDF
ITB_CIP260548_CONSTRUCT-_Auxiliary_Apparatus_Storage_for_Fire_Station_7_-_Addendum_2.pdf PDF
ITB_CIP260548_CONSTRUCT-_Auxiliary_Apparatus_Storage_for_Fire_Station_7__-_Exhibit_C_-_Specifications.pdf PDF
ITB_CIP260548_CONSTRUCT-_Auxiliary_Apparatus_Storage_for_Fire_Station_7__-_Exhibit_B_-_Price_Proposal.xlsx XLSX spreadsheet
ITB_CIP260548_CONSTRUCT-_Auxiliary_Apparatus_Storage_for_Fire_Station_7__-_Exhibit_A_-_Scope_of_Work.pdf PDF
ITB_CIP260548_CONSTRUCT-_Auxiliary_Apparatus_Storage_for_Fire_Station_7__-_Exhibit_D_-__Plan_Set.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

This item has been signed and sealed using Digital Signature.

Printed copies of this document are not considered signed and sealed and the authentication code must be verified on any electronic copies.

Sheets and Views
Layout1
2025-10-03T11:12:37-0400
Gregory S Wayland

File details come from the government source that posted it. Updated .