This is a bid documents and plan set for the Ocala International Airport, a City of Ocala facility in Marion County, Florida, for concrete pads and T-hangar taxilane rehabilitation work. The project encompasses Schedule A (T-Hangar Taxilane Rehabilitation) and Schedule B (Concrete Pads), involving the installation of new concrete and asphalt pavements, drainage infrastructure, grading, erosion control, and associated site work across multiple taxilanes and parking areas at the airport. The scope includes demolition of existing pavement, removal of soil to bottom of pavement box, installation of 10-inch and 5-inch concrete pads on limerock base courses, 4-inch asphalt overlays, drainage systems including trench drains and stormwater pipes, oil-water separators, marking and signage, and restoration of disturbed areas with sod. The project is organized into eight construction phases with a total construction time of 150 consecutive calendar days. A pre-bid meeting is scheduled for October 8, 2026, at 10:00 AM at Ocala International Airport (1770 SW 60th Avenue, Suite 600, Ocala, FL 34474), with attendance listed as not mandatory. The bid documents include comprehensive plans and specifications across 43 sheets, encompassing general notes, construction safety and phasing plans, existing and demolition plans, geometry and marking plans, typical sections, concrete and pavement details, grading and drainage plans, spot grading, stormwater profiles, utility plans, and geotechnical boring logs.
The contractor is responsible for all costs related to construction staking, equipment and material storage, staging area setup, construction entrance tracking pads, site cleanup, dust control via water truck and vacuum sweeper, waste disposal, utility location and protection, airfield safety compliance, and restoration of disturbed non-paved areas. Bid bond is required at 5% of the bid amount. The contractor must coordinate closely with airport operations and the Owner's Representative regarding phasing, haul routes, equipment parking, and gate access. Specific requirements include provision of gate guards during working hours, compliance with FAA airfield lighting and marking standards, protection of existing utilities and airfield infrastructure, regular airfield pavement sweeping to maintain Foreign Object Debris (FOD)-free conditions, and adherence to all environmental regulations. Materials such as asphalt millings and demolition materials become airport property with right of first refusal, and only unclaimed materials may be removed off-site. The project involves work in active airfield operational areas with Runway Safety Areas (RSA) and Taxiway Object Free Areas (TOFA), requiring low-profile barricades, flagmen at active taxiway crossings, and strict compliance with aircraft operations protocols throughout the construction duration.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT AREAS
LOCATION MAP
OCALA INTERNATIONAL
AIRPORT
VICINITY MAP
PREPARED BY:
IT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION
OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND
SURVEYOR, TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A
LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE
ARCHITECT, OR LAND SURVEYOR SHALL STAMP THE DOCUMENT AND INCLUDE THE
NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH
ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
PREPARED FOR:
FLORIDA
MJ PROJECT NO.:
MARION COUNTY
CONCRETE PADS AND T-HANGAR
TAXILANE REHABILITATION
BID DOCUMENTS
19033.11
OCALA INTERNATIONAL AIRPORT
AUGUST 2026
OCALA INTERNATIONAL AIRPORT
1770 SW 60TH AVENUE, SUITE 600
OCALA, FLORIDA
(352) 629-2489
WWW.OCALAFL.GOV
OCALA, FLORIDA
1770 SW 60TH AVENUE, SUITE 600
PE_NO
PE_DATE
SEALED
1522 PENMAN ROAD SUITE 14
JACKSONVILLE, FLORIDA 32250
CITY OF OCALA
ROBERT B. OVERBY
57558
DRAWN
DESIGNED
CHECKED
SCALE
DATE
PROJECT
DRAWING TITLE
DRAWING NUMBER
OF
K:
\O
C
AL
A
IN
TE
R
N
AT
IO
N
AL
\T
-1
.1
O
C F
C O
N C
R
ET
E
PA
D S\
D R
AW
\D
R
AW
IN
G
S\
SH
EE
T
FI
LE
S\
3.
G
EN
R
.D W
G
A
1522 PENMAN ROAD; SUITE 14
JACKSONVILLE, FLORIDA 32250
2 3 4 5 6 7
1 2 3 4 5 6 7
STAMP
PROJECT MILESTONE
B
C
D
E
A
B
C
D
E
NO. DATE DESCRIPTION
REVISIONS
C
LI
EN
T:
PR
O
JE
C
T:
SUBMISSIONS TABLE
# SUBMISSION DATE
1 PRELIMINARY DESIGN DECEMBER 5, 2025
2 FINAL DESIGN JANUARY 2026
SUBCONSULTANT CONTACT TABLE
COMPANY ROLE ADDRESS PHONE EMAIL
SES ENVIRONMENTAL RESOURCE
SOLUTIONS LLC
DOCUMENTED CATEGORICAL
EXCLUSION (CATEX) 3550 St. Johns Bluff Road South, Jacksonville, FL 32224 904-285-1397 mail@ersenvironmental.com
R.M. BARRINEAU AND ASSOCIATES TOPOGRAPHIC SURVEY Oakhurst Professional Park 1309 S.E. 25th Loop Suite 103, Ocala, FL 34471 352-369-3771 diane@rmbarrineau.com
GEO-TECHNOLOGIES, INC GEOTECHNICAL SERVICES 1016 S.E. 3rd Avenue, Ocala, FL 34471 352-694-7711 gpolk@geotechfl.com
3 BID DOCUMENTS AUGUST 2026
A/P
AC
ACC.
A.D.B.E.
ADD.
ADMIN.
ALT.
AOA
APPROX.
AWOS
BEG.
BIT.
BMP
BVCE
BVCS
CB
CD
CMP
C.O.
CONC.
CONT.
CY
DIA.
DWG.
E=, E =
EG
E-EHH
EJC
ELEV.
ELEC.
EMH
E-EMH
EOP
EVCE
EVCS
EXIST.
FAA
FES
FT
GRD
HDPE
HW
IND.
INCID.
JC
LAT.
LF
AIRPORT
ACRES
ACCESS
AS DETERMINED BY ENGINEER
ADDITIVE
ADMINISTRATION
ALTERNATE
AIRPORT OPERATIONS AREA
APPROXIMATELY
AUTO AIRPORT WEATHER STA.
BEGINNING
BITUMINOUS
BEST MANAGEMENT PRACTICE
BEG OF VERTICAL CURVE ELEV.
BEG OF VERTICAL CURVE STA.
CENTERLINE
CATCH BASIN
CROSS DRAIN
CORRUGATED METAL PIPE
UD CLEAN OUT
CONCRETE
CONTINUED
CUBIC YARDS
DIAMETER
DRAWING
EASTING
EXISTING GROUND
EXISTING ELECTRICAL HANDHOLE
ELECTRICAL JUNCTION CAN
ELEVATION
ELECTRIC OR ELECTRICAL
ELECTRICAL MANHOLE
EXISTING ELECTRICAL MANHOLE
EDGE OF PAVEMENT
END OF VERTICAL CURVE ELEV
END OF VERTICAL CURVE STA
EXISTING
FEDERAL AVIATION ADMIN.
LONG.
LT
LVC
MAT.
MAX.
MES
MIN.
MPH
N=, N =
NO.
NOM.
NOTAM
N.T.S.
OCF
OFF
OFZ
PAPI
PC
PROP.
PT
PVC
PVI
PVM'T
RCP
REIL
REQ'D
ROFA
ROFZ
RPR
RPZ
RSA
RT
RWY
SEL.
SF
STA
SUPP.
SY
TEMP.
TLOFA
TOFA
TSA
TSS
TYP.
TW
UD
UE
U/G
MAXIMUM
MITERED END SECTION
MINIMUM
MILES PER HOUR
NORTHING
NUMBER
NOMINAL
NOTICE TO AIR MISSIONS
NOT TO SCALE
ABBREVIATIONS:
TAXIWAY OR TAXILANE SAFETY AREA
THRESHOLD SITING SURFACE
TYPICAL
TAXIWAY
UNDERDRAIN
UNDERGROUND ELECTRIC
UNDERGROUND
LONGITUDE
LEFT
LENGTH OF VERTICAL CURVE
MATERIAL
AIRPORT IDENTIFIER
OFFSET
OBSTACLE FREE ZONE
PRECISION APPROACH PATH INDICATOR
POINT OF CURVATURE
PROPOSED
POINT OF TANGENCY
POLYVINYL CHLORIDE PIPE
POINT OF VERTICAL INTERSECTION
PAVEMENT
REINFORCED CONCRETE PIPE
RUNWAY END IDENTIFIER LIGHT
REQUIRED
RWY OBJECT FREE AREA
RWY OBSTACLE FREE ZONE
RESIDENT PROJECT REPRESENTATIVE
RWY PROTECTION ZONE
RWY SAFETY AREA
RIGHT
RUNWAY
SELECTIVE
SQUARE FEET
STATION
SUPPLEMENTAL
SQUARE YARDS
TEMPORARY
TAXILANE OBJECT FREE AREA
TAXIWAY OBJECT FREE AREA
FLARED END SECTION
FEET
GROUND WIRE
HIGH-DENSITY POLYETHYLENE
HEADWALL
INDIVIDUAL
INCIDENTAL
JUNCTION CAN
LATITUDE
LINEAR FEET
O C
AL
A
IN
TE
R N
AT
IO
N
AL
A
IR
PO
R
T O
C
AL
A, F
LO
R
ID
A
GENERAL NOTES
C O
N C
R
ET
E
PA
D S
AN
D
T -H
AN
G
AR
T
AX
IL
AN
E
R
EH
AB
IL
IT
AT
IO
N
NOT TO SCALE
CLH
RBO
CLH
19033.11
AUGUST 2026
GN-01
2 42
BID DOCUMENTS
SHEET LIST TABLE
Sheet
Number Sheet Title PAGE
NUMBER
CV-01 COVER SHEET 1
GN-01 GENERAL NOTES 2
GN-02 QUANTITIES 3
GP-01 GENERAL PLAN 4
CS-01 CONSTRUCTION SAFETY AND PHASING PLAN - 1 OF 3 5
CS-02 CONSTRUCTION SAFETY AND PHASING PLAN - 2 OF 3 6
CS-03 CONSTRUCTION SAFETY AND PHASING PLAN - 3 OF 3 7
EX-01 EXISTING CONDITIONS PLAN - 1 OF 3 8
EX-02 EXISTING CONDITIONS PLAN - 2 OF 3 9
EX-03 EXISTING CONDITIONS PLAN - 3 OF 3 10
DE-01 DEMOLITION PLAN - 1 OF 3 11
DE-02 DEMOLITION PLAN - 2 OF 3 12
DE-03 DEMOLITION PLAN - 3 OF 3 13
GE-01 GEOMETRY AND MARKING PLAN - 1 OF 3 14
GE-02 GEOMETRY AND MARKING PLAN - 2 OF 3 15
GE-03 GEOMETRY AND MARKING PLAN - 3 OF 3 16
GE-04 TYPICAL SECTIONS 17
GE-05 CONCRETE DETAILS 18
GE-06 PAVEMENT TRANSITION DETAILS 19
GE-07 MARKING DETAILS 20
GR-01 GRADING, DRAINAGE, AND EROSION CONTROL PLAN - 1 OF 3 21
GR-02 GRADING, DRAINAGE, AND EROSION CONTROL PLAN - 2 OF 3 22
GR-03 GRADING, DRAINAGE, AND EROSION CONTROL PLAN - 3 OF 3 23
PR-01 PROFILE 24
SW-01 STORMWATER PLAN 25
SW-02 STORMWATER PROFILES 26
GR-04 SPOT GRADING PLAN - 1 OF 3 27
GR-05 SPOT GRADING PLAN - 2 OF 3 28
GR-06 SPOT GRADING PLAN - 3 OF 3 29
GR-07 GRADING AND DRAINAGE DETAILS - 1 OF 3 30
GR-08 GRADING AND DRAINAGE DETAILS - 2 OF 3 31
GR-09 GRADING AND DRAINAGE DETAILS - 3 OF 3 32
GR-10 EROSION CONTROL DETAILS 33
UT-01 UTILITY PLAN 34
UT-02 ELECTRICAL DETAILS 35
UT-03 WATER DETAILS 36
BL-01 BORING LOCATION MAP - 1 OF 2 37
BL-02 BORING LOCATION MAP - 2 OF 2 38
BL-03 BORING LOGS - 1 OF 4 39
BL-04 BORING LOGS - 2 OF 4 40
BL-05 BORING LOGS - 3 OF 4 41
BL-06 BORING LOGS - 4 OF 4 42
GENERAL NOTES
1. CONSTRUCTION STAKE-OUT SHALL BE PERFORMED BY CONTRACTOR IN ACCORDANCE
WITH ARTICLE 50-06 OF THE GENERAL PROVISIONS OF THE CONTRACT DOCUMENTS. IT
SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE ALL MEASUREMENTS
THAT MAY BE REQUIRED TO LAY OUT THE CONSTRUCTION. THE COST OF STAKING WILL
NOT BE PAID FOR DIRECTLY AND SHALL BE INCLUDED IN THE UNIT PRICES FOR THE
VARIOUS ITEMS OF WORK.
2. THE CONTRACTOR WILL BE RESPONSIBLE FOR THE CLEANUP AND DISPOSAL OF ALL TRASH
AND DEBRIS CREATED BY HIS WORK OR PERSONNEL. NO BURNING IS ALLOWED ON SITE.
ALL TRASH AND DEBRIS MUST BE DISPOSED OF OFFSITE.
3. THE CONTRACTOR SHALL MAKE HIS OWN ARRANGEMENTS FOR ASPHALT AND OR
CONCRETE BATCH PLANT LOCATIONS WHICH MUST BE LOCATED OFF AIRPORT PROPERTY.
4. THE CONTRACTOR SHALL VISIT SITE TO DETERMINE EXISTING CONDITIONS PRIOR TO
SUBMITTING BID. THE CONTRACTOR SHALL REPORT TO THE ENGINEER ANY VARIATIONS
FROM THE INFORMATION SHOWN ON THE CONSTRUCTION PLANS.
5. APPROVED CUTS IN PAVEMENT OR CONCRETE SHALL BE MADE USING A PAVEMENT SAW,
AND SHALL BE PATCHED TO MATCH THE EXISTING SURFACE IN A MANNER APPROVED BY
THE ENGINEER.
6. EXISTING EASEMENTS TO OTHER PROPERTIES SHALL BE MAINTAINED AT ALL TIMES.
7. AIRFIELD PAVEMENTS SHALL BE KEPT FREE OF ALL DEBRIS, DIRT, ETC., AT ALL TIMES. ANY
SPILLAGE OF EXCAVATION OR OTHER MATERIAL SHALL BE CLEANED UP IMMEDIATELY BY
THE CONTRACTOR WITH A MOTOR DRIVEN SWEEPER OR VACUUM AS REQUIRED BY THE
ENGINEER. A PROGRAM OF REGULAR AIRFIELD PAVEMENT INSPECTION WILL BE PLANNED
BY THE CONTRACTOR, AIRPORT OPERATIONS AND THE OWNER'S REPRESENTATIVE.
SWEEPERS ARE TO BE EQUIPPED WITH NON-METALIC BROOMS.
8. ALL NON-PAVED AREAS OUTSIDE THE LIMITS OF CONSTRUCTION WHICH ARE DISTURBED
BY THE CONTRACTOR'S OPERATIONS, SUCH AS THE CONTRACTOR'S ACCESS ROAD,
STAGING AREA, HAUL ROUTES, ETC., SHALL BE RESTORED TO THEIR ORIGINAL CONDITION
AND GRASSED UPON COMPLETION OF THE PROJECT.
9. ANY DAMAGES DONE TO AIRPORT PROPERTY OR UTILITIES (SUCH AS RUNWAY, TAXIWAYS,
APRONS, FENCING, EXISTING CABLES) WILL BE REPAIRED BY THE CONTRACTOR TO THE
APPROVAL OF THE OWNER OF THE FACILITY IN A SATISFACTORY MANNER. THE
CONTRACTOR WILL BEAR ALL COSTS FOR REPAIRS USING INDUSTRY STANDARD
PRACTICES AND MATERIALS.
10. THE CONTRACTOR SHALL MAINTAIN SECURITY WITHIN THE PROJECT SITE AT ALL TIMES.
NO UNAUTHORIZED PERSONNEL SHALL BE ALLOWED ON THE SITE.
11. CONTRACTOR SHALL MAINTAIN ALL AIRFIELD SAFETY DEVICES SUCH AS STAKED LIMIT
LINES, FOR THE DURATION OF THE PROJECT AS REQUIRED. DAMAGED STAKES OR
FLAGGING SHALL BE REPLACED IMMEDIATELY. CONTRACTOR TO SUBMIT PLAN SHOWING
LOCATION OF LIMIT LINES FOR EACH PHASE AND FOR PROJECT DURATION TO THE
ENGINEER FOR APPROVAL.
12. THE CONTRACTOR SHALL OBTAIN ALL PERMITS NECESSARY FOR THE COMPLETION OF
THIS PROJECT.
13. THE CONTRACTOR IS RESPONSIBLE FOR COMPLIANCE WITH ALL ENVIRONMENTAL RULES
AND REGULATIONS OF THE CITY, COUNTY, STATE, ARMY CORPS OF ENGINEERS, AND ANY
OTHER JURISDICTIONAL AGENCIES, AND ALL CONDITIONS SET FORTH IN ENVIRONMENTAL
PERMITS.
14. AIRCRAFT OPERATING ON THE AIRFIELD MAKE THE CONSTRUCTION AREA A ZONE OF HIGH
LEVEL NOISE. THE CONTRACTOR IS ADVISED TO TAKE THE NECESSARY PRECAUTIONS,
SUCH AS THE USE OF EAR PLUGS AND EAR MUFFS TO PREVENT EAR INJURY TO ANY
PERSONNEL WORKING IN THE AREA.
15. ALL DISPUTES ARISING FROM THE CONTRACTOR SHALL BE DECIDED BY THE ENGINEER,
WHOSE DECISION SHALL BE FINAL.
16. BURNING OF DEBRIS WILL NOT BE ALLOWED ON AIRPORT PROPERTY.
17. ALL DEMOLISHED MATERIALS BECOME THE PROPERTY OF THE CONTRACTOR UNLESS
OTHERWISE SHOWN IN THE CONTRACT DOCUMENTS. CONSTRUCTION AND DEMOLITION
DEBRIS SHALL BE LEGALLY DISPOSED OF OFF AIRPORT PROPERTY.
18. THE CONTRACTOR SHALL KEEP A WATER TRUCK ONSITE AT ALL TIMES FOR THE PURPOSE
OF CONTROLLING DUST AS REQUIRED BY THE CONTRACT DOCUMENTS.
19. NO SITE WORK SHALL BE CONDUCTED PRIOR TO OBTAINING A SITE PERMIT FROM THE
CITY. THE CONTRACTOR SHALL NOT OBTAIN ANY PERMITS PRIOR TO THE PRE-CONSTRUCTION
MEETING, TO BE SCHEDULED BY THE RPR.
HAUL ROUTE STAGING
20. THE CONTRACTOR WILL BE RESPONSIBLE FOR THE STORAGE AND SECURITY OF HIS
MATERIAL AND EQUIPMENT AND SHALL ERECT STORAGE FACILITIES AND FENCING AS
NECESSARY. THE CONTRACTOR'S STORAGE AND STAGING AREA SHALL BE IN THE
LOCATION SHOWN ON THE PLAN SHEETS.
21. THE CONTRACTOR'S STAGING AREA(S) AND HAUL ROUTES SHOWN ON THE PLANS ARE
GENERAL AND FOR INFORMATIONAL PURPOSES ONLY. THE ACTUAL SIZE AND LOCATION
OF STAGING AREAS AND HAUL ROUTES WILL BE APPROVED BY THE OWNER PRIOR TO
CONSTRUCTION.
22. CONTRACTOR WILL NOT BE ALLOWED TO USE ANY OF THE EXISTING RUNWAYS OR
TAXIWAYS AS PART OF THE HAUL ROAD UNLESS SPECIFICALLY AUTHORIZED BY THE
OWNER'S REPRESENTATIVE. UNDER NO CIRCUMSTANCE SHALL THE CONTRACTOR CROSS
ANY RUNWAY AT ANY TIME WITH CONSTRUCTION VEHICLES OR EQUIPMENT.
23. ALL CONSTRUCTION TRAFFIC SHALL ENTER AND EXIT THE PROJECT AREA THROUGH THE
PROJECT ACCESS ROUTES APPROVED BY THE ENGINEER ONLY. THE CONTRACTOR SHALL
BE RESPONSIBLE FOR THE SECURITY OF ALL GATES HE USES FOR ACCESS ONTO AIRPORT
PROPERTY. THE CONTRACTOR SHALL POST A GUARD AT ANY ACCESS GATE THAT IS NOT
LOCKED.
24. THE EXISTING AIRPORT PAVEMENTS ACCESS ROADS AND HAUL ROUTES MAY NOT BE
CAPABLE OF SUPPORTING CERTAIN TYPES OF CONSTRUCTION EQUIPMENT. PRIOR TO
BIDDING, THE CONTRACTOR SHALL FULLY SATISFY HIMSELF AS TO THE ABILITY OF THE
EXISTING AIRPORT PAVEMENTS TO SATISFACTORILY SUSTAIN THE TYPE OF EQUIPMENT HE
PLANS TO USE. CONTRACTOR SHALL SIZE THE EQUIPMENT USED FOR CONSTRUCTION
ACCORDINGLY. ANY DAMAGE CAUSED BY HAULING OR ANY OTHER CONSTRUCTION
ACTIVITY TO EXISTING PAVEMENT SHALL BE REPAIRED BY THE CONTRACTOR AT NO
ADDITIONAL COST TO THE OWNER.
25. THE OWNER'S REPRESENATIVE SHALL DESIGNATE AREAS TO BE USED BY THE
CONTRACTOR FOR THE PARKING OF CONSTRUCTION EQUIPMENT AND VEHICLES WHEN
NOT ENGAGED IN THE CONSTRUCTION DURING NON-WORKING DAYS AND NIGHTS AS WELL
AS AREAS FOR CONTRACTOR'S EMPLOYEES AUTO PARKING.
26. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING AND PROVIDING ALL PERMANENT
AND TEMPORARY UTILITY CONNECTIONS TO THE STAGING AREA.
MOVEMENT ON AIRFIELD
27. AREAS OUTSIDE THE PROJECT LIMITS ARE DESIGNATED AS RESTRICTED AREAS. THE
CONTRACTOR'S FORCES ARE PROHIBITED FROM ENTERING RESTRICTED AREAS AT ANY
TIME, UNLESS SPECIFICALLY AUTHORIZED BY THE OWNER'S REPRESENTATIVE OR
AIRPORT OPERATIONS.
28. THE CONTRACTOR SHALL CONDUCT HIS CONSTRUCTION OPERATIONS AS SHOWN ON THE
CONSTRUCTION SAFETY & PHASING PLAN, AND HIS APPROVED PHASING PLAN. THE
CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ACTIVITIES WITH THE OWNER'S
REPRESENTATIVE TO MINIMIZE INTERFERENCE TO AIRCRAFT OPERATIONS DURING
CONSTRUCTION.
29. NO CONTRACTOR VEHICLES, EQUIPMENT, OR PERSONNEL SHALL CROSS OR BE WITHIN
ANY RUNWAY SAFETY AREA OR WITHIN ANY TAXIWAY OBJECT FREE AREA AS DELINEATED
IN THE PLANS. THE CONTRACTOR SHALL NOT PARK OR LEAVE UNATTENDED ANY
EQUIPMENT WITHIN THE RUNWAY OBJECT FREE AREA (ROFA) OR THE RUNWAY
PROTECTION ZONE (RPZ). EQUIPMENT NOT MANNED AND BEING USED SHALL NOT BE
ALLOWED WITHIN THE ROFA OR RPZ.
30. ALL VEHICLES USED ON THE AIRFIELD SHALL MEET FAA REQUIREMENTS FOR MARKINGS
AND LIGHTING. (SEE AC 150/5210-5D).
31. ALL ACTIVE AIRPORT OPERATIONAL AREAS WHICH ARE ADJACENT TO A CONSTRUCTION
WORK AREA SHALL BE SEPARATED BY TYPE II LOW PROFILE BARRICADES OR OTHER
BARRIER APPROVED BY THE ENGINEER. NO CONSTRUCTION TRAFFIC WILL CROSS ACTIVE
AIRPORT OPERATIONAL AREAS. THE CONTRACTOR SHALL PROVIDE AND INSTALL THE
BARRIERS AS SHOWN ON THE DRAWINGS AND WHERE DIRECTED BY THE ENGINEER. SEE
SPECIFICATION 01030 AND 01530 FOR ADDITIONAL INFORMATION.
32. THE CONTRACTOR SHALL WORK WITH THE ENGINEER IN SCHEDULING ALL TAXIWAY
OPENINGS/CLOSINGS TO BE CONSISTENT WITH AIRFIELD OPERATIONS. WHEN THE
CONTRACTOR'S OPERATIONS CROSS ACTIVE TAXIWAYS, HE SHALL BE REQUIRED TO
PROVIDE A FLAGMAN ON EACH SIDE OF THE ACTIVE CROSSING TO DIRECT VEHICULAR
TRAFFIC AND PROTECT AIRCRAFT TRAFFIC. THE CONTRACTOR SHALL ALSO HAVE
SUITABLE EQUIPMENT APPROVED BY THE ENGINEER AT EACH CROSSING TO KEEP THE
CROSSING CLEAN OF ALL DIRT AND DEBRIS AND SAFE FOR AIRCRAFT TRAFFIC.
BURIED UTILITIES
33. PRIOR TO DIGGING ANY TRENCHES, THE CONTRACTOR SHALL NOTIFY AIRPORT FOR ALL
UTILITIES (ELECTRIC, GAS, TELEPHONE, WATER, FIBER, AND ETC.) AND OBTAIN LOCATIONS
OF UNDERGROUND UTILITIES.
34. CONTRACTOR SHALL BE RESPONSIBLE FOR THE LOCATION AND IDENTIFICATION OF ALL
EXISTING UTILITIES AND UNDERGROUND PIPELINES IN CONSTRUCTION AREA. ANY
DAMAGES TO EXISTING UTILITIES OR UNDERGROUND PIPELINES ON OR OFF AIRPORT
PROPERTY SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. ALL REPAIR WORK
SHALL MEET THE APPROVAL OF THE OWNER OF THE DAMAGED UTILITY. NO
REIMBURSEMENT WILL BE ALLOWED FOR UTILITY/PIPE REPAIR OR REPLACEMENT.
35. THE CONTRACTOR SHALL PROTECT EXISTING UTILITIES, AIRFIELD LIGHTING AND NAVAIDS
NOT CALLED OUT TO BE REMOVED OR ABANDONED. ANY DAMAGES DONE TO AIRPORT
PROPERTY OR UTILITIES (INCLUDING, BUT NOT LIMITED T0 RUNWAYS, TAXIWAYS, APRONS,
FENCING, EXISTING CABLES, LIGHTING, SIGNS, NAVAIDS) WILL BE REPAIRED BY THE
CONTRACTOR TO THE APPROVAL OF THE OWNER OF THE FACILITY IN A SATISFACTORY
MANNER. THE CONTRACTOR WILL BEAR ALL COSTS FOR REPAIRS.
36. ANY UNPLANNED, UNAPPROVED, OR ACCIDENTAL SHUTDOWN OR INTERRUPTION OF
SERVICE TO ANY LIGHTING CIRCUIT OR NAVIGATIONAL AID REQUIRES IMMEDIATE
NOTIFICATION OF AIRPORT OPERATIONS AND THE OWNER'S REPRESENTATIVE BY THE
CONTRACTOR. THE COST OF MATERIALS AND LABOR REQUIRED TO REPAIR THE LIGHTING
CIRCUIT SHALL BE BORNE BY THE CONTRACTOR.
2 of 432 of 43
CHECKED
SCALE
DATE
PROJECT
DRAWING TITLE
DRAWING NUMBER
OF
K:
\O
C
AL
A
IN
TE
R
N
AT
IO
N
AL
\T
-1
.1
O
C F
C O
N C
R
ET
E
PA
D S\
D R
AW
\D
R
AW
IN
G
S\
SH
EE
T
FI
LE
S\
3.
G
EN
R
.D W
G
A
1522 PENMAN ROAD; SUITE 14
JACKSONVILLE, FLORIDA 32250
2 3 4 5 6 7
1 2 3 4 5 6 7
STAMP
PROJECT MILESTONE
B
C
D
E
A
B
C
D
E
NO. DATE DESCRIPTION
REVISIONS
C
LI
EN
T:
PR
O
JE
C
T:O C
AL
A
IN
TE
R N
AT
IO
N
AL
A
IR
PO
R
T O
C
AL
A, F
LO
R
ID
A
QUANTITIES
C O
N C
R
ET
E
PA
D S
AN
D
T -H
AN
G
AR
T
AX
IL
AN
E
R
EH
AB
IL
IT
AT
IO
N
NOT TO SCALE
CLH
RBO
CLH
19033.11
AUGUST 2026
GN-02
3 42
BID DOCUMENTS
SCHEDULE A BASE BID
SCHEDULE A ADD ALT 1
SCHEDULE B BASE BID
3 of 433 of 43
TSA
TSA
TSA
TOFA
TOFA
TSA
TSA
ET
ET
ET
R
SA
R
SA
R
SA
R
SA
R
SA
R
SA
R
SA
R
SA
R
SA
R
SA
R
SA
R
SA
R
SA
R
SA
R
SA
R
SA
R
SA
R
SA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
R O
FA
R
O
FA
R O
FA
R
O
FA
R O
FA
R
O
FA
R O
FA
R
O
FA
R O
FA
R O
FA
R
O
FA
R O
FA
R
O
FA
R O
FA
R
O
FA
R O
FA
R
O
FA
R O
FA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
TO
FA
TO
FA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
SCHEDULE B:
CONCRETE PADS
SCHEDULE B:
CONCRETE PADS
TWY A3
TWY A2
TWY A1
TWY A4
TWY A5
TWY A6
TWY A7
TWY A8
TWY A9
TWY A10
TWY A11
TWY A12
TWY A13
R W
Y
-3
(1
' X
7'
TW
Y
A
FUEL
FARM
TERMINAL
BUILDING
TWY B
RWY 8-26 (50' X 3009')
TW
Y
B3 TW
Y
B2 TW
Y
B1
APRON
ATCT
FBO/ BOX
HANGAR
FBO CORPORATE
HANGARTWY A3
TWY A2
TWY A1
TWY A4
TWY A5
TWY A6
TWY A7
TWY A8
TWY A9
TWY A10
TWY A11
TWY A12
TWY A13
R W
Y
-3
(1
' X
7'
TW
Y
A
FUEL
FARM
TERMINAL
BUILDING
TWY B
RWY 8-26 (50' X 3009')
TW
Y
B3 TW
Y
B2 TW
Y
B1
APRON
ATCT
FBO/ BOX
HANGAR
FBO CORPORATE
HANGAR
CP#3170
CP#7001
CP#7003
CP#7004 CP#7005
CP#7006
CP#7007
CP#7008
CP#1
CP#2
CP#3
CP#4
CONTROL POINT TABLE
POINT
CP#1
CP#2
CP#3
CP#4
CP#3170
CP#7001
CP#7003
CP#7004
CP#7005
CP#7006
CP#7007
CP#7008
NORTHING
1761378.460
1756371.730
1759977.050
1758875.260
1759183.464
1760385.600
1761467.444
1761213.084
1761238.650
1760710.794
1760404.854
1761068.784
EASTING
584809.560
584806.510
584494.040
584808.030
586308.857
585723.580
585887.191
585745.464
586152.537
586328.457
586301.907
585567.308
ELEVATION
77.40
77.00
79.00
76.82
81.43
81.01
79.35
77.43
76.14
77.57
78.52
76.57
DESCRIPTION
OCF AP STA A
OCF AP STA B
OCF ARP 2
OCF ARP
SET IRON ROD & CAP (5/8" WIT LB5091)
SET IRON ROD & CAP (5/8" WIT LB5091)
SET IRON ROD & CAP (5/8" WIT LB5091)
SET IRON ROD & CAP (5/8" WIT LB5091)
SET IRON ROD & CAP (5/8" WIT LB5091)
SET IRON ROD & CAP (5/8" WIT LB5091)
SET IRON ROD & CAP (5/8" WIT LB5091)
SET IRON ROD & CAP (5/8" WIT LB5091)
SCHEDULE A AND B STAGING AREA
SCHEDULE B
STAGING AREA
SCHEDULE A:
T-HANGAR TAXILANE
REHABILITATION
DRAWN
DESIGNED
CHECKED
SCALE
DATE
PROJECT
DRAWING TITLE
DRAWING NUMBER
OF
K:
\O
C
AL
A
IN
TE
R
N
AT
IO
N
AL
\T
-1
.1
O
C F
C O
N C
R
ET
E
PA
D S\
D R
AW
\D
R
AW
IN
G
S\
SH
EE
T
FI
LE
S\
3.
G
EN
R
.D W
G
A
1522 PENMAN ROAD; SUITE 14
JACKSONVILLE, FLORIDA 32250
2 3 4 5 6 7
1 2 3 4 5 6 7
STAMP
PROJECT MILESTONE
B
C
D
E
A
B
C
D
E
NO. DATE DESCRIPTION
REVISIONS
C
LI
EN
T:
PR
O
JE
C
T:
SCALE
0 500 1000 1500 FT
O C
AL
A
IN
TE
R N
AT
IO
N
AL
A
IR
PO
R
T O
C
AL
A, F
LO
R
ID
A
GENERAL PLAN
C O
N C
R
ET
E
PA
D S
AN
D
T -H
AN
G
AR
T
AX
IL
AN
E
R
EH
AB
IL
IT
AT
IO
N
1"=500'
CLH
RBO
CLH
19033.11
AUGUST 2026
GP-01
4 42
BID DOCUMENTS
LEGEND
CHAIN LINK FENCE
PROPERTY LINE
SCHEDULE A PROJECT AREA
SCHEDULE B PROJECT AREA
CONTRACTOR STAGING AREA
CONTROL POINT
RUNWAY OBJECT FREE AREA
RUNWAY SAFETY AREA
TAXIWAY OBJECT FREE AREA
TAXIWAY SAFETY AREA
ROFA
RSA
TOFA
TSA
SURVEY NOTES
1. DATES OF FIELD SURVEY: SEPTEMBER 23, 2025 AND FEBRUARY 06,
2026 BY R.M. BARRINEAU & ASSOCIATES, INC.
2. BEARINGS AND STATE PLANE COORDINATES DEPICTED HEREON ARE
GRID, WEST FLORIDA ZONE, NAD-83 (CORS96) EPOCH:2002.0000),
BASED ON TRIMBLE VIRTUAL REFERENCE STATION NETWORK AND
REFERENCED TO CITY OF OCALA ENGINEERING DEPARTMENT
CONTROL POINT 0011.
3. VERTICAL DATUM BASED ON CITY OF OCALA ENGINEERING
DEPARTMENT CONTROL POINT 0011 WITH AN ELEVATION OF 85.20',
NAVD-88.
4 of 434 of 43
R30
R34'
R30
R30'
R30
R32'
R32
R30'
R50
37' (T
YP.)
ET
ET
X X X
X
X
XXX
R O
FA
R
O
FA
R O
FA
R
O
FA
R O
FA
R
O
FA
R O
FA
R
O
FA
R O
FA
R
O
FA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
INSTALL PHASE 7 LOW PROFILE
BARRICADES (TYP.)
(INCIDENTAL TO ITEM M-200-1)
INSTALL PHASE 6 LOW PROFILE
BARRICADES (TYP.)
(INCIDENTAL TO ITEM M-200-1)
TW
Y
A
FUEL
FARM
T-HANGARS
T-HANGARS
T-HANGARS
T-HANGARS
BOX HANGAR
AIRPORT
ADMIN/BOX
HANGAR
BOX HANGAR
HANGARS HANGARS
SW
60TH
AVE
TA
XI
LA
N
E
TA
XI
LA
N
E
CONTRACTOR SHALL PROVIDE GATE GUARD TO BE STATIONED
AT ACCESS GATE #4A DURING WORKING HOURS AND GATE TO
BE LOCKED DURING NON-WORKING HOURS.
(INCIDENTAL TO ITEM M-200-1)
CONTRACTOR STAGING AREA FOR WORK
AREAS 1 TO 7
MAXIMUM STOCKPILE HEIGHT: 25'
CONTRACTOR SHALL PROVIDE VACUUM POWERED SWEEPER
AND DEDICATED OPERATOR DURING DURATION OF WORK.
(INCIDENTAL TO M-200-1)
CONTRACTOR SHALL COORDINATE WITH AIRPORT TO
ENSURE NO OBSTRUCTIONS ARE IN HAUL ROUTE
HAUL ROUTE (TYP.)
CONTRACTOR SHALL COORDINATE WITH
FBO AND AIRPORT FOR FUEL DELIVERIES.
(INCIDENTAL TO ITEM M-200-1)
100' ROW
50' 50'
ROW
ROW CENTER
LINE
AIRPORT PROPERTY
LINE
30.91'
INSTALL CONSTRUCTION ENTRANCE TRACKING PAD.
SEE DETAIL, SHEET GR-11
(INCIDENTAL TO M-200-1)
DRAWN
DESIGNED
CHECKED
SCALE
DATE
PROJECT
DRAWING TITLE
DRAWING NUMBER
OF
K:
\O
C
AL
A
IN
TE
R
N
AT
IO
N
AL
\T
-1
.1
O
C F
C O
N C
R
ET
E
PA
D S\
D R
AW
\D
R
AW
IN
G
S\
SH
EE
T
FI
LE
S\
3.
C
SP
P.
D W
G
A
1522 PENMAN ROAD; SUITE 14
JACKSONVILLE, FLORIDA 32250
2 3 4 5 6 7
1 2 3 4 5 6 7
STAMP
PROJECT MILESTONE
B
C
D
E
A
B
C
D
E
NO. DATE DESCRIPTION
REVISIONS
C
LI
EN
T:
PR
O
JE
C
T:
SCALE
0 50 100 150 FT
OVERALL CONSTRUCTION SAFETY AND PHASING PLAN
NOTES
1. ALL CONSTRUCTION PERSONNEL AND EQUIPMENT
SHALL REMAIN WITHIN ACTIVE WORK AREAS.
2. ALL VEHICLES FROM THE CONSTRUCTION WORK
AREAS SHALL BE CLEAR FROM FOREIGN OBJECT
DEBRIS (FOD) PRIOR TO ENTERING OR EXITING THE
OCALA INTERNATIONAL AIRPORT. CONTRACTOR SHALL
BE RESPONSIBLE FOR PROVIDING A VACUUM SWEEPER
WITH DEDICATED OPERATOR AT ALL TIMES.
3. ALL DUMP BODY VEHICLES SHALL HAVE RETRACTABLE
TARPS EQUIPPED FOR THE PURPOSE OF COVERING
THEIR LOAD IN AN EFFORT TO PREVENT FOD.
4. ACCESS TO THE AIRPORT WILL BE VIA THE EXISTING
GATE AS SHOWN ON THE PLANS. THE CONTRACTOR
SHALL STATION A CONTRACTOR SUPPLIED GATE
GUARD AT THE GATE DURING WORKING HOURS.
5. ALL CONTRACTOR ACCESS AND HAUL ROUTES SHALL
BE COORDINATED WITH THE AIRPORT PRIOR TO START
OF WORK.
6. ANY PAVEMENT OR OTHER STRUCTURE DAMAGED DUE
TO CONSTRUCTION SHALL BE REPLACED BY THE
CONTRACTOR AT NO ADDITIONAL COST TO THE
OWNER.
7. ANY PAVEMENT MARKING DAMAGED OR OBSCURED
DUE TO HEAVY TRAFFIC SHALL BE REPLACED BY THE
CONTRACTOR AT NO ADDITIONAL COST TO THE
OWNER.
8. STOCKPILE HEIGHTS SHALL NOT EXCEED 25'.
9. TYPICAL ALLOWABLE CONTRACTOR WORK HOURS ARE
SUNRISE TO SUNSET, AIRPORT OPERATIONS HAS THE
RIGHT TO DELAY THE START AND END OF WORK DUE
TO WEATHER OR AIRPORT EMERGENCIES.
10. PHASES 6 AND 7 ARE PROHIBITED FROM BEING
PERFORMED CONCURRENTLY
11. PHASE 8 MAY BE PERFORMED ANYTIME WITHIN THE 150
CALENDAR DAYS
12. CONTRACTOR SHALL PERIODICALLY SWEEP EXISTING
ON-SITE PAVED SURFACES AS WELL AS SW 60TH AVE
TO KEEP THOSE SURFACES IN A SUBSTANTIALLY
SEDIMENT-FREE CONDITION. SWEEPING SHALL BE
DONE ON A PERIODIC, AS-NEEDED BASIS THROUGHOUT
THE WORK WEEK AND AT MINIMUM AFTER EVERY RAIN
EVENT AND EVERY FRIDAY AFTERNOON PRIOR TO
CEASING WORK FOR THE WEEK. CONTRACTOR SHALL
PERFORM ADDITIONAL SWEEPING AS DIRECTED BY THE
RPR.
13. ALL MATERIALS, MACHINERY, AND VEHICLES SHALL BE
STORED ON-SITE IN AN ORDERLY ORGANIZED FASHION.
STOP
RSA
ROFA
TOFA
TSA
LEGEND
PROPERTY LINE
RIGHT OF WAY
CENTERLINE
RIGHT OF WAY
RUNWAY SAFETY AREA
RUNWAY OBJECT
FREE AREA
TAXIWAY SAFETY AREA
TAXIWAY OBJECT
FREE AREA
HAUL ROUTE
LOW PROFILE BARRICADE
VACUUM SWEEPER
STAGING AREA
WORK AREA
DESIGNATION
PHASE 1
PHASE 2
PHASE 3
PHASE 4
PHASE 5
PHASE 6
PHASE 7
PHASE 8
O C
AL
A
IN
TE
R N
AT
IO
N
AL
A
IR
PO
R
T O
C
AL
A, F
LO
R
ID
A
CONSTRUCTION
SAFETY AND PHASING
PLAN - 1 OF 3
C O
N C
R
ET
E
PA
D S
AN
D
T -H
AN
G
AR
T
AX
IL
AN
E
R
EH
AB
IL
IT
AT
IO
N
1"=50'
CLH
RBO
CLH
19033.11
AUGUST 2026
CS-01
5 42
BID DOCUMENTS
CONTRACTOR CALENDAR TIME:
150 CONSECUTIVE CALENDAR DAYS
SCHEMATIC CONSTRUCTION SEQUENCING
IN CALENDAR DAYS
(N O
TI
C
E
TO
P R
O C
EE
D
0 10
PHASE 1
(14)
20 30 40 50 60 70 80
PHASE 2
(14)
90 100 110 120
CALENDAR DAYS
PHASE 3
(14)
PHASE 4
(14)
PHASE 5
(14)
PHASE 6
(50)
PHASE 7
(25)
PHASE 8
(5) SU
BS
TA
N
TI
AL
C
O M
PL
ET
IO
N
-1
C O
N
SE
C U
TI
VE
C
AL
EN
D
AR
D
AY
S
130 140 150
MATCHLINE (SEE SHEET CS-02) 5 of 435 of 43
R30' R55'
R50
R 60'
R40
R38'
R40
R40'
R50'
R50
ET
R O
FA
R
O
FA
R O
FA
R
O
FA
R O
FA
R
O
FA
R O
FA
R
O
FA
R O
FA
R
O
FA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TWY A3
LIGHTED WIND CONE
FBO/ BOX HANGAR
FBO CORPORATE HANGAR
T-HANGARS
T-HANGARS
T-HANGARS
T-HANGARS
TA
XI
LA
N
E
INSTALL LOW PROFILE
BARRICADES (TYP.)
(INCIDENTAL TO ITEM M-200-1)
HAUL ROUTE (TYP.)
CONTRACTOR SHALL PROVIDE VACUUM POWERED SWEEPER
AND DEDICATED OPERATOR DURING DURATION OF WORK.
(INCIDENTAL TO M-200-1)
100' ROW
50' 50'
ROW
ROW CENTER LINE
AIRPORT PROPERTY LINE
31.59'
INSTALL CONSTRUCTION BARRIER FENCE
SEE DETAIL, SHEET GR-11
(INCIDENTAL TO M-200-1)
DRAWN
DESIGNED
CHECKED
SCALE
DATE
PROJECT
DRAWING TITLE
DRAWING NUMBER
OF
K:
\O
C
AL
A
IN
TE
R
N
AT
IO
N
AL
\T
-1
.1
O
C F
C O
N C
R
ET
E
PA
D S\
D R
AW
\D
R
AW
IN
G
S\
SH
EE
T
FI
LE
S\
3.
C
SP
P.
D W
G
A
1522 PENMAN ROAD; SUITE 14
JACKSONVILLE, FLORIDA 32250
2 3 4 5 6 7
1 2 3 4 5 6 7
STAMP
PROJECT MILESTONE
B
C
D
E
A
B
C
D
E
NO. DATE DESCRIPTION
REVISIONS
C
LI
EN
T:
PR
O
JE
C
T:
SCALE
0 50 100 150 FT
RSA
ROFA
TOFA
TSA
LEGEND
PROPERTY LINE
RIGHT OF WAY
CENTERLINE
RIGHT OF WAY
RUNWAY SAFETY AREA
RUNWAY OBJECT
FREE AREA
TAXIWAY SAFETY AREA
TAXIWAY OBJECT
FREE AREA
HAUL ROUTE
LOW PROFILE BARRICADE
VACUUM SWEEPER
STAGING AREA
WORK AREA
DESIGNATION
PHASE 1
PHASE 2
PHASE 3
PHASE 4
PHASE 5
PHASE 6
PHASE 7
PHASE 8
O C
AL
A
IN
TE
R N
AT
IO
N
AL
A
IR
PO
R
T O
C
AL
A, F
LO
R
ID
A
CONSTRUCTION
SAFETY AND PHASING
PLAN - 2 OF 3
C O
N C
R
ET
E
PA
D S
AN
D
T -H
AN
G
AR
T
AX
IL
AN
E
R
EH
AB
IL
IT
AT
IO
N
1"=50'
CLH
RBO
CLH
19033.11
AUGUST 2026
CS-02
6 42
BID DOCUMENTS
MATCHLINE (SEE SHEET CS-01)
MATCHLINE (SEE SHEET CS-03) 6 of 436 of 43
10" 96"
NOTES:
1. PLACE BARRICADES CONTINUOUSLY ACROSS PAVEMENT TO WITHIN
5' OF EDGE OF PAVEMENT OR ADBE.
2. BARRICADES SHALL BE ORANGE HDPE WITH WHITE REFLECTIVE BANDS
(OR APPROVED EQUAL).
3. CONTRACTOR SHALL BE RESPONSIBLE FOR PLACEMENT AND MAINTENANCE
OF ALL BARRICADES THROUGH THE PROJECT DURATION
MULTI-BARRIER
AIRPORT-RUNWAY BARRICADE
LOW PROFILE CONSTRUCTION BARRICADE DETAIL
NOT TO SCALE
(INCIDENTAL TO ITEM M-200-1)
SOLAR POWERED RED
FLASHING WARNING LIGHTS
R O
FA
R
O
FA
R O
FA
R
O
FA
R O
FA
R
O
FA
R O
FA
R
O
FA
R O
FA
R
O
FA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TWY A5
TERMINAL
BUILDING
APRON
ATCT
SELF SERVE
FUEL STATION
BOX HANGAR
BOX HANGAR
STORAGE
SHED
ELECTRICAL
VAULT
CONTRACTOR STAGING AREA FOR PHASE
8MAXIMUM STOCKPILE HEIGHT: 25'
CONTRACTOR SHALL PROVIDE GATE GUARD TO BE
STATIONED AT ACCESS GATE #2 DURING WORKING HOURS
AND GATE TO BE LOCKED DURING NON-WORKING HOURS.
HAUL ROUTE (TYP.)
INSTALL LOW PROFILE BARRICADES (TYP.)
100' ROW
50' 50'
ROW
ROW CENTER LINE
AIRPORT PROPERTY LINE
33.34'
INSTALL CONSTRUCTION ENTRANCE TRACKING PAD.
SEE DETAIL, SHEET GR-11
(INCIDENTAL TO M-200-1)
INSTALL CONSTRUCTION BARRIER FENCE
SEE DETAIL, SHEET GR-11
(INCIDENTAL TO M-200-1)
DRAWN
DESIGNED
CHECKED
SCALE
DATE
PROJECT
DRAWING TITLE
DRAWING NUMBER
OF
K:
\O
C
AL
A
IN
TE
R
N
AT
IO
N
AL
\T
-1
.1
O
C F
C O
N C
R
ET
E
PA
D S\
D R
AW
\D
R
AW
IN
G
S\
SH
EE
T
FI
LE
S\
3.
C
SP
P.
D W
G
A
1522 PENMAN ROAD; SUITE 14
JACKSONVILLE, FLORIDA 32250
2 3 4 5 6 7
1 2 3 4 5 6 7
STAMP
PROJECT MILESTONE
B
C
D
E
A
B
C
D
E
NO. DATE DESCRIPTION
REVISIONS
C
LI
EN
T:
PR
O
JE
C
T:
SCALE
0 50 100 150 FT
STOP RSA
ROFA
TOFA
TSA
LEGEND
PROPERTY LINE
RIGHT OF WAY
CENTERLINE
RIGHT OF WAY
RUNWAY SAFETY AREA
RUNWAY OBJECT
FREE AREA
TAXIWAY SAFETY AREA
TAXIWAY OBJECT
FREE AREA
HAUL ROUTE
LOW PROFILE BARRICADE
VACUUM SWEEPER
STAGING AREA
WORK AREA
DESIGNATION
PHASE 1
PHASE 2
PHASE 3
PHASE 4
PHASE 5
PHASE 6
PHASE 7
PHASE 8
O C
AL
A
IN
TE
R N
AT
IO
N
AL
A
IR
PO
R
T O
C
AL
A, F
LO
R
ID
A
CONSTRUCTION
SAFETY AND PHASING
PLAN - 3 OF 3
C O
N C
R
ET
E
PA
D S
AN
D
T -H
AN
G
AR
T
AX
IL
AN
E
R
EH
AB
IL
IT
AT
IO
N
1"=50'
CLH
RBO
CLH
19033.11
AUGUST 2026
CS-03
7 42
BID DOCUMENTS
MATCHLINE (SEE SHEET CS-02)
7 of 437 of 43
ET
X X X X X
X
X X
X
XXXXX
UE UE UE UE UE UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
SIGN (EFSO)
SIGN (EFSO)
4" P.V.C.
18" H.D.P.E.
18" P.V.C.
" P
.V .C
" P
.V .C
" P
.V .C
18" P.V.C
EXISTING RIM = 76.87'
N. INVERT = 73.04'
W. INVERT = 73.04'
S. INVERT = 73.07'
RIM = 75.83'
S. INVERT = 73.02'
RIM = 77.42'
E. INVERT = 77.15'
W. INVERT = 76.72'
RIM = 77.40'
E. INVERT = 75.58'
S. INVERT = 75.01' INVERT = 77.23'
FUEL
FARM
T-HANGARS
T-HANGARS
T-HANGARS
BOX HANGAR
TA
XI
LA
N
E
DRAWN
DESIGNED
CHECKED
SCALE
DATE
PROJECT
DRAWING TITLE
DRAWING NUMBER
OF
K:
\O
C
AL
A
IN
TE
R
N
AT
IO
N
AL
\T
-1
.1
O
C F
C O
N C
R
ET
E
PA
D S\
D R
AW
\D
R
AW
IN
G
S\
SH
EE
T
FI
LE
S\
3.
E
XS
T.
D W
G
A
1522 PENMAN ROAD; SUITE 14
JACKSONVILLE, FLORIDA 32250
2 3 4 5 6 7
1 2 3 4 5 6 7
STAMP
PROJECT MILESTONE
B
C
D
E
A
B
C
D
E
NO. DATE DESCRIPTION
REVISIONS
C
LI
EN
T:
PR
O
JE
C
T:
SCALE
0 30 60 90 FT
O C
AL
A
IN
TE
R N
AT
IO
N
AL
A
IR
PO
R
T O
C
AL
A, F
LO
R
ID
A
EXISTING CONDITIONS
PLAN - 1 OF 3
C O
N C
R
ET
E
PA
D S
AN
D
T -H
AN
G
AR
T
AX
IL
AN
E
R
EH
AB
IL
IT
AT
IO
N
1"=30'
CLH
RBO
CLH
19033.11
AUGUST 2026
EX-01
8 42
BID DOCUMENTS
MATCHLINE (SEE SHEET EX-02)
LEGEND
EXISTING 1' MAJOR CONTOUR
EXISTING MINOR 0.5' CONTOUR
CHAIN LINK FENCE
PROPERTY LINE
EXISTING STORMWATER LINE
EXISTING UNDERGROUND
ELECTRIC LINE
EXISTING WATER LINE
EXISTING ELECTRIC
STRUCTURE
EXISTING TRANSFORMER
EXISTING INFILTRATION BASINS
EXISTING ASPHALT
EXISTING CONCRETE
ET
UE
8 of 438 of 43
UEUEUEUEUEUEUEUEUE
UE
UE
U E
12" H.D.P.E.
12" X 19" R.C.P.
FBO CORPORATE HANGAR
T-HANGARS
T-HANGARS
T-HANGARS
T-HANGARS
TA
XI
LA
N
E
DRAWN
DESIGNED
CHECKED
SCALE
DATE
PROJECT
DRAWING TITLE
DRAWING NUMBER
OF
K:
\O
C
AL
A
IN
TE
R
N
AT
IO
N
AL
\T
-1
.1
O
C F
C O
N C
R
ET
E
PA
D S\
D R
AW
\D
R
AW
IN
G
S\
SH
EE
T
FI
LE
S\
3.
E
XS
T.
D W
G
A
1522 PENMAN ROAD; SUITE 14
JACKSONVILLE, FLORIDA 32250
2 3 4 5 6 7
1 2 3 4 5 6 7
STAMP
PROJECT MILESTONE
B
C
D
E
A
B
C
D
E
NO. DATE DESCRIPTION
REVISIONS
C
LI
EN
T:
PR
O
JE
C
T:O C
AL
A
IN
TE
R N
AT
IO
N
AL
A
IR
PO
R
T O
C
AL
A, F
LO
R
ID
A
EXISTING CONDITIONS
PLAN - 2 OF 3
C O
N C
R
ET
E
PA
D S
AN
D
T -H
AN
G
AR
T
AX
IL
AN
E
R
EH
AB
IL
IT
AT
IO
N
1"=30'
CLH
RBO
CLH
19033.11
AUGUST 2026
EX-02
9 42
BID DOCUMENTS
SCALE
0 30 60 90 FT
MATCHLINE (SEE SHEET EX-01)
LEGEND
EXISTING 1' MAJOR CONTOUR
EXISTING MINOR 0.5' CONTOUR
CHAIN LINK FENCE
PROPERTY LINE
EXISTING STORMWATER LINE
EXISTING UNDERGROUND
ELECTRIC LINE
EXISTING WATER LINE
EXISTING ELECTRIC
STRUCTURE
EXISTING TRANSFORMER
EXISTING INFILTRATION BASINS
EXISTING ASPHALT
EXISTING CONCRETE
ET
9 of 439 of 43
U E
U E
U E
TERMINAL
BUILDING
APRON
ATCT
SELF SERVE
FUEL STATION
STORAGE
SHED ELECTRICAL
VAULT
DRAWN
DESIGNED
CHECKED
SCALE
DATE
PROJECT
DRAWING TITLE
DRAWING NUMBER
OF
K:
\O
C
AL
A
IN
TE
R
N
AT
IO
N
AL
\T
-1
.1
O
C F
C O
N C
R
ET
E
PA
D S\
D R
AW
\D
R
AW
IN
G
S\
SH
EE
T
FI
LE
S\
3.
E
XS
T.
D W
G
A
1522 PENMAN ROAD; SUITE 14
JACKSONVILLE, FLORIDA 32250
2 3 4 5 6 7
1 2 3 4 5 6 7
STAMP
PROJECT MILESTONE
B
C
D
E
A
B
C
D
E
NO. DATE DESCRIPTION
REVISIONS
C
LI
EN
T:
PR
O
JE
C
T:O C
AL
A
IN
TE
R N
AT
IO
N
AL
A
IR
PO
R
T O
C
AL
A, F
LO
R
ID
A
EXISTING CONDITIONS
PLAN - 3 OF 3
C O
N C
R
ET
E
PA
D S
AN
D
T -H
AN
G
AR
T
AX
IL
AN
E
R
EH
AB
IL
IT
AT
IO
N
1"=30'
CLH
RBO
CLH
19033.11
AUGUST 2026
EX-03
10 42
BID DOCUMENTS
SCALE
0 30 60 90 FT
LEGEND
EXISTING 1' MAJOR CONTOUR
EXISTING MINOR 0.5' CONTOUR
CHAIN LINK FENCE
PROPERTY LINE
EXISTING STORMWATER LINE
EXISTING UNDERGROUND
ELECTRIC LINE
EXISTING WATER LINE
EXISTING ELECTRIC
STRUCTURE
EXISTING TRANSFORMER
EXISTING INFILTRATION BASINS
EXISTING ASPHALT
EXISTING CONCRETE
ET
10 of 4310 of 43
X X X X X
X
X X
X
XXXXX
UE UE UE UE UE UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
FUEL FARM
T-HANGARS
T-HANGARS
T-HANGARS
T-HANGARS
BOX HANGAR
TA
XI
LA
N
E
U E
U E
U E
U E
U E
U E
REMOVE CABLE AND
CONDUIT IF NEEDED,
CAP UNDER EXISTING
TAXILANE
REMOVE SOIL TO BOTTOM OF
PAVEMENT BOX (ITEM P-152)
SEE SHEET GE-04 FOR
TYPICAL SECTION
REMOVE SOIL TO BOTTOM OF
PAVEMENT BOX (ITEM P-152)
(SEE SHEET PR-01 FOR PROFILE AND
SHEET GE-04 FOR TYPICAL SECTIONS)
PAVEMENT TRANSITION (TYP.)
1 2
8 9
12 13
MILL 2" OF ASPHALT (TYP.)
PROTECT EXISTING PAVEMENT (TYP.)
DEMOLITION POINT TABLE
POINT
NORTHING
1761147.497
1761147.424
1761109.997
1761109.997
1761091.837
1761040.335
1761035.583
1761055.133
1761055.133
1761035.928
1761040.339
1761091.497
1761091.497
1760948.768
1760948.863
1761000.021
1761004.424
1760985.133
1760985.014
1761004.769
1761000.017
1760948.859
EASTING
585666.144
585717.791
585717.811
585666.144
585612.858
585620.623
585652.366
585652.366
585727.366
585727.366
585756.832
585764.491
585766.949
585766.717
585764.491
585756.832
585727.424
585727.366
585652.366
585652.366
585620.623
585612.964
DRAWN
DESIGNED
CHECKED
SCALE
DATE
PROJECT
DRAWING TITLE
DRAWING NUMBER
OF
K:
\O
C
AL
A
IN
TE
R
N
AT
IO
N
AL
\T
-1
.1
O
C F
C O
N C
R
ET
E
PA
D S\
D R
AW
\D
R
AW
IN
G
S\
SH
EE
T
FI
LE
S\
3.
D
EM
O
.D W
G
A
1522 PENMAN ROAD; SUITE 14
JACKSONVILLE, FLORIDA 32250
2 3 4 5 6 7
1 2 3 4 5 6 7
STAMP
PROJECT MILESTONE
B
C
D
E
A
B
C
D
E
NO. DATE DESCRIPTION
REVISIONS
C
LI
EN
T:
PR
O
JE
C
T:O C
AL
A
IN
TE
R N
AT
IO
N
AL
A
IR
PO
R
T O
C
AL
A, F
LO
R
ID
A
DEMOLITION PLAN - 1
OF 3
C O
N C
R
ET
E
PA
D S
AN
D
T -H
AN
G
AR
T
AX
IL
AN
E
R
EH
AB
IL
IT
AT
IO
N
1"=30'
CLH
RBO
CLH
19033.11
AUGUST 2026
DE-01
11 42
BID DOCUMENTS
NOTES
1. ALL PAVEMENT REMOVAL SHALL BE SAW
CUT TO FORM A CLEAN EDGE AT THE LINE
OF REMOVAL
2. AIRPORT TO HAVE RIGHT OF FIRST
REFUSAL FOR ASPHALT MILLINGS
GENERATED FROM ASPHALT REMOVAL
AND OTHER MATERIALS FROM DEMOLITION.
ONLY MATERIAL NOT CLAIMED BY THE
AIRPORT MAY BE REMOVED BY THE
CONTRACTOR OFF-SITE.
3. TYPE AND LOCATION OF EXISTING
UTILITIES SHOWN IS BASED ON AVAILABLE
INFORMATION. CONTRACTOR SHALL BE
RESPONSIBLE FOR VERIFYING AND
LOCATING ALL EXISTING UTILITIES PRIOR
TO DEMOLITION.
4. CONTRACTOR SHALL PROTECT AND
REPAIR ANY DAMAGES TO THE EXISTING
ABUTTING ASPHALT AND CONCRETE AT NO
ADDITIONAL COST TO THE OWNER.
SCALE
0 30 60 90 FT
MATCHLINE (SEE SHEET DE-02)
SOIL REMOVAL
PAVEMENT MILLING
PAVEMENT TRANSITION
REMOVE CABLE AND CONDUIT
SCHEDULE A LIMITS
SCHEDULE B LIMITS
LEGEND
11 of 4311 of 43
UE
UE
U E
FBO CORPORATE HANGAR
T-HANGARS
T-HANGARS
T-HANGARS
T-HANGARS
TA
XI
LA
N
E
PROTECT EXISTING PAVEMENT (TYP.)
MILL 2" OF ASPHALT (TYP.)
PAVEMENT TRANSITION (TYP.)
DRAWN
DESIGNED
CHECKED
SCALE
DATE
PROJECT
DRAWING TITLE
DRAWING NUMBER
OF
K:
\O
C
AL
A
IN
TE
R
N
AT
IO
N
AL
\T
-1
.1
O
C F
C O
N C
R
ET
E
PA
D S\
D R
AW
\D
R
AW
IN
G
S\
SH
EE
T
FI
LE
S\
3.
D
EM
O
.D W
G
A
1522 PENMAN ROAD; SUITE 14
JACKSONVILLE, FLORIDA 32250
2 3 4 5 6 7
1 2 3 4 5 6 7
STAMP
PROJECT MILESTONE
B
C
D
E
A
B
C
D
E
NO. DATE DESCRIPTION
REVISIONS
C
LI
EN
T:
PR
O
JE
C
T:O C
AL
A
IN
TE
R N
AT
IO
N
AL
A
IR
PO
R
T O
C
AL
A, F
LO
R
ID
A
DEMOLITION PLAN - 2
OF 3
C O
N C
R
ET
E
PA
D S
AN
D
T -H
AN
G
AR
T
AX
IL
AN
E
R
EH
AB
IL
IT
AT
IO
N
1"=30'
CLH
RBO
CLH
19033.11
AUGUST 2026
DE-02
12 42
BID DOCUMENTS
SCALE
0 30 60 90 FT
MATCHLINE (SEE SHEET DE-01)
LEGEND
1. ALL PAVEMENT REMOVAL SHALL BE SAW
CUT TO FORM A CLEAN EDGE AT THE LINE
OF REMOVAL
2. AIRPORT TO HAVE RIGHT OF FIRST
REFUSAL FOR ASPHALT MILLINGS
GENERATED FROM ASPHALT REMOVAL
AND OTHER MATERIALS FROM DEMOLITION.
ONLY MATERIAL NOT CLAIMED BY THE
AIRPORT MAY BE REMOVED BY THE
CONTRACTOR OFF-SITE.
3. TYPE AND LOCATION OF EXISTING
UTILITIES SHOWN IS BASED ON AVAILABLE
INFORMATION. CONTRACTOR SHALL BE
RESPONSIBLE FOR VERIFYING AND
LOCATING ALL EXISTING UTILITIES PRIOR
TO DEMOLITION.
4. CONTRACTOR SHALL PROTECT AND
REPAIR ANY DAMAGES TO THE EXISTING
ABUTTING ASPHALT AND CONCRETE AT NO
ADDITIONAL COST TO THE OWNER.
SOIL REMOVAL
PAVEMENT MILLING
PAVEMENT TRANSITION
REMOVE CABLE AND CONDUIT
SCHEDULE A LIMITS
SCHEDULE B LIMITS
LEGEND
12 of 4312 of 43
U E
U E
TERMINAL
BUILDING
APRON
ATCT
SELF SERVE
FUEL STATION
STORAGE SHED
ELECTRICAL VAULT
REMOVE SOIL TO BOTTOM OF
PAVEMENT BOX (ITEM P-152)
SEE SHEET GE-04 FOR
TYPICAL SECTION
PAVEMENT TRANSITION (TYP.)
LOCATE AND PROTECT EXISTING
ELECTRICAL CABLE
23 24
DEMOLITION POINT TABLE
POINT
NORTHING
1759018.181
1759018.127
1758982.127
1758981.235
EASTING
585873.470
585897.174
585897.188
585873.507
DRAWN
DESIGNED
CHECKED
SCALE
DATE
PROJECT
DRAWING TITLE
DRAWING NUMBER
OF
K:
\O
C
AL
A
IN
TE
R
N
AT
IO
N
AL
\T
-1
.1
O
C F
C O
N C
R
ET
E
PA
D S\
D R
AW
\D
R
AW
IN
G
S\
SH
EE
T
FI
LE
S\
3.
D
EM
O
.D W
G
A
1522 PENMAN ROAD; SUITE 14
JACKSONVILLE, FLORIDA 32250
2 3 4 5 6 7
1 2 3 4 5 6 7
STAMP
PROJECT MILESTONE
B
C
D
E
A
B
C
D
E
NO. DATE DESCRIPTION
REVISIONS
C
LI
EN
T:
PR
O
JE
C
T:O C
AL
A
IN
TE
R N
AT
IO
N
AL
A
IR
PO
R
T O
C
AL
A, F
LO
R
ID
A
DEMOLITION PLAN - 3
OF 3
C O
N C
R
ET
E
PA
D S
AN
D
T -H
AN
G
AR
T
AX
IL
AN
E
R
EH
AB
IL
IT
AT
IO
N
1"=30'
CLH
RBO
CLH
19033.11
AUGUST 2026
DE-03
13 42
BID DOCUMENTS
SCALE
0 30 60 90 FT
LEGEND
1. ALL PAVEMENT REMOVAL SHALL BE SAW
CUT TO FORM A CLEAN EDGE AT THE LINE
OF REMOVAL
2. AIRPORT TO HAVE RIGHT OF FIRST
REFUSAL FOR ASPHALT MILLINGS
GENERATED FROM ASPHALT REMOVAL
AND OTHER MATERIALS FROM DEMOLITION.
ONLY MATERIAL NOT CLAIMED BY THE
AIRPORT MAY BE REMOVED BY THE
CONTRACTOR OFF-SITE.
3. TYPE AND LOCATION OF EXISTING
UTILITIES SHOWN IS BASED ON AVAILABLE
INFORMATION. CONTRACTOR SHALL BE
RESPONSIBLE FOR VERIFYING AND
LOCATING ALL EXISTING UTILITIES PRIOR
TO DEMOLITION.
4. CONTRACTOR SHALL PROTECT AND
REPAIR ANY DAMAGES TO THE EXISTING
ABUTTING ASPHALT AND CONCRETE AT NO
ADDITIONAL COST TO THE OWNER.
SOIL REMOVAL
PAVEMENT MILLING
PAVEMENT TRANSITION
REMOVE CABLE AND CONDUIT
SCHEDULE A LIMITS
SCHEDULE B LIMITS
LEGEND
13 of 4313 of 43
X X X X X
X
X X
X
XXXXX
FUEL
FARM
T-HANGARS
T-HANGARS
T-HANGARS
BOX HANGAR
TA
XI
LA
N
E
51'
INSTALL 10" P-501 CONCRETE ON 6" P-211
LIMEROCK BASE COURSE
(ITEMS P-501, P-211)
INSTALL 4" SQUARE
CONCRETE CURB
(ITEM P-610-5.2)
INSTALL 5" P-501 CONCRETE ON 6"
P-211 LIMEROCK BASE COURSE
(ITEMS P-501, P-211)
PAINT NEW 6" SINGLE SOLID YELLOW
TAXILANE CENTERLINE (TYP.)
(ITEM P-620)
75'
PAVEMENT TRANSITION (TYP.)
SEE DETAIL, SHEET GE-06
INSTALL 4" FDOT 334 TYPE SP-12.5 SUPERPAVE ASPHALT
CONCRETE, WITH P-603 TACK COAT BETWEEN LIFTS.
INSTALL 10" LIMEROCK BASE COURSE.
(ITEMS P-401, P-603, P-211)
2'
INSTALL 6" TYPE II BOLLARDS SPACED AT 3.5' O.C.
SEE DETAIL, SHEET GE-06
CONTRACTOR SHALL VERIFY DEPTH AND LOCATION
OF EXISTING STORMWATER PIPE BEFORE
INSTALLING BOLLARDS. SEE SHEET EX-01
(ITEM M-500-1)
A
A
INSTALL 2" FDOT 334 TYPE SP-12.5
SUPERPAVE ASPHALT CONCRETE
(ITEM FDOT 334)
SURFACE PREPARATION AND PAINT NEW 6" SINGLE
SOLID YELLOW DRIVEWAY CENTERLINE MARKING
WITH 6" BLACK OUTLINE (TYP.)
(ITEM P-620) (ADD. ALT. #1)
SEE SECTION A-A,
SHEET GE-04
14 15
B
B
SEE SECTION B-B,
SHEET GE-04
C
C
SEE SECTION C-C,
SHEET GE-04
D
D
SEE SECTION D-D,
SHEET GE-04
R37' (TYP.)
0+
1+
2+
2+
R
TY
P.
N:1761020.177 E:585562.968
N:1761020.175 E:585816.803
PAINT NEW 6" SINGLE SOLID YELLOW TAXILANE
RADIUS MARKING (TYP.)
(ITEM P-620) (ADD. ALT. #1)
GEOMETRY POINT TABLE
POINT
NORTHING
1761251.678
1761251.787
1761229.850
1761205.482
1761203.207
1761141.559
1761147.424
1761147.497
1761110.009
1761109.997
1761091.837
1761040.335
1761035.583
1761055.133
1761055.133
1761035.928
1761040.339
1761091.497
1761091.433
1760948.768
1760948.863
1761000.021
1761004.424
1760985.133
1760985.014
1761004.769
1761000.017
1760948.859
1761095.128
1761070.616
1760968.117
1760944.175
EASTING
585718.576
585794.036
586116.623
586116.230
585765.889
585767.086
585717.791
585666.144
585666.156
585717.811
585612.858
585620.623
585652.366
585652.366
585727.366
585727.366
585756.832
585764.491
585766.948
585766.717
585764.491
585756.832
585727.424
585727.366
585652.366
585652.366
585620.623
585612.964
586114.506
586114.930
586126.088
586126.450
MARKINGS POINT TABLE
POINT
NORTHING
1761254.721
1761217.629
1761180.670
1761119.770
1761082.742
1761045.805
1761036.937
1761003.271
1760993.827
1761020.176
1761020.180
1761036.418
1761096.429
1761003.298
1760943.298
1760956.764
1760919.828
1760866.958
EASTING
585777.474
585814.410
585777.295
585777.208
585814.179
585777.116
585776.991
585777.041
585777.027
585758.128
585619.380
585600.474
585600.467
585600.574
585600.428
585813.964
585776.901
585776.810
DRAWN
DESIGNED
CHECKED
SCALE
DATE
PROJECT
DRAWING TITLE
DRAWING NUMBER
OF
K:
\O
C
AL
A
IN
TE
R
N
AT
IO
N
AL
\T
-1
.1
O
C F
C O
N C
R
ET
E
PA
D S\
D R
AW
\D
R
AW
IN
G
S\
SH
EE
T
FI
LE
S\
3.
G
EO
M
.D W
G
A
1522 PENMAN ROAD; SUITE 14
JACKSONVILLE, FLORIDA 32250
2 3 4 5 6 7
1 2 3 4 5 6 7
STAMP
PROJECT MILESTONE
B
C
D
E
A
B
C
D
E
NO. DATE DESCRIPTION
REVISIONS
C
LI
EN
T:
PR
O
JE
C
T:O C
AL
A
IN
TE
R N
AT
IO
N
AL
A
IR
PO
R
T O
C
AL
A, F
LO
R
ID
A
GEOMETRY AND
MARKING PLAN - 1 OF
C O
N C
R
ET
E
PA
D S
AN
D
T -H
AN
G
AR
T
AX
IL
AN
E
R
EH
AB
IL
IT
AT
IO
N
1" = 30'
CLH
RBO
CLH
19033.11
AUGUST 2026
GE-01
14 42
BID DOCUMENTS
NOTES
1. SCHEDULE A PAVEMENT GEOMETRY
DESIGNED FOR TDG 1B
2. SCHEDULE A PAVEMENT GEOMETRY
DESIGNED FOR TDG 1A
3. SEE TYPICAL SECTIONS ON SHEET GE-04
CONCRETE PAVEMENT
2" ASPHALT
4" ASPHALT
PAVEMENT MARKINGS
TAXILANE SAFETY AREA
TAXILANE OBJECT FREE AREA
PAVEMENT TRANSITION
BOLLARD
LIMITS OF SCHEDULE A
LIMITS OF SCHEDULE B
LEGEND
TSA
TLOFA
SCALE
0 30 60 90 FT
MATCHLINE (SEE SHEET GE-02) 14 of 4314 of 43
FBO CORPORATE HANGAR
T-HANGARS
T-HANGARS
T-HANGARS
T-HANGARS
T-HANGARS
TA
XI
LA
N
E
SURFACE PREPARATION AND PAINT NEW 6"
SINGLE SOLID YELLOW DRIVEWAY CENTERLINE
MARKING WITH 6" BLACK OUTLINE.
CENTERLINE MARKINGS ARE APPROXIMATELY
35'. TERMINATE MARKING AT PAVEMENT JOINT
(ITME P-620) (ADD. ALT. #1)
SURFACE PREPARATION AND PAINT NEW 6" SINGLE
SOLID YELLOW DRIVEWAY CENTERLINE MARKING
WITH 6" BLACK OUTLINE (TYP.)
(ITEM P-620) (ADD. ALT. #1)
PAVEMENT TRANSITION (TYP.)
4243444546
INSTALL 2" FDOT 334 TYPE SP-12.5
SUPERPAVE ASPHALT CONCRETE
(ITEM FDOT 334)
R37' (TYP.)
R37'
PAINT NEW 6" SINGLE SOLID YELLOW TAXILANE
RADIUS MARKING (TYP.)
(ITEM P-620) (ADD. ALT. #1)
GEOMETRY POINT TABLE
POINT
NORTHING
1760842.389
1760817.615
1760713.446
1760693.300
1760600.385
1760580.170
1760550.506
1760530.496
1760437.169
1760418.009
1760418.750
1760417.423
1760418.502
1760417.462
1760366.105
1760365.971
EASTING
586142.437
586142.175
586249.162
586248.803
586281.655
586281.544
586249.076
586248.844
586282.029
586281.920
586110.895
586069.059
585960.458
585916.154
585789.715
585722.973
MARKINGS POINT TABLE
POINT
NORTHING
1760829.894
1760792.958
1760740.368
1760703.304
1760666.368
1760627.197
1760590.134
1760577.742
1760553.197
1760540.680
1760503.743
1760464.457
1760427.394
1760390.457
1760349.118
EASTING
585813.747
585776.684
585776.594
585813.531
585776.467
585776.400
585813.337
585776.316
585776.274
585813.252
585776.189
585776.122
585813.059
585775.996
585738.992
DRAWN
DESIGNED
CHECKED
SCALE
DATE
PROJECT
DRAWING TITLE
DRAWING NUMBER
OF
K:
\O
C
AL
A
IN
TE
R
N
AT
IO
N
AL
\T
-1
.1
O
C F
C O
N C
R
ET
E
PA
D S\
D R
AW
\D
R
AW
IN
G
S\
SH
EE
T
FI
LE
S\
3.
G
EO
M
.D W
G
A
1522 PENMAN ROAD; SUITE 14
JACKSONVILLE, FLORIDA 32250
2 3 4 5 6 7
1 2 3 4 5 6 7
STAMP
PROJECT MILESTONE
B
C
D
E
A
B
C
D
E
NO. DATE DESCRIPTION
REVISIONS
C
LI
EN
T:
PR
O
JE
C
T:O C
AL
A
IN
TE
R N
AT
IO
N
AL
A
IR
PO
R
T O
C
AL
A, F
LO
R
ID
A
GEOMETRY AND
MARKING PLAN - 2 OF
C O
N C
R
ET
E
PA
D S
AN
D
T -H
AN
G
AR
T
AX
IL
AN
E
R
EH
AB
IL
IT
AT
IO
N
1" = 30'
CLH
RBO
CLH
19033.11
AUGUST 2026
GE-02
15 42
BID DOCUMENTS
NOTES
1. PAVEMENT GEOMETRY DESIGNED FOR TDG
1B
2. SEE TYPICAL SECTIONS ON SHEET XX
CONCRETE PAVEMENT
2" ASPHALT
4" ASPHALT
PAVEMENT MARKINGS
TAXILANE SAFETY AREA
TAXILANE OBJECT FREE AREA
PAVEMENT TRANSITION
BOLLARD
LIMITS OF SCHEDULE A
LIMITS OF SCHEDULE B
LEGEND
TSA
TLOFA
SCALE
0 30 60 90 FT
MATCHLINE (SEE SHEET GE-01)
15 of 4315 of 43
TERMINAL
BUILDING
APRON
ATCT
SELF SERVE
FUEL STATION
STORAGE SHED
ELECTRICAL VAULT
' 36'
26'
PAVEMENT TRANSITION (TYP.)
INSTALL 5" P-501 CONCRETE ON 6"
P-211 LIMEROCK BASE COURSE
(ITEMS P-501, P-211)
INSTALL 6" SINGLE SOLID WHITE PARKING MARKINGS (TYP.)
(ITEM FDOT 710)
INSTALL WHEELSTOP 2' FROM EDGE OF PAVEMENT (TYP.)
WHEELSTOP SIZE AND MATERIAL TO MATCH NEARBY WHEELSTOPS
(ITEM P-610-5.1)
E
E
SEE SECTION A-A,
SHEET GE-04
GEOMETRY POINT TABLE
POINT
NORTHING
1759018.181
1759018.127
1758982.128
1758981.235
EASTING
585873.470
585899.174
585899.188
585873.507
DRAWN
DESIGNED
CHECKED
SCALE
DATE
PROJECT
DRAWING TITLE
DRAWING NUMBER
OF
K:
\O
C
AL
A
IN
TE
R
N
AT
IO
N
AL
\T
-1
.1
O
C F
C O
N C
R
ET
E
PA
D S\
D R
AW
\D
R
AW
IN
G
S\
SH
EE
T
FI
LE
S\
3.
G
EO
M
.D W
G
A
1522 PENMAN ROAD; SUITE 14
JACKSONVILLE, FLORIDA 32250
2 3 4 5 6 7
1 2 3 4 5 6 7
STAMP
PROJECT MILESTONE
B
C
D
E
A
B
C
D
E
NO. DATE DESCRIPTION
REVISIONS
C
LI
EN
T:
PR
O
JE
C
T:O C
AL
A
IN
TE
R N
AT
IO
N
AL
A
IR
PO
R
T O
C
AL
A, F
LO
R
ID
A
GEOMETRY AND
MARKING PLAN - 3 OF
C O
N C
R
ET
E
PA
D S
AN
D
T -H
AN
G
AR
T
AX
IL
AN
E
R
EH
AB
IL
IT
AT
IO
N
1" = 30'
CLH
RBO
CLH
19033.11
AUGUST 2026
GE-03
16 42
BID DOCUMENTS
NOTES
1. SEE TYPICAL SECTIONS ON SHEET GE-04
CONCRETE PAVEMENT
2" ASPHALT
4" ASPHALT
PAVEMENT MARKINGS
TAXILANE SAFETY AREA
TAXILANE OBJECT FREE AREA
PAVEMENT TRANSITION
BOLLARD
LIMITS OF SCHEDULE A
LIMITS OF SCHEDULE B
LEGEND
TSA
TLOFA
SCALE
0 30 60 90 FT
VEHICLE PARKING
PAVEMENT MARKINGS
16 of 4316 of 43
TS-02
TYPICAL 2" ASPHALT SECTION A-A
NOT TO SCALE
VARIES
VARIES
TYPICAL 4" ASPHALT SECTION B-B
NOT TO SCALE
50 ' TYPICAL (VARIES)
1.0% (TYP.) 1.0% (TYP.)
5.0% ±0.5 (TYP.) 5.0% ±0.5 (TYP.)
TYPICAL 5" CONCRETE WASH PAD SECTION C-C
NOT TO SCALE
70'
1.0% (TYP.) 1.0% (TYP.)
5.0% ±0.5 (TYP.) 5.0% ±0.5 (TYP.)
10' (TYP.) 10' (TYP.)
NOTE: TRANSITION BETWEEN CONCRETE AND ASPHALT BASE COURSES FOR A MINIMUM OF 10'
TYPICAL 10" CONCRETE FUEL PAD SECTION D-D
NOT TO SCALE
70'
1.0% (TYP.)
10' MIN. 4'10' MIN.4'
TSA 79' TYPICAL
(VARIES)
2'
TYPICAL 5" CONCRETE
VEHICLE PARKING SECTION E-E
NOT TO SCALE
36'
VARIES
EXISTING SUBGRADE
2" ASPHALT CONCRETE, SP-12.5
(PG 67-22) (ITEM FDOT 334)
EXISTING TOPSOIL
EXISTING LIMEROCK BASE COURSE.
7"-13" DEPTH, SEE BORING LOGS,
SHEETS C037 THROUGH C042
COMPACT EXISTING SUBGRADE TO
95% ASTM D698 TO A DEPTH OF 12"
(INCIDENTAL TO ITEM P-152)
2" ASPHALT CONCRETE, SP-12.5
(PG 67-22) (ITEM FDOT 334)
10" LIMEROCK BASE COURSE
COMPACTED TO 95% ASTM D698
(ITEM P-211)
1.5" DROP OFF FROM EDGE OF PAVEMENT
2" ASPHALT CONCRETE, SP-12.5
(PG 67-22) (ITEM FDOT 334)
TACK COAT BETWEEN
ASPHALT LIFTS
(ITEM P-603)
TIE INTO EXISTING GRADE (TYP.)
COMPACT EXISTING SUBGRADE TO
95% ASTM D698 TO A DEPTH OF 12"
(INCIDENTAL TO ITEM P-152)
5" CONCRETE
(ITEM P-501)
2" SOD ON 4" TOPSOIL (TYP.) (ITEMS T-904 AND T-905)
6" LIMEROCK BASE COURSE
COMPACTED TO 95% ASTM D698
(ITEM P-211)
1.5" DROP OFF FROM EDGE OF PAVEMENT
TIE INTO EXISTING GRADE (TYP.)
COMPACT EXISTING SUBGRADE TO
100% ASTM D1557 TO A DEPTH OF 12"
(INCIDENTAL TO ITEM P-152)
10" CONCRETE (ITEM P-501)
6" LIMEROCK BASE COURSE
COMPACTED TO 100% ASTM D1557
(ITEM P-211)
4" SQUARE CONCRETE CURB
(ITEM P-610-5.2)
EXISTING CONCRETE SURFACE
CONCRETE BOLLARD LOCATED 2' FROM
EDGE OF PAVEMENT.
SEE DETAIL, SHEET C019
(ITEM M-500-1)
TRENCH DRAIN
SEE DETAIL, SHEET C031
2" SOD ON 4" TOPSOIL (TYP.) (ITEMS T-904 AND T-905)
2" SOD ON 4" TOPSOIL (TYP.)
(ITEMS T-904 AND T-905)
5" CONCRETE (ITEM P-501)
6" LIMEROCK BASE
COURSE COMPACTED
TO 95% ASTM D698
(ITEM P-602)
EXISTING TOPSOIL
EXISTING
CONCRETE
PAVEMENT
COMPACT EXISTING SUBGRADE TO
95% ASTM D698 TO A DEPTH OF 12"
(INCIDENTAL TO ITEM P-152)
NOTES
FUEL PAD SUBGRADE AND LIMEROCK BASE COURSE TO BE COMPACTED TO 100% D1557. ALL
OTHER AREAS TO BE COMPACTED TO 95% D698
DRAWN
DESIGNED
CHECKED
SCALE
DATE
PROJECT
DRAWING TITLE
DRAWING NUMBER
OF
K:
\O
C
AL
A
IN
TE
R
N
AT
IO
N
AL
\T
-1
.1
O
C F
C O
N C
R
ET
E
PA
D S\
D R
AW
\D
R
AW
IN
G
S\
SH
EE
T
FI
LE
S\
3.
D
ET
S.
D W
G
A
1522 PENMAN ROAD; SUITE 14
JACKSONVILLE, FLORIDA 32250
2 3 4 5 6 7
1 2 3 4 5 6 7
STAMP
PROJECT MILESTONE
B
C
D
E
A
B
C
D
E
NO. DATE DESCRIPTION
REVISIONS
C
LI
EN
T:
PR
O
JE
C
T:O C
AL
A
IN
TE
R N
AT
IO
N
AL
A
IR
PO
R
T O
C
AL
A, F
LO
R
ID
A
TYPICAL SECTIONS
C O
N C
R
ET
E
PA
D S
AN
D
T -H
AN
G
AR
T
AX
IL
AN
E
R
EH
AB
IL
IT
AT
IO
N
NONE
MRB
RBO
MRB
19033.11
AUGUST 2026
GE-04
17 42
BID DOCUMENTS
17 of 4317 of 43
51'
75'
26'
13'
.6
6'
12.5'
17'
T Te
3 4" NON-EXTRUDING PREMOLDED
COMPRESSIBLE MATERIAL ASTM
D-1751
TO NEAREST JOINT BUT
NOT LESS THAN 10'
SEE JOINT SEALING DETAIL
Te = 1.25 T TO NEAREST 1"
BUT AT LEAST T + 2"
TYPE A THICKENED EDGE ISOLATION JOINT
NOT TO SCALE
(INCIDENTAL TO ITEM P-501)
TYPE C CONTRACTION JOINT WITH DOWEL BAR
NOT TO SCALE
(INCIDENTAL TO ITEM P-501)
SEE JOINT DETAIL, SHEET GE-06
PROPOSED 1" DIA. EPOXY COATED STEEL
DOWEL, 18" LONG AND 12" O.C., GREASE
ONE END, SET DURING PAVING PROPOSED PORTLAND
CEMENT CONCRETE
PAVEMENT
T/2
T
TYPE D DUMMY CONTRACTION JOINT
NOT TO SCALE
(INCIDENTAL TO ITEM P-501)
SEE JOINT DETAIL, THIS SHEET
PROPOSED PORTLAND
CEMENT CONCRETE
PAVEMENT
T
CONCRETE PADS JOINT LAYOUT PLAN
PARKING PAD
WASH PAD
FUEL PAD
DOWEL BAR POSITION DETAIL AT JOINT EDGE
NOT TO SCALE
(INCIDENTAL TO ITEM P-501)
EPOXY COATED
DOWEL BAR (TYP.)
TRANSVERSE JOINT
LONGITUDINAL JOINT
10" (MIN.)
12"
(MIN.)
TRANSVERSE WIRE D6
LONGITUDINAL WIRE D6
12"
(TYP.)
12"
(TYP.)
3"
3" PLAN
NOTES:
1. ALL IRREGULAR SHAPED SLABS THOSE WITH UTILITY BLOCKOUTS, AND
HEAT RESISTANT CONCRETE SLABS SHALL BE REINFORCED
2. PROVIDE CHAIRS FOR THE WELDED WIRE FABRIC PLACEMENT WITHIN THE
SLABS
3. WELDED WIRE TO BE LOCATED IN THE MIDDLE OF THE SLAB
WELDED WIRE FABRIC DETAIL
NOT TO SCALE
(INCIDENTAL TO ITEM P-501)
4'
EXISTING CONCRETE
PROPOSED ASPHALT
EXISTING ASPHALT APRON
TYPE C CONTRACTION JOINT,
SEE DETAIL, THIS SHEET
TYPE A THICKENED EDGE
ISOLATION JOINT
SEE DETAIL, THIS SHEET
TYPE D DUMMY CONTRACTION JOINT
SEE DETAIL, THIS SHEET
TYPE A THICKENED EDGE ISOLATION
JOINT ON BOTH SIDES OF TRENCH DRAIN
SEE DETAIL, THIS SHEET
TYPE A THICKENED EDGE
ISOLATION JOINT
SEE DETAIL, THIS SHEET
TYPE D DUMMY CONTRACTION JOINT
SEE DETAIL, THIS SHEET
TYPE C CONTRACTION JOINT
SEE DETAIL, THIS SHEET
C
A C C
C A D
A
A
A D
D
D
D
D
D
D
C C C C
A
A
A
A
A
A
A
DRAWN
DESIGNED
CHECKED
SCALE
DATE
PROJECT
DRAWING TITLE
DRAWING NUMBER
OF
K:
\O
C
AL
A
IN
TE
R
N
AT
IO
N
AL
\T
-1
.1
O
C F
C O
N C
R
ET
E
PA
D S\
D R
AW
\D
R
AW
IN
G
S\
SH
EE
T
FI
LE
S\
3.
D
ET
S.
D W
G
A
1522 PENMAN ROAD; SUITE 14
JACKSONVILLE, FLORIDA 32250
2 3 4 5 6 7
1 2 3 4 5 6 7
STAMP
PROJECT MILESTONE
B
C
D
E
A
B
C
D
E
NO. DATE DESCRIPTION
REVISIONS
C
LI
EN
T:
PR
O
JE
C
T:O C
AL
A
IN
TE
R N
AT
IO
N
AL
A
IR
PO
R
T O
C
AL
A, F
LO
R
ID
A
CONCRETE DETAILS
C O
N C
R
ET
E
PA
D S
AN
D
T -H
AN
G
AR
T
AX
IL
AN
E
R
EH
AB
IL
IT
AT
IO
N
NONE
MRB
RBO
MRB
19033.11
AUGUST 2026
GE-05
18 42
18 of 4318 of 43
1/2"
3/4"(±1/8")
JOINT SEALANT ASTM D6690 BETWEEN NEW
PAVEMENT AND EXISTING PAVEMENT
(ITEM P-605-1)
CREATE SQUARE EDGE BY SAW CUTTING
EXISTING PAVEMENT
(INCIDENTAL TO ITEM P-605)
PLACE BITUMINOUS TACK COAT ON ENTIRE
EXISTING EDGE PRIOR TO PAVING
(ITEM P-603)
SAWCUT PAVEMENT JOINT 12" WIDE BY
4" DEEP PRIOR TO PLACING JOINT SEALANT
(INCIDENTAL TO ITEM P-605)
EXISTING BITUMINOUS
CONCRETE PAVEMENT
OR PCC PAVEMENT
NEW PAVEMENTEXISTING PAVEMENT
PAVEMENT TRANSITION DETAILS
NOT TO SCALE
(INCIDENTAL TO ITEM FDOT 334)
1/2"
3/4"(±1/8")
NOTE:
1.) FACE OF EXISTING PAVEMENT SHALL BE FREE
OF DIRT AND DEBRIS AND MAY REQUIRE
WASHING OR USE OF WIRE BRUSH
(INCIDENTAL TO ITEM P-401-1)
JOINT SEALANT ASTM D-6690 BETWEEN NEW
BIT. CONC. AND EXISTING PAVEMENT
(ITEM P-605-1)
CREATE SQUARE EDGE BY SAW CUTTING
EXISTING PAVEMENT TO FULL DEPTH
(INCIDENTAL TO ITEM FDOT 334)
PLACE BITUMINOUS TACK COAT ON ENTIRE
EXISTING EDGE PRIOR TO PAVING
(ITEM P-603)
SAWCUT PAVEMENT JOINT 12" WIDE BY
4" DEEP PRIOR TO PLACING JOINT SEALANT
(ITEMS P-101-5.1 & P-605-5.1)
EXISTING BITUMINOUS
CONCRETE PAVEMENT
MILL WIDTH VARIES
(2' NOMINAL)
COLD MILL 2" EXISTING ASPHALT (TYP.)
(INCIDENTAL TO ITEM FDOT 334)
EXISTING ASPHALT
NEW PAVEMENTEXISTING PAVEMENT
PCC CONSTRUCTION/CONTRACTION JOINT DETAIL
NOT TO SCALE
(INCIDENTAL TO ITEM P-501)
1/4" RADIUS OR
CHAMFER (TYP.)
SEALANT MATERIAL (ASTM D5893) 1/8"-1/16" BELOW SURFACE
(INCIDENTAL TO ITEM P-501)
FUEL PAD SEALANT SHALL BE ASTM D7116
*DEPTH TO WIDTH
RATIO SHALL MEET
MANUFACTURER
REQUIREMENTS
NOTES:
1. SEALANT RESERVOIR SIZED TO PROVIDE PROPER SHAPE FACTOR, W/D, FIELD POURED AND
PREFORMED SEALANTS REQUIRE DIFFERENT SHAPE FACTORS FOR OPTIMUM PERFORMANCE.
2. BACKER ROD MATERIAL MUST BE COMPATIBLE WITH THE TYPE OF LIQUID SEALANT USED AND
SIZED TO PROVIDE THE DESIRED SHAPE FACTOR.
1/2" MIN.
1.25"
1/2" D*
BACKER ROD
MATERIAL
4.33" SAWCUT
DEPTH FOR
CONTRACTION
JOINTS
2" ASPHALT DEPTH
4" ASPHALT DEPTH
6" BOLLARD DETAIL
NOT TO SCALE
(ITEM M-500-1)
2' MIN.
4'
VA
R
IE
S (3
' M
IN
6"
12" SUBGRADE COMPACTED TO
MIN. 100% DENSITY, ACCORDING
TO ASTM D-1557 MIN. DENSITY.
2' X 2' X 3'-6" 3000 PSI
MIN. CONCRETE FOOTING
MIN. 7' LONG, 6" DIA. SCH. 80
STEEL PIPE FILLED WITH 3000
PSI MIN. CONCRETE (CONCRETE TO
HAVE ROUNDED TOP AS SHOWN)
PROPOSED
PAVEMENT
PAINT BOLLARD SAFETY YELLOW
PAVEMENT
SURFACE
REFERENCE POINT FOR
LAYOUT. SEE PAVEMENT
LAYOUT PLANS
1.5"R
4"
4"
16"
CURB
HEIGHT
2'
CONCRETE CURB DETAIL
NOT TO SCALE
(ITEM P-610-5.2)
2" ASPHALT CONCRETE, SP-12.5
(PG 67-22) (ITEM FDOT 334)
2" ASPHALT CONCRETE, SP-12.5
(PG 67-22) (ITEM FDOT 334)
EXISTING PAVEMENT EDGE
2" ASPHALT CONCRETE, SP-12.5
(PG 67-22) (ITEM FDOT 334)
PROPOSED TURF
DRAWN
DESIGNED
CHECKED
SCALE
DATE
PROJECT
DRAWING TITLE
DRAWING NUMBER
OF
K:
\O
C
AL
A
IN
TE
R
N
AT
IO
N
AL
\T
-1
.1
O
C F
C O
N C
R
ET
E
PA
D S\
D R
AW
\D
R
AW
IN
G
S\
SH
EE
T
FI
LE
S\
3.
D
ET
S.
D W
G
A
1522 PENMAN ROAD; SUITE 14
JACKSONVILLE, FLORIDA 32250
2 3 4 5 6 7
1 2 3 4 5 6 7
STAMP
PROJECT MILESTONE
B
C
D
E
A
B
C
D
E
NO. DATE DESCRIPTION
REVISIONS
C
LI
EN
T:
PR
O
JE
C
T:O C
AL
A
IN
TE
R N
AT
IO
N
AL
A
IR
PO
R
T O
C
AL
A, F
LO
R
ID
A
PAVEMENT
TRANSITION DETAILS
C O
N C
R
ET
E
PA
D S
AN
D
T -H
AN
G
AR
T
AX
IL
AN
E
R
EH
AB
IL
IT
AT
IO
N
NONE
MRB
RBO
MRB
19033.11
AUGUST 2026
GE-06
19 42
19 of 4319 of 43
TAXILANE CENTERLINE MARKING DETAIL
NOT TO SCALE
(ITEMS P-620-5.1A AND P-620-5.1B AND P-620-5.1C)
6" YELLOW STRIPE
WITH TYPE III BEADS
6" BLACK BORDER
WITH NO BEADSLAYOUT POINT (TYP)
CONCRETE WHEEL STOP DETAIL
NOT TO SCALE
(ITEM P-610-5.1)
6'-0"
6'-0"
3"
1" CHAMFER
3"
3/4" DIA. HOLE 11-1/2"
9"
5-3/4"
5-3/4"
6'-0"
END VIEW
3"
3"4"
SIDE VIEW
TOP VIEW
NOTES
1. CONCRETE: 4000 PSI MINIMUM AFTER 28 DAYS
LAYOUT POINT
3'-0"
VEHICLE PAVEMENT MARKING DETAIL
NOT TO SCALE
(ITEM M-500-2)
NOTES:
1. BLACK BORDER REQUIRED FOR EXISTING ASPHALT AND ALL CONCRETE PAVEMENTS
2. SURFACE PREPARATION REQUIRED. WASH EXISTING MARKINGS AND LET DRY BEFORE PAINTING
OVER
9' (TYP.)
2' (TYP.)
19' (TYP.)
CONCRETE WHEEL STOP
SEE DETAIL, THIS SHEET
6" WHITE STRIPE
(ITEM FDOT 710)
NEW ASPHALT TAXILANE CENTERLINE MARKING DETAIL
NOT TO SCALE
(ITEMS P-620-5.1A AND P-620-5.1B)
6" YELLOW STRIPE
WITH TYPE III BEADS
LAYOUT POINT (TYP)
DRAWN
DESIGNED
CHECKED
SCALE
DATE
PROJECT
DRAWING TITLE
DRAWING NUMBER
OF
K:
\O
C
AL
A
IN
TE
R
N
AT
IO
N
AL
\T
-1
.1
O
C F
C O
N C
R
ET
E
PA
D S\
D R
AW
\D
R
AW
IN
G
S\
SH
EE
T
FI
LE
S\
3.
D
ET
S.
D W
G
A
1522 PENMAN ROAD; SUITE 14
JACKSONVILLE, FLORIDA 32250
2 3 4 5 6 7
1 2 3 4 5 6 7
STAMP
PROJECT MILESTONE
B
C
D
E
A
B
C
D
E
NO. DATE DESCRIPTION
REVISIONS
C
LI
EN
T:
PR
O
JE
C
T:O C
AL
A
IN
TE
R N
AT
IO
N
AL
A
IR
PO
R
T O
C
AL
A, F
LO
R
ID
A
MARKING DETAILS
C O
N C
R
ET
E
PA
D S
AN
D
T -H
AN
G
AR
T
AX
IL
AN
E
R
EH
AB
IL
IT
AT
IO
N
NONE
MRB
RBO
MRB
19033.11
AUGUST 2026
GE-07
20 42
20 of 4320 of 43
SFSF
ET
X X X X X
X
X X
X
XXXXX
UE UE UE UE UE UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
U E
U E
U E
U E
TIE INTO EXISTING PAVEMENT
EXISTING STORM MANHOLE 2
EXISTING STORM
MANHOLE 1
NEW RIM ELEVATION: 76.35