ITB 25-45SS Electronic Bid Form.xlsx
XLSX spreadsheet 22 KB Posted
- Solicitation number
- 25-45SS
- Issued by
- Sarasota County, Florida
About this file
This document is an Invitation to Bid (ITB) #25-45SS for the Utilities Administration Building Men's Locker Room Remodeling project located in Florida. The bid form outlines a comprehensive renovation project involving demolition and remodeling of the men's locker room, with four primary line items: general mobilization/demobilization, demolition and removal of existing facilities, remodeling of the locker room, and a 10% owner-controlled contingency. The project will be constructed under a single prime contract and involves replacing plumbing fixtures, interior finishes, toilet partitions, lockers, lighting, and toilet room accessories.
The bid form is structured as an electronic spreadsheet where vendors must enter unit prices, with totals automatically calculated. There are specific instructions requiring vendors to upload the completed bid form with their submittal, with a warning that failure to do so may result in being declared non-responsive. No specific pricing, funding sources, or budget details are explicitly stated in the document. The bid form allows for line item pricing but currently shows zero dollar amounts, indicating that vendors are expected to complete the pricing information during their bid submission.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ITB 25-45SS Plans.pdf | ||
| ITB 25-45SS Exhibit A - Required Forms.pdf | ||
| ITB 25-45SS Technical Specifications.pdf | ||
| ITBCON.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Form
| BID FORM |
| ITB #25-45SS UTILITIES ADMINISTRATION BUILDING MEN'S LOCKER ROOM REMODELING |
| ITEM NO. | DESCRIPTION | UNIT | QTY | UNIT PRICE | AMOUNT |
| 1 | General Mobilization/ Demobilization | LS | 1 | $ - 0 | |
| 2 | Demolition and Removal of Existing Facilities within the Men's Locker Room | LS | 1 | $ - 0 | |
| 3 | Remodel of Men's Locker Room | LS | 1 | $ - 0 | |
| SUBTOTAL | $ - 0 |
4 Owner-Controlled Contingency (10%) $ - 0 $ - 0
PROJECT TOTAL $ - 0
| Bid Form Instructions: Please enter the Unit Prices above. Totals are automatically calculated. All other boxes are locked and cannot be edited. |
| Vendor is responsible for verifying that totals and unit prices are correct. The City is not responsible for formula errors within this spreadsheet. Should an error be detected, Vendor shall notify the Purchasing Division for a corrected Bid Form. This Bid Form must be uploaded with bid submittal. Failure to upload Bid Form with bid submittal may result in Vendor being declared non-responsive. |
Vendor Name
File details come from the government source that posted it. Updated .